HRERA GurugramTemp Project Id : RERA-GRG-PROJ-669-2020
Submission Date : 19-08-2020 11:45:58 AM
Applicant Type : Company
Project Type: ONGOING




BPTP LIMITED
OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 FARIDABAD FARIDABAD HR 121004 IN
01149572787
9871883334 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com
http://bptp.com
XXXX442A
U45201DL2003PLC121733
 
 


 
 


 
 







PARK TERRA
VILLAGE BASAI .SECTOR 37 D, GURUGRAM, HARYANA
GURGAON
GURUGRAM
8800093280
8800093280 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com
RAHUL BHATNAGAR
9810163594
9810163594 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
174827328-07-2017724311RBL BANKHRERA Gurugram







63075 (Sqr/mtrs)
1.75
1.75
299792.95 (Sqr/mtrs)
License no 83 of 2008 and License no 94 of 2011
No
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Address     M-11, MIDDLE CIRCUS,CONNAUGHT CIRCUS,NEW DELHI-110001
Annexure-B- AS A PROMOTER.
PROMOTER IS APPLYING BY VIRTUE OF HAVING AGREEMENT.
No
AS ANNEXED.
No
No
Yes







29037.83 Lakhs
2175.34 Lakhs
18395.09 Lakhs
2271.06 Lakhs
6196.33 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS63075
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total63075




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS226.84SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM86.01SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE112.17SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM418.02SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL132.41SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING78.79SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING780.66SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS87.83SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE348.34SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING


21-09-2012 (date)
21-09-2012 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BED ROOM FLAT71.346066
2APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BED ROOM HALL KITCHEN FLAT92.54216190266
3APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BED ROOM HALL KITCHEN FLAT95.166516
4APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BED ROOM HALL KITCHEN FLAT106.54228185436






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
APARTMENTS380AS ANNEXED.


21-09-2012
31-12-2016
12-10-2020
21-09-2012
0
12-10-2020
AS PROVIDED
AS PROVIDED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
21-09-2012
100
12-10-2020
AS PROVIDED.
AS ANNEXED.


450
180
0
150
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments7425.94
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments800600650
Shops000
Plots000

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments725850700800
Shops0000
Plots0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments975780775760
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0920835800
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements251520
Water Supply System654
Sewerage treatment & garbage disposal7108
Electricity Supply System322530
Storm Water Drainage1089
Parks and Playgrounds547
Clubhouse/community centres293528
Shopping area000
Other687962

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements17121415
Water Supply System4785
Sewerage treatment & garbage disposal10689
Electricity Supply System28342527
Storm Water Drainage41267
Parks and Playgrounds6896
Clubhouse/community centres18303234
Shopping area0000
Other65556560

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements14201815
Water Supply System5876
Sewerage treatment & garbage disposal881416
Electricity Supply System26303228
Storm Water Drainage56105
Parks and Playgrounds3845
Clubhouse/community centres18162220
Shopping area0000
Other48687055

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements121514
Water Supply System858
Sewerage treatment & garbage disposal7912
Electricity Supply System333236
Storm Water Drainage12108
Parks and Playgrounds679
Clubhouse/community centres202125
Shopping area000
Other505560












Particulars Remarks, if any
i. No. of Flats/Apartments constructed456
ii. No. of Flats/ Apartments booked380
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter41264.77594 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter29938.98125 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter11325.79468 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter11325.79468 Lakhs
vii. Amount invested in the project upto the date of application14496.81 Lakhs
Land cost (If any)2155.47 Lakhs
Apartments7425.94 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.4915.40 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession14541.02 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
6500 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 2722.62 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS226.840
II. WATER SUPPLY SYSTEM86.010
III. STORM WATER DRAINAGE112.170
IV. ELECTRICITY SUPPLY SYSTEM418.020
V. SEWAGE TREATMENT & GARBAGE DISPOSAL132.410
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER78.790
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE348.340
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.87.830
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM780.660
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
IDBI BANK LIMITED, A WING IST FLOOR, VIDEOCON TOWER , JANDEWALAN
413102000007597
IBKL0000413
110259037
00413
Inderbir Singh Bhatia and Rakesh Aggarwal
As annexed.











No
No
No
No
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 83 OF 2008ALREADY BEEN OBTAINED05-04-2008
II. LICENSE NO 94 OF 2011ALREADY BEEN OBTAINED24-10-2011
III. SERVICE PLAN ESTIMATEALREADY BEEN OBTAINED07-11-2013
IV. ZONING PLAN APPROVALALREADY BEEN OBTAINED09-05-2012
V. ENVIORNMENTAL CLEARANCE ALREADY BEEN OBTAINED20-07-2016
VI. FOREST NOCALREADY BEEN OBTAINED08-02-2012
VII. FIRE FIGHTING SCHEMEALREADY BEEN OBTAINED09-07-2013








Yes


Yes


As Annexed.







VISSIONAIRE VILLAS, SECTOR 70 GURUGRAM
56233
10
10
5
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
932.830493.28
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1300 Lakhs
1000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020




PEDESTAL FLOORS SECTOR 70A GURUGRAM
303304
174
58
143
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5550.8702718.42
Cost of the apartments000
Cost of the infrastructure000
Others costs000


10200 Lakhs
8000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020




PARK SENTOSA, SECTOR 77 FARIDABAD
743720
420
0
159
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22701.6505630.20
Cost of the apartments000
Cost of the infrastructure000
Others costs000


3600 Lakhs
10100 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2013
31-07-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING& DRAWING& KITCHEN- IMPORTED MARBLE TOILETS –VITRIFIED TILLES BALCONY-CERAMIC TILES
2WALL FINISHING DETAILSOBD/ACRYLIC EMULSION
3KITCHEN DETAILSMODULAR KITCHEN
4BATHROOM FITTINGSGROHE & EQUIVILENT
5WOOD WORK ETC6MM TO 8MM TOUGHENED GLASS
6DOORS AND WINDOS FRAMESEXTERNAL –UPVC INTERNAL- FRAME-RED MIRANDI DOORS – FLUSH DOORS
7GLASS WORK6MM TO 8MM TOUGHENED GLASS
8ELECTRIC FITTINGSLEGRAND
9CONDUCTING AND WIRING DETAILSPVC HEAVY DUTY CONDUITS
10CUPBOARD DETAILSMASTER BEDROOM
11WATER STORAGEUG TANK & OVERHEAD TANKS
12LIFT DETAILS2 NOS.
13EXTERNAL GLAZINGSUPVC
13.1WINDOWS/GLAZINGSUPVC
14DOORS FLUSH DOORS
14.1MAIN DOORS FLUSH DOORS
14.2INTERNAL DOORS FLUSH DOORS
15AIR CONDITIONINGLIVING & DINING & MASTER BEDROOM.
16ELECTRICAL FITTINGSLEGRAND
17CNG PIPE LINE_
18PROVISION OF WIFI AND BROADBAND FACILITY_
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
20INTERNAL FINISHING OBD /ACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR IMPORTED MARBLE
1 . 2 WALLS OBD /ACRYLIC EMULSION PAINT
1 . 3 CEILING OBD /ACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLS OBD /ACRYLIC EMULSION PAINT
2 . 3 CEILING OBD /ACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBES_
3 . MASTER TOILET
3 . 1 FLOOR VITRIFIED TILES (600MMX600MM)
3 . 2 WALLSVITRIFIED TILES (300MMX300MM)
3 . 3 CEILING GRID CEILING
3 . 4 COUNTERS IMPORTED MARBLE
3 . 5 SANITARY WARE/CP FITTINGS GROHE /KOHLER
3 . 6 FITTING/FIXTURESGROHE /KOHLER
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSOBD /ACRYLIC EMULSION PAINT
4 . 3 CEILINGOBD /ACRYLIC EMULSION PAINT
4 . 4 WARDROBES N.A
5 . TOILET
5 . 1 FLOORVITRIFIED TILES ( 600MMX600MM)
5 . 2 WALLSVITRIFIED TILES (300MMX300MM)
5 . 3 CEILINGOBD /ACRYLIC EMULSION PAINT
5 . 4 COUNTERSIMPORTED MARBLE
5 . 5 SANITARY WARE/CP FITTINGSGROHE /KOHLER
5 . 6 FIXTURESGROHE /KOHLER
6 . KITCHEN
6 . 1 FLOORIMPORTED MARBLE
6 . 2 WALLSVITRIFIED TILES & CERAMIC TILES
6 . 3 CEILINGOBD /ACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESGROHE /KOHLER
6 . 6 KITCHEN APPLIANCESN.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOOR_
7 . 2 WALLS & CEILING-
7 . 3 TOILET-
7 . 4 BALCONY-
8 . SIT-OUTS
8 . 1 FLOOR-
8 . 2 WALLS & CEILING-
8 . 3 RAILINGS-
8 . 4 FIXTURES-












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN16-03-2020 View Document
2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND16-03-2020 View Document
3DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.16-03-2020 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN16-03-2020 View Document
5NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT16-03-2020 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 PROJECT CONTINUATION- RC/REP/HARERA/GGM/299 of 2017/7(3)/2022/16 DATED 20.12.2022 12-04-2023 View Document
2 OC uploaded 28-02-2024 View Document