SOBHA, SARJAPUR-MARATHAHALLI OUTER RING ROAD (ORR) DEVARABISANAHALLI, BELLANDUR POST, BANGALORE KA 560103
0804932000
0804932000 (Number Shared by Promoter in Public)
haryana.rera@sobha.com
https://www.sobha.com/
XXXX723E
L45201KA1995PLC018475
SOBHA CITY, PHASE-2, PART-1
REVENUE ESTATE OF BABUPUR VILLAGE, VILLAGE BABUPUR, SECTOR-108, GURUGRAM, HARYANA
GURGAON
GURUGRAM
01244855555
9870429922 (Number Shared by Promoter in Public)
scg.rera@sobha.com
JOBY FRANCIS
1244855555
8800389988 (Number Shared by Promoter in Public)
joby.francis@sobh.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
15930
18-01-2018
161140
AXIS BANK LIMITED
HRERA Gurugram
2
16125
22-05-2018
120854
AXIS BANK LIMITED
HRERA Gurugram
0.7906 (Acre)
1.75
0.105654
39.375 (Acre)
107 of 2008 (26.05.2020)
No
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address A-11, KAILASH COLONY, NEW DELHI-110048
Address 44, GOLF LINKS, NEW DELHI-110003
Address 44, GOLF LINKS, NEW DELHI-110003
Address 44, GOLF LINKS, NEW DELHI-110003
Address 44, GOLF LINKS, NEW DELHI-110003
Annexure-B- JDA AND POWER OF ATTORNEY
AGREEMENT AND POWER OF ATTORNEY WERE EXECUTED AFTER GRANT OF LICENCE.
Yes
THIS IS REVENUE SHARE AGREEMENT WITH LANDOWNER.
No
Yes
Yes
15812.58 Lakhs
2480 Lakhs
6171.95 Lakhs
158.93 Lakhs
7001.70 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
0.164982
3
CONSTRUCTION OF ROADS
0.258571
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
0
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0.047772
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0.3192622
Total
0.7905872
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP
Yes
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
GMDA
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
45.17
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
52.10
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
21.37
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
0
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
29
AS PER PROJECT REPORT
6
STREET LIGHTING
0
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
0
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
1.53
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
15
STREET LIGHT
9.76
AS PER PROJECT REPORT
NA (date)
19-01-2016 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type D, D1, E, E1
12579
96
43
53
1
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
D, D1, E, E1
53
(TOWER C3) 3RD FLOOR IS UNDER PROGRESS
27-07-2018
31-10-2022
31-10-2022
01-10-2019
14
31-03-2021
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
01-10-2019
14
31-03-2021
129
63
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
2283
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
306.65
0
0
500
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
365.15
262.61
272.23
333.51
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
281.75
461.58
337.46
526.18
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
241.50
Shops
0
Plots
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
6.55
Water Supply System
7.56
Sewerage treatment & garbage disposal
4.21
Electricity Supply System
0
Storm Water Drainage
3.10
Parks and Playgrounds
0.22
Clubhouse/community centres
0
Shopping area
0
Other
0
Street Light
1.42
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
4.08
0.45
Water Supply System
4.70
0.52
Sewerage treatment & garbage disposal
2.62
0.29
Electricity Supply System
0
0
Storm Water Drainage
1.93
0.21
Parks and Playgrounds
0.14
0.02
Clubhouse/community centres
0
0
Shopping area
0
0
Other
0
0
Street Light
0.88
0.10
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
12.47
5.26
11.34
11.57
Water Supply System
14.38
6.07
13.08
13.34
Sewerage treatment & garbage disposal
8
3.38
7.28
7.43
Electricity Supply System
0
0
0
0
Storm Water Drainage
5.90
2.49
5.37
5.47
Parks and Playgrounds
0.42
0.18
0.38
0.39
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Light
2.69
1.14
2.45
2.50
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
0
ii. No. of Flats/ Apartments booked
43
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
10307 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
3819 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
6488 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
499 Lakhs
vii. Amount invested in the project upto the date of application
4356 Lakhs
Land cost (If any)
402 Lakhs
Apartments
2283 Lakhs
Infrastructure
23 Lakhs
EDC/ Taxes Etc.
1648 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
11457 Lakhs
(a) In respect of existing allottees
5188 Lakhs
(b) In respect of rest of the project
6269 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
45.17
6.55
II. WATER SUPPLY SYSTEM
52.10
7.56
III. STORM WATER DRAINAGE
21.37
3.10
IV. ELECTRICITY SUPPLY SYSTEM
0
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
29
4.21
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
1.53
0.22
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
0
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
9.76
1.42
Yes
Yes
STANDARD CHARTERED BANK, KORAMANGALA, BANGALORE
45505402123
SCBL0036073
560036002
036073
Mr. J C Sharma (Managing Director)
Mr. Subhash Mohan Bhat (Chief Financial Officer)
Mr. Vigneshwar G Bhat (Company Secretary)
Mr. Ramesh Babu K (Vice President – Finance)
Mr. M Radhakrishnan (Deputy General Manager)
Mr. Chandrashekhar Gowda (Senior Manager – Finance)
Ms. Lakshmi Anand (Senior Manager- Internal Audit)
Attached
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. SERVICE ESTIMATES PLAN
ALREADY BEEN OBTAINED
12-03-2019
II. FIRE SCHEME APPROVAL
ALREADY BEEN OBTAINED
24-05-2017
III. CONSENT TO ESTABLISH
ALREADY BEEN OBTAINED
30-11-2017
IV. ENVIRONMENT CLEARANCE
ALREADY BEEN OBTAINED
29-08-2017
V. ELECTRICAL LOAD AVAILABILITY
ALREADY BEEN OBTAINED
06-10-2016
VI. HUDA CONSTRUCTION WATER NOC
ALREADY BEEN OBTAINED
30-04-2017
VII. AIRPORT HEIGHT CLEARANCE
ALREADY BEEN OBTAINED
24-11-2017
VIII. NATURAL CONSERVATION ZONE NOC
ALREADY BEEN OBTAINED
05-11-2013
IX. FOREST NOC
ALREADY BEEN OBTAINED
30-10-2013
X. LICENCE
ALREADY BEEN OBTAINED
27-05-2008
Yes
Yes
Possession Date: 31.10.2022
SOBHA CITY, PHASE-1, PART-1
12.88495
240
0
189
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
27060
0
16531
Cost of the apartments
13300
0
8931
Cost of the infrastructure
343
0
182
Others costs
13417
0
7418
24422 Lakhs
9422 Lakhs
7000 Lakhs
7000 Lakhs
No
30-10-2021
30-10-2021
SOBHA CITY, PHASE-1, PART-2
0.76635
240
0
197
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
28559
0
10216
Cost of the apartments
13299
0
4485
Cost of the infrastructure
343
0
92
Others costs
14917
0
5639
15660 Lakhs
22043 Lakhs
7000 Lakhs
7000 Lakhs
No
01-05-2022
01-05-2022
SOBHA CITY, PHASE-3
0.754
96
0
35
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
13266
0
1650
Cost of the apartments
6361
0
762
Cost of the infrastructure
159
0
8
Others costs
6746
0
880
1872 Lakhs
6627 Lakhs
0 Lakhs
0 Lakhs
No
31-10-2023
31-10-2023
SOBHA CITY, PHASE-4
2.6778
288
0
13
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
28566
0
1026
Cost of the apartments
14262
0
6
Cost of the infrastructure
368
0
0
Others costs
13936
0
1020
337 Lakhs
2005 Lakhs
6000 Lakhs
6000 Lakhs
No
31-12-2024
31-12-2024
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
NATURAL / ENGINEERED STONE FLOORING AND SKIRTING/ LAMINATED WOODEN FLOORING AND SKIRTING / VITRIFIED TILE FLOORING AND SKIRTING /CERAMIC TILE.
2
WALL FINISHING DETAILS
FOR INTERNAL WALLS, PLASTIC EMULSION PAINT / CERAMIC WALL TILING WHEREVER APPLICABLE & TEXTURED PAINT FOR EXTERNAL WALLS.
FRAME – TIMBER FRAME & SHUTTERS – WITH BOTH SIDE MASONITE SKIN.
7
GLASS WORK
-
8
ELECTRIC FITTINGS
FITTING OF REPUTED MAKE APPROVED BY ISI & IS SPECIFICATION.
9
CONDUCTING AND WIRING DETAILS
PVC CONDUITS AND COPPER CABLES OF REPUTED MAKE AS PER ISI AND IS SPECIFICATION.
10
CUPBOARD DETAILS
-
11
WATER STORAGE
COMMON UGR OF 690 KL.
12
LIFT DETAILS
CAPACITY - 1 NO. OF 15 PASSENGER & 2 NOS. OF 8 PASSENGER LIFT OF REPUTED MAKE.
13
EXTERNAL GLAZINGS
NA
13.1
WINDOWS/GLAZINGS
HEAVY-DUTY ALUMINIUM GLAZED SLIDING WINDOWS & FRENCH WINDOWS MADE FROM SPECIALLY DESIGNED AND MANUFACTURED SECTIONS.
14
DOORS
NA
14.1
MAIN DOORS
FRAME – TIMBER.
SHUTTERS – WITH BOTH SIDE MASONITE SKIN.
14.2
INTERNAL DOORS
MAIN DOOR & BEDROOM DOORS
• FRAME – TIMBER.
• SHUTTERS – WITH BOTH SIDE MASONITE SKIN.
TOILET DOOR
• FRAME – TIMBER
• SHUTTERS –WITH OUTSIDE MASONITE AND INSIDE LAMINATE.
15
AIR CONDITIONING
POWER CONNECTION MADE AVAILABLE FOR SPLIT AC IN LIVING, DINING AND ALL THE BED ROOMS.
16
ELECTRICAL FITTINGS
NA
17
CNG PIPE LINE
-
18
PROVISION OF WIFI AND BROADBAND FACILITY
CONDUIT PROVISION FOR DEDICATED INTERNET CONNECTION MADE AVAILABLE WITH RJ-45 SOCKET OUTLET IN ONE OF THE BEDROOMS.
19
EXTERNAL FINISHING/COLOUR SCHEME
ALL WALLS PAINTED IN TEXTURED PAINT.
20
INTERNAL FINISHING
PLASTIC EMULSION PAINT FOR WALLS & CEILING.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
SUPERIOR QUALITY NATURAL / ENGINEERED STONE FLOORING AND SKIRTING.
1 . 2
WALLS
PLASTIC EMULSION PAINT FOR WALLS.
1 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING.
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
LAMINATED WOODEN FLOORING AND SKIRTING.
2 . 2
WALLS
PLASTIC EMULSION PAINT FOR WALLS.
2 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING.
2 . 4
MODULAR WARDROBES
-
3 . MASTER TOILET
3 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING.
3 . 2
WALLS
SUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING
3 . 3
CEILING
FALSE CEILING WITH GRID PANELS.
3 . 4
COUNTERS
NATURAL/ENGINEERED STONE VANITY COUNTERS.
3 . 5
SANITARY WARE/CP FITTINGS
EUROPEAN WATER CLOSET WALL HUNG,
COUNTER TOP WASH BASIN
3 . 6
FITTING/FIXTURES
CHROMIUM PLATED FITTINGS :-
S/L DIVERTER
BATH SPOUT WITH BUTTON
OVERHEAD SHOWER
TELEPHONIC SHOWER
S/ L BASIN MIXER
ANGULAR STOP COCK
HEALTH FAUCET
CP P-TRAP
WASTE COUPLING
METRO POLE FLUSH VALVE
COCKROACH TRAP
GEYSER – HORIZONTAL OF 25 LTR CAPACITY
4 . BED ROOMS
4 . 1
FLOOR
SUPERIOR QUALITY VITRIFIED TILE FLOORING AND SKIRTING.
4 . 2
WALLS
PLASTIC EMULSION PAINT FOR WALLS.
4 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING.
4 . 4
WARDROBES
-
5 . TOILET
5 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING.
5 . 2
WALLS
SUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING.
5 . 3
CEILING
FALSE CEILING WITH GRID PANELS.
5 . 4
COUNTERS
NATURAL / ENGINEERED STONE VANITY COUNTERS.
5 . 5
SANITARY WARE/CP FITTINGS
EUROPEAN WATER CLOSET WALL HUNG, COUNTER TOP WASH BASIN
5 . 6
FIXTURES
CHROMIUM PLATED FITTINGS :-
S/L DIVERTER
BATH SPOUT
OVERHEAD SHOWER
S/ L BASIN MIXER
ANGULAR STOP COCK
HEALTH FAUCET
CP P-TRAP
WASTE COUPLING
METRO POLE FLUSH VALVE
COCKROACH TRAP
GEYSER – HORIZONTAL OF 25 LTR CAPACITY
6 . KITCHEN
6 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING.
6 . 2
WALLS
SUPERIOR QUALITY CERAMIC TILING UP TO CEILING.
6 . 3
CEILING
PLASTIC EMULSION PAINT FOR CEILING.
6 . 4
COUNTERS
-
6 . 5
FIXTURES
SINK MIXER (WALL MOUNTED)
SINGLE BOWL SINGLE DRAIN SS SINK IN UTILITY
2 IN 1 BIB COCK IN UTILITY
ANGULAR STOP COCK
COCKROACH TRAP
BIB COCK WITH NOZZLE IN LIVING / DINING SIT OUT (WHEREVER APPLICABLE)
6 . 6
KITCHEN APPLIANCES
-
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING.
7 . 2
WALLS & CEILING
PLASTIC EMULSION PAINT FOR WALLS & CEILING.
7 . 3
TOILET
• SUPERIOR QUALITY CERAMIC TILE FLOORING.
• SUPERIOR QUALITY CERAMIC WALL TILING UP TO FALSE CEILING.
• NATURAL / ENGINEERED STONE VANITY COUNTERS.
• FALSE CEILING WITH GRID PANELS
7 . 4
BALCONY
• SUPERIOR QUALITY CERAMIC TILE FLOORING AND SKIRTING.
• NATURAL / ENGINEERED STONE COPING FOR PARAPET/MS HANDRAIL AS PER DESIGN.
• PLASTIC EMULSION PAINT FOR CEILING.
• ALL WALLS PAINTED IN TEXTURED PAINT.
8 . SIT-OUTS
8 . 1
FLOOR
SUPERIOR QUALITY CERAMIC TILE FLOORING AND SKIRTING.
8 . 2
WALLS & CEILING
PLASTIC EMULSION PAINT FOR CEILING.
ALL WALLS PAINTED IN TEXTURED PAINT.
8 . 3
RAILINGS
NATURAL / ENGINEERED STONE COPING FOR PARAPET/MS HANDRAIL AS PER DESIGN.
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT