HRERA GurugramTemp Project Id : RERA-GRG-PROJ-158-2019
Submission Date : 12-03-2019 06:10:35 AM
Applicant Type : Company
Project Type: ONGOING




KASHISH DEVELOPERS LIMITED
87,OLD A.G. COLONY,KADRU,RANCHI-834002(HARYANA)
06512341269
8076947647 (Number Shared by Promoter in Public)
vijay@kashishgroup.com
XXXX061C
U74300JH2001PLC012131
 
 


 
 


 
 


 
 







MANOR ONE
SEC-111, DWARKA EXPRESSWAY,GURUGRAM-122017
GURGAON
GURUGRAM
9999236926 (Number Shared by Promoter in Public)
ashok@kashishgroup.com
ASHOK KUMAR SHARMA
9999236926 (Number Shared by Promoter in Public)
ashok@kashishgroup.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1319130-08-20171025753AXIS BANK LTD.HRERA Gurugram
21852814-08-20191807000AXIS BANK LTD.HRERA Gurugram
31847606-08-20191807000AXIS BANK LTD.HRERA Gurugram







14.843 (Acre)
175
175
14.843 (Acre)
110 of 2011
No
Address     87,OLD A.G. COLONY, KADRU,RANCHI-834002(JHARKHAND)
Annexure-B- COLLABORATOR/DEVELOPER
AFTER GRANT OF LICENSE
Yes
60:40 REVENUE SHARING BETWEEEN LAND OWNING COMPANIES AND DEVELOPER 25 CRORES NON-REFUNDABLE AMOUNT PAID BY DEVELOPER TO LAND OWNING COMPANIES
No
No
Yes







104100 Lakhs
16300 Lakhs
56000 Lakhs
5000 Lakhs
26800 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.551
3CONSTRUCTION OF ROADS6.774
4PAVEMENTS0
5PARKS AND PLAYGROUNDS5.723
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0.220
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.372
Total14.64




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDANo
WATER SUPPLYHUDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDANo
STORM WATER DRAINAGEHUDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS254AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM391AS PER PROJECT REPORT
3STORM WATER DRAINAGE84AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM30AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL38AS PER PROJECT REPORT
6STREET LIGHTING20AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING275AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS22.5AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE20AS PER PROJECT REPORT
10SHOPPING AREA8AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM66.82AS PER PROJECT REPORT
12SCHOOL125AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY28AS PER PROJECT REPORT
14ANY OTHER250AS PER PROJECT REPORT


31-08-2012 (date)
08-06-2013 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERA-1BHK48.0312446781
2APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB1-2BHK105.421106442
3APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB1-2BHK84.14250242
4APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB1-2BHK96.862000
5APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB1-2BHK80.412000
6APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB1-2BHK96.8634000
7APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB1-2BHK80.4134000
8APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB2-2BHK105.421000
9APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB2-2BHK84.142000
10APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB2-2BHK96.862000
11APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB2-2BHK80.412000
12APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB2-2BHK96.8634000
13APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB2-2BHK80.4134000
14APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC1-3BHK139.181000
15APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC1-3BHK132.882000
16APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC1-3BHK132.8834000
17APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC2-3BHK139.181000
18APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC2-3BHK132.882000
19APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC2-3BHK132.8834000
20APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB3-2BHK105.421000
21APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB3-2BHK84.142000
22APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB3-2BHK96.862000
23APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB3-2BHK80.412000
24APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB3-2BHK96.8634000
25APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB3-2BHK80.4134000
26APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB4-2BHK105.421000
27APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB4-2BHK84.142000
28APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB4-2BHK96.862000
29APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB4-2BHK80.412000
30APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB4-2BHK96.8634000
31APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB4-2BHK80.4134000
32APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB5-2BHK105.421000
33APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB5-2BHK84.142000
34APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB5-2BHK96.862000
35APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB5-2BHK80.412000
36APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB5-2BHK96.8634000
37APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERB5-2BHK80.4134000
38APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC3-3BHK139.181000
39APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC3-3BHK132.882000
40APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC3-3BHK132.8834000
41APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC4-3BHK139.181000
42APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC4-3BHK132.882000
43APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC4-3BHK132.8834000
44APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC5-3BHK139.181000
45APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC5-3BHK132.882000
46APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERC5-3BHK132.8834000
47APARTMENT/SHOPS/OTHER BUILDINGS Type TOWERD-4BHK301.6116000
48APARTMENT/SHOPS/OTHER BUILDINGS Type VILLA337.0814000






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
TOWERA-1BHK460
TOWERB1-2BHK520
TOWERB2-2BHK550
TOWERC1-3BHK+S190
TOWERC2-3BHK+S330
TOWERB3-2BHK00
TOWERB4-2BHK160
TOWERB5-2BHK220
TOWERC3-3BHK30
TOWERC4-3BHK00
TOWERC5-3BHK120
TOWERD-4BHK50
VILLA BLOCK-VILLA50


17-09-2012
01-07-2016
31-12-2021
17-09-2012
0
31-07-2020


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
17-09-2012
0
31-07-2020


964
38
0
194
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments59000
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments37003700
Shops400400
Plots00

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3700370037003700
Shops400400400400
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3700370037003700
Shops400400400400
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other1000

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements50.850.850.8
Water Supply System16.816.816.8
Sewerage treatment & garbage disposal6.006.006.00
Electricity Supply System7.67.67.6
Storm Water Drainage4.04.04.0
Parks and Playgrounds54.054.054.0
Clubhouse/community centres11.8811.8811.88
Shopping area20.120.120.1
Other000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements50.850.8
Water Supply System16.816.8
Sewerage treatment & garbage disposal6.006.00
Electricity Supply System7.67.6
Storm Water Drainage4.04.0
Parks and Playgrounds54.054.0
Clubhouse/community centres11.8811.88
Shopping area20.120.1
Other00












Particulars Remarks, if any
i. No. of Flats/Apartments constructed732
ii. No. of Flats/ Apartments booked268
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter31178 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter18202 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter12995 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter12995 Lakhs
vii. Amount invested in the project upto the date of application59000 Lakhs
Land cost (If any)16300 Lakhs
Apartments19000 Lakhs
Infrastructure1000 Lakhs
EDC/ Taxes Etc.6800 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession45100 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
50300 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 43365 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS2540
II. WATER SUPPLY SYSTEM3910
III. STORM WATER DRAINAGE840
IV. ELECTRICITY SUPPLY SYSTEM300
V. SEWAGE TREATMENT & GARBAGE DISPOSAL380
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER21.310
IX. SOLID WASTE COLLECTION & MGMT SYSTEM66.820
X. CLUBHOUSE5940
XI. NEIGHBOURHOOD SHOPPING1050
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.22.500
XIII. COVERED PARKING80
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM2750
XVII. OTHER FACILITIES AS PER PROJECT REPORT01000









Yes
Yes
AXIS BANK, RANCHI BRANCH, JHARKHAND-834001
919020003704777
UTIB0000106
834211002
0106
Ajit Choudhary(MD)/Arun Kumar Mishra(Authorised Signatory) H. No.87, Old AG Colony, Kadru, Argora. Ranchi-834002 Jharkhand











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED01-10-2013
II. CTE, HARYANA STATE POLLUTION CONTROL BOARDALREADY BEEN OBTAINED28-11-2013
III. NOC , AIRPORT AUTHORITY OF INDIAALREADY BEEN OBTAINED26-06-2012
IV. ARAVALI NOTIFICATIONALREADY BEEN OBTAINED10-07-2013
V. FOREST NOCALREADY BEEN OBTAINED14-06-2013
VI. FIRE NOCALREADY BEEN OBTAINED11-01-2014
VII. BUILDING PLANS APPROVALALREADY BEEN OBTAINED08-06-2013








Yes


Yes


1. Rate of Interest for delay in possession SBI highest MCLR Plus 2 percent. 2. Defect liability period of 5 yrs for Buider













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEITALIAN MARBLE/ENGINEERED WOOD
2WALL FINISHING DETAILS POP PUNNING WITH ACRYLIC EMULSION PAINT
3KITCHEN DETAILS DESIGNER MODULAR KITCHEN, FULLY FITTED WITH PREMIUM BRAD HOB,CHIMNEY, GRANITE CORNER TOP,STAINLESS STEEL SINK IMPORTED CP FITTINGS. ENCLOSURE EXHAUT FAN VENTED TO EXTERIOR. WATER PURIFIER/RO & GEYSER
4BATHROOM FITTINGSPREMIUM TILES, MARBLES TILES,
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESALL DOORS 8 FT HIGH, FLUSH SHUTTERS WITH POLISHED WOOD VENEER AND SOLID WOOD DOOR FRAME
7GLASS WORKNA
8ELECTRIC FITTINGSPREMIUM MODULAR SWITCHES AND SOCKETS,
9CONDUCTING AND WIRING DETAILSCOPPER WIRING
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSUPVC/POWDER COATED ALUMINIUM WINDOW FRAME WITH TWIN TRACK
14DOORSALL DOORS 8 FT HIGH, FLUSH SHUTTERS WITH POLISHED WOOD VENEER AND SOLID WOOD DOOR FRAME
14.1MAIN DOORSALL DOORS 8 FT HIGH, FLUSH SHUTTERS WITH POLISHED WOOD VENEER AND SOLID WOOD DOOR FRAME
14.2INTERNAL DOORSALL DOORS 8 FT HIGH, FLUSH SHUTTERS WITH POLISHED WOOD VENEER AND SOLID WOOD DOOR FRAME
15AIR CONDITIONINGVRV AIR-CONDITIONED
16ELECTRICAL FITTINGSPREMIUM MODULAR SWITCHES AND SOCKETS,
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGPOP PUNNING WITH EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORITALIAN MARBLE/ENGINEERED WOOD
1 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORITALIAN MARBLE/ENGINEERED WOOD
2 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORMARBLE/TILES
3 . 2 WALLSPREMIUM TILES
3 . 3 CEILINGACRYLIC EMULSION PAINT
3 . 4 COUNTERSIMPORTED MARBLE COUNTER
3 . 5 SANITARY WARE/CP FITTINGSBATH TUB WITH JACUZZI,GLAZED SHOWER ENCLOSURE, EXHAUST FAN VENTED TO EXTERIOR,
3 . 6 FITTING/FIXTURES4-FIXTURE TOILET WITH IMPORTED /HIGH END WITH PREMIUM BRAND HOB, CHIMNEY, CP FITTINGS,MIRROR WITH WALL MOUNTED VANITY LIGHTING
4 . BED ROOMS
4 . 1 FLOORITALIAN MARBLE/ENGINEERED WOOD
4 . 2 WALLSPOP PUNNING WITH ACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORMARBLE/TILES
5 . 2 WALLSPREMIUM TILES
5 . 3 CEILINGACRYLIC EMULSION PAINT
5 . 4 COUNTERSIMPORTED MARBLE COUNTER
5 . 5 SANITARY WARE/CP FITTINGS4 FIXTURE TOILET WITH IMPORTED/HIGH END LUXURY CHINAWARE CP FITTINGS, BATH TUB WITH JACUZZI, GLAZED SHOWER ENCLOSURE,
5 . 6 FIXTURESEXHAUST FAN VENTED TO EXTERIOR, MIRROR WITH WALL MOUNTED VANITY LIGHTING
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPREMIUM TILES
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE COUNTER TOP
6 . 5 FIXTURESSTAINLESS STEEL SINK, IMPORTED CP FITTINGS
6 . 6 KITCHEN APPLIANCESWATER PURIFIER/RO, GEYSER, PREMIUM BRAND HOB, CHIMNEY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER PAINT
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1AREA CALCULATION BLOCK A27-08-2019 ------
2AREA CALCULATION BLOCK D27-08-2019 ------
3DEMARCATION PLAN26-08-2019 View Document
4SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN26-08-2019 View Document
5SERVICE PLAN 226-08-2019 ------
6SIDE ELEVATION BLOCK A26-08-2019 ------
7AREA CALCULATION BASEMENT26-08-2019 ------
8AREA CALCULATION BLOCK C27-08-2019 ------
9AREA CALCULATION VILLA26-08-2019 ------
10AREA CALCULATION BLOCK B27-08-2019 ------
11SERVICE PLAN 426-08-2019 ------
12SERVICE PLAN 326-08-2019 ------
13A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS23-02-2019 View Document
14COPY OF LICENSE ALONG WITH SCHEDULE OF LAND12-03-2019 View Document
15NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT12-03-2019 View Document
16CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT12-03-2019 View Document
17CASH FLOW STATEMENT OF THE PROPOSED PROJECT12-03-2019 View Document
18IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN12-03-2019 View Document
19DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD12-03-2019 View Document
20IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN12-03-2019 View Document
21ZONING PLAN12-03-2019 View Document
22FRONT ELEVATION26-08-2019 ------
23DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.26-08-2019 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 PROJECT CONTINUATION- RC/REP/HARERA/GGM/ 58 OF 2019/7(3)/2022/11 DATED 22.11.2022 13-12-2022 View Document