HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2197-2026
Submission Date : 23-06-2026 10:54:28 AM
Applicant Type : Company
Project Type: NEW




ANANT RAJ LIMITED
H-65, CONNAUGHT CIRCUS NEW DELHI-110001
1143034473
8527333662 (Number Shared by Promoter in Public)
akhil.kumar@anantrajlimited.com
http://anantrajlimited.com
XXXX972B
L45400HR1985PLC021622
 
 


 
 


 
 


 
 







THE ESTATE ONE
SECTOR 63A, GURUGRAM
GURGAON
GURUGRAM
01143034463
8527333662 (Number Shared by Promoter in Public)
info@anantrajlimited.com
AKHIL KUMAR
01143034463
8527333662 (Number Shared by Promoter in Public)
akhil.kumar@anantrajlimited.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
169936212-06-20262644300STATE BANK OF INDIAHRERA Gurugram
269939817-07-20265805STATE BANK OF INDIAHRERA Gurugram







5.0875 (Acre)
312
312
5.0875 (Acre)
259 of 2025
No
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Annexure-B- AS A COLLABORATOR (COPY OF THE COLLABORATION AGREEMENTS ARE ENCLOSED)
BEFORE GRANT OF LICENSE
Yes
A) COLLABORATION AGREEMENT BEARING REGISTRATION NO.16528 DATED 19-DEC-2025 EXECUTED BETWEEN ANANT RAJ LTD. AND ITS SUBSIDIARY COMPANIES I.E. FOUR CONSTRUCTION PVT LTD., HAMARA REALTY PVT LTD. AND ROSE REALTY PVT LTD. B) COLLABORATION AGREEMENT DULY REGISTERED WITH REGN. NO.12601 DATED 29-NOV-2021 AND ADDENDUM REGISTERED UNDER REGN. NO.16428 DATED 18-DEC-2025 EXECUTED BETWEEN ANANT RAJ LIMITED AND DESTINATION PROPERTIES PVT. LTD.
No
Yes
Yes







133526.97 Lakhs
48285.39 Lakhs
59851.00 Lakhs
2450.00 Lakhs
22940.58 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 2657.349
3CONSTRUCTION OF ROADS 8746.3
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 3134.48
6GREEN BELTS 1254.97
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 75.542
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13AREAUNDERCOMMERCIALUNITS 115.115
14AREAUNDERTWENTYFOURMTRROAD 4604.594
Total20588.35




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS95.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM70.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE80.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM900.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL70.00AS PER PROJECT REPORT
6STREET LIGHTING15.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING400.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS20.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0.00AS PER PROJECT REPORT
10SHOPPING AREA0.00AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM60.00AS PER PROJECT REPORT
12SCHOOL0.00AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0.00AS PER PROJECT REPORT
14ANY OTHER130.00AS PER PROJECT REPORT
15ELECTRIC SUB STATION400.00AS PER PROJECT REPORT
16RAIN WATER HARVESTING30.00AS PER PROJECT REPORT
17UNDERGROUND WATER TANK90.00AS PER PROJECT REPORT
18RENEWABLE ENERGY SYSTEM60.00AS PER PROJECT REPORT
19SEWERAGE SYSTEM90.00AS PER PROJECT REPORT


NA (date)
03-07-2026 (date)
01-07-2026
21-07-2033
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings135.88262
Apartment/Shops/Other Buildings147.21262
Apartment/Shops/Other Buildings127.931502
Apartment/Shops/Other Buildings148.181502
Apartment/Shops/Other Buildings16.81161
Apartment/Shops/Other Buildings17.00461





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments101.41
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments7374.711246.02
Shops00
Plots00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1812.781791.532492.041869.03
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1869.032492.042492.043080.05
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3738.063738.064361.074361.07
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4984.082492.041246.021232.52
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1232.521246.021246.021079.02
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments463.01229.26360.02287.02
Shops0000
Plots0000

ParticularsYear-2033
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments623.01311.510
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements23.750
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other32.5032.50
Underground water tank045.00

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal35.00
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Renewable energy system13.50

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System017.50
Sewerage treatment & garbage disposal035.00
Electricity Supply System00
Storm Water Drainage020.00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Renewable energy system13.5027.00
Underground water tank045.00
Sewerage system022.50

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0023.7547.50
Water Supply System17.5017.5017.500
Sewerage treatment & garbage disposal0000
Electricity Supply System0225.00225.00450.00
Storm Water Drainage20.0020.0020.000
Parks and Playgrounds05.005.0010.00
Clubhouse/community centres0000
Shopping area0000
Other0032.5032.50
Sewerage System22.5022.5022.500
Street Lighting03.753.757.50
Security and Fire Fighting100.00100.00100.00100.00
Electric Sub station00400.00
Renewable energy system006.00
Rain water harvesting0030.00












Yes
Yes
STATE BANK OF INDIA,JAWAHAR VYAPAR BHAWAN, NEW DELHI
45283730835
SBIN0006199
110002192
006199
Mr. Amit Sarin (MD) ,Mr.Aman Sarin(Director & CEO) & Mr Ashim Sarin(Director and COO) Address H-65,Connaught Place, New Delhi 110001
Enclosed with the Application











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
No
No
No
No
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ASSURANCE FOR SEWERAGE CONNECTIONALREADY BEEN OBTAINED16-03-2026
II. ASSURANCE FOR SUPPLY OF 275 KLD TREATED WATER FOR CONSTRUCTIONALREADY BEEN OBTAINED16-03-2026
III. ASSURANCE FOR STORM WATERCONNECTIONALREADY BEEN OBTAINED19-04-2026
IV. ASSURANCE FOR WATER SUPPLYALREADY BEEN OBTAINED12-03-2026
V. ZONING PLANALREADY BEEN OBTAINED24-12-2025
VI. DEMARCATION PLANALREADY BEEN OBTAINED24-12-2025
VII. LICENSE NO.259 OF 2025ALREADY BEEN OBTAINED24-12-2025
VIII. BUILDING PLAN APPROVALALREADY BEEN OBTAINED03-07-2026








Yes


Yes


As per standard agreement format of RERA







ASHOK ESTATE, SECTOR 63AGURUGRAM HARYANA
20.1409
0.00
320
0.00
308
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
30550.930.0029940.98
Cost of the apartments0.000.000.00
Cost of the infrastructure4028.180.001663.29
Others costs26522.750.0028277.69


79600.42 Lakhs
830.94 Lakhs
0.00 Lakhs
0.00 Lakhs
No
31-12-2026
31-12-2026




THE ESTATE RESIDENCES, SEC 63A, GURUGRAM
5.43263
248
0
195
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
90954.41021680.95
Cost of the apartments56470.0009887.23
Cost of the infrastructure000
Others costs34484.41011793.72


42130.49 Lakhs
1372.87 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2030
31-03-2030










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES / MARBLE / GRANITE / LAMINATED WOOD
2WALL FINISHING DETAILSOBD / SEMI -ACRYLIC / ACRYLIC EMULSION / TILES
3KITCHEN DETAILSMODULAR KITCHEN WITH CABINETRY, SS SINK, HOB & CHIMNEY
4BATHROOM FITTINGSCP FITTINGS, WASH BASIN, WC WITH ACCESSORIES
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESMS / UPVC/ AL/ WOOD/ COMPOSITE MATERIAL
7GLASS WORKCLEAR / TINTED / COATED / FROSTED GLASS AS PER POINT NO.13.
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSPVC CONDUITS, FR WIRING
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGEOHT & UGT WATER TANKS
12LIFT DETAILSBRANDED MAKE
13EXTERNAL GLAZINGSUPVC / ALUMINIUM
13.1WINDOWS/GLAZINGSUPVC / ALUMINIUM
14DOORSWOODEN FLUSH DOOR
14.1MAIN DOORSWOODEN FIRE RESISTANT FLUSH DOOR
14.2INTERNAL DOORSWOODEN FLUSH DOOR
15AIR CONDITIONINGVRV / VRF WITH HIGH WALL UNITS IN LIVING, DINING, BEDROOMS, UTILITY & KITCHEN
16ELECTRICAL FITTINGSSWITCH BOX AND SOCKETS
17CNG PIPE LINEPNG GAS PIPELINE PROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE PAINT
20INTERNAL FINISHINGNIL
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE
1 . 2 WALLSACRYLIC EMULSION
1 . 3 CEILINGACRYLIC EMULSION
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION
2 . 3 CEILINGACRYLIC EMULSION
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORTILES / MARBLE / GRANITE
3 . 2 WALLSCOMBINATION OF TILES / ACRYLIC EMULSION PAINT & MIRROR
3 . 3 CEILINGACRYLIC EMULSION
3 . 4 COUNTERSMARBLE / GRANITE / SYNTHETIC STONE
3 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC, TOWEL RAIL / RINGS, TOILET PAPER HOLDER
3 . 6 FITTING/FIXTURESGLASS SHOWER-PARTITION, EXHAUST FAN
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION
4 . 3 CEILINGACRYLIC EMULSION
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORTILES / MARBLE / GRANITE
5 . 2 WALLSCOMBINATION OF TILES / ACRYLIC EMULSION PAINT AND MIRROR
5 . 3 CEILINGACRYLIC EMULSION
5 . 4 COUNTERSMARBLE / GRANITE / SYNTHETIC STONE
5 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS / WASH BASIN, WC, TOWEL RAIL/ RINGS, TOILET PAPER HOLDER
5 . 6 FIXTURESGLASS SHOWER - PARTITION, EXHAUST FAN
6 . KITCHEN
6 . 1 FLOORTILES / GRANITE
6 . 2 WALLSTILES UPTO 2' ABOVE COUNTER / EMULSION PAINT IN THE BALANCE AREA
6 . 3 CEILINGACRYLIC EMULSION
6 . 4 COUNTERSGRANITE / SYNTHETIC STONE
6 . 5 FIXTURESCP FITTINGS, SS SINK EXHAUST FAN
6 . 6 KITCHEN APPLIANCESHOB, CHIMNEY (NO APPLIANCES WILL BE PROVIDED)
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES
7 . 2 WALLS & CEILINGOBD/ SEMI ACRYLIC / TILES
7 . 3 TOILETCP-FITTINGS, WC, WASH BASIN
7 . 4 BALCONYTILES / CEMENT-BASED EXTERIOR GRADE PAINT
8 . SIT-OUTS
8 . 1 FLOORTILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT
8 . 3 RAILINGSMS / SS/ AL / GLASS
8 . 4 FIXTURESCEILING LIGHTS












Sr. No.Document DescriptionDate of Document UploadView Document
1 FOREST APPROVAL 19-08-2026 View Document
2 TOWER C PODIUM GROUND FLOOR PLAN AND PODIUM1 19-08-2026 View Document
3 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 21-08-2026 View Document
4 ELEVATION A 19-08-2026 View Document
5 TOWER D TERRACE PLAN 19-08-2026 View Document
6 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 21-08-2026 View Document
7 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 19-08-2026 View Document
8 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 19-08-2026 View Document
9 AFFIDAVIT FOR NO LITIGATION AND ELECTRICITY PLAN 19-08-2026 View Document
10 BANK UNDERTAKING FINAL 19-08-2026 View Document
11 BASEMENT 1 19-08-2026 View Document
12 BASEMENT 2 19-08-2026 View Document
13 MULTILEVEL PODICUM 1 19-08-2026 View Document
14 COMMERCIAL PLAN ELEVATION AREA 19-08-2026 View Document
15 COMMUNITY CENTER GROUND PODIUM 1 FIRST PODIUM 2 FLOOR PLAN AND AREA DIAGRAM 19-08-2026 View Document
16 EWS GROUND TYPICAL TERRACE MUMTY FLOOR PLAN 19-08-2026 View Document
17 LOI 19-08-2026 View Document
18 TOWER C AND D TYPICAL PLAN 19-08-2026 View Document
19 TOWER C MACHINE ROOM PLAN 19-08-2026 View Document
20 TOWER B REFUGE FLOOR PLAN AND AREA 19-08-2026 View Document
21 TOWER B SECTION XX 19-08-2026 View Document
22 TOWER B TYPICAL FLOOR PLAN AND AREA 19-08-2026 View Document
23 TOWER C PODIUM 2 PLAN AND PODIUM 2 AREA 19-08-2026 View Document
24 TOWER D 36TH FLOOR PLAN 19-08-2026 View Document
25 TOWER D REFUGE FLOOR 15TH 24TH 33TH PLAN AREA DIAGRAM 19-08-2026 View Document
26 TOWER D PODIUM 3 FLOOR PLAN 19-08-2026 View Document
27 TOWER C TERRACE PLAN AND MACHINE PLAN 21-08-2026 View Document
28 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 11-03-2026 View Document
29 DEMARCATION PLAN 11-06-2026 View Document
30 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 17-06-2026 View Document
31 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 11-06-2026 View Document
32 ZONING PLAN 11-06-2026 View Document
33 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 11-06-2026 View Document
34 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 17-06-2026 View Document
35 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 17-06-2026 View Document
36 LC IV & LC IV 1 19-08-2026 View Document
37 TOWER B TERRACE FLOR PLAN AND AREA DIAGRAM AND MUMTY FLOOR PLAN 19-08-2026 View Document
38 COMMUNITY CENTER SECOND PODICUM 3 PLAN AND AREA 19-08-2026 View Document
39 SITE SECTION 19-08-2026 View Document
40 TOWER C PODIUM FLOOR PLAN 19-08-2026 View Document
41 ASSURANCES WATER AND OTHERS 19-08-2026 View Document
42 PODIUM 2 MULTILEVEL CAR PARK AND COMMUNITY CENTER 19-08-2026 View Document
43 TOWER A PODIUM 1 FLOOR PLAN AND AREA 19-08-2026 View Document
44 AKS 19-08-2026 View Document
45 TOWER D POIDUM 2 PLAN AND PODIUM AREA 19-08-2026 View Document
46 TOWER D TYPICAL FLOOR PLAN 36 TO 40TH 19-08-2026 View Document
47 GREEN AREA DETAIL 19-08-2026 View Document
48 NEC LATEST 19-08-2026 View Document
49 SITE PLAN SERVICES 19-08-2026 View Document
50 TOWER D TYPICAL FLOOR PLAN 19-08-2026 View Document