HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2136-2025
Submission Date : 23-01-2026 03:43:53 PM
Applicant Type : Company
Project Type: NEW




BPTP LIMITED
OT-14, 3RD FLOOR, NEXTDOOR PARKLANDS,SECTOR-76 FARIDABDFARIDABAD HR 121004 IN
9717790021
9717790021 (Number Shared by Promoter in Public)
Rera.gurugram@bptp.com
http://bptp.com
XXXX442A
U45201HR2003PLC082732
 
 


 
 


 
 


 
 


 
 


 
 







BPTP GREEN OAKS BOULEVARD
SECTOR 70A GURUGRAM
GURGAON
GURUGRAM
9810810516
9810810516 (Number Shared by Promoter in Public)
RERA.GURUGRAM@BPTP.COM
DEVENDER KUMAR
9810810516
9810810516 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
126626222-01-202659758INDUSIND BANK SECTOR 44 NOIDAHRERA Gurugram
226626322-01-202619920INDUSIND BANK SECTOR 44 NOIDAHRERA Gurugram







0.328 (Sqr/mtrs)
1.5
1.13
15.5625 (Sqr/mtrs)
61 of 2021
No
Address     : OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 , FARIDABAD, HARYANA, INDIA - 121004.
Address     ADDRESS: OT-16 3RD FLOOR NEXT DOOR PARKLANDS SECTOR-76 FARIDABAD HARYANA INDIA - 121004
Address     OT-14 3RD FLOOR NEXT DOOR PARKLANDS SECTOR-75 FARIDABAD HARYANA INDIA - 121004
Address     OT-16 3RD FLOOR NEXT DOOR U-BLOCK BPTP PARKLANDS SECTOR-76 FARIDABAD HARYANA INDIA -121004
Address     OT-14 3RD FLOOR NEXT DOOR PARKLANDS SECTOR-76 FARIDABAD HR 121004 IN
Address     OT-16 3RD FLOOR NEXT DOOR U-BLOCK BPTP PARKLANDS SECTOR-76 FARIDABAD HARYANA INDIA-121004
Address     OT-16 3RD FLOOR NEXT DOOR U-BLOCK BPTP PARKLANDS SECTOR-76 FARIDABAD HARYANA INDIA-121004
Address     ADDRESS: OT-16 3RD FLOOR NEXT DOOR PARKLANDS SECTOR-76 FARIDABAD HARYANA INDIA - 121004
Annexure-B- AS PER NCLT ORDER DATED 20.09.2024 AND DTCP ORDER DATED 09.04.2025.
AS PER NLCT ORDER DARED 20.09.2024 AND DTCP ORDER DATED 09.04.2025.
Yes
AS PER NLCT ORDER DARED 20.09.2024 AND DTCP ORDER DATED 09.04.2025.
Yes
Yes
Yes







1647.97 Lakhs
95.93 Lakhs
980.58 Lakhs
63.87 Lakhs
507.54 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.147769
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0.180231
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total0.328




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS14.26SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM5.70SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE2.28SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM31.37SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL1.71SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS2.85SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15FIRE5.70YET TO BE PREPARED


NA (date)
04-09-2025 (date)
01-04-2026
31-12-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings25.720
Apartment/Shops/Other Buildings26.2220
Apartment/Shops/Other Buildings26.2820
Apartment/Shops/Other Buildings26.56140
Apartment/Shops/Other Buildings30.4730
Apartment/Shops/Other Buildings31.520
Apartment/Shops/Other Buildings51.310
Apartment/Shops/Other Buildings51.5820
Apartment/Shops/Other Buildings51.7510





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops21.4221.4217.8517.85
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops28.5632.1217.8524.99
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops24.9928.5632.1214.28
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops17.8521.4214.2821.42
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops45.1145.1154.1331.58
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments36.0949.6240.600
Shops00036.09
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments000
Shops49.6263.150
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System00.460.460.51
Sewerage treatment & garbage disposal00.140.140.15
Electricity Supply System02.512.512.82
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements01.431.281.14
Water Supply System0.570.680.800.86
Sewerage treatment & garbage disposal0.170.210.240.26
Electricity Supply System3.143.764.394.71
Storm Water Drainage0000.46
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.431.571.431.28
Water Supply System0.460.630.170.11
Sewerage treatment & garbage disposal0.140.190.050.03
Electricity Supply System2.513.450.940.63
Storm Water Drainage0.460.460.460.46
Parks and Playgrounds0.140.290.290.34
Clubhouse/community centres0000
Shopping area0000
Other0000
FIRE0.46

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.431.140.430.29
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0.260.230.290.23
Clubhouse/community centres0000
Shopping area0000
Other0000
FIRE0.681.140.860.57

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.430.290.290.14
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0.260.170.200.09
Clubhouse/community centres0000
Shopping area0000
Other0000
FIRE0.680.680.340.29

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.14260.1426
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds0.090
Clubhouse/community centres00
Shopping area00
Other00












Yes
No
RBL BANK, GROUND FLOOR, M-6, HAUZ KHAS, NEW DELHI - 110016
400001111141
RATN0000141
110176006
0141
Mr. Kabul Chawla Address: 7, Amrita Shergill Marg Delhi-110003 Mr. Sudhanshu Tripathi Address: 202, 3rd Floor, Jor Bagh, , Delhi -110003 Mr. Manik Malik D- 2/2406, Vasant Kunj, South West Delhi, Delhi- 110070 Mr. Sachin Gupta H.No C-5/32. Yamuna Vihar, Delhi -110053 Mr. Rakesh Kumar Agrawal D-308 , Narwana Apartment , 89, IP Extension , Patparganj Delhi- 110092 Mr. Amit Singhal Address: E3/28, Nand Nagri Mandoli Delhi-110093 Mr. Sanjeev Loknath Agrawal Flat no 32 Sudarshan Apartments IP Extension Delhi -110092
ATTACHED











No
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ROADSALREADY BEEN OBTAINED23-01-2026
II. WATER SUPPLY (ASSURANCE GRANTED)ALREADY BEEN OBTAINED08-10-2021
III. SEWAGE DISPOSAL (ASSURANCE GRANTED)ALREADY BEEN OBTAINED28-09-2021
IV. STORM WATER DRAINAGE (ASSURANCE GRANTED)ALREADY BEEN OBTAINED29-09-2021
V. ELECTRICAL LOADALREADY BEEN OBTAINED08-02-2023
VI. SITE PLANALREADY BEEN OBTAINED04-09-2025
VII. ZONING PLANALREADY BEEN OBTAINED09-02-2023
VIII. BUILDING PLANALREADY BEEN OBTAINED04-09-2025
IX. SERVICE PLAN ESTIMATES APPROVALALREADY BEEN OBTAINED07-11-2024








Yes


Yes


As per HRERA rules







102 EDEN ESTATE II
7.03125
0
65
0
65
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2934.302934.3
Cost of the apartments000
Cost of the infrastructure1453.7201387.67
Others costs1480.5801546.63


10634.48 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-09-2021
31-03-2027




102 EDEN ESTATE III
9.903
0
126
0
103
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4760.0904760.09
Cost of the apartments000
Cost of the infrastructure2358.0001967.54
Others costs2402.0902792.55


28366.63 Lakhs
9488.94 Lakhs
0 Lakhs
0 Lakhs
No
02-04-2025
27-11-2029




ATSAIRE GARDEN
97.98125
0
1129
0
851
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
91369.15091369.15
Cost of the apartments000
Cost of the infrastructure45017.87044974.17
Others costs46351.28046394.98


202055.21 Lakhs
2710.25 Lakhs
0 Lakhs
0 Lakhs
No
01-04-2011
31-08-2026




DOWNTOWN 66
4.235
504
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-01-2026
31-10-2032




VERTI GREENS
9.4292
885
0
471
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
210964.120210964.12
Cost of the apartments178633.0207891.03
Cost of the infrastructure000
Others costs32331.10203073.09


149808.65 Lakhs
120388.54 Lakhs
0 Lakhs
0 Lakhs
No
01-04-2025
14-06-2032




GAIA RESIDENCIES
1.6838
531
0
0
64
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
93542.92093542.92
Cost of the apartments82337.770432.98
Cost of the infrastructure000
Others costs11205.15093109.94


25170.18 Lakhs
21697.71 Lakhs
0 Lakhs
0 Lakhs
No
01-10-2025
01-10-2032




GREEN OAKS
15.5625
0
258
0
197
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6630.3806630.38
Cost of the apartments000
Cost of the infrastructure3658.5503658.55
Others costs2971.8302971.83


42671.15 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-10-2021
27-08-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEINTERNAL TILE - NITCO-CREMA BELLINI TILE EXTERNAL STONE-NITCO-GISELLE GREY, NITCO-CREMA BELLA WALKWAY – AS/LANDSCAPE
2WALL FINISHING DETAILSEXTERNAL – 1.DULUX RAJKOT FARMHOUSE BEIGE(60YY 75/108) WITH TEXTURE. 2. VOX FRONTO– SLAT PANEL WALNUT V BLACK 3. FRP CORNICE FINISHED SAME AS WALL SCHEME INTERNAL- 1. DULUX RAL 9010 (PURE WHITE)
3KITCHEN DETAILSNIL
4BATHROOM FITTINGSJAQUAR & AQUIANT
5WOOD WORK ETCFAçADE (VOX FRONTO-SLAT PANEL WALNUT V-BLACK)
6DOORS AND WINDOS FRAMESFRAME SIZE-110X60 DOOR QUANTITY- 32 WINDOW QUANTITY- 37
7GLASS WORKONLY EXTERNAL FACADE
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNIL
11WATER STORAGEDOMESTIC WATER – 2700 LTRS FIRE WATER TANK – 25000 LTRS FLUSHING WATER – 2700 LTRS
12LIFT DETAILS4 NOS. (1750X1850)
13EXTERNAL GLAZINGS-
13.1WINDOWS/GLAZINGS-
14DOORS--
14.1MAIN DOORS-
14.2INTERNAL DOORS-
15AIR CONDITIONING-
16ELECTRICAL FITTINGS-
17CNG PIPE LINENIL
18PROVISION OF WIFI AND BROADBAND FACILITYNIL
19EXTERNAL FINISHING/COLOUR SCHEME 1.DULUX RAJKOT FARMHOUSE BEIGE(60YY 75/108) WITH TEXTURE. 2. VOX FRONTO– SLAT PANEL WALNUT V BLACK 3. FRP CORNICE FINISHED SAME AS WALL SCHEME 4. METAL PIPES & FRAMES FINISHED IN COAL MINE. 5. (STONE)NITCO-GISELLE GREY, NITCO-CREMA BELLA 6. VOX SOFIT WALNUT CEILING PANEL 7. METAL PATTERNED JAALI 8. (ALSTONE HPL) DREAMY GREY & CUSTOMIZED TEXTURED HPL
20INTERNAL FINISHINGPAINT DULUX RAL 9010 (PURE WHITE) TOILET 1. SIMPOLO RICCO TILE-AURORA PEARL (WALL) 2. SIMPOLO RICCO TILE-CONMET DOVE (FLOOR) 3. SIMPOLO,SPARKO WHITE POLISHED COUNTER TOP
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNIL
1 . 2 WALLSNIL
1 . 3 CEILINGNIL
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNIL
2 . 2 WALLSNIL
2 . 3 CEILINGNIL
2 . 4 MODULAR WARDROBESNIL
3 . MASTER TOILET
3 . 1 FLOORNIL
3 . 2 WALLSNIL
3 . 3 CEILINGNIL
3 . 4 COUNTERSNIL
3 . 5 SANITARY WARE/CP FITTINGSNIL
3 . 6 FITTING/FIXTURESNIL
4 . BED ROOMS
4 . 1 FLOORNIL
4 . 2 WALLSNIL
4 . 3 CEILINGNIL
4 . 4 WARDROBESNIL
5 . TOILET
5 . 1 FLOORNIL
5 . 2 WALLSNIL
5 . 3 CEILINGNIL
5 . 4 COUNTERSNIL
5 . 5 SANITARY WARE/CP FITTINGSNIL
5 . 6 FIXTURESNIL
6 . KITCHEN
6 . 1 FLOORNIL
6 . 2 WALLSNIL
6 . 3 CEILINGNIL
6 . 4 COUNTERSNIL
6 . 5 FIXTURESNIL
6 . 6 KITCHEN APPLIANCESNIL
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNIL
7 . 2 WALLS & CEILINGNIL
7 . 3 TOILETNIL
7 . 4 BALCONYNIL
8 . SIT-OUTS
8 . 1 FLOORNIL
8 . 2 WALLS & CEILINGNIL
8 . 3 RAILINGSNIL
8 . 4 FIXTURESNIL












Sr. No.Document DescriptionDate of Document UploadView Document
1 ROAD LAYOUT 20-04-2026 ------
2 SEWERAGE LAYOUT 20-04-2026 ------
3 ZONING PLAN APPROVED LETTER ON 09.02.2023 (15.5625ACS) 29-05-2026 ------
4 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 29-05-2026 View Document
5 COMPLETION CERTIIFCATE (RESIDENTIAL PLOTTED COLONY) 29-05-2026 ------
6 BANK UNDERTAKING 20-04-2026 ------
7 COLLABORATION AGREEMENT 29-05-2026 ------
8 AUTO DEBIT UNDERTAKING 20-04-2026 ------
9 FLOOR PLANS (GF AND FF) 29-05-2026 ------
10 ELECTRICAL APPROVAL DTD 08.02.2023 FOR DDJAY SEC-70A 20-04-2026 ------
11 LOI 15.5625ACS. 20-04-2026 ------
12 LAND TITLE SEARCH REPORT 29-05-2026 ------
13 WATER SUPPLY LAYOUT 29-05-2026 ------
14 DRAFT ALLOTMENT LETTER 29-05-2026 ------
15 FIRE SCHEME APPROVAL 29-05-2026 ------
16 NCZ UNDERTAKING 29-05-2026 ------
17 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 29-05-2026 View Document
18 DRAFT CONVEYANCE DEED 29-05-2026 ------
19 NON ENCUMBERANCE CERTIFICATE 29-05-2026 ------
20 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 29-05-2026 View Document
21 WILD LIFE UNDERTAKING 29-05-2026 ------
22 DRAFT APPLICATION FORM 29-05-2026 ------
23 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 29-05-2026 View Document
24 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 29-05-2026 View Document
25 FORM LC-IV 29-05-2026 ------
26 FLOOR PLAN- SECOND FLOOR AND TERRACE PLAN 29-05-2026 ------
27 WATER DOMESTIC - ASSURANCE 29-05-2026 ------
28 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 29-05-2026 View Document
29 STORM WATER LAYOUT 29-05-2026 ------
30 DRAFT AGREEMENT TO SALE 29-05-2026 ------
31 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 23-01-2026 View Document
32 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 23-01-2026 View Document
33 FOREST NOC BPTP 20-04-2026 ------
34 PERT CHART SERVICES 20-04-2026 ------
35 DTCP ORDER MERGER-AMALGAMATED GURUGRAM 29-05-2026 ------
36 CA CERTIFICATE COST BOULEVARD (1) 20-04-2026 ------
37 BR 20-04-2026 ------
38 BR III - COMMERCIAL 1 20-04-2026 ------
39 DEMAND DRAFT 29-05-2026 ------
40 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 29-05-2026 View Document
41 AKSHHIZRA 20-04-2026 ------
42 FLUSHING WATER LAYOUT 20-04-2026 ------
43 ELEVATION AND SECTION PLAN 20-04-2026 ------
44 SERVICE ESTIMATE APPROVAL 20-04-2026 ------
45 ZONING PLAN 20-04-2026 View Document
46 PERT CHART CONSTRUCTION (1) 20-04-2026 ------
47 CA CERTIFICATE NETWORTH 29-05-2026 ------