HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1939-2025
Submission Date : 23-04-2025 12:47:40 AM
Applicant Type : Company
Project Type: NEW




TULIP INFRATECH PVT. LTD
1204, 12TH FLOOR INDRA PRAKASH BUILDING, 21 BARAKHAMBA ROAD
01244417777
9891293997 (Number Shared by Promoter in Public)
INFO@TULIPGROUP.IN
HTTP://WWW.TULIPGROUP.IN
XXXX755E
U7010DL2005PTC144086
 
 


 
 


 
 


 
 







TULIP VIOLET
SECTOR 69 & 70
BADSHAHPUR ST
GURUGRAM
01244417777
9891293997 (Number Shared by Promoter in Public)
info@tulipgroup.in
JAI SINGH
01244417777
9891293997 (Number Shared by Promoter in Public)
info@tulipgroup.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1123-04-2025842000PNB (00001)HRERA Gurugram
2223-04-2025481000PNB (00002)HRERA Gurugram
325051522856345515-05-202560000ONLINE PAYMENT-250515228563455HRERA Gurugram







7.64375 (Acre)
175
175
33.08375 (Acre)
34 of 2024 (07-03-2024), 78 of 2010 (15-10-2010)
No
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     VILLAGE BADSHAHPUR GURUGRAM
Address     PLOT 76G SECTOR 18 GURUGRAM
Annexure-B- COLLABORATION AGREEMENT ANNEXED WITH FILE
COLLABORATION AND GPA MADE BEFORE GRANT OF LICENSE
Yes
ANNEXURE B
No
Yes
Yes







34528.44 Lakhs
630.43 Lakhs
23974.93 Lakhs
445.226 Lakhs
9477.86 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 47914.38
3CONSTRUCTION OF ROADS 2106.689
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 11220.509
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13CONV SHOPPING 154.79
Total61396.368




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA (ALREADY CONNECTED)No
WATER SUPPLYGMDA Yes
ELECTRICITYGMDA Yes
SEWAGE DISPOSALGMDA Yes
STORM WATER DRAINAGEGMDA Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS66.59SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM22.20SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE22.20SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM88.78SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL22.20SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING11.10SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING159.78SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS44.39SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM5.00SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING


20-02-2025 (date)
20-02-2025 (date)
01-07-2025
31-12-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings122.21282
Apartment/Shops/Other Buildings122.09302
Apartment/Shops/Other Buildings127.2531
Apartment/Shops/Other Buildings173.051531
Apartment/Shops/Other Buildings131.3212





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0207.21
Shops21.6621.66
Plots00

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments884.96884.96884.96442.48
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments998.5641092.1681092.168546.08
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1107.801107.801107.80768.925
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1107.801107.801092.168546.084
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments884.960884.960884.960884.960
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments677.753677.753677.753677.753
Shops0000
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments677.753677.753677.753677.753
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electricity supply system0
Rain water harvesting0
Renewable energy system0
Security and fire fighting0
Street Lighting0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0066.59
Water Supply System11.09811.0980
Sewerage treatment & garbage disposal11.09811.0980
Electricity Supply System000
Storm Water Drainage11.09811.0980
Parks and Playgrounds0022.196
Clubhouse/community centres000
Shopping area000
Other000
Street Lighting005.549
Renewable energy system002.5
Security and fire fighting0079.88
Electricity supply system0088.78
Rain water harvesting03.000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds22.196
Clubhouse/community centres0
Shopping area0
Other0
Security and fire fighting79.887
Street Lighting5.549
Renewable energy system2.5
Rain water harvesting0
Electricity supply system0












Yes
No
PUNJAB NATIONAL BANK ECE HOUSE, K.G. MARG, NEW DELHI, NEW DELHI 110001
1120002102328976
PUNB0112000
110024043
112000
Atul Rai
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 34 OF 2024 ALREADY BEEN OBTAINED07-03-2024
II. BR-III VIDE MEMO NO. ZP-663-II/PA(DK)/2025/6649ALREADY BEEN OBTAINED20-02-2025
III. ENVIRONMENT CLEARANCE VIDE NO. SEAC/HR/2024/174ALREADY BEEN OBTAINED30-01-2025








Yes


Yes


Underlined







TULIP CRIMSON
9.16875
720
0
306
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
109844.4010333.01
Cost of the apartments74628.87012593.96
Cost of the infrastructure3073.6000
Others costs32111.9309079.65


37581.94 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2032
31-03-2033










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEI) LIVING/DINING: TILES /IMPORTED MARBLE II) MASTER BEDROOM/DRESS ROOM AND BEDROOM : LAMINATED WOODENFLOORING III) KITCHEN: ANTI SKID TILES / EQUIVALENT IV) ALLTOILETS: PREMIUM QUALITY TILES. V) SIT OUTS/BALCONY: ANTISKID CERAMIC TILES VI) UTILITY ROOM: VITRIFIED TILES VII)UTILITY TOILET & BALCONY: ANTI SKID CERAMIC FLOOR TILES.
2WALL FINISHING DETAILSI) LIVING/DINING, MASTER BEDROOM, BEDROOMS: ACRYLICEMULSION PAINT FINISH II) MASTER TOILET/DRESS ROOM,TOILETS: PREMIUM QUALITY TILES/MIRROR III) KITCHEN: 2’-0”DADO ABOVE COUNTERS AND ACRYLIC EMULSION PAINT. IV)UTILITY ROOMS/ UTILITY BALCONY/UTILITY TOILET: OIL BOUNDPAINT FINISH V) SIT OUTS/BALCONY: PERMANENTTEXTURE/PAINT FINISH.
3KITCHEN DETAILSMARBLE/GRANITE COUNTER WITH STAINLESS STEEL SINK, CPFITTINGS AND MODULAR KITCHEN.
4BATHROOM FITTINGS I) MASTER TOILET/DRESS ROOM: SANITARY WARE INCLUDESWASH BASIN AND EWC CP FITTINGS: HOT AND COLD WATERWALL AND BASIN MIXTURE OF PREMIUM BRANDS, HANDSHOWER, HEALTH FAUSET& ANGLE VALVE.
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESHARD WOOD DOOR FRAMES WITH MOULDED SKIN DOOR /PANEL DOOR SHUTTERS.
7GLASS WORKNA
8ELECTRIC FITTINGSSWITCHES ONLY (NO LIGHTS& FIXTURES)
9CONDUCTING AND WIRING DETAILSPVC CONDUIT AND COPPER WIRING.
10CUPBOARD DETAILSNA
11WATER STORAGEUNDER GROUND / OVER HEAD TANKS
12LIFT DETAILSCAPACITY OF 10 / 13 PERSONS, KONE OR EQUIVALENT
13EXTERNAL GLAZINGSENERGY EFFICIENT DOUBLE GLASS ALUMINIUM /UPVCGLAZINGS WITH FLY MESH SHUTTER IN ALL HABITABLEAREAS & ALUMINIUM / UPVC FRAMES WITH SINGLE GLASS INALL TOILETS & UTILITY ROOMS.
13.1WINDOWS/GLAZINGS NERGY EFFICIENT DOUBLE GLASS ALUMINIUM /UPVCGLAZINGS WITH FLY MESH SHUTTER IN ALL HABITABLEAREAS & ALUMINIUM / UPVC FRAMES WITH SINGLE GLASS INALL TOILETS & UTILITY ROOMS.
14DOORSMOULDED SKIN DOOR / PANEL DOOR SHUTTERS.
14.1MAIN DOORSMOULDED SKIN DOOR / PANEL DOOR SHUTTERS.
14.2INTERNAL DOORSPOLISHED MOULDED SKIN DOOR/FLUSH DOORS
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSSWITCHES ONLY (NO LIGHTS & FIXTURES)
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEPAINT FINISHES
20INTERNAL FINISHINGPAINT FINISHES
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILES /IMPORTED MARBLE
1 . 2 WALLSACRYLIC EMULSION PAINT FINISH
1 . 3 CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT FINISH
2 . 3 CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORPREMIUM QUALITY TILES
3 . 2 WALLSPREMIUM QUALITY TILES
3 . 3 CEILINGGRID FALSE CEILINGOR EQUIVALENT
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN & EWC, CP FITTINGS: HOT AND COLD WATERWALL AND BASIN MIXTURE OF PREMIUM BRANDS, HANDSHOWER, HEALTH FAUSET& ANGLE VALVE.
3 . 6 FITTING/FIXTURESBATH TUB, SHOWER PARTITION, EXHAUST FAN.
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT FINISH
4 . 3 CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORPREMIUM QUALITY TILES
5 . 2 WALLSPREMIUM QUALITY TILES/
5 . 3 CEILINGGRID FALSE CEILLINGOREQUIVLAENT
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSWASH BASIN &EWC;, CP FITTINGS: HOT AND COLD WATERWALL AND BASIN MIXTURE OF PREMIUM BRANDS, HANDSHOWER, HEALTH FAUSET& ANGLE VALVE.
5 . 6 FIXTURESEXHAUST FAN
6 . KITCHEN
6 . 1 FLOORANTI SKID TILES OR EQUIVALENT
6 . 2 WALLS2'-0” DADO ABOVE COUNTERS & ACRYLIC EMULSION PAINT
6 . 3 CEILINGACRYLIC EMULSION PAINT WITH PARTIAL FALSE CEILING
6 . 4 COUNTERSMARBLE / GRANITE WITH STAINLESS STEEL SINK, CPFITTINGS
6 . 5 FIXTURESMODULER KITCHEN
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGOIL BOUND PAINT FINISH
7 . 3 TOILETANTI SKID CERAMIC FLOOR TILES & CERAMIC TILES ON THEWALLS WITH CP FITTINGS, SANITARY WARE, EXHAUST FAN
7 . 4 BALCONYANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORANTI SKID CERAMIC TILES
8 . 2 WALLS & CEILINGPERMANENT TAXTURE/ PAINT FINISH
8 . 3 RAILINGS4'-0” HIGH WALL/TOUGHENED GLASS RAILINGS
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN22-04-2025 View Document
2NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT22-04-2025 View Document
3SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN22-04-2025 View Document
4DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD22-04-2025 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN22-04-2025 View Document
6A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS22-04-2025 View Document
7S-101 SITE PLAN07-07-2025 View Document
8S-109 VILLA 1&2-FLOOR LAYOUTS, ELEVATION, SECTION, AREA DETAILS07-07-2025 View Document
9S-103D TOWER-A FLOOR LAYOUT07-07-2025 View Document
10S-103J TOWER- A SECTION07-07-2025 View Document
11S- 04 NURSERY SCHOOL 107-07-2025 View Document
12AIRPORT NOC TULIP VIOLET07-07-2025 View Document
13DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.07-07-2025 View Document
14CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT07-07-2025 View Document
15BR-III (LICENSE 34 OF 2024 AND 78 OF 2010)07-07-2025 View Document
16FOREST NOC07-07-2025 View Document
17ZONING PLAN07-07-2025 View Document
18S-105C TOWER-D FLOOR LAYOUT07-07-2025 View Document
19CA CERTIFICATE FOR COST ESTIMATES AND COST INCURRED07-07-2025 View Document
20CA CERTIFICATE FOR FINANCIAL RESOURCES07-07-2025 View Document
21DEMARCATION PLAN07-07-2025 View Document
22S-105G TOWER-D SECTION07-07-2025 View Document
23S-105A TOWER-D FLOOR LAYOUT07-07-2025 View Document
24FIRE APPROVAL07-07-2025 View Document
25LOI VIOLET ADDL. LICENSE07-07-2025 View Document
26NON ENCUMBRANCE CERTIFICATE TULIP VIOLET PH III07-07-2025 View Document
27PHASING PLAN SIGNED BY DTCP07-07-2025 View Document
28SERVICE PLAN ESTIMATE07-07-2025 View Document
29S-103A TOWER-A FLOOR LAYOUT07-07-2025 View Document
30S-105F TOWER-D ELEVATION07-07-2025 View Document
31CA CERTIFICATE FOR FINANCIAL INVENTORY07-07-2025 View Document
32S- 05 NURSERY SCHOOL 207-07-2025 View Document
33S-103H TOWER-A ELEVATION07-07-2025 View Document
34ASSURANCE COMBINED07-07-2025 View Document
35ENVIRONMENT CLERANCE07-07-2025 View Document
36LETTER FROM DTCP WITH PHASING PLAN07-07-2025 View Document
37COPY OF LICENSE ALONG WITH SCHEDULE OF LAND07-07-2025 View Document