H-334, GROUND FLOOR, NEW RAJINDER NAGAR, NEW DELHI-60
01128744111
8743991222 (Number Shared by Promoter in Public)
monikaproperty@rediffmail.com
XXXX074F
U70101DL1997PTC088463
TAPASYA ONE
SECTOR 53 WAZIRABAD GURUGRAM
WAZIRABAD ST
GURUGRAM
01242577988
9971798255 (Number Shared by Promoter in Public)
monikaproperty@rediffmail.com
JAY SHANKAR PRASAD
01242577988
9971798255 (Number Shared by Promoter in Public)
jay.shankar@tapasyagroup.in
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
57559
26-07-2017
226100
KOTAK MAHINDRA BAK LTD
HRERA Gurugram
2
74898
31-07-2017
226010
KOTAK MAHINDRA BANK LTD.
HRERA Gurugram
3
99736
14-02-2020
339070
KOTAK MAHINDRA BANK LTD.
HRERA Gurugram
3.1918 (Acre)
1.75
1.749
3.1918 (Acre)
5 OF 2001(31.08.2001) AND 115 OF 2004(27.07.2004)
Yes
17700 Lakhs
106.10 Lakhs
12743.53 Lakhs
256.47 Lakhs
4593.90 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
5163.535
3
CONSTRUCTION OF ROADS
2718.00
4
PAVEMENTS
1030.135
5
PARKS AND PLAYGROUNDS
2311.82
6
GREEN BELTS
943.17
7
VEHICLE PARKINGS
750.00
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
Total
12916.66
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HUDA
Yes
WATER SUPPLY
HUDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
HPCB/HUDA
Yes
STORM WATER DRAINAGE
PUBLIC HEALTH
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
44.85
SUBMITTED TO HUDA
2
WATER SUPPLY SYSTEM
89.64
SUBMITTED TO HUDA
3
STORM WATER DRAINAGE
19.28
SUBMITTED TO HUDA
4
ELECTRICITY SUPPLY SYSTEM
0
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
21.90
SUBMITTED TO HUDA
6
STREET LIGHTING
5.88
SUBMITTED TO HUDA
7
SECURITY AND FIRE FIGHTING
0
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
0
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
15
HORTICULTURE
2.07
SUBMITTED TO HUDA
16
MTC OF SERVICES AND RESURFACING OF ROADS
72.85
SUBMITTED TO HUDA
16-08-2016 (date)
16-08-2016 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER A
13351
76
2
0
1
2
APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER B
5189
6
0
0
1
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
TOWER A
2
0
TOWER B
0
0
10-04-2008
30-06-2023
30-06-2023
14-04-2018
80
30-06-2023
FURTHER DETAILS IS PROVIDED IN REP-1 PART-C-X
TOWER - B COMPLETED.
APPROX 80 % OF CIVIL WORK HAS BEEN COMPLETED AND REMAINING 20% OF CIVIL WORK TO BE COMPLETED AFTER THE MECHANICAL, ELECTRICAL, PLUMBING (MEP) SERVICES, FIRE FIGHTING SYSTEM AND INFRASTRUCTURE LIKE GENERATOR, LIFTS, ESCALATORS ARE INSTALLED IN TOWER - A.
PARTIALLY OC OF TOWER B AND TOWER A RECEIVED.
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
NOT APPLICABLE
10-04-2008
0
30-06-2023
NOT APPLICABLE
NOT APPLICABLE
0
0
724
60
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Construction Cost
6653.61
EDC IDC
321.87
Infrastructure Cost
133.90
Land Cost
106.10
Others Cost including taxes levies etc
3063.95
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
Others Cost including taxes levies etc
48.32
Construction Cost
243.60
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Others Cost including taxes levies etc
66.44
12.08
18.12
42.28
Construction Cost
334.95
60.90
91.35
213.15
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Construction Cost
913.49
334.95
304.50
608.99
Others Cost including taxes levies etc
181.21
66.44
60.40
120.81
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Others Cost including taxes levies etc
60.40
181.21
181.21
108.73
Construction Cost
304.50
913.49
913.49
548.09
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
Others Cost including taxes levies etc
60.40
Construction Cost
304.50
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
23.42
Water Supply System
46.80
Sewerage treatment & garbage disposal
11.43
Electricity Supply System
0
Storm Water Drainage
10.07
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Horticulture and Road side Plantation
1.08
MTC of Services and Resurfacing of Roads
38.03
Street Lighting
3.07
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0.32
Water Supply System
0.64
Sewerage treatment & garbage disposal
0.16
Electricity Supply System
0
Storm Water Drainage
0.14
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Street Lighting
0.05
Horticulture and Road side Plantation
0.01
MTC of Services and Resurfacing of Roads
0.52
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0.96
0.21
0.32
0.86
Water Supply System
1.93
0.43
0.64
1.71
Sewerage treatment & garbage disposal
0.47
0.10
0.16
0.42
Electricity Supply System
0
0
0
0
Storm Water Drainage
0.41
0.09
0.14
0.37
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
MTC of Services and Resurfacing of Roads
1.57
0.35
0.52
1.39
Street Lighting
0.13
0.05
0.05
0.11
Horticulture and Road side Plantation
0.04
0.01
0.01
0.04
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
2.57
1.18
1.07
3.21
Water Supply System
5.14
2.36
2.14
6.43
Sewerage treatment & garbage disposal
1.26
0.58
0.52
1.57
Electricity Supply System
0
0
0
0
Storm Water Drainage
1.11
0.51
0.46
1.38
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
MTC of Services and Resurfacing of Roads
4.18
1.91
1.74
5.22
Horticulture and Road side Plantation
0.12
0.05
0.05
0.15
Street Lighting
0.34
0.15
0.15
0.42
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
1.07
3.21
3.21
2.14
Water Supply System
2.14
6.43
6.43
4.28
Sewerage treatment & garbage disposal
0.52
1.57
1.57
1.05
Electricity Supply System
0
0
0
0
Storm Water Drainage
0.46
1.38
1.38
0.92
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Horticulture and Road side Plantation
0.05
0.15
0.15
0.10
Street Lighting
0.15
0.42
0.42
0.28
MTC of Services and Resurfacing of Roads
1.74
5.22
5.22
3.48
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
1.07
Water Supply System
2.14
Sewerage treatment & garbage disposal
0.52
Electricity Supply System
0
Storm Water Drainage
0.46
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
MTC of Services and Resurfacing of Roads
1.74
Horticulture and Road side Plantation
0.05
Street Lighting
0.15
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
82
As on 31.12.2019
ii. No. of Flats/ Apartments booked
2
As on 31.12.2019
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
2900 Lakhs
As on 31.12.2019
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
2650 Lakhs
As on 31.12.2019
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
250 Lakhs
As on 31.12.2019
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
250 Lakhs
As on 31.12.2019
vii. Amount invested in the project upto the date of application
10279.43 Lakhs
As on 31.12.2019
Land cost (If any)
106.10 Lakhs
As on 31.12.2019
Apartments
6653.61 Lakhs
As on 31.12.2019
Infrastructure
133.90 Lakhs
As on 31.12.2019
EDC/ Taxes Etc.
3385.82 Lakhs
As on 31.12.2019
viii. Balance cost to be incurred for completion of the project and delivery of possession
7420.57 Lakhs
As on 31.12.2019
(a) In respect of existing allottees
250 Lakhs
As on 31.12.2019
(b) In respect of rest of the project
7670.57 Lakhs
As on 31.12.2019
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
3835.00 Lakhs
As on 31.12.2019
x. Total liabilities against the project up-to-date. (Annex details in folder C)
2682.67 Lakhs
As on 31.12.2019
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
44.85
23.42
II. WATER SUPPLY SYSTEM
89.64
46.80
III. STORM WATER DRAINAGE
19.28
10.07
IV. ELECTRICITY SUPPLY SYSTEM
0
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
21.90
11.43
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
80.8
42.18
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
0
0
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
0
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
0
0
Yes
Yes
KOTAK MAHINDRA BANK, 79, OLD RAJINDER NAGAR MARKET, NEW DELHI-60
01792560000013
KKBK0000179
110485010
000179
Som Arora, Address: 50-51, Shivaji Marg, Westend Green Farm Society, Rajokari, New Delhi-110038
UPLOADED
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. APPROVED ZOING PLAN
ALREADY BEEN OBTAINED
26-04-2006
II. ENVIRONMENT CLEARANCE
ALREADY BEEN OBTAINED
20-08-2018
III. CERTIFICATE OF REGISTRATION ISSUED BY THE LABOUR COMMISSIONER HARYANA & REGISTERING OFFICER, LABOUR DEPARTMENT HARYANA
ALREADY BEEN OBTAINED
01-01-2016
IV. BOCW REGISTRATION ISSUED BY THE ASSISTANT DIRECTOR (IS& H) GURUGRAM -II, REGISTRATION OFFICER CUM ASSESSING AUTHORITY , GOVERNMENT OF HARYANA
ALREADY BEEN OBTAINED
18-01-2018
V. NOC FROM POLLUTION BOARD
ALREADY BEEN OBTAINED
29-08-2017
VI. NOC FROM FOREST DEPT.
ALREADY BEEN OBTAINED
28-10-2015
VII. ARAVALI NOTIFICATION
ALREADY BEEN OBTAINED
24-11-2015
VIII. ASSURANCE LETTER FOR ELECTRICITY DEPARTMENT
ALREADY BEEN OBTAINED
13-02-2017
IX. NOC FROM HUDA FOR CONSTRUCTION
ALREADY BEEN OBTAINED
06-10-2010
X. NOC FROM AIRPORTS AUTHORITY
ALREADY BEEN OBTAINED
30-01-2019
Yes
Yes
Possession Date: June, 2023
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
GF CENTRAL PLAZA - PAVERS/ TILES, COMMON TOILETS -
VITRIFIED / CERAMIC TILES, CORRIDORS / PASSAGE - VITRIFIED /
CERAMIC TILES, RETAIL SHOPS - BARE SHELL, COMMON
STAIRCASE - KOTA STONE.
2
WALL FINISHING DETAILS
PLASTERED WALLS IN SHOP
3
KITCHEN DETAILS
KOTA IN FLOORING AND SINK
4
BATHROOM FITTINGS
SINGLE LEVER C.P. FITTINGS, EWC, HEALTH FAUCET, WASH
BASIN.
5
WOOD WORK ETC
N/A
6
DOORS AND WINDOS FRAMES
N/A
7
GLASS WORK
N/A
8
ELECTRIC FITTINGS
BRANDED MODULAR SWITCHES AND SOCKETS.
9
CONDUCTING AND WIRING DETAILS
COPPER WIRING
10
CUPBOARD DETAILS
N/A
11
WATER STORAGE
WATER TANK UNDERGROUND + OVERHEAD ( 6.5 KLD)
12
LIFT DETAILS
3 LIFTS IN TOWER B OPERATIONAL. MAKE MITSUBISHI, SPEED 1.5 M/SEC.
13
EXTERNAL GLAZINGS
DGU IN THE EXTERNAL FACADE IN TOWER B
13.1
WINDOWS/GLAZINGS
UPVC/ALUMINIUM SLIDING SWING GLASS SHUTTER
14
DOORS
N/A
14.1
MAIN DOORS
N/A
14.2
INTERNAL DOORS
N/A
15
AIR CONDITIONING
VRV SYSTEM IN TOWER B.
TOWER A YET TO BE PLANNED.
16
ELECTRICAL FITTINGS
BRANDED MODULAR SWITCHES AND SOCKETS. COPPER
WIRING
17
CNG PIPE LINE
PNG BEING PROVIDED IN TOWER B
18
PROVISION OF WIFI AND BROADBAND FACILITY
N/A
19
EXTERNAL FINISHING/COLOUR SCHEME
EXTERNAL FACADE IS OF DRU IN TOWER B
20
INTERNAL FINISHING
PLASTER WITH PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
N/A
1 . 2
WALLS
N/A
1 . 3
CEILING
N/A
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
N/A
2 . 2
WALLS
N/A
2 . 3
CEILING
N/A
2 . 4
MODULAR WARDROBES
N/A
3 . MASTER TOILET
3 . 1
FLOOR
N/A
3 . 2
WALLS
N/A
3 . 3
CEILING
N/A
3 . 4
COUNTERS
N/A
3 . 5
SANITARY WARE/CP FITTINGS
N/A
3 . 6
FITTING/FIXTURES
N/A
4 . BED ROOMS
4 . 1
FLOOR
N/A
4 . 2
WALLS
N/A
4 . 3
CEILING
N/A
4 . 4
WARDROBES
N/A
5 . TOILET
5 . 1
FLOOR
N/A
5 . 2
WALLS
N/A
5 . 3
CEILING
N/A
5 . 4
COUNTERS
N/A
5 . 5
SANITARY WARE/CP FITTINGS
N/A
5 . 6
FIXTURES
N/A
6 . KITCHEN
6 . 1
FLOOR
N/A
6 . 2
WALLS
N/A
6 . 3
CEILING
N/A
6 . 4
COUNTERS
N/A
6 . 5
FIXTURES
N/A
6 . 6
KITCHEN APPLIANCES
N/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
N/A
7 . 2
WALLS & CEILING
N/A
7 . 3
TOILET
N/A
7 . 4
BALCONY
N/A
8 . SIT-OUTS
8 . 1
FLOOR
ANTI-SKID CERAMIC TILES/ VITRIFIED
8 . 2
WALLS & CEILING
N/A
8 . 3
RAILINGS
N/A
8 . 4
FIXTURES
N/A
Sr. No.
Document Description
Date of Document Upload
View Document
1
DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT