HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1899-2025
Submission Date : 04-04-2025 05:52:25 PM
Applicant Type : Firm
Project Type: NEW


HERCULES VENTURES LLP
B61 , WAZIRPUR INDUSTRIAL AREA, NEW DELHI 110052
7290085085
9205884222 (Number Shared by Promoter in Public)
yudhvir@gracedeveloper.co.in
ACL9935
AARFH9463K















GRACE RESILVIAA
SECTOR 78, VILLAGE NAURANGPUR, GURUGRAM
MANESAR
GURUGRAM
7290085085
9205884222 (Number Shared by Promoter in Public)
yudhvir@gracedeveloper.co.in
YUDHVIR SINGH
7290085085
9205884222 (Number Shared by Promoter in Public)
yudhvir@gracedeveloper.co.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150981710-03-2025300000ICICI BANKHRERA Gurugram
251063505-05-2025106578ICICI BANKHRERA Gurugram







1.0450 (Acre)
2.64
2.64
5.0187 (Acre)
52 of 2023 Granted by Directorate of Town and Country Planning, Chandigarh Haryana, on the date 14.03.2023 valid up to 12.03.2028
No
Address     SECTOR 78 VILLAGE NAURANGPUR, GURUGRAM
Annexure-B- COLLABORATION AGREEMENT
AFTER GRANT OF LICENSE
Yes
AS PER COLLABORATION AGREEMENT
No
Yes
Yes







7945.88 Lakhs
574.18 Lakhs
7243.70 Lakhs
0 Lakhs
128.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 4228.96
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total4228.96




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0.00YET TO BE PREPARED
2WATER SUPPLY SYSTEM0.00YET TO BE PREPARED
3STORM WATER DRAINAGE0.00YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM0.00YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL0.00YET TO BE PREPARED
6STREET LIGHTING0.00YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0.00YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0.00YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0.00YET TO BE PREPARED
10SHOPPING AREA0.00YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0.00YET TO BE PREPARED
12SCHOOL0.00YET TO BE PREPARED
13HOSPITAL/DISPENSARY0.00YET TO BE PREPARED
14ANY OTHER0.00YET TO BE PREPARED


15-03-2023 (date)
23-10-2024 (date)
01-04-2025
30-09-2029
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 124.44 34
Total34


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings78.0913634





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments362.19362.19362.19
Shops000
Plots000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments362.19362.19422.59452.71
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments694.12694.12694.12694.12
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments694.12331.94271.59241.41
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments241.63
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2029)
Apr-JuneJuly-SepOct-DecJan-Mar












No
No
ICICI BANK LIMITED, MALIBU TOWN, SECTOR-50, GURUGRAM, HARYANA.
777705987147
ICIC0002447
110229407
2447
Yudhvir Singh-H.no-377/28 Street No 7 , Jyoti Park , GURGAON / Prabhjit Singh Sarna -23/41, West Punjabi Bagh, West Delhi, Delhi / Rajneesh Wadhwa- Belaire , E-231 DLF PHASE- V, Golf Course Gurgaon, Sikanderpur Ghosi Haryana -122002
YES











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
No
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. 52 OF 2023 VALID UPTO 13.03.2028ALREADY BEEN OBTAINED14-03-2023








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEITALIAN MARBLE+ COMPRESSED WOOD FLOORING+ VITRIFIED TILES+ ANTI SKID TILES
2WALL FINISHING DETAILSTEXTURE PAINT / TILES / STONES/STONE TEXTURE+ PLASTIC EMULSION AND POP
3KITCHEN DETAILSMODULAR KITCHEN WITH ADEQUATE FITTINGS APPROX. INR BUDGET 2 LACS PER KITCHEN.PROVISION FOR HOBBS, CHIMNEY, GEYSER (3 LITRE) & RO PURIFIER. WALL TILES
4BATHROOM FITTINGSCERAMIC TILES UP TO CEILING, TOUGHENED GLASS SHOWER PARTITION, CUPBOARD UNDER BASIN ANTI SKID TILES, UNDER BASIN, AN=-SKID =LES
5WOOD WORK ETCSAAL (OR SIMILAR) SOLID WOOD WITH MOULDINGS. DOOR/WINDOW FRAMES
6DOORS AND WINDOS FRAMESSAAL (OR SIMILAR) SOLID WOOD WITH MOULDINGS. DOOR/WINDOW FRAM
7GLASS WORK TOUGHNED GLASS
8ELECTRIC FITTINGSLED, DOOR VIDEO PHONES, CCTV CAMERAS AT MAIN AND FLOOR ENTRANCES WITH RECORDING
9CONDUCTING AND WIRING DETAILSFINOLEX, HAVELLS, OR SIMILAR
10CUPBOARD DETAILSN/A
11WATER STORAGETRIPLE LAYER, 1000 LITRE PER FLOOR - SINTEX, OR SIMILAR
12LIFT DETAILSGOOD QUALITY LIFT FROM JOHNSON OR KONE OR SIMILAR
13EXTERNAL GLAZINGSTOUGHNED
13.1WINDOWS/GLAZINGSUPVC 5 MM THICKNESS
14DOORSINTERNAL FLUSH DOORS WITH VINEAR OR MICA IN WOODEN STYLE
14.1MAIN DOORSSAAL (OR SIMILAR) SOLID WOOD WITH MOULDINGS
14.2INTERNAL DOORSINTERNAL FLUSH DOORS WITH VINEAR OR MICA IN WOODEN STYLE
15AIR CONDITIONINGN/A
16ELECTRICAL FITTINGSLED, DOOR VIDEO PHONES, CCTV CAMERAS AT MAIN AND FLOOR ENTRANCES WITH RECORDING
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONAL
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT / TILES / STONES/STONE TEXTURE
20INTERNAL FINISHING PLASTIC EMULSION AND POP
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORITALIAN MARBLE
1 . 2 WALLSPLASTIC EMULSION (VOC FREE) - VELVET TOUCH WITH POP
1 . 3 CEILINGFALSE CEILING
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORCOMPRESSED WOOD FLOORING
2 . 2 WALLSPLASTIC EMULSION (VOC FREE) - VELVET TOUCH WITH POP
2 . 3 CEILINGFALSE CEILING
2 . 4 MODULAR WARDROBESALUMINIUM WITH 6MM TOUGHENED GLASS
3 . MASTER TOILET
3 . 1 FLOORANTI SKID TILES
3 . 2 WALLSCERAMIC TILES UP TO CEILING
3 . 3 CEILINGOIL BOND DISTEMPER
3 . 4 COUNTERSGRANITES
3 . 5 SANITARY WARE/CP FITTINGSTOUGHENED GLASS SHOWER PARTITION, CUPBOARD UNDER BASIN, ANTISKID TILES , WASHBASIN COUNTER(4’X3’), MIRROR (4’X3’), FITTNGS WORTH RS 25,000 (JAQUAR OR BETTER), GEYSER(5 STAR RATED), EXHAUST FAN , TAP AND SHOWER DIVERTORS, TOWEL RAIL AND RACK. MASTER BEDROOMS TO HAVE TWO WASHBASINS (IF REQUIRED) AND 5’X3’ MIRROR. HIGH PRESSURE SHOWER HEADS, WATER PROOFING
3 . 6 FITTING/FIXTURESUNDER BASIN, ANTISKID TILES , WASHBASIN COUNTER(4’X3’), MIRROR (4’X3’), FITTNGS WORTH RS 25,000 (JAQUAR OR BETTER), GEYSER(5 STAR RATED), EXHAUST FAN , TAP AND SHOWER DIVERTORS, TOWEL RAIL AND RACK. MASTER BEDROOMS TO HAVE TWO WASHBASINS (IF REQUIRED) AND 5’X3’ MIRROR. HIGH PRESSURE SHOWER HEADS, WATER PROOFING
4 . BED ROOMS
4 . 1 FLOORVETRIFIED TILES
4 . 2 WALLSPLASTIC EMULSION WITH POP
4 . 3 CEILINGOIL BOND DISTEMPER
4 . 4 WARDROBESALUMINIUM WITH 6MM TOUGHENED GLASS
5 . TOILET
5 . 1 FLOORANTI SKID TILES
5 . 2 WALLSCERAMIC TILES
5 . 3 CEILINGOIL BOND DISTEMPER
5 . 4 COUNTERSGRANITES
5 . 5 SANITARY WARE/CP FITTINGSSINK,WASH BASIN, &TAPS;
5 . 6 FIXTURESSINK,WASH BASIN, &TAPS;
6 . KITCHEN
6 . 1 FLOORITALIAN MARBLE
6 . 2 WALLSCERAMIC TILES
6 . 3 CEILINGFALSE CEILING
6 . 4 COUNTERSGRANITES
6 . 5 FIXTURESMODULAR KITCHEN WITH ADEQUATE FITINGS APPROX.PROVISION FOR HOBBS, CHIMNEY, GEYSER (3 LITRE) & RO PURIFIER. WALL TILES; GRANITE TOP, WOOD WORK AS PER SPECIFICATION
6 . 6 KITCHEN APPLIANCESPROVISION FOR HOBBS, CHIMNEY, GEYSER (3 LITRE) & RO PURIFIER. WALL TILES; GRANITE TOP, WOOD WORK AS PER SPECIFICATION
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID TILES
7 . 2 WALLS & CEILINGCERAMIC TILES & OIL BOND DISTEMPER
7 . 3 TOILETN/A
7 . 4 BALCONYAVAILABLE
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1 DEMARCATION PLAN 10-03-2025 View Document
2 ZONING PLAN 10-03-2025 View Document
3 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 27-03-2025 View Document
4 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 27-03-2025 View Document
5 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 27-03-2025 View Document
6 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 27-03-2025 View Document
7 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 27-03-2025 View Document
8 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 27-03-2025 View Document
9 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 27-03-2025 View Document
10 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 27-03-2025 View Document
11 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 27-03-2025 View Document
12 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 27-03-2025 View Document
13 TSR 04-07-2025 ------
14 BR - AUTH SIGNATORY 04-07-2025 ------
15 LC-IV-B 04-07-2025 ------
16 BUILDING PLAN-PLOT- 50-52 04-07-2025 ------
17 BUILDING PLAN-PLOT- 22-24 04-07-2025 ------
18 AFFIDAVIT 4(2)(I)(D) 04-07-2025 ------
19 BRS III - PLOT-29-49 04-07-2025 ------
20 BUILDING PLAN-PLOT- 62-64 04-07-2025 ------
21 LC-IV 04-07-2025 ------
22 BUILDING PLAN-PLOT-37-38, 49 04-07-2025 ------
23 CA CERTIFICATE FOR NET WORTH 04-07-2025 ------
24 COLL. AGREEMENT 04-07-2025 ------
25 LAND TITLE SEARCH REPORT 04-07-2025 ------
26 BUILDING PLAN-PLOT-19-21 04-07-2025 ------
27 SPE - BOOKLET 04-07-2025 ------
28 AFFIDAVIT - NO MINING 04-07-2025 ------
29 ASSURANCE - STP WATER 04-07-2025 ------
30 LC V 04-07-2025 ------
31 BUILDING PLAN-PLOT- 34-36 04-07-2025 ------
32 BUILDING PLAN-PLOT- 25-27 04-07-2025 ------
33 BUILDING PLAN-PLOT- 65-67 04-07-2025 ------
34 DD NO 2 04-07-2025 ------
35 BUILDING PLAN-PLOT-59-61 04-07-2025 ------
36 SHIZRA 04-07-2025 ------
37 BR FOR BANK ACCOUNT OPERATIONS 04-07-2025 ------
38 BRS III - PLOT-19-28 04-07-2025 ------
39 DTP LETTER-PLOT-31-38, 49 04-07-2025 ------
40 BUILDING PLAN-PLOT- 31-33 04-07-2025 ------
41 NAKAL JAMABANDI 04-07-2025 ------
42 SERVICE PLAN ESTIMATE -DTCP-SANCTION LETTER 04-07-2025 ------
43 MUTATION 04-07-2025 ------
44 GRACE DD 3L 04-07-2025 ------
45 BUILDING PLAN-PLOT-28-30 04-07-2025 ------
46 BRS III - PLOT-50-68 04-07-2025 ------
47 ASSURANCE - DHBVN 04-07-2025 ------
48 ASSURANCE -SEWERAGE NEW 04-07-2025 ------
49 ASSURANCE -WATER 04-07-2025 ------
50 BROCHURE 04-07-2025 ------
51 LOI 04-07-2025 ------
52 NON ENCUMBRANCES CERTUFICATE 04-07-2025 ------
53 AFFIDAVIT - NO FOREST LAND DIVERSION 04-07-2025 ------
54 AFFIDAVIT - NO POWER LINE SHIFTING 04-07-2025 ------
55 BUILDING PLAN-PLOT 68 04-07-2025 ------
56 DTP LETTER-PLOT-50,51,52,59-68 04-07-2025 ------
57 FOREST NOC 04-07-2025 ------
58 SPE - BOOKLET 1 04-07-2025 ------
59 AFFIDAVIT - NCZ NOC 04-07-2025 ------
60 AFFIDAVIT - NO TREE CUTTING 04-07-2025 ------
61 DTP LETTER-PLOT-19-30 04-07-2025 ------
62 MASTER DATA 04-07-2025 ------
63 CA CERTIFICATE FOR PROJECT COST INCURRED TILL DATE 04-07-2025 ------
64 CA CERTIFICATE FOR PROMOTER EQUITY 04-07-2025 ------