HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1848-2025
Submission Date : 24-01-2025 01:46:45 PM
Applicant Type : Company
Project Type: NEW




UNION BUILDMART PRIVATE LIMITED
41ST FLOOR, TOWER-1, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66, BADSHAHPUR, GURGAON, HARYANA
0124473200
9711348349 (Number Shared by Promoter in Public)
Unionbuildmart0207@gmail.com
http://unionbuildmart.in
XXXX843M
U70100HR2012PTC089615
 
 


 
 


 
 


 
 







M3M MANSION PH-2
SECTOR 113, VILL CHAUMA,GURUGRAM
GURGAON
GURUGRAM
01244732000
8929012754 (Number Shared by Promoter in Public)
Unionbuildmart0207@gmail.com
BHARAT VIGMAL
01244732000
8929012754 (Number Shared by Promoter in Public)
Unionbuildmart0207@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150263322-01-2025476900ICICI BANK LIMITEDHRERA Gurugram
250263422-01-20252441300ICICI BANK LIMITEDHRERA Gurugram







1.515 (Acre)
5.12
5.09
10.225 (Acre)
DTCP License no 229 of 2023 dated 02.11.2023
No
Address     CABIN-2,LGF,F-22,SUSHANT SHOPPING ARCADE, SUSHANT LOK PHASE-1, GURUGRAM,HARYANA
Address     CABIN-1,LGF,F-22,SUSHANT SHOPPING ARCADE, SUSHANT LOK PHASE-1, GURUGRAM,HARYANA
Address     41ST FLOOR,TOWER-1,M3M INTERNATIONAL FINANCIAL CENTER, SECTOR 66,GURUGRAM,HARYANA
Annexure-B- COLLABORATOR VIDE REGISTERED DEVELOPMENT RIGHTS AGREEMENTS.
BEFORE THE GRANT OF LICENSE
Yes
THE SUMMARY OF THE AGREEMENTS ARE ATTACHED IN FOLDER-A
No
Yes
Yes







112038.08 Lakhs
36885.91 Lakhs
29399.27 Lakhs
1506.50 Lakhs
44246.40 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.515
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total1.515




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS87.08AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM24.07AS PER PROJECT REPORT
3STORM WATER DRAINAGE10.45AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM80.11AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL17.42AS PER PROJECT REPORT
6STREET LIGHTING6.97AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING44.65AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS10.45AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0.00AS PER PROJECT REPORT
10SHOPPING AREA0.00AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0.00AS PER PROJECT REPORT
12SCHOOL0.00AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0.00AS PER PROJECT REPORT
14ANY OTHER0.00AS PER PROJECT REPORT
15HARDSCAPE AND SOFTSCAPE212.48AS PER PROJECT REPORT
16BOUNDARY WALL73.15AS PER PROJECT REPORT
17MAIN ENTRANCE WORK AND GUARD HOUSE34.83AS PER PROJECT REPORT
18PARKING MARKING28.48AS PER PROJECT REPORT
19STP22.47AS PER PROJECT REPORT
20UNDERGROUND TANK UGT26.68AS PER PROJECT REPORT
21RAIN WATER HARVESTING1.74AS PER PROJECT REPORT
22ELECTRICAL SUB STATION114.99AS PER PROJECT REPORT
23ELECTRIFICATION159.42AS PER PROJECT REPORT
24CONSULTANCY187.69AS PER PROJECT REPORT
25INFRA ESTABLISHMENTS363.37AS PER PROJECT REPORT


27-01-2025 (date)
27-01-2025 (date)
01-02-2025
29-02-2032
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings138.89602
Apartment/Shops/Other Buildings141.21302
Apartment/Shops/Other Buildings141.68302
Apartment/Shops/Other Buildings158.3342
Apartment/Shops/Other Buildings181.5932
Apartment/Shops/Other Buildings187.85602
Apartment/Shops/Other Buildings189.06532
Apartment/Shops/Other Buildings284.6812
Apartment/Shops/Other Buildings287.5312
Apartment/Shops/Other Buildings386.9422





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments230.49164.64131.71312.46
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1078.841322.081122.281548.98
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1798.711910.781650.481768.25
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1641.242151.622287.431734.09
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1861.451840.761403.30956.06
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments888.44479.21558.00558.00
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.614.357.84
Water Supply System01.201.20
Sewerage treatment & garbage disposal00.870.87
Electricity Supply System000
Storm Water Drainage00.520.52
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
Infra Establishments18.1718.17
Consultancy9.389.38
Boundary Wall3.66

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3.484.354.354.35
Water Supply System2.412.411.201.20
Sewerage treatment & garbage disposal1.741.740.870.87
Electricity Supply System0000
Storm Water Drainage1.041.040.520.52
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Main Entrance work and Guard House1.741.742.792.79
Boundary Wall3.663.663.664.39
Infra Establishments18.1718.1718.1718.17
Consultancy9.389.389.389.38
Rain water harvesting0.030.090.090.17
STP2.252.25
Underground tank UGT1.33
Hardscape and Softscape10.62

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements8.718.718.718.71
Water Supply System1.441.931.931.93
Sewerage treatment & garbage disposal1.041.391.391.39
Electricity Supply System004.018.01
Storm Water Drainage0.630.840.840.84
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Main Entrance work and Guard House2.793.483.483.48
Infra Establishments54.5118.1736.3436.34
Consultancy28.1518.7718.779.38
Rain water harvesting0.170.170.140.17
Underground tank UGT1.332.672.932.67
STP1.120.901.572.25
Boundary Wall5.125.127.318.78
Hardscape and Softscape21.2521.2531.8731.87
Firefighting services1.340.841.681.68
Parks and Play grounds1.041.04

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.456.102.611.74
Water Supply System1.441.441.932.41
Sewerage treatment & garbage disposal1.041.041.391.74
Electricity Supply System8.0120.0320.0320.03
Storm Water Drainage0.630.630.841.04
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground tank UGT1.874.006.673.20
Hardscape and Softscape31.8721.2521.2521.25
Parks and Play grounds2.612.612.091.04
Firefighting services2.853.363.361.68
Security6.976.976.976.97
Street Light1.741.741.741.74
Infra Establishments18.1718.1754.5118.17
Consultancy9.389.3828.159.38
Electrification39.8539.8539.8539.85
Electrical sub station28.7528.7528.7528.75
Boundary Wall8.787.315.126.58
Main Entrance work and Guard House2.792.793.483.48
Parking Marking7.127.127.127.12
STP1.572.255.622.70
Rain water harvesting0.170.170.170.17












Yes
Yes
ICICI BANK LIMITED, BRANCH SECTOR 54, SUNCITY, GURGAON, HARYANA -122003
777705152025
ICIC0000399
110229060
000399
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 AreraColony Bhopal M.P. 462016 2) MS. Amarjot Kaur Sahni-3/66Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi-House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon,Haryana- 122002 4)Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad,Haryana- 121001 5) Mr. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, UP 6) Mr. Pratap Singh-10A Pocket 2 MayurVihar East Delhi 110096 7) Ms. Meenal Sood- C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015 8) Mr. Anurag Kulshrestha- 1 F Pocket-3, Mayur Vihar, Phase 1, Chilla Saroda Khadar, East Delhi 9) Mr. Surender Kumar Gupta- 954 Gokul Dham, Society 1st Floor Krishna Colony, Gurugram 10) Mr.Rajiv Kumar Verma- House No.-06 E,Pratap Enclave,Mohan Garden,Uttam Nagar,,West Delhi 11) Mr.Ashok Kumar- Hajipur(15),Guragon,Haryana 12) Mr.Amit Saxena- 163,Sarai Nazar Ali,Behind M.M,G Hospital,Ghaziabad Uttar Pradesh
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE APPROVALALREADY BEEN OBTAINED02-11-2023
II. LOI APPROVALALREADY BEEN OBTAINED18-04-2023
III. CONSTRUCTION WATER ASSURANCEALREADY BEEN OBTAINED01-12-2023
IV. DRINKING WATER ASSURANCEALREADY BEEN OBTAINED01-12-2023
V. STORM WATER CONNECTION ASSURANCEALREADY BEEN OBTAINED07-11-2023
VI. SEWERAGE CONNECTION ASSURANCEALREADY BEEN OBTAINED01-12-2023
VII. ENVIRONMENT CLEARANCE ALREADY BEEN OBTAINED19-05-2024
VIII. FOREST NOCALREADY BEEN OBTAINED07-08-2018
IX. BUILDING PLAN APPROVAL (BRIII) ALREADY BEEN OBTAINED27-01-2025
X. ROAD ACCESS PERMISSION ALREADY BEEN OBTAINED29-05-2024








Yes


Yes


AS PER THE RULES AND REGULATIONS OF HARERA







M3M MANSION
8.71
968
0
637
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
15385915385916214.52
Cost of the apartments89179.0289179.025782.26
Cost of the infrastructure9837.019837.010
Others costs54842.9754842.9710432.26


68114.28 Lakhs
262746.87 Lakhs
0 Lakhs
0 Lakhs
No
29-02-2032
29-02-2032




M3M CAPITAL PHASE-1
5.004
750
0
719
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
79219.9879219.9846137.71
Cost of the apartments46549.2446549.2433496.57
Cost of the infrastructure4944.424944.420
Others costs27726.3227726.3212639.14


65261.96 Lakhs
59942.10 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2026
30-06-2026




M3M CAPITAL PHASE-2
7.7139
1760
0
1656
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
138005.90138005.9061138.62
Cost of the apartments87620.8787620.8745698.64
Cost of the infrastructure4755.3400
Others costs45629.6992307.2615439.98


138710.38 Lakhs
142020.06 Lakhs
0 Lakhs
0 Lakhs
No
13-12-2026
13-12-2026




M3M CAPITAL PHASE-3
0.9187
328
0
256
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
37840.2737840.276912.60
Cost of the apartments21907.5321907.533435.96
Cost of the infrastructure1205.1800
Others costs14727.5634404.313476.64


29165.82 Lakhs
34088.88 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2027
31-03-2027










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATEDWOODEN FLOOR/CERAMIC TILE
2WALL FINISHING DETAILSPLASTER WITH OBD OR ABOVE
3KITCHEN DETAILSCOMBINATION OF TILES AND PLASTER WITH FITTINGS
4BATHROOM FITTINGSCP FITTINGS & CHINAWARE
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESEXTERNAL ALUMINIUM WITH GLASS INTERNAL – WOODEN OR ABOVE
7GLASS WORKONLY EXTERNAL DOOR/WINDOW
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSNA
11WATER STORAGEAS PER NORMS
12LIFT DETAILSLIFTS AS PER BUILDING PLANS
13EXTERNAL GLAZINGSGLASS WITH ALUMINIUM / UPVC
13.1WINDOWS/GLAZINGSGLASS WITH ALUMINIUM / UPVC
14DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
14.1MAIN DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER PROOF PAINT
20INTERNAL FINISHINGPAINT/GLASS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER OBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
2 . 2 WALLSPLASTER & OBD OR ABOVE
2 . 3 CEILINGOBD OR ABOVE
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER & DADO
3 . 3 CEILINGGRID FALSE CEILING/OBD OR ABOVE
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
4 . 2 WALLSPLASTER & OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER & DADO
5 . 3 CEILINGGRID FALSE CEILING/OBD
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER & DADO
6 . 3 CEILINGOBD
6 . 4 COUNTERSSTONE/MARBLE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER & PAINT
7 . 3 TOILETANTISKID CERAMIC TILES
7 . 4 BALCONYANTISKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1SEWRAGW CONNECTION ASSURANCE24-01-2025 ------
2T-A ELEVATION-218-02-2025 ------
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT24-01-2025 View Document
4ARAVALI NOC24-01-2025 ------
5STRUCTURAL PLAN-118-02-2025 ------
6JAMABANDI18-02-2025 ------
7STRUCTURAL PLAN-418-02-2025 ------
8STRUCTURAL PLAN-618-02-2025 ------
9T-B ELEVATION PLAN-218-02-2025 ------
10IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN24-01-2025 View Document
11T-B SECOND FLOOR LAYOUT18-02-2025 ------
12ENVIRONMENT CLEARANCE18-02-2025 ------
13LOI18-02-2025 ------
14COPY OF LICENSE ALONG WITH SCHEDULE OF LAND24-01-2025 View Document
15IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN24-01-2025 View Document
16DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.24-01-2025 View Document
17LOI24-01-2025 ------
18LC VI24-01-2025 ------
19JAMABANDI24-01-2025 ------
20INFORMATION TO REVENUE DEPARTMENT24-01-2025 ------
21EC24-01-2025 ------
22TSR24-01-2025 ------
23FOREST NOC24-01-2025 ------
24CONSTRUCTION WATER ASSURANCE24-01-2025 ------
25DRINKING WATER ASSURANCE24-01-2025 ------
26STORM WATER CONNECTION ASSURANCE24-01-2025 ------
27T-B TERRACE & MUMTY PLAN18-02-2025 ------
28SITE PLAN WITH SERVICES18-02-2025 ------
29REP-II18-02-2025 ------
30STRUCTURAL PLAN-518-02-2025 ------
31T-B FIRST FLOOR LAYOUT18-02-2025 ------
32T-B ELEVATION PLAN-118-02-2025 ------
33STRUCTURAL PLAN-318-02-2025 ------
34T-A STILT LEVEL LAYOUT18-02-2025 ------
35STRUCTURAL PLAN-218-02-2025 ------
36T-A 27TH,28TH &30TH; FLOOR LAYOUT18-02-2025 ------
37T-A SECOND FLOOR LAYOUT18-02-2025 ------
38T-B TYPICAL(19TH,29TH) FLOOR LAYOUT18-02-2025 ------
39FIRE SCHEME APPLICATION18-02-2025 ------
40MUTATION18-02-2025 ------
41T-B SECTION YY18-02-2025 ------
42LICENSE18-02-2025 ------
43T-A SECTION-XX18-02-2025 ------
44T-A SECTION-YY18-02-2025 ------
45T-A PENTHOUSE FLOOR LVL LAYOUT18-02-2025 ------
46T-A TYPICAL 3RD TO 18TH, 20TH TO 26TH FLOOR PLAN18-02-2025 ------
47RAPAT18-02-2025 ------
48T-A FIRST FLOOR LAYOUT18-02-2025 ------
49SERVICE PLANS & ESTIMATES APPLICATION18-02-2025 ------
50T-B TYPICAL 3RD TO 18TH, 20TH TO 28TH & 30TH FLOOR LAYOUT18-02-2025 ------
51T-A TERRACE & MUMTY FLOOR LAYOUT18-02-2025 ------
52SIZRA18-02-2025 ------
53BR-III18-02-2025 ------
54DEMARCATION PLAN18-02-2025 ------
55REVISED ZONING PLAN18-02-2025 ------
56SITE PLAN18-02-2025 ------
57T-A 19TH&29TH; FLOOR LAYOUT18-02-2025 ------
58T-A ELEVATION-118-02-2025 ------
59T-B PENTHOUSE FLOOR18-02-2025 ------
60T-B SECTION-XX18-02-2025 ------
61T-B STILT LEVEL LAYOUT18-02-2025 ------