HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1243-2022
Submission Date : 26-04-2023 03:38:40 PM
Applicant Type : Company
Project Type: NEW




PAREENA INFRASTRUCTURES PVT. LTD.
C7A IIND FLOOR, OMAXE CITY CENTRE MALL, SOHNA ROAD, GURUGRAM, HARYANA 122018
1242219440
8800693505 (Number Shared by Promoter in Public)
info@pareena.in
Http://www.pareena.in
XXXX883J
U70109DL2009PTC188725
 
 


 
 


 
 







HANU RESIDENCY
HANU RESIDENCY BADSHAHPUR AKLIMPUR ROAD, SECTOR-68,
BADSHAHPUR ST
GURUGRAM
8800693505 (Number Shared by Promoter in Public)
info@pareena.in
MUKESH GUPTA
1242219440
9818146886 (Number Shared by Promoter in Public)
mgengineers9@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1870326-04-20233058155IDBI BANK, GURUGRAMHRERA Gurugram
2867418-05-2023210980IDBI BANK, GURUGRAMHRERA Gurugram







10.02847 (Acre)
237
236.99
10.02847 (Acre)
License granted by DTCP, Haryana Endst. No.LC-4504-JE.(VA)-2022/15626 Dated 06.06.2022
Yes







41515.21 Lakhs
11187.26 Lakhs
19998.28 Lakhs
1509.95 Lakhs
8819.72 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS4143.17
3CONSTRUCTION OF ROADS16558.90
4PAVEMENTS0
5PARKS AND PLAYGROUNDS5236.62
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION418.44
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES8093.70
12ANY OTHER0
13COMMERCIAL2422.44
14RENEWABLE159.85
15PARKING3526.83
Total40559.95




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS210.22SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM247.92SUBMITTED TO HUDA
3STORM WATER DRAINAGE57.51SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM117.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL165.75SUBMITTED TO HUDA
6STREET LIGHTING38.48SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING161.93SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS26.12SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO HUDA
10SHOPPING AREA0SUBMITTED TO HUDA
11RENEWABLE ENERGY SYSTEM67.50SUBMITTED TO HUDA
12SCHOOL0SUBMITTED TO HUDA
13HOSPITAL/DISPENSARY0SUBMITTED TO HUDA
14ANY OTHER0SUBMITTED TO HUDA
15RWH43YET TO BE PREPARED
16ELECTRIC SUBSTATION30SUBMITTED TO HUDA
17PARKING42.05SUBMITTED TO HUDA
18MAINTANACE252.93SUBMITTED TO HUDA
19UNDERGROUND WATER TANK111.18SUBMITTED TO HUDA


03-01-2023 (date)
03-01-2023 (date)
01-10-2023
31-05-2027
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings605776
Apartment/Shops/Other Buildings604876
Apartment/Shops/Other Buildings60702
Apartment/Shops/Other Buildings34.921282
Apartment/Shops/Other Buildings35.541282





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00854.68
Shops000
Plots000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments922.45891.971693.631268.42
Shops27.1433.5216.76154.45
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1893.362165.311862.021418.40
Shops70.25122.94158.0771.93
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1216.581084.711168.431158.27
Shops107.89107.8935.9617.98
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1158.270
Shops17.980
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Security And Fire Fighting024.29
Underground Water Tank55.59

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements058.8158.8158.81
Water Supply System61.9821.6121.613.08
Sewerage treatment & garbage disposal14.3857.3957.3924.59
Electricity Supply System0000
Storm Water Drainage4.5527.127.13.86
Parks and Playgrounds0003.61
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting9.596.3922.3715.96
Electrical Sub Station15.015.0
Parking8.768.75
Rain Water Harvesting2.31
STP13.61
Street Lightning9.59
Underground Water Tank28.54

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.850
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds3.610
Clubhouse/community centres00
Shopping area00
Other00
Street Lightning9.59
STP13.81
Rain Water Harvesting2.3
Construction of Circular Road3.67
Maintenance Of Services222.63












Yes
No
IDBI BANK LTD, OMAXE MALL GURUGRAM
0295102000011477
IBKL000295
110259035
000295
Mr. Surender Kumar Verma, Flat No.3, The Palm Apartments, Plot No. 13-B,Sec-06, Dwarka Sector-6, South West Delhi, Delhi-110075 Mr. Virender Verma, Flat No.2, The Palm Apartments, Plot No. 13-B,Sec-06, Dwarka Sector-6, South West Delhi, Delhi-110075











No
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLAN BR-III VIDE MEMO NO. ZP-1591/JD(RA)/2022/224 ALREADY BEEN OBTAINED03-01-2023
II. ASSURANCE FOR CONSTRUCTION WATER SUPPLYALREADY BEEN OBTAINED26-07-2022
III. ASSURANCE FOR DOMESTIC WATER SUPPLYALREADY BEEN OBTAINED04-08-2022
IV. ZONING PLAN VIDE DRG NO. DTCP 8373ALREADY BEEN OBTAINED06-06-2022








Yes


Yes









COBAN RESIDENCES, SECTOR-99A
10.5875
544
0
544
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
47142471420
Cost of the apartments17783.8117783.810
Cost of the infrastructure1190.761190.760
Others costs28167.4328167.430


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
11-03-2024
11-03-2024




LAXMI APARTMENTS
5
837
0
837
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
17-12-2024
24-12-2024




ELITE RESIDENCY/EXPRESS 99
4.741
236
0
236
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
11-08-2026
14-01-2026




MICASA
13.48275
951
0
951
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
15-01-2025
20-01-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
2WALL FINISHING DETAILSWHITE/COLOUR WASH (STANDARD MAKE)
3KITCHEN DETAILSPROVIDED (AS PER DRAWINGS)
4BATHROOM FITTINGSCP FITTINGS (HINDWARE OR EQUIVALENT)
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMIRANTI WOOD FRAMES
7GLASS WORK4MM THICK GLASS IN WINDOWS
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSCOPPER WIRE IN UPVC CONDUITS (
10CUPBOARD DETAILSNA
11WATER STORAGEOVERHEAD WATER TANK
12LIFT DETAILSPROVIDED (JOHNSON'S OR EQUIVALENT)
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSMS Z SECTION (STANDARD MAKE)
14DOORSFLUSH DOORS WITH ENAMEL PAINT
14.1MAIN DOORSFLUSH DOORS WITH ENAMEL PAINT
14.2INTERNAL DOORSFLUSH DOORS WITH ENAMEL PAINT
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER COAT EXTERIOR PAINT (ASIAN, BERGER OR EQUIVALENT)
20INTERNAL FINISHINGCOLOUR/WHITE WASH (STANDARD MAKE)
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORCERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
1 . 2 WALLSCOLOUR/WHITE WASH (STANDARD MAKE)
1 . 3 CEILINGWHITE WASH (STANDARD MAKE)
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORCERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
2 . 2 WALLSCOLOUR/WHITE WASH (STANDARD MAKE)
2 . 3 CEILINGWHITE WASH (STANDARD MAKE)
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
3 . 2 WALLS6 FEET HEIGHT CERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
3 . 3 CEILINGWHITE WASH (STANDARD MAKE)
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGS2 TAPS (STANDARD MAKE)
3 . 6 FITTING/FIXTURESWASH BASIN (HINDWARE OR EQUIVALENT)
4 . BED ROOMS
4 . 1 FLOORCERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
4 . 2 WALLSCOLOUR/WHITE WASH (STANDARD MAKE)
4 . 3 CEILINGWHITE WASH (STANDARD MAKE)
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
5 . 2 WALLS6 FEET HEIGHT CERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
5 . 3 CEILINGWHITE WASH (STANDARD MAKE)
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGS2 TAPS (STANDARD MAKE)
5 . 6 FIXTURESWASH BASIN (HINDWARE OR EQUIVALENT)
6 . KITCHEN
6 . 1 FLOORCERAMIC TILES (KAJARIA, SOMANY OR EQUIVALENT)
6 . 2 WALLSCOLOUR/WHITE WASH (STANDARD MAKE)
6 . 3 CEILINGWHITE WASH (STANDARD MAKE)
6 . 4 COUNTERSGRANITE STONE
6 . 5 FIXTURESSINGLE BOWL STEEL SINK
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT23-12-2022 View Document
2AF-AR-18 COMMERCIAL-1 FLOOR PLAN18-01-2023 ------
3AF-AR-21 COMMERCIAL-218-01-2023 ------
4AF-AR-20 COMMERCIAL-1 ELEVATIONS & SECTION18-01-2023 ------
5IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN18-01-2023 View Document
6AF-AR-8 TOWER-1 2 ELEVATION AND SECTION18-01-2023 ------
7AF-AR-11 TOWER-3,4,7,8 ELEVATION AND SECTION18-01-2023 ------
8AF-AR-14 TOWER-5 SECTION18-01-2023 ------
9AF-AR-15 TOWER-6 FLOOR PLAN18-01-2023 ------
10AF-AR-19 COMMERCIAL-1 AREA DETAIL18-01-2023 ------
11AF-AR-09 TOWER-3,4,7,8 FLOOR PLAN18-01-2023 ------
12AF-AR-06 TOWER-1 2 FLOOR PLAN18-01-2023 ------
13AF-AR-07 TOWER-1 2 FLOOR PLAN18-01-2023 ------
14AF-PL-2 ALL TOWERS WATER SUPPLY SYSTEM18-01-2023 ------
15SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN18-01-2023 View Document
16DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD18-01-2023 View Document
17SITE PLAN18-01-2023 ------
18AF-AR-02 SITE PARKING PLAN18-01-2023 ------
19AF-AR-05 TOWER-1 2 FLOOR PLAN18-01-2023 ------
20AF-AR-04 SITE PLAN GREEN18-01-2023 ------
21AF-AR-12 TOWER-5 FLOOR PLAN18-01-2023 ------
22IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN18-01-2023 View Document
23AF-AR-10 TOWER-3,4,7,8 FLOOR PLAN18-01-2023 ------
24AF-AR-03 BASEMENT PLAN18-01-2023 ------
25AF-AR-13 TOWER-5 ELEVATION18-01-2023 ------
26AF-AR-16 TOWER-6 ELEVATION18-01-2023 ------
27AF-AR-17 TOWER-6 SECTION18-01-2023 ------
28AF-PL-1 SITE LAYOUT PUBLIC HEALTH18-01-2023 ------
29IRRIGATION LAYOUT11-07-2023 ------
30BR-III_HANU11-07-2023 ------
31SERVICE ESTIMATE11-07-2023 ------
32ALLOTMENT LETTER (REVISED PAYMENT PLAN)11-07-2023 ------
33CASH FLOW STATEMENT OF THE PROPOSED PROJECT11-07-2023 View Document
34STORM WATER LAYOUT11-07-2023 ------
35BBA _HANU (REVISED PAYMENT PLAN)11-07-2023 ------
36REVISED FOREST NOC11-07-2023 ------
37FIRE LAYOUT11-07-2023 ------
38COPY OF LICENSE ALONG WITH SCHEDULE OF LAND11-07-2023 View Document
39JAMABANDI MUTATION_PART111-07-2023 ------
40LOAD ASSURANCE DHBVN11-07-2023 ------
41ASSURANCE FOR TREATED WATER 50KLD11-07-2023 ------
42ASSURANCE FOR WATER SUPPLY11-07-2023 ------
43LC-III (LETTER OF INTENT)11-07-2023 ------
44PROJECT REPORT11-07-2023 ------
45DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.11-07-2023 View Document
46ZONING PLAN11-07-2023 View Document
47ROAD LAYOUT11-07-2023 ------
48SEWER LAYOUT11-07-2023 ------
49WATER SUPPLY LAYOUT11-07-2023 ------
50JAMABANDI 28.02.202211-07-2023 ------
51JAMABANDI 10.05.202311-07-2023 ------
52JAMABANDI MUTATION_PART2 11-07-2023 ------
53MUTATION & BADAR 10.05.202311-07-2023 ------
54MUTATION 29.11.2022 11-07-2023 ------
55SIZRA 29.11.202211-07-2023 ------