HRERA GurugramTemp Project Id : RERA-GRG-PROJ-429-2019
Submission Date : 10-12-2019 04:33:43 AM
Applicant Type : Company
Project Type: ONGOING




AMEYA COMMERCIAL PROJECTS PVT LTD
AMEYA ONE, DLF CITY -V, SECTOR 42 GOLF COURSE ROAD GURGAON- 122002
01242571477
9910160554 (Number Shared by Promoter in Public)
info@ameyagroup.in
http://ameyagroup.in
XXXX691Q
U70200DL2009PTC195340
 
 


 
 


 
 







SAPPHIRE 92
SECTOR 92, GURGAON
GURGAON
GURUGRAM
9911938383
9911938383 (Number Shared by Promoter in Public)
INFO@AMEYAGROUP.IN
DS NEGI
01242571477
8826560244 (Number Shared by Promoter in Public)
INFO@AMEYAGROUP.IN








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
115252027-07-2017177050BOBHRERA Gurugram







2.50 (Acre)
1.75
1.747
2.50 (Acre)
102 of 2014
Yes







12604.00 Lakhs
13.00 Lakhs
7952.15 Lakhs
388.85 Lakhs
4250.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS4046.85
3CONSTRUCTION OF ROADS2261.957
4PAVEMENTS1517.56
5PARKS AND PLAYGROUNDS271.462
6GREEN BELTS535.296
7VEHICLE PARKINGS1484
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total10117.125




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDAYes
WATER SUPPLYHUDA/GMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDAYes
STORM WATER DRAINAGEHUDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS94.58YET TO BE PREPARED
2WATER SUPPLY SYSTEM178.86YET TO BE PREPARED
3STORM WATER DRAINAGE36.06YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL60.20YET TO BE PREPARED
6STREET LIGHTING5.88YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0.99YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15MAINTENANCE UP TO TEN YEARS12.29YET TO BE PREPARED


NA (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 27.424741453291






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
1450


11-12-2017
27-06-2024
27-06-2024
11-12-2017
45
27-06-2024


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
11-12-2017
50
27-02-2024


308
0
0
53
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Dack slab Glazing structural M S structural1.64
D G set fixing work2.75
Electrical external work0.94
Electrical H T panel work0.82
Electrical internal work1.96
Electrical L T panel work1.84
Ess panels and gas flooding sytem0.15
External Plumping work5.86
Fire Fighting System3.69
Interior and finishing work20.00
Internal Plumping work4.92
Lift work3.90
Pump and water treatment0.45
Security System0.65
Solar system0.95
Structural Work29.00

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0
Structural Work1.50

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Structural Work1.501.301.301.20

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Structural Work1.201.201.201.00

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Structural Work1.0000.900.90

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Structural Work0.900.900.900.90
Ess panels and gss flooding system0.10.05

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Structural Work1.200.801.201.20
Interior and finishing work3.50
Internal plumping work1.00
External plumping work1.50
Fire fighting system0.80
Ess panels and gss flooding system3.50

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Dack slab glazing structural M S structural0.750.750.14
Internal plumping work1.000.900.900.90
Fire fighting system0.300.800.750.40
Electrical internal work0.500.500.500.30
Electrical L T panel work1.000.500.20
D G set fixing work1.501.000.25
Lift work2.000.750.750.35
Interior and finishing work3.003.002.802.90
Structural Work1.201.451.201.15
External plumping work1.501.251.000.61
Electrical H T panel work0.300.30
Solar system0.450.40
Pump and water treatment0.25
Electrical external work0.400.40
Security system0.45
Pump and warer treatment works0.20
Ess panels and gss flooding system0.15

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00
Structural Work0.900.90
Pump and water treatment0
Ess panels and gss flooding system0
Electrical internal work0.16
Electrical external work0.14
Electrical H T panel work0.22
Electrical L T panel work0.14
External plumping work0
Security system0.20
Solar system0.10
Lift work0.05
Interior and finishing work1.30
Internal plumping work0.22
D G set fixing work0
Fire fighting system0.14




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0.95
Water Supply System1.87
Sewerage treatment & garbage disposal0.60
Electricity Supply System0
Storm Water Drainage0.47
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000.400.30
Water Supply System01.000.500.25
Sewerage treatment & garbage disposal00.250.200.10
Electricity Supply System0000
Storm Water Drainage000.200.27
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.250
Water Supply System0.120
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00












Particulars Remarks, if any
i. No. of Flats/Apartments constructed0
ii. No. of Flats/ Apartments booked147
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter59 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter28.94 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter30.06 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs31.03.2019
Land cost (If any)13 Lakhs
Apartments4195 Lakhs
Infrastructure32 Lakhs
EDC/ Taxes Etc.747 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project7649 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 7649 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS94.580
II. WATER SUPPLY SYSTEM178.860
III. STORM WATER DRAINAGE36.060
IV. ELECTRICITY SUPPLY SYSTEM00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL60.200
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.0.990
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
BANK OF BARODA
30290200000435
BARB0DLFGUR
110012096
SECTOR 53, GURGAON
Gopal Gulati











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. CONSENT TO ESTABLISHALREADY BEEN OBTAINED30-10-2018
II. MINING PERMISSIONALREADY BEEN OBTAINED13-01-2018
III. REGISTRATION UNDER BOCW ACTALREADY BEEN OBTAINED31-05-2019
IV. SANCTIONED LETTER OF APPROVAL OF BUILDING PLANSALREADY BEEN OBTAINED26-02-2015
V. ASSURANCE OF WATER SUPPLYALREADY BEEN OBTAINED04-11-2015
VI. NOC FOR CONSTRUCTION PURPOSEALREADY BEEN OBTAINED03-09-2014
VII. ASSURANCE OF ELECTRICAL CONNECTIONALREADY BEEN OBTAINED21-10-2014
VIII. ASSURANCE OF EXTERNAL SERVICESALREADY BEEN OBTAINED20-12-2014
IX. FOREST NOCALREADY BEEN OBTAINED08-06-2013
X. ARAVALI NOCALREADY BEEN OBTAINED13-02-2015
XI. AIRPORT AUTHORITY HEIGHT PERMISSION ALREADY BEEN OBTAINED11-03-2015
XII. FIRE SCHEME APPROVALAPPLIED FOR BUT YET TO RECEIVE27-04-2018








Yes


Yes









AMEYA COMMERCIAL PROJECTS PVT LTD SECTOR-93
3.15
551
0
139
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
15364.0000
Cost of the apartments9222.36078.38
Cost of the infrastructure772.6400
Others costs5369.0000


351 Lakhs
0 Lakhs
15 Lakhs
351 Lakhs
No
27-08-2024
27-08-2024










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN07-12-2019 View Document
2A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS07-12-2019 View Document
3IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN07-12-2019 View Document
4ZONING PLAN09-03-2021 View Document
5BUILDING PLAN APPROVAL09-03-2021 ------
6DEMARCATION PLAN09-03-2021 View Document
7COPY OF LICENSE ALONG WITH SCHEDULE OF LAND09-03-2021 View Document
8CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT09-03-2021 View Document
9NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT09-03-2021 View Document
10DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.09-03-2021 View Document
11SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN09-03-2021 View Document
12ANNEXURE-DETAILS OF THE PLOTS/APARTMENTS IN THE PROJECT10-03-2021 ------