HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2053-2025
Submission Date : 25-09-2025 03:25:21 PM
Applicant Type : Company
Project Type: NEW




EMAAR INDIA LIMITED
EMAAR BUSINESS PARK, MG ROAD, SIKANDERPUR, SECTOR -28, GURUGRAM-122001
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
Https://in.emaar.com/en/
XXXX308B
U45201DL2005PLC133161
 
 


 
 


 
 


 
 


 
 


 
 


 
 







SERENITY HILLS (PHASE-2)
SECTOR 86, GURUGRAM, HARYANA
MANESAR
GURUGRAM
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae
MANOJ SHARMA
01244421155
8448295834 (Number Shared by Promoter in Public)
coordination.in@emaar.ae








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
193408318-09-20251645000HSBC BANKHRERA Gurugram







7.213 (Acre)
1.41
1.41
25.90 (Acre)
License No. 10 of 2025 dated 16.01.2025 validity up to 15.01.2030 and License No. 75 of 2025 dated 22.05.2025 validity upto 21.05.2030
No
Address     H-38, GROUND FLOOR, M2K, WHITE HOUSE, SECTOR 57, GURUGRAM, HARYANA
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Address     306-308, SQUARE-ONE, C-2, DISTRICT CENTRE, SAKET, NEW DELHI-110017
Annexure-B- DEVELOPER
BY VIRTUE OF COLLABORATION AGREEMENT
Yes
THE DEVELOPER SHALL PERFORM ITS OBLIGATIONS IN A TIMELY AND ORDERLY MANNER IN ACCORDANCE WITH THE TERMS OF THIS AGREEMENT AND SHALL ENSURE MATERIAL COMPLIANCE WITH ALL APPLICABLE LAWS AND REGULATIONS INCLUDING THE RERA ACT, THE HRERA RULES AND IN THE PERFORMANCE OF ITS OBLIGATION UNDER THIS AGREEMENT AND THEREAFTER, UNLESS SUCH PERFORMANCE OF ITS OBLIGATION UNDER THIS AGREEMENT AND THEREAFTER, UNLESS SUCH PERFORMANCE IS HINDERED FOR REASONS ATTRIBUTABLE TO PIPL.
No
Yes
Yes







158021.79 Lakhs
75958.28 Lakhs
64663.46 Lakhs
1780.86 Lakhs
15619.19 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.581
3CONSTRUCTION OF ROADS 0.960
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 5.60
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13AREAUNDERBOUNDARYWALL 0.01
14AREAUNDERTOWERDROPOFFS 0.063
Total7.214




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNNo
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS283.16AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM295.49AS PER PROJECT REPORT
3STORM WATER DRAINAGE33.84AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM65.24AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL60.88AS PER PROJECT REPORT
6STREET LIGHTING61AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING51AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS66.21AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15RAIN WATER HARVESTING43.33AS PER PROJECT REPORT
16ELECTRICAL SUBSTATION264.28AS PER PROJECT REPORT
17ELECTRIFICATION COST151.33AS PER PROJECT REPORT
18STP136.13YET TO BE PREPARED
19UNDERGROUND WATER TANK71.24YET TO BE PREPARED
20PARKING204.17YET TO BE PREPARED


25-09-2025 (date)
25-09-2025 (date)
16-10-2025
30-09-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings146.39363
Apartment/Shops/Other Buildings146.46343
Apartment/Shops/Other Buildings113.1843
Apartment/Shops/Other Buildings113.26653
Apartment/Shops/Other Buildings113.0943
Apartment/Shops/Other Buildings113.18123
Apartment/Shops/Other Buildings113.18563
Apartment/Shops/Other Buildings146.46663
Apartment/Shops/Other Buildings113.26653
Apartment/Shops/Other Buildings113.1843
Apartment/Shops/Other Buildings146.39363
Apartment/Shops/Other Buildings146.46343





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Land281.27

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00104.331650.98
Shops0000
Plots0000
Land0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3249.791157.522353.104653.27
Shops0000
Plots0000
Land10203.463779.061889.5311337.18

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4823.102493.073824.524831.42
Shops0000
Plots0000
Land018895.3000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3175.413163.785563.052294.98
Shops0000
Plots0000
Land0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3172.102608.87496.1121285.73
Shops0000
Plots0000
Land0018895.300

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1985.421618.591290.741587.76
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments354.45708.94701.851014.90
Shops0000
Plots0000
Land0007558.12

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments13.5321.16
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
UNDERGROUND WATER TANK4
ELECTRIFICATION COST8
ELECTRIFICATION STATION13
RAIN WATER HARVESTING2
STP MEP PART7

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements001428
Water Supply System00044
Sewerage treatment & garbage disposal0008
Electricity Supply System0000
Storm Water Drainage0005
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
ELECTRIFICATION SUB STATION2681313
RAIN WATER HARVESTING4134
STP MEP PART1441014
UNDERGROUND WATER TANK7257
ELECTRIFICATION COST15588
SECURITY AND FIRE FIGHTING0

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements8202814
Water Supply System9213015
Sewerage treatment & garbage disposal2453
Electricity Supply System01673
Storm Water Drainage1232
Parks and Playgrounds01773
Clubhouse/community centres0000
Shopping area0000
Other0000
PARKING0512010
SECURITY AND FIRE FIGHTING01353
STREET LIGHTING015153
ELECTRIFICATION COST8888
ELECTRIFICATION SUB STATION13131313
STP MEP PART7777
UNDERGROUND WATER TANK4444
RAIN WATER HARVESTING2222

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements14141414
Water Supply System15151515
Sewerage treatment & garbage disposal3333
Electricity Supply System3332
Storm Water Drainage2222
Parks and Playgrounds3333
Clubhouse/community centres0000
Shopping area0000
Other0000
ELECTRICAL SUB STATION13131313
ELECTRIFICATION COST8888
UNDERGROUND WATER TANK4497
PARKING10101010
STP771814
RAIN WATER HARVESTING2264
SECURITY AND FIRE FIGHTING3333
STREET LIGHTING3333

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements14372811
Water Supply System15383012
Sewerage treatment & garbage disposal3752
Electricity Supply System3873
Storm Water Drainage2431
Parks and Playgrounds3973
Clubhouse/community centres0000
Shopping area0000
Other0000
ELECTRICAL SUB STATION13131313
RAIN WATER HARVESTING2120
UNDERGROUND WATER TANK3240
STP5470
PARKING1027208
SECURITY AND FIRE FIGHTING3752
STREET LIGHTING3862
ELECTRIFICATION COST8888

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements814
Water Supply System915
Sewerage treatment & garbage disposal23
Electricity Supply System23
Storm Water Drainage12
Parks and Playgrounds23
Clubhouse/community centres00
Shopping area00
Other00
STREET LIGHTING23
SECURITY AND FIRE FIGHTING23
PARKING610
ELECTRICAL SUB STATION1318
ELECTRIFICATION COST811












Yes
Yes
HSBC BANK, JMD REGENT SQUARE, DLF PHASE II, GURGAON MEHRAULI ROAD, GURGAON
057122129911
HSBC0110005
110039005
110005
Mr. Jamal Majed Khalfan Bin Theniyah, Mr. Haroon Saeed Siddiqui, Mr. Kalyan Chakrabarti Yanmendra, Mr. Sumil Mathur, Mr. Ashish Kumar Bagri, Mr. Rahul Bindle, Mr. Sanjeev Sharma, Ms. Madhuri Mehta, Mr. Rajeev Chaudhary, Mr. Mohit Gupta, Mr. Swapnil Gupta, Mr. Rahul Agarwal, Mr. Ankush Mittal, Ms. Chinky Kindra, Mr. Bhaskar Arora











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 75 OF 2025 ALREADY BEEN OBTAINED22-05-2025
II. LICENSE NO. 10 OF 2025ALREADY BEEN OBTAINED16-01-2025
III. APPROVAL OF ZONING PLANALREADY BEEN OBTAINED06-08-2025
IV. APPROVAL OF BUILDING PLAN BRIIIALREADY BEEN OBTAINED25-09-2025
V. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED08-09-2025
VI. ASSURANCE OF STORM CONNECTIONALREADY BEEN OBTAINED05-09-2025
VII. NO OBJECTION CERTIFICATE FOR HEIGHT CLEARANCEALREADY BEEN OBTAINED04-08-2025
VIII. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED08-09-2025








Yes


Yes


Draft







MARBELLA PHASE 2 SECTOR 65&66; GURUGRAM
66.059
0
501
0
137
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
43432042880
Cost of the apartments000
Cost of the infrastructure000
Others costs653265326532


16462 Lakhs
858 Lakhs
0 Lakhs
42880 Lakhs
No
31-12-2027
31-12-2027




URBAN OASIS PHASE 1 AND 2
6.64
424
0
424
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
804696841414047
Cost of the apartments71848591769107
Cost of the infrastructure000
Others costs862192384940


6243 Lakhs
15108 Lakhs
0 Lakhs
12570 Lakhs
No
30-09-2028
30-09-2028




EMAAR BUSINESS DISTRICT 99, SECTOR 99, GURUGRAM, HARYANA
3.26875
0
35
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
946394637177
Cost of the apartments000
Cost of the infrastructure18311831773
Others costs287628761671


3683 Lakhs
10319 Lakhs
0 Lakhs
7177 Lakhs
No
17-08-2026
17-08-2026




EMAAR BUSINESS DICTRICT 83
9.10625
116
0
95
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10987182455295
Cost of the apartments000
Cost of the infrastructure60895438737
Others costs4898182454558


1007 Lakhs
1759 Lakhs
0 Lakhs
6390 Lakhs
No
31-12-2028
31-12-2018




AMARIS , SECTOR-61, GURUGRAM, HARYANA
6.118
522
0
519
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10465110437418171
Cost of the apartments859179205210142
Cost of the infrastructure000
Others costs18734123228029


9855 Lakhs
15865 Lakhs
0 Lakhs
15479 Lakhs
No
30-10-2030
30-10-2030




URBAN OASIS PHASE 4
1.62
101
0
95
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
24581257875295
Cost of the apartments10687222693433
Cost of the infrastructure000
Others costs1389535181862


0 Lakhs
0 Lakhs
0 Lakhs
4750 Lakhs
No
30-09-2029
30-09-2029




THE 88
1.58
88
0
84
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
956994982902
Cost of the apartments382384411749
Cost of the infrastructure000
Others costs574610571153


637 Lakhs
875 Lakhs
0 Lakhs
2625 Lakhs
No
31-03-2029
31-03-2029










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSESTONE / LAMINATED WOODEN FLOORING/VITRIFIED ANTISKID TILES
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT
3KITCHEN DETAILSMODULAR KITCHEN WITH CHIMNEY, HOBB,SS, SINK, GEYSER
4BATHROOM FITTINGSWASH BASIN, WC, MIRROR, SHOWER PARTITION
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGVRF WITH HIGH WALL UNITS IN BEDROOM, LIVING, DINING, KITCHEN
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORSTONE
1 . 2 WALLSACRYLIC EMULSION PAINT
1 . 3 CEILINGACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION PAINT
2 . 3 CEILINGACRYLIC EMULSION PAINT
2 . 4 MODULAR WARDROBESE
3 . MASTER TOILET
3 . 1 FLOORANTISKID VITRIFIED TILE
3 . 2 WALLSVITRIFIED TILES/CERAMIC TILES/ACRYLIC EMULSION PAINT
3 . 3 CEILINGMOISTURE RESISTANT GYPSUM BOARD CEILING
3 . 4 COUNTERSGRANITE/MARBLE
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESWASH BASIN, WC, MIRROR, SHOWER PARTITION
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION PAINT
4 . 3 CEILINGACRYLIC EMULSION PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID VITRIFIED TILE
5 . 2 WALLSVITRIFIED TILES, OIL BOND DISTEMPER
5 . 3 CEILINGVITRIFIED TILES/CERAMIC TILES/OIL BOND DISTEMPER
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESCP FITTINGS AND CHINAWARE
6 . KITCHEN
6 . 1 FLOORANTISKID VITRIFIED TILE
6 . 2 WALLSVITRIFIED TILES
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSQUARTZ/GRANITE/ARTIFICAL STONE
6 . 5 FIXTURESMODULAR KITCHEN WITH CHIMNEY, HOBB, SSSINK, GEYSER, BRANDED CP
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID VITRIFIED TILE
7 . 2 WALLS & CEILINGOIL BOND DISTEMPER
7 . 3 TOILETCP FITTINGS AND CHINAWARE
7 . 4 BALCONYMETAL RAILING WITH LAMINATED GLASS
8 . SIT-OUTS
8 . 1 FLOORANTISKID VITRIFIED TILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 18-09-2025 View Document
2 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 18-09-2025 View Document
3 DEMARCATION PLAN 18-09-2025 View Document
4 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 25-09-2025 View Document
5 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 25-09-2025 View Document
6 BANK UNDERTAKING 17-11-2025 ------
7 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 17-11-2025 View Document
8 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 17-11-2025 View Document
9 SITE PLAN STILT LEVEL PLAN 17-11-2025 ------
10 TOWER B3 34 AND 35 17-11-2025 ------
11 BASEMENT 1 AREA DETAIL AND AREA DIAGRAM 17-11-2025 ------
12 SITE PLAN WITH GREEN AREA 17-11-2025 ------
13 ASSURANCE FOR STORM WATER CONNECTION 17-11-2025 ------
14 TOWER B2 SECTON 1 17-11-2025 ------
15 CA CERTIFICATE FOR COST INCURRED 17-11-2025 ------
16 TOWER C1 STILT GROUND 17-11-2025 ------
17 TOWER B3 TYPICAL 17-11-2025 ------
18 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 17-11-2025 View Document
19 TOWER C1 TYPICAL 17-11-2025 ------
20 TOWER B2 34,35,36 17-11-2025 ------
21 MUTATION 17-11-2025 ------
22 TOWER B1 ELEVATION A&B 17-11-2025 ------
23 TOWER B2 TYPICAL 17-11-2025 ------
24 HEIGHT CLEARANCE 17-11-2025 ------
25 TOWER B3 STILT GROUND 17-11-2025 ------
26 LIST OF PENDING LITIGATIONS SERENITY PH 2 17-11-2025 ------
27 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 17-11-2025 View Document
28 JAMABANDI 17-11-2025 ------
29 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 17-11-2025 View Document
30 LAND TITLE SEARCH REPORT 17-11-2025 ------
31 BASEMENT 1 PLAN 17-11-2025 ------
32 ASSURANCE FOR SEWERAGE CONNECTION 17-11-2025 ------
33 CONSTRUCTION WATER NOC 17-11-2025 ------
34 CORRIGENDUM FOR CORRECTION IN NAME AMARDEEP BUILDCON AND GATEAU SECTOR-86, GURUGRAM 17-11-2025 ------
35 TOWER B1 C&D 17-11-2025 ------
36 TOWER B1 35 TERRACE LEVEL 17-11-2025 ------
37 BASEMENT 2 AREA DETAIL & AREA DIAGRAM 17-11-2025 ------
38 SIZRA 17-11-2025 ------
39 TOWER B3 ELEVATION 17-11-2025 ------
40 TOWER B3 36 TERRACE LEVEL 17-11-2025 ------
41 TOWER B2 ELEVATION 17-11-2025 ------
42 TOWER B1 18,19,20 17-11-2025 ------
43 COD ORDER 17-11-2025 ------
44 FOREST NOC 17-11-2025 ------
45 BUILDING PLAN APPROVAL LETTER BR III 17-11-2025 ------
46 PHASING PLAN 17-11-2025 ------
47 LOI 17-11-2025 ------
48 PROJECT REPORT S HILLS 1 17-11-2025 ------
49 ASSURANCE FOR WATER SUPPLY 17-11-2025 ------
50 NON-ENCUMBERANCE CERTIFICATE 17-11-2025 ------
51 BASEMENT 1 STILT GROUND 1ST 17-11-2025 ------
52 BASEMENT 2 PLAN 17-11-2025 ------
53 COLLABORATION AGREEMENT 17-11-2025 ------
54 REGISTRATION FEES DEMAND DRAFT 17-11-2025 ------
55 SITE PLAN WITH EXTERNAL SERVICE 17-11-2025 ------
56 TOWER B3 SECTOR 1&3 17-11-2025 ------
57 TOWER B3 ELEVATION A&B 17-11-2025 ------
58 TOWER B3 18,20,19TH 17-11-2025 ------
59 TOWER B2 ELEVATION C&D 17-11-2025 ------
60 TOWER B1 34 &35; FLOOR LEVEL 17-11-2025 ------
61 ZONING PLAN 17-11-2025 View Document
62 BBA DRAFT 19-11-2025 ------