HRERA GurugramTemp Project Id : RERA-GRG-PROJ-439-2019
Submission Date : 25-01-2020 02:00:23 AM
Applicant Type : Company
Project Type: ONGOING




SEPSET PROPERTIES PRIVATE LIMITED
11TH FLOOR, PARAS TWIN TOWER GOLF COURSE ROAD, SECTOR-54 GURGAON 122002 HR
7042388080 (Number Shared by Promoter in Public)
INFO@PARASBUILDTECH.COM
https://parasbuildtech.com/
XXXX687G
U45300DL2007PTC163112
 
 


 
 


 
 







PARAS DEWS
SECTOR-106, DWARKA EXPRESSWAY, DAULATABAD, GURGAON-122001
GURGAON
GURUGRAM
7042388080 (Number Shared by Promoter in Public)
INFO@PARASBUILDTECH.COM
NARENDRA SINGH
9711312848 (Number Shared by Promoter in Public)
narendra.singh@parasbuildtech.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
134029427-07-20171670783HDFC BANKHRERA Gurugram
233053417-03-20221948853HDFC BANKHRERA Gurugram
321562221-07-20221400000HDFC BANKHRERA Gurugram
421562321-07-20221086385HDFC BANKHRERA Gurugram







13.762 (Sqr/mtrs)
1.75
1.75
13.762 (Sqr/mtrs)
61/2012
Yes







81201.06 Lakhs
19933 Lakhs
27256.36 Lakhs
7200.17 Lakhs
26811.53 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1SEWAGE AND SOLID WASTE TREATMENT FACILITY0
2AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
3ANY OTHER0
4PLOTS TO BE SOLD0
5LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.8868
6CONSTRUCTION OF ROADS4.00
7PAVEMENTS0
8PARKS AND PLAYGROUNDS1.8533
9GREEN BELTS0
10VEHICLE PARKINGS5.6056
11ELECTRICITY SUB-STATION0.1963
12CLUB HOUSE0.2200
Total13.762




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes
ENVIRONMENTAL CLEARANCESTATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY HARYANAYes
FOREST CLEARANCEDEPUTY COMMISSIONER FORESTYes
POLLUTION HARAYANA STATE POLLUTION CONTROL BOARDYes
FIRE SAFETYCOMMISSIONER MUNICIPAL CORPORATIONYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS295.30SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM412.18SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE106.43SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM750.00SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL157.45SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING21.11SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING90.00SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS10.00SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15CONSTRUCTION OF ROAD352.70SUBMITTED TO TOWN & COUNTRY PLANNING
16ELECTRICAL SUB STATION200.00SUBMITTED TO TOWN & COUNTRY PLANNING
17RAINWATER HARVESTING17.00SUBMITTED TO TOWN & COUNTRY PLANNING
18UGT35.00SUBMITTED TO TOWN & COUNTRY PLANNING
19PARKING3958.00SUBMITTED TO TOWN & COUNTRY PLANNING
20STP45.00SUBMITTED TO TOWN & COUNTRY PLANNING


01-02-2016 (date)
07-10-2016 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER A10386959411
2APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER B2014819619601
3APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER C1932618818711
4APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER D9825757411
5APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER E805810267351
6APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER F53726839291






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
TOWER A94100 %
TOWER B196100 %
TOWER C187100 %
TOWER D74100 %
TOWER E6795 %
TOWER F3995 %


13-06-2012
31-07-2021
31-03-2023
13-06-2012
95
31-03-2023
ANNEXURE-C REP-II


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
13-06-2012
95
31-03-2023
ANNEXURE-C REP-II


1000
63
131
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments25898.35
Shops0
Plots0
Commercial67.21

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments169.24169.24169.24169.24
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments169.24
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements295.30
Water Supply System412.18
Sewerage treatment & garbage disposal157.45
Electricity Supply System625.00
Storm Water Drainage106.43
Parks and Playgrounds10.00
Clubhouse/community centres446.99
Shopping area0
Other0
Commercial Component67.21
Construction of circulation road352.70
Electrical Substation200.00
Parking3958.00
Rainwater Harvesting17.00
Security and Fire Fighting90.00
STP45.80
UGT35.00

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other25.025.025.025.0

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other25.0












Particulars Remarks, if any
i. No. of Flats/Apartments constructed657
ii. No. of Flats/ Apartments booked657
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter1211.1 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter613.8 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter577.3 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter577.3 Lakhs
vii. Amount invested in the project upto the date of application7942.67 Lakhs
Land cost (If any)19933 Lakhs
Apartments25898.35 Lakhs
Infrastructure349.13 Lakhs
EDC/ Taxes Etc.26811.53 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession846.21 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project846.21 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
39219.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 1858.39 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS295.30295.30
II. WATER SUPPLY SYSTEM412.18412.18
III. STORM WATER DRAINAGE106.43106.43
IV. ELECTRICITY SUPPLY SYSTEM750.0625.0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL157.45157.45
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.10.0010.00
XIII. COVERED PARKING3958.003958.00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM90.0090.00
XVII. OTHER FACILITIES AS PER PROJECT REPORT670.81668.11









Yes
Yes
INDUSIND BANK LTD., BLOCK A, G.F., SUSHANT LOK, PHASE-1, TOWER B,MOHALI
25124456100
INDB0000022
110234004
000022
Aman Nagar
FCA SHILPA GUPTA











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ROADS APPROVALS FROM GMDAALREADY BEEN OBTAINED09-05-2022
II. WATER SUPPLY FROM GMDAALREADY BEEN OBTAINED10-12-2018
III. POLLUTION APPROVAL FROM HARYANA STATE POLLUTION CONTROL BOARDALREADY BEEN OBTAINED18-06-2019
IV. ENVIRONMENTAL CLEARANCE FROM STATE ENVIRONMENTAL IMPACT AUTHORITYALREADY BEEN OBTAINED18-06-2019
V. FOREST CLEARANCE FROM DEPUTY COMMISSIONER FORESTALREADY BEEN OBTAINED04-03-2013
VI. FIRE SAFETY FROM COMMISSIONER MUNICIPAL CORPORATIONALREADY BEEN OBTAINED14-09-2018
VII. ELECTRICTITY SUPPLY FROM DHBVNALREADY BEEN OBTAINED26-03-2019
VIII. SEWAGE DISPOSAL FROM GMDAALREADY BEEN OBTAINED17-06-2022








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEIMPORTED MARBLE/VERIFID TILES
2WALL FINISHING DETAILSCERAMIC TILES/PAINT
3KITCHEN DETAILSCERAMIC TILES/PAINT
4BATHROOM FITTINGSCERAMIC TILES
5WOOD WORK ETCLAMINATED WOODEN WORK
6DOORS AND WINDOS FRAMESLAMINATED SHUTTER
7GLASS WORKTOUGHENED GLASS
8ELECTRIC FITTINGSHAVELLS/POLYCAB
9CONDUCTING AND WIRING DETAILSFRLS (HAVELLS/POLYCAB)
10CUPBOARD DETAILSLAMINATED WOODEN WORK
11WATER STORAGEJINDAL TANK
12LIFT DETAILSJOHNSON/THNSSENKPUPP
13EXTERNAL GLAZINGSTEXTURE
13.1WINDOWS/GLAZINGSALLUMINIUM WITH 6MM TOUGHENED GLASS
14DOORSLAMINATED SHUTTER
14.1MAIN DOORSLAMINATED SHUTTER
14.2INTERNAL DOORSLAMINATED SHUTTER
15AIR CONDITIONINGVOLTAS 1-1.5 L
16ELECTRICAL FITTINGSHAVELLS/POLYCAB
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYAIRTEL
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE (ASIAN/BERGER)
20INTERNAL FINISHINGOBD/ PLASTIC EMULSION (ASIAN/ BERGER)
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORBOTTCHINO IMPORTED MARBLE
1 . 2 WALLSASIAN, BERGER PLASTIC EMULSION
1 . 3 CEILINGASIAN, BERGER PLASTIC EMULSION
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORACTION TESSA, LAMINATED WOODEN FLOORING
2 . 2 WALLSASIAN, BERGER PLASTIC EMULSION
2 . 3 CEILINGASIAN, BERGER PLASTIC EMULSION
2 . 4 MODULAR WARDROBESLAMINATED WOODEN
3 . MASTER TOILET
3 . 1 FLOORSOMANI,NITCO, ORIENT,ANTI SKID TILES
3 . 2 WALLSSOMANI,NITCO, ORIENT CERAMIC TILES
3 . 3 CEILINGASIAN,BERGER OIL BASED DISTAMPER
3 . 4 COUNTERSLAMINATED WOODEN
3 . 5 SANITARY WARE/CP FITTINGSISI MARKED(HINDWARE,CERA,SOMANI)
3 . 6 FITTING/FIXTURESISI MARKED
4 . BED ROOMS
4 . 1 FLOORACTION TESSA, LAMINATED WOODEN FLOORING
4 . 2 WALLSASIAN, BERGER PLASTIC EMULSION
4 . 3 CEILINGASIAN, BERGER PLASTIC EMULSION
4 . 4 WARDROBESLAMINATED WOODEN
5 . TOILET
5 . 1 FLOORSOMANI,NITCO, ORIENT,ANTI SKID TILES
5 . 2 WALLSSOMANI,NITCO, ORIENT CERAMIC TILES
5 . 3 CEILINGASIAN,BERGER OIL BASED DISTAMPER
5 . 4 COUNTERSLAMINATED WOODEN
5 . 5 SANITARY WARE/CP FITTINGSISI MARKED(HINDWARE,CERA,SOMANI)
5 . 6 FIXTURESISI MARKED
6 . KITCHEN
6 . 1 FLOORSOMANI,NITCO, ORIENT,ANTI SKID TILES
6 . 2 WALLSSOMANI,NITCO, ORIENT CERAMIC TILES/PAINT
6 . 3 CEILINGASIAN,BERGER OIL BASED DISTAMPER
6 . 4 COUNTERSISI MARKED(SOMANI)
6 . 5 FIXTURESISI MARKED(SOMANI)
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORSOMANI,NITCO, ORIENT,ANTI SKID TILES
7 . 2 WALLS & CEILINGSOMANI,NITCO, ORIENT CERAMIC TILES AND OIL BON DDISTEMPER
7 . 3 TOILETSOMANI
7 . 4 BALCONYSOMANI,NITCO, ORIENT,ANTI SKID TILES
8 . SIT-OUTS
8 . 1 FLOORSOMANI,NITCO, ORIENT,ANTI SKID TILES
8 . 2 WALLS & CEILINGASIAN, BERGER TEXTURE
8 . 3 RAILINGSALLUMINIUM
8 . 4 FIXTURESISI MARKED












Sr. No.Document DescriptionDate of Document UploadView Document
1A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS28-02-2020 View Document
2LOI- DEWS28-02-2020 ------
3SERVICE PLAN-SEWER DRAINAGE LAYOUT28-02-2020 ------
4DEMARCATION PLAN28-02-2020 View Document
5BASEMENT PLAN-A 2ND FLOOR PLAN28-02-2020 ------
6NURSERY SCHOOL-128-02-2020 ------
7SHOPPING-228-02-2020 ------
8AIRPORT CLEARANCE-DEWS28-02-2020 ------
9SECTION Y-Y, TOWER-D28-02-2020 ------
10ZONING PLAN28-02-2020 View Document
11CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT28-02-2020 View Document
12AUTHORIZED SIGNATORY FOR BANK- DEWS28-02-2020 ------
13ENVIRONMENT CLEARANCE-DEW28-02-2020 ------
14BASEMENT PLAN-A 1ST FLOOR PLAN28-02-2020 ------
15FIRE NOC EWS (BLOCK-D)-DEWS28-02-2020 ------
16REP-I- DEWS28-02-2020 ------
17COMMUNITY BUILDING-28-02-2020 ------
18ELEVATION 2-2 , TOWER-B28-02-2020 ------
19LC-IV28-02-2020 ------
20RERA REGISTRATION CERTIFICATE PARAS DEW28-02-2020 ------
21SERVICE PLAN-FIRE FIGHTING & ROAD LAYOUT28-02-2020 ------
22ELEVATION-B, TOWER-D28-02-2020 ------
23GROUND FLOOR PLAN & AREA, TOWER-B28-02-2020 ------
24SERVICE ESTIMATES-APPROVAL LETTER 28-02-2020 ------
25COMMUNITY BUILDING28-02-2020 ------
26ELEVATION-A, TOWER-D28-02-2020 ------
27ELEVATION-C, TOWER-D28-02-2020 ------
28SERVICE PLAN-GARDEN HYDRANT LAYOUT28-02-2020 ------
29ELEVATION-D, TOWER-D28-02-2020 ------
30SECTION X-X, TOWER-B28-02-2020 ------
31AIRPORT CLEARANCE-DEWS (RENEWAL)28-02-2020 ------
32SITE PLAN28-02-2020 ------
33SERVICE PLAN- WATER SUPPLY-FLUSHING28-02-2020 ------
34SERVICRE PLAN- STROM DRAINAGE LAYOUT28-02-2020 ------
35ELEVATION 2-2, TOWER-A28-02-2020 ------
36EWS BLOCK-A, FLOOR PLAN & SECTION28-02-2020 ------
37EWS BLOCK-B, FLOOR PLAN & SECTION28-02-2020 ------
38EWS BLOCK-D, FLOOR PLAN & SECTION28-02-2020 ------
39FOREST NOC-DEWS28-02-2020 ------
40EWS BLOCK-E, FLOOR PLAN & SECTION28-02-2020 ------
41TYPICAL FLOOR PLAN & AREA, TOWER-B28-02-2020 ------
42GROUND & TYPICAL FLOOR 1ST TO 5TH28-02-2020 ------
43GROUND, TYPICAL FLOOR PLAN & AREA, TOWER-D28-02-2020 ------
44PENT HOUSE FLOOR PLAN TOWER-A28-02-2020 ------
45SECTION X-X , TOWER-A28-02-2020 ------
46SECTION X-X, TOWER-D28-02-2020 ------
47TERRACE FLOOR PLAN, TOWER-B28-02-2020 ------
48TYPICAL FLR 6TH TO 23RD FLOOR & TERRACE FLOOR PLAN, TOWER-A28-02-2020 ------
49SITE PLAN28-02-2020 ------
50ELEVATION 1-1, TOWER-A28-02-2020 ------
51EWS BLOCK-C, FLOOR PLAN & SECTION28-02-2020 ------
52ELEVATION 1-1, TOWER-B28-02-2020 ------
53FIRE NOC-DEWS28-02-2020 ------
54SERVICE ESTIMATES-BOOKLET28-02-2020 ------
55NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT24-01-2020 View Document
56ALOTTMENT LETTER25-01-2020 ------
57DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.20-01-2020 View Document
58RENEWAL LICENSE COPY20-01-2020 ------
59COPY OF LICENSE ALONG WITH SCHEDULE OF LAND20-01-2020 View Document
60IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN25-01-2020 View Document
61IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN25-01-2020 View Document
62AAI RENEWAL-TILL 05.12.19 SEPSET26-10-2022 ------
63APPROVAL OF SERVICE ESTIMATES26-10-2022 ------
64BOOKLET- SERVICE ESTIMATES-DEWS26-10-2022 ------
65LC-IV & LC-IVA-BILATERAL AGREEMENT-DEWS26-10-2022 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 Extension No. 05 of 2022 28-11-2022 View Document
2 OC uploaded 04-08-2023 View Document