HRERA GurugramTemp Project Id : RERA-GRG-PROJ-362-2019
Submission Date : 07-02-2020 06:44:03 AM
Applicant Type : Company
Project Type: ONGOING




M/S RAHEJA DEVELOPERS LIMITED
W4D, 204/5, KESHAV KUNJ, CARIAPPA MARG, SAINIK FARMS, NEW DELHI
9971091904 (Number Shared by Promoter in Public)
compliances@raheja.com
http://raheja.com
XXXX468E
U45400DL1990PLC042200
 
 


 
 


 
 


 
 







RAHEJA REVANTA
SECTOR 78, GURUGRAM, HARYANA
GURGAON
GURUGRAM
9971091904 (Number Shared by Promoter in Public)
compliances@raheja.com
AJAY MOHANTY
9971091904 (Number Shared by Promoter in Public)
ajay.mohanty@raheja.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150006628-07-20171326500"ICICI BANK "HRERA Gurugram







18.7213 (Acre)
32.7
32.6
18.7234 (Acre)
32 of 2017
No
Address     W4D, 204/5, KESHAV KUNJ, CARIAPPA MARG, WESTERN AVENUE, SAINIK FARMS, NEW DELHI
Address     VILLAGE SIKOHPUR, TEHSIL MANESAR, GURUGRAM
Annexure-B- DEVELOPMENT AGREEMENT AND GPA
BEFORE THE GRANT OF LICENSE
Yes
YES
Yes
Yes
Yes







99286 Lakhs
22558 Lakhs
49369.13 Lakhs
7320.87 Lakhs
20038 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3.12
3CONSTRUCTION OF ROADS2.098
4PAVEMENTS2.43
5PARKS AND PLAYGROUNDS2.51
6GREEN BELTS2.51
7VEHICLE PARKINGS12.61
8ELECTRICITY SUB-STATION0.29
9CLUB HOUSE0.10
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.22
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13NURSERY0.06
14CONVENIENT0.06
15EWS0.10
Total26.108




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDA/GMDANo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS190.90SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM460.95SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE83.07SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM623.64AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL70SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING21.55SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING26.4SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS205.42AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE682.71AS PER PROJECT REPORT
10SHOPPING AREA101.88AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL217.13AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15EWS914.45AS PER PROJECT REPORT


24-04-2017 (date)
24-04-2017 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type HIGH RISE 1 BHK63.12403913
2APARTMENT/SHOPS/OTHER BUILDINGS Type 2 BHK TYPE 190.916215843
3APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE I(LAWN)90.96422
4APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE II89.96161602
5APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE II-T89.962202
6APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE III93161602
7APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE III-T932202
8APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE IV91.5161602
9APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE IV-T91.52202
10APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE V90.35161602
11APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK TYPE V-T90.352202
12APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK - TYPE I114.18302912
13APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK-TYPE II117.62302822
14APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK TYPE III136.57161512
15APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK TYPE III-T136.572202
16APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK TYPE IV147.27423843
17APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK TYPE IV-T147.278713
18APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK TYPE V150.78802
19APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK TYPE V-T150.72202
20APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK-VI130.346513
21APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK-VI-T130.342113
22APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK- PENTHOUSE206.66512
23APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK179.3110849593
24APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK (LAWN)179.314040
25APARTMENT/SHOPS/OTHER BUILDINGS Type 5BHK (LAWN)238.622202
26APARTMENT/SHOPS/OTHER BUILDINGS Type 6BHK323.5512931
27APARTMENT/SHOPS/OTHER BUILDINGS Type LOW RISE 4 BR_ 3-TOI0153116370
28APARTMENT/SHOPS/OTHER BUILDINGS Type 3-BR + 3-TOI.0535210
29APARTMENT/SHOPS/OTHER BUILDINGS Type 2-BR + 2-TOI06510
30APARTMENT/SHOPS/OTHER BUILDINGS Type 4-BR + 5-TOI182.942020
31APARTMENT/SHOPS/OTHER BUILDINGS Type EWS18.3514874740
32APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-19.4301100
33APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-211.6251100
34APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-39.501100
35APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-411.6951100
36APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-59.5701100
37APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-611.7651100
38APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-79.4301100
39APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-811.6251100
40APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-99.501100
41APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-1011.6951100
42APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-119.5701100
43APARTMENT/SHOPS/OTHER BUILDINGS Type SHOP-1211.6951100






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
00


01-10-2012
30-04-2016
31-07-2022
01-10-2012
0
31-07-2022


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-10-2012
0
31-07-2022


0
0
1000
178
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments74234
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar












Particulars Remarks, if any
i. No. of Flats/Apartments constructed932
ii. No. of Flats/ Apartments booked732
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter105721.02 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter84953.55 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter20767.47 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter4642.45 Lakhs
vii. Amount invested in the project upto the date of application74234 Lakhs
Land cost (If any)22558 Lakhs
Apartments33538 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.18137 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession25052 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
22000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 2933 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS190.900
II. WATER SUPPLY SYSTEM460.950
III. STORM WATER DRAINAGE83.070
IV. ELECTRICITY SUPPLY SYSTEM623.640
V. SEWAGE TREATMENT & GARBAGE DISPOSAL700
VI. CLUB HOUSE/COMMUNITY CENTRE682.710
VII. SCHOOL217.130
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING101.880
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.205.420
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM26.40
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
BANK OF BARODA, PARLIAMENT STREET, NEW DELHI
5860200001340
BARB0PARLIA
110012028
PARLIA
Navin M. Raheja











No
Yes
Yes
Yes
Yes
Yes
No
No
No
No


Yes
No
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NUMBER 49 OF 2011 ALREADY BEEN OBTAINED01-06-2011
II. NOC FOR NON ARAVALLI HILLSALREADY BEEN OBTAINED09-10-2012
III. CTE EXTENSION NO. HSPCB/CONSENT/:2821217GUSOCTE3523322ALREADY BEEN OBTAINED06-02-2017
IV. NOC FOR NON-FOREST HILLS LANDALREADY BEEN OBTAINED30-01-2013
V. FOREST NOCALREADY BEEN OBTAINED24-12-2012
VI. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED31-07-2017
VII. HUDA WATER PERMISSIONALREADY BEEN OBTAINED09-10-2015
VIII. POWER ASSURANCEALREADY BEEN OBTAINED28-10-2016
IX. AAI REVALIDATION LETTER NO. AAI/RHQ/NR/ATM/NOC/REVALIDATION/2008/134/194-97ALREADY BEEN OBTAINED24-02-2016








Yes


Yes









RAHEJA ARANYA PHASE-II, SECTOR-11 & 14, SOHNA, MEWAT, GURUGRAM, HARYANA
45.803
0
402
0
164
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
236282362813038
Cost of the apartments000
Cost of the infrastructure000
Others costs000


11460 Lakhs
1385 Lakhs
9000 Lakhs
9000 Lakhs
Yes
01-10-2016
27-08-2022




KRISHNA HOUSING SCHEME, SECTOR-14, SOHNA, GURUGRAM, HARYANA
10
1644
0
1509
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
21189211898935
Cost of the apartments000
Cost of the infrastructure000
Others costs000


15932 Lakhs
3679 Lakhs
5500 Lakhs
3300 Lakhs
Yes
31-07-2019
09-03-2020




TRINITY-I, SECTOR-84, GURUGRAM, HARYANA
2.281
245
0
116
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
803080301840
Cost of the apartments000
Cost of the infrastructure000
Others costs000


2644 Lakhs
182 Lakhs
6800 Lakhs
6800 Lakhs
Yes
19-06-2019
31-12-2022




MAHESHWARA (TOWER-A,B,C,D&E), SECTOR-11 & 14, SOHNA, GURUGRAM, HARYANA
3.753
276
0
112
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
275602756010659
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1774 Lakhs
660 Lakhs
10000 Lakhs
4600 Lakhs
Yes
14-06-2021
03-04-2023




VANYA, TOWER A- GULMOHAR, SECTOR-99A, GURUGRAM, HARYANA
2.28
140
0
92
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
857685762210
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1749 Lakhs
405 Lakhs
12000 Lakhs
6150 Lakhs
No
29-11-2022
31-12-2022




VANYA, TOWER B- AMALTAS, SECTOR-99A, GURUGRAM, HARYANA
2.21
139
0
92
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
832283222145
Cost of the apartments000
Cost of the infrastructure000
Others costs000


645 Lakhs
102 Lakhs
12000 Lakhs
6150 Lakhs
Yes
08-12-2022
31-12-2022




VANYA, TOWER C-PALASH, SECTOR- 99A, GURUGRAM, HARYANA
2.28
140
0
80
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
857685761639
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1466 Lakhs
411 Lakhs
12000 Lakhs
6150 Lakhs
No
08-12-2022
31-12-2022










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSE• FLOORS: DESIGNER TILES/ MARBLE
2WALL FINISHING DETAILS• WALLS: PLASTIC EMULSION PAINT
3KITCHEN DETAILSFLOORS: COMBINATION OF ONE OR MORE OF DESIGNER TILES/GRANITE/MARBLE • FITTINGS & FIXTURES: MODULAR KITCHEN WITH GRANITE COUNTER, SS SINK AND CP FITTINGS • WALLS: 2’HIGH GLAZED TILES ABOVE COUNTER AND OIL BOUND DISTEMPER ON REMAINING AREA • CEILINGS: OIL BOUND DISTEMPER
4BATHROOM FITTINGS• FLOORS: COMBINATION OF ONE OR MORE OF DESIGNER TILES/MARBLE • FITTINGS & FIXTURES: SINGLE LEVER CP FITTINGS, WALL HUNG WC, SHOWER PANELS IN ALL TOILETS (EXCEPT SERVANT TOILET AND POWDER ROOM) • WALLS: COMBINATION OF ONE OR MORE OF DESIGNER TILES • CEILINGS: GYP. BOARD /CALCIUM SILICATE/POP FALSE CEILING WITH INTEGRATED CFL LIGHT FITTINGS AND PROVISION FOR HIDING GEYSER OVER IT
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMES• DOOR FRAME WITH PANELED SHUTTERS. FIRE PROOF ENGINEERED DOORS WHERE REQUIRED • ALUMINUM FRAME WITH DGU GLASS.
7GLASS WORKNA
8ELECTRIC FITTINGSMODULAR SWITCHES, COPPER ELETRICAL WIRING THROUGHOUT IN CONCEALED CONDUIT WITH PROVISION FOR LIGHT POINTS, POWER POINTS,TV, LAN AND TELEPHONE SOCKETS
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSBRANDED HIGH SPEED LIFTS • FLOORS: IMPORTED MARBLE/GRANITE FLOORING • WALLS: COMBINATION OF ONE OR MORE OF GRANITE/MARBLE/ TERRAZZO/ OIL BOUND DISTEMPER • CEILINGS: PREMIUM PLASTIC EMULSION PAINT
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORS• DOOR FRAME WITH PANELED SHUTTERS. FIRE PROOF ENGINEERED DOORS WHERE REQUIRED • ALUMINUM FRAME WITH DGU GLASS.
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGSPLIT UNIT ACS IN EVERY BEDROOM AND LIVING/DINING ROOM AS PER PLAN
16ELECTRICAL FITTINGSMODULAR SWITCHES, COPPER ELETRICAL WIRING THROUGHOUT IN CONCEALED CONDUIT WITH PROVISION FOR LIGHT POINTS, POWER POINTS,TV, LAN AND TELEPHONE SOCKETS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMECOMBINATION OF ONE OR MORE OF ALL WEATHER PAINT/STONE/ ALCO / GRIT WORK
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORDESIGNER TILES/ MARBLE
1 . 2 WALLSPLASTIC EMULSION PAINT
1 . 3 CEILINGOIL BOUND DISTEMPER WITH DESIGNER ENGINEERED CORNICE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED/WOODEN FLOOR
2 . 2 WALLSPLASTIC EMULSION PAINT
2 . 3 CEILINGOIL BOUND DISTEMPER WITH DESIGNER ENGINEERED CORNICE
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCOMBINATION OF ONE OR MORE OF DESIGNER TILES/MARBLE
3 . 2 WALLSCOMBINATION OF ONE OR MORE OF DESIGNER TILES
3 . 3 CEILINGGYP. BOARD /CALCIUM SILICATE/POP FALSE CEILING WITH INTEGRATED CFL LIGHT FITTINGS AND PROVISION FOR HIDING GEYSER OVER IT
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESSINGLE LEVER CP FITTINGS, WALL HUNG WC, SHOWER PANELS IN ALL TOILETS (EXCEPT SERVANT TOILET AND POWDER ROOM)
4 . BED ROOMS
4 . 1 FLOORLAMINATED/WOODEN FLOOR
4 . 2 WALLSPLASTIC EMULSION PAINT
4 . 3 CEILINGOIL BOUND DISTEMPER WITH DESIGNER ENGINEERED CORNICE
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCOMBINATION OF ONE OR MORE OF DESIGNER TILES/MARBLE
5 . 2 WALLSCOMBINATION OF ONE OR MORE OF DESIGNER TILES
5 . 3 CEILINGGYP. BOARD /CALCIUM SILICATE/POP FALSE CEILING WITH INTEGRATED CFL LIGHT FITTINGS AND PROVISION FOR HIDING GEYSER OVER IT
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESSINGLE LEVER CP FITTINGS, WALL HUNG WC, SHOWER PANELS IN ALL TOILETS (EXCEPT SERVANT TOILET AND POWDER ROOM)
6 . KITCHEN
6 . 1 FLOORCOMBINATION OF ONE OR MORE OF DESIGNER TILES/GRANITE/MARBLE
6 . 2 WALLS2’HIGH GLAZED TILES ABOVE COUNTER AND OIL BOUND DISTEMPER ON REMAINING AREA
6 . 3 CEILINGOIL BOUND DISTEMPER
6 . 4 COUNTERSNA
6 . 5 FIXTURESMODULAR KITCHEN WITH GRANITE COUNTER, SS SINK AND CP FITTINGS
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCOMBINATION OF ONE OR MORE OF GRANITE / VITRIFIED / TERRAZZO / TILES
7 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
7 . 3 TOILETCP FITTINGS, BATH FITTINGS AND APPROPRIATE SANITARY WARE IN TOILET
7 . 4 BALCONYFLOORS: ANTI-SKID/VITRIFIED/STONE TILES FITTINGS AND FIXTURES: GLASS RAILING, INTEGRATED CEILING HEIGHTS WALLS: WEATHER COAT EMULSION CEILINGS: WEATHER COAT EMULSION/ OIL BOUND DISTEMPER
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN29-11-2019 View Document
2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND29-11-2019 View Document
3ZONING PLAN29-11-2019 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN29-11-2019 View Document
5SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN07-02-2020 View Document
6NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT07-02-2020 View Document
7A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS07-02-2020 View Document
8DEMARCATION PLAN06-02-2020 View Document
9DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD07-02-2020 View Document
10DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.07-02-2020 View Document