VATIKA EXPRESS CITY - XPRESSIONS (PHASE-I)
SECTOR-88A & 88B
KADIPUR ST
GURUGRAM
0000000000
9212481475 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
JITENDRA KUMAR
0000000000
9212481475 (Number Shared by Promoter in Public)
vatika.rera@vatikagroup.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
Address K-26, VASANT KUNJ ROAD, MAHIPALPUR, NEW DELHI
Annexure-B- COLLABORATION AGREEMENTS, REVENUE RECORDS ETC.
BEFORE THE GRANT OF LICENSES
Yes
PROVIDED
No
Yes
Yes
12464.29 Lakhs
637.78 Lakhs
9114.75 Lakhs
885.25 Lakhs
1826.51 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
20.14091
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
0
3
CONSTRUCTION OF ROADS
19.47
4
PAVEMENTS
6.49
5
PARKS AND PLAYGROUNDS
6.05
6
GREEN BELTS
1.21
7
VEHICLE PARKINGS
0
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0.5
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
13
BUILT
8.71
14
BOOTHS
0.054
15
AMENITY
3.12
16
AREA
30.96
Total
96.70491
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HUDA/HSVP
No
WATER SUPPLY
HUDA/HSVP
No
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
HUDA/HSVP
No
STORM WATER DRAINAGE
HUDA/HSVP
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
239.02
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
79.67
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
97.38
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
132.79
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
79.67
AS PER PROJECT REPORT
6
STREET LIGHTING
61.97
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
26.56
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
44.26
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
0
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
15
RAIN WATER HARVESTING
26.56
AS PER PROJECT REPORT
16
ELECTRICAL SUB STATION
97.38
AS PER PROJECT REPORT
05-05-2016 (date)
05-05-2016 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEXURE-22
35236.56
384
258
126
0
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
ANNEXURE-22
258
ANNEXURE-22
07-05-2016
30-07-2020
30-07-2020
07-05-2016
58
30-07-2020
PROVIDED
PROVIDED
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
07-05-2016
58
30-07-2020
PROVIDED
PROVIDED
0
0
680
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
1293.32
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
267.00
255.00
Shops
0
0
Plots
0
0
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
223.00
269.00
278.00
233.65
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
5.20
7.83
75.79
290.00
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1500.00
2000.00
2416.96
0
Shops
0
0
0
0
Plots
0
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
27.76
Water Supply System
18.50
Sewerage treatment & garbage disposal
18.50
Electricity Supply System
15.42
Storm Water Drainage
22.62
Parks and Playgrounds
2.06
Clubhouse/community centres
0
Shopping area
0
Other
0
Electrical Sub station
4.52
Rain Water Harvesting
2.47
Security and fire fighting
1.23
Street lighting
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
5.50
7.50
Water Supply System
2.00
2.00
Sewerage treatment & garbage disposal
2.00
2.00
Electricity Supply System
1.50
1.50
Storm Water Drainage
3.00
3.00
Parks and Playgrounds
0
0
Clubhouse/community centres
0
0
Shopping area
0
0
Other
0
0
Street lighting
0
0
Electrical Sub station
4.00
4.00
Security and fire fighting
0
0
Rain Water Harvesting
0
0
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
8.00
4.00
5.00
8.00
Water Supply System
2.00
2.00
2.00
2.00
Sewerage treatment & garbage disposal
2.00
2.00
2.00
2.00
Electricity Supply System
1.50
1.50
1.50
1.50
Storm Water Drainage
3.00
3.00
3.00
3.00
Parks and Playgrounds
1.00
0
0
1.00
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street lighting
0
0
0
0
Security and fire fighting
1.00
0
0
1.00
Rain Water Harvesting
1.00
0
0
1.00
Electrical Sub station
3.50
3.50
3.50
3.50
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
1.66
0.60
1.66
1.00
Water Supply System
0
0
0
1.00
Sewerage treatment & garbage disposal
0
0
0
1.00
Electricity Supply System
1.00
0
1.00
1.00
Storm Water Drainage
0
0
0
1.00
Parks and Playgrounds
1.00
0
1.00
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Electrical Sub station
1.00
0
1.00
1.00
Rain Water Harvesting
0
0
0.27
0
Street lighting
0
0
0
1.00
Security and fire fighting
1.00
0
1.00
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
37.80
66.17
64.37
Water Supply System
3.53
22.06
22.58
Sewerage treatment & garbage disposal
3.53
22.06
22.58
Electricity Supply System
30.97
36.76
37.64
Storm Water Drainage
1.20
26.96
27.60
Parks and Playgrounds
7.00
13.22
17.99
Clubhouse/community centres
0
0
0
Shopping area
0
0
0
Other
0
0
0
Security and fire fighting
5.75
8.05
7.53
Electrical Sub station
13.30
26.96
27.60
Rain Water Harvesting
6.94
7.35
7.53
Street lighting
29.98
15.49
15.49
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
384
To be Constructed
ii. No. of Flats/ Apartments booked
258
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
26728.86 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
5333.82 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
21395.04 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
21395.04 Lakhs
vii. Amount invested in the project upto the date of application
3641.06 Lakhs
Land cost (If any)
637.78 Lakhs
Apartments
1293.32 Lakhs
Infrastructure
113.08 Lakhs
EDC/ Taxes Etc.
1596.88 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
8823.23 Lakhs
(a) In respect of existing allottees
5928.11 Lakhs
(b) In respect of rest of the project
2895.12 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
1358.00 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
1358.00 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
239.0
27.8
II. WATER SUPPLY SYSTEM
79.7
18.5
III. STORM WATER DRAINAGE
97.4
22.6
IV. ELECTRICITY SUPPLY SYSTEM
132.8
15.4
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
0
0
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
44.3
2.1
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
26.6
1.2
XVII. OTHER FACILITIES AS PER PROJECT REPORT
265.6
25.5
Yes
Yes
HDFC BANK LTD., ADDRESS: FIP, M.G. ROAD , GURUGRAM HARYANA-122002
57500000115574
HDFC0000280
110240037
0280
1. Mr. Anil Bhalla
Address: Hyde Park, Prakrati Marg, Sultanpur Farms, Gadaipur, South Delhi, Delhi 110030.
2. Mr. Gautam Bhalla
Address: LCG05 PHB, The Laburnam,
Nathupur (67),
Nathupur Gurgaon,
Gurgaon, Haryana 122002.
3. Mr. K.V. George
Address: Flat No. 1504, Mohinder Apartment, Plot No 17, Sector 12, Dwarka, South West Delhi, Delhi 110075.
4. Mrs. Veena Bhoomia
Address: C1/577B,Rear Block,
1st Floor, Near Euro Kids School,
Palam Vihar,Choma (62), Gurgaon,
Haryana-122017.
Uploaded
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. LAY OUT PLAN
ALREADY BEEN OBTAINED
05-05-2016
Yes
Yes
SOVEREIGN NEXT (PHASE - I) SECTOR-82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA
34519.201
151
0
81
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
18175.00
18175.00
9849.29
Cost of the apartments
10350.00
10350.00
5266.00
Cost of the infrastructure
1150.00
1150.00
585.00
Others costs
6675.00
6675.00
3998.29
7602.94 Lakhs
4179.31 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
30-07-2022
30-07-2022
TURNING POINT (PHASE - I) SECTOR 88B, VILLAGE HARSARU, SUB-TEHSIL HARSARU, DISTRICT GURUGRAM, STATE HARYANA
93588.71
703
0
99
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
33415.00
33415.00
4081.38
Cost of the apartments
25200.00
25200.00
453.31
Cost of the infrastructure
2800.00
2800.00
50.00
Others costs
5415.00
5415.00
3578.07
975.94 Lakhs
7752.46 Lakhs
15000.00 Lakhs
15000.00 Lakhs
No
30-01-2025
30-01-2025
TOWN SQUARE (BLOCK-D) SECTOR 82A, VILLAGE SHIKOHPUR, TEHSIL MANESAR, DISTRICT GURUGRAM, STATE HARYANA
13809.560
188
0
22
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
10586.00
10586.00
9646.93
Cost of the apartments
4500.00
4500.00
3835.50
Cost of the infrastructure
500.00
500.00
426.00
Others costs
5586.00
5586.00
5385.43
486.26 Lakhs
798.92 Lakhs
14600.00 Lakhs
14600.00 Lakhs
No
30-07-2018
30-07-2018
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
REFER SECTION BELOW
2
WALL FINISHING DETAILS
REFER SECTION BELOW
3
KITCHEN DETAILS
REFER SECTION BELOW
4
BATHROOM FITTINGS
REFER SECTION BELOW
5
WOOD WORK ETC
NOT APPLICABLE
6
DOORS AND WINDOS FRAMES
ALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS
7
GLASS WORK
NOT APPLICABLE
8
ELECTRIC FITTINGS
IS COMPLIANT MODULAR SWITCHES / SOCKETS, SWITCHGEAR AND DISTRIBUTION BOXES FROM REPUTED MAKES AND BRAND
9
CONDUCTING AND WIRING DETAILS
IS COMPLIANT COPPER WIRING IN CONCEALED CONDUITS. ADEQUATE PROVISION FOR LIGHT POINTS, FAN POINTS, RECEPTACLES AND POWER POINTS IN ALL ROOMS
10
CUPBOARD DETAILS
NOT APPLICABLE
11
WATER STORAGE
OHT
12
LIFT DETAILS
ELEVATOR ACCESS FOR APARTMENTS FROM STILT LEVEL
13
EXTERNAL GLAZINGS
NA
13.1
WINDOWS/GLAZINGS
ALUMINUM OR UPVC FRAME WINDOWS WITH CLEAR GLASS
14
DOORS
NA
14.1
MAIN DOORS
COMPOSITE DOOR WITH LOCKS, HANDLES AND KNOBS FROM REPUTED MAKES AND BRANDS
14.2
INTERNAL DOORS
COMPOSITE DOOR WITH HANDLES AND KNOBS FROM REPUTED MAKES AND BRANDS
15
AIR CONDITIONING
NOT APPLICABLE
16
ELECTRICAL FITTINGS
REFER SECTION ABOVE
17
CNG PIPE LINE
NOT APPLICABLE
18
PROVISION OF WIFI AND BROADBAND FACILITY
NOT APPLICABLE
19
EXTERNAL FINISHING/COLOUR SCHEME
EXTERNAL GRADE ANTI FUNGAL / ANTI ALGAL PAINT FROM REPUTED MAKES AND BRANDS
20
INTERNAL FINISHING
REFER SECTION BELOW
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
HIGH QUALITY, ABRASION RESISTANT MATT FINISHED VITRIFIED TILES
1 . 2
WALLS
EMULSION PAINT ON PLASTERED WALL
1 . 3
CEILING
OBD ON PLASTER
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
WOODEN LAMINATED FLOORING
2 . 2
WALLS
PREMIUM EMULSION PAINT ON PLASTERED WALL
2 . 3
CEILING
OBD ON PLASTER
2 . 4
MODULAR WARDROBES
NOT APPLICABLE
3 . MASTER TOILET
3 . 1
FLOOR
MATT FINISHED/ANTI-SKID CERAMIC TILES
3 . 2
WALLS
GLAZED / MATT FINISHED CERAMIC WALL TILES UP TO DADO LEVEL. EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL
3 . 3
CEILING
OBD ON PLASTER
3 . 4
COUNTERS
NOT APPLICABLE
3 . 5
SANITARY WARE/CP FITTINGS
WASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
3 . 6
FITTING/FIXTURES
BASIN MIXER, SHOWER MIXER - DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
4 . BED ROOMS
4 . 1
FLOOR
WOODEN LAMINATED FLOORING
4 . 2
WALLS
PREMIUM EMULSION PAINT ON PLASTERED WALL
4 . 3
CEILING
OBD ON PLASTER
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
MATT FINISHED/ANTI-SKID CERAMIC TILES
5 . 2
WALLS
GLAZED / MATT FINISHED CERAMIC WALL TILES UP TO DADO LEVEL. EMULSION ON PLASTERED SURFACES ABOVE DADO LEVEL
5 . 3
CEILING
OBD ON PLASTER
5 . 4
COUNTERS
NOT APPLICABLE
5 . 5
SANITARY WARE/CP FITTINGS
WASH BASIN AND EUROPEAN WATER CLOSET (EWC) OF REPUTED MAKES AND BRANDS
5 . 6
FIXTURES
BASIN MIXER, SHOWER MIXER - DIVERTER WITH BATH SPOUT AND OVERHEAD SHOWER, HEALTH FAUCET ALONG WITH NECESSARY ANGLE VALVES ETC. OF REPUTED MAKES AND BRANDS
6 . KITCHEN
6 . 1
FLOOR
MATT FINISHED CERAMIC TILES
6 . 2
WALLS
2’ HIGH CERAMIC TILES DADO ABOVE COUNTER LEVEL. PREMIUM EMULSION ON PLASTER IN REMAINING AREAS
6 . 3
CEILING
OBD ON PLASTER
6 . 4
COUNTERS
NOT APPLICABLE
6 . 5
FIXTURES
DOUBLE BOWL SINK, MIXER WITH PLUMBING AND ELECTRICAL POINTS FOR GEYSER, WATER PURIFIER
6 . 6
KITCHEN APPLIANCES
NOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
MATT FINISHED CERAMIC TILES
7 . 2
WALLS & CEILING
PAINT ON PLASTER
7 . 3
TOILET
MATT FINISHED CERAMIC TILES ON FLOOR, DADO OF GLAZED / MATT FINISHED CERAMIC WALL TILES
7 . 4
BALCONY
MATT FINISHED / ANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1
FLOOR
MATT FINISHED CERAMIC TILES
8 . 2
WALLS & CEILING
EXTERIOR GRADE PAINT ON PLASTER
8 . 3
RAILINGS
MS
8 . 4
FIXTURES
NOT APPLICABLE
Sr. No.
Document Description
Date of Document Upload
View Document
1
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT