HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1704-2024
Submission Date : 09-08-2024 02:34:22 PM
Applicant Type : Company
Project Type: NEW




TARC LIMITED
2ND FLOOR, C-3, QUTAB INSTITUTIONAL AREA ROAD, BLOCK C, KATWARIA SARAI, NEW DELHI, DELHI 110016
1141244344
9810585435 (Number Shared by Promoter in Public)
ajay.pathania@tarc.in
https://www.tarc.in/
XXXX650B
L70100DL2016PLC390526
 
 


 
 


 
 


 
 


 
 


 
 







TARC ISHVA
SECTOR 63A GURUGRAM
GURGAON
GURUGRAM
1141244344
9810585435 (Number Shared by Promoter in Public)
tarc@tarc.in
RATNADEEP PAUL
1141244344
9958112270 (Number Shared by Promoter in Public)
ratnadeep.paul@tarc.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
158901706-07-20241775000KOTAK MAHINDRA BANKHRERA Gurugram
258901606-07-2024887000KOTAK MAHINDRA BANKHRERA Gurugram
358902719-08-2024886500KOTAK MAHINDRA BANKHRERA Gurugram
458903127-08-202427000KOTAK MAHINDRA BANKHRERA Gurugram







6.9500 (Acre)
3.15
3.149
6.9500 (Acre)
137 of 2023 Date 05.07.2023
Yes







125948.91 Lakhs
2540.03 Lakhs
50765.33 Lakhs
10426.26 Lakhs
62217.26 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0.8291
3CONSTRUCTION OF ROADS3.1430
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.9031
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0.1606
9CLUB HOUSE0.2917
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.6225
Total6.95




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS2055.81AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM710.79AS PER PROJECT REPORT
3STORM WATER DRAINAGE258.80AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM2499.31AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL0AS PER PROJECT REPORT
6STREET LIGHTING57.59AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING120.72AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS931.50AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE1740.54AS PER PROJECT REPORT
10SHOPPING AREA185.67AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM60.95AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15SEWERAGE SYSTEM230.42AS PER PROJECT REPORT
16PARKING 723.19AS PER PROJECT REPORT
17UNDERGROUND WATER TANK80.03AS PER PROJECT REPORT
18RAIN WATER HARVESTING45.12AS PER PROJECT REPORT
19STP131.27AS PER PROJECT REPORT
20ELECTRICAL SUB STATION594.58AS PER PROJECT REPORT


NA (date)
14-08-2024 (date)
01-09-2024
31-12-2031
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings145.1022
Apartment/Shops/Other Buildings151.5222
Apartment/Shops/Other Buildings154.02402
Apartment/Shops/Other Buildings147.60682
Apartment/Shops/Other Buildings193.1863
Apartment/Shops/Other Buildings195.33243
Apartment/Shops/Other Buildings200.352143
Apartment/Shops/Other Buildings327.5863
Apartment/Shops/Other Buildings147.30242
Apartment/Shops/Other Buildings20.31721





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments831.572554.11
Shops00
Plots00

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4484.551633.442593.713930.16
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3930.163999.854078.414332.10
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4599.724659.053429.702707.66
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1565.701435.45
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements102.79102.79102.79102.79
Water Supply System0.000035.54
Sewerage treatment & garbage disposal0000
Electricity Supply System0.00000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres053.6182.33118.18
Shopping area06.249.5814.26
Other0000
Security and Fire Fighting0006.04
Underground water tank04.004.004.00
STP06.566.566.56

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements102.79102.79102.79102.79
Water Supply System35.5435.5435.5471.08
Sewerage treatment & garbage disposal0000
Electricity Supply System124.97124.97124.97124.97
Storm Water Drainage12.9412.9425.8825.88
Parks and Playgrounds46.5846.5846.5846.58
Clubhouse/community centres114.88114.88155.60201.55
Shopping area14.3014.3018.3122.61
Other0000
Security and fire and fighting6.046.046.046.04
Parking36.1636.1636.1636.16
Renewable energy system3.053.053.053.05
Underground water tank4.004.004.004.00
Street Lighting2.882.882.882.88
Sewerage system11.5211.5211.5211.52
STP6.566.566.566.56
Rain water harvesting2.262.262.262.26
Electrical sub station00

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements102.79102.79205.58205.58
Water Supply System71.0871.0871.0871.08
Sewerage treatment & garbage disposal0000
Electricity Supply System249.93249.93249.93249.93
Storm Water Drainage25.8825.8825.8825.88
Parks and Playgrounds93.1593.1593.1593.15
Clubhouse/community centres86.6892.4296.95111.74
Shopping area8.328.869.3110.73
Other0000
Rain water harvesting4.514.514.514.51
STP6.566.566.5613.13
Electrical sub station029.7359.4659.46
Renewable energy system6.106.106.106.10
Parking72.3272.3272.3272.32
Underground water tank4.004.004.008.00
Security and fire and fighting6.0412.0712.0712.07
Street Lighting5.765.765.765.76
Sewerage system23.0423.0423.0423.04

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements205.58205.58205.580
Water Supply System71.0871.0871.080
Sewerage treatment & garbage disposal0000
Electricity Supply System249.93249.93249.93249.93
Storm Water Drainage25.8825.8825.880
Parks and Playgrounds93.1593.1593.1593.15
Clubhouse/community centres111.74125.32136.8168.93
Shopping area10.7312.0713.146.46
Other0000
Underground water tank8.008.008.008.00
Electrical sub station59.4659.4659.4689.19
STP13.1313.1313.1313.13
Rain water harvesting4.514.514.514.51
Parking72.3272.3272.3272.32
Renewable energy system6.106.106.106.10
Security and fire and fighting12.0712.0712.0712.07
Street Lighting5.765.765.765.76
Sewerage system23.0423.0423.0423.04

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres34.4634.46
Shopping area3.233.23
Other00
Electrical sub station89.1989.19












Yes
Yes
KOTAK MAHINDRA BANK ADDRESS AMBADEEP BUILDING, KG MARG, NEW DELHI
8947709925
KKBK000172
110485003
000172
RAJEEV TREHAN ADDRESS: C-3, Qutab Institutional Area Road, Block C, Katwaria Sarai, New Delhi
YES











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. WATER SUPPLYALREADY BEEN OBTAINED25-08-2023
II. SEWAGE DISPOSALALREADY BEEN OBTAINED23-08-2023
III. STORM WATER DRAINAGEALREADY BEEN OBTAINED23-08-2023
IV. ELECTRICAL LOADALREADY BEEN OBTAINED24-11-2023
V. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED28-03-2023
VI. FOREST NOCALREADY BEEN OBTAINED15-11-2022
VII. POWER LINE SHIFTING NOCALREADY BEEN OBTAINED10-11-2022
VIII. HUDA CONSTRUCTIONALREADY BEEN OBTAINED10-10-2023
IX. BUILDING PLANALREADY BEEN OBTAINED14-08-2024








Yes


Yes


As per Norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILE/WOODEN FLOORING/MARBLE
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT
3KITCHEN DETAILSSINGLE LEVER COUNTER TOP
4BATHROOM FITTINGSCHINAWARE , SINGLE LEVER COUNTER TOP
5WOOD WORK ETCNO
6DOORS AND WINDOS FRAMESWINDOWS - ALUMINIUM POWDER-COATED SECTIONS AND FLUSH DOOR
7GLASS WORKWINDOWS- ALUMINIUM POWDER-COATED SECTIONS
8ELECTRIC FITTINGSFAN AND ELECTRIC POINT
9CONDUCTING AND WIRING DETAILSHEAVY DUTY , MODULAR
10CUPBOARD DETAILSNA
11WATER STORAGEYES
12LIFT DETAILS2 PASSENGER LIFTS SERVING EVERY APARTMENT
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSWINDOWS- ALUMINIUM POWDER COATED SECTIONS
14DOORSFLUSH DOOR
14.1MAIN DOORSFLUSH DOOR
14.2INTERNAL DOORSFLUSH DOOR
15AIR CONDITIONINGVARIABLE RATE FLOW SYSTEM
16ELECTRICAL FITTINGSHEAVY DUTY CONDUTING MODULAR SWITCHES, C CURVE MCB
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL GRADE TEXTURE PAINT
20INTERNAL FINISHINGACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGPOP CEILING
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGPOP CEILING
2 . 4 MODULAR WARDROBESNO
3 . MASTER TOILET
3 . 1 FLOORMARBLE
3 . 2 WALLSMARBLE
3 . 3 CEILINGFALSE CEILING
3 . 4 COUNTERSVANITY COUNTER
3 . 5 SANITARY WARE/CP FITTINGSSINGLE LEVER COUNTER TOP
3 . 6 FITTING/FIXTURESSINGLE LEVER COUNTER TOP
4 . BED ROOMS
4 . 1 FLOORWOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGPOP CEILING
4 . 4 WARDROBESNO
5 . TOILET
5 . 1 FLOORTILE
5 . 2 WALLSTILE
5 . 3 CEILINGFALSE CEILING
5 . 4 COUNTERSVANITY COUNTER
5 . 5 SANITARY WARE/CP FITTINGSCP FITTING & CERAMIC FIXTURES
5 . 6 FIXTURESSINGLE LEVER COUNTER TOP
6 . KITCHEN
6 . 1 FLOORMARBLE
6 . 2 WALLSACRYLIC EMULSION PAINT
6 . 3 CEILINGPOP CEILING
6 . 4 COUNTERSMARBLE/KOREAN
6 . 5 FIXTURESCP FITTING & FIXTURES
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILE
7 . 2 WALLS & CEILINGOBD PAINT
7 . 3 TOILETTILE
7 . 4 BALCONYTILE
8 . SIT-OUTS
8 . 1 FLOORTILE
8 . 2 WALLS & CEILINGOBD PAINT
8 . 3 RAILINGSMETAL
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1ELECTRICA LOAD AVAILABILITY01-08-2024 ------
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.09-08-2024 View Document
3FOREST NOC01-08-2024 ------
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT09-08-2024 View Document
5ASSURANCE FOR STORM WATER CONNECTION01-08-2024 ------
6HUDA CONSTRUCTION01-08-2024 ------
7JAMABANDI COPY02-08-2024 ------
8AAI NOC01-08-2024 ------
9ASSURANCE FOR SEWERAGE CONNECTION01-08-2024 ------
10LC-IV02-08-2024 ------
11LOI02-08-2024 ------
12MUTATION COPY02-08-2024 ------
13AKS-SHAJRA02-08-2024 ------
14POWER SHIFTING LINE NOC02-08-2024 ------
15DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD09-08-2024 View Document
16COPY OF LICENSE ALONG WITH SCHEDULE OF LAND09-08-2024 View Document
17BRIII03-09-2024 ------
18T-5-E-2 ELEVATION03-09-2024 ------
19T-5-E-2 ELEVATION03-09-2024 ------
20NON ENCUMBRANCE CERTIFICATE03-09-2024 ------
21T-1-P-303-09-2024 ------
22T-5-E-1 ELEVATION03-09-2024 ------
23SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN03-09-2024 View Document
24SIZERA PLAN OVERLAP SITE PLAN03-09-2024 ------
25E-1 ELEVATION03-09-2024 ------
26E-2 ELEVATION03-09-2024 ------
27TARC CA CERTIFICATE INCURRED COST03-09-2024 ------
28TRANSFER DEED- 63 A03-09-2024 ------
29B-2 PARKING03-09-2024 ------
30TARC CA CERTIFICATE (INVENTORY)03-09-2024 ------
31T-3-E-2 ELEVATION03-09-2024 ------
32T-3-P-203-09-2024 ------
33T-5-P-403-09-2024 ------
34ZONING PLAN03-09-2024 View Document
35S-1SECTION03-09-2024 ------
36T-1-P-203-09-2024 ------
37T-3-E-1 ELEVATION03-09-2024 ------
38T-3-E-2 ELEVATION03-09-2024 ------
39CASH FLOW STATEMENT OF THE PROPOSED PROJECT03-09-2024 View Document
40LAND TITLE SEARCH REPORT03-09-2024 ------
41WATER ASSURANCE PDF03-09-2024 ------
42T-3-P-403-09-2024 ------
43CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT03-09-2024 View Document
44B-1 PARKING03-09-2024 ------
45IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN03-09-2024 View Document
46T-5-P-303-09-2024 ------
47INFORMATION OF REVENUE DEPARTMENT03-09-2024 ------
48C-2 SECTION03-09-2024 ------
49T-1-P-403-09-2024 ------
50T-3-P-103-09-2024 ------
51BANK AFFIDAVIT03-09-2024 ------
52SALE DEED03-09-2024 ------
53C-1 SECTION03-09-2024 ------
54A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS03-09-2024 View Document
55T-1-E-1 ELEVATION03-09-2024 ------
56T-1-E-2 ELEVATION03-09-2024 ------
57T-1-P-103-09-2024 ------
58IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN03-09-2024 View Document
59T-3-P-303-09-2024 ------
60T-5-P-103-09-2024 ------
61T-5-P-203-09-2024 ------
62DEMARCATION PLAN03-09-2024 View Document
63BANK UNDERTAKING03-09-2024 ------