HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2184-2026
Submission Date : 18-05-2026 02:56:41 PM
Applicant Type : Company
Project Type: NEW




ROF INFRATECH AND HOUSING PRIVATE LIMITED
BUILDING 80 SECTOR 44 GURUGRAM
01244399399
9717022441 (Number Shared by Promoter in Public)
legalcompliance@rof.co.in
Http://rof.co.in
XXXX913H
U70102DL2012PTC239356
 
 


 
 


 
 







ADVIK BY ROF
VILLAGE SOHNA, SECTOR 36
SOHNA
GURUGRAM
01244399399
9717022441 (Number Shared by Promoter in Public)
legalcompliance@rof.co.in
MUKESH KUMAR
01244399399
9560890400 (Number Shared by Promoter in Public)
legalcompliance@rof.co.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
143016116-05-2026205000PUNJAB NATIONAL BANK, KANHAI, SECTOR-45 GURUGRAMHRERA Gurugram
243016216-05-2026103000PUNJAB NATIONAL BANK, KANHAI, SECTOR-45 GURUGRAMHRERA Gurugram
343017610-06-2026300213PUNJAB NATIONAL BANK, KANHAI, SECTOR-45 GURUGRAMHRERA Gurugram







2.08125 (Acre)
2.40
2.398
2.08125 (Acre)
129 OF 2024 DATED 24-10-2024
Yes







20419.01 Lakhs
7290.55 Lakhs
8074.70 Lakhs
1777.15 Lakhs
3276.61 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1909.373
3CONSTRUCTION OF ROADS 2345.937
4PAVEMENTS 2248.749
5PARKS AND PLAYGROUNDS 1467.93
6GREEN BELTS 130.34
7VEHICLE PARKINGS 123.727
8ELECTRICITY SUB-STATION 196
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total8422.056




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSNHAINo
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNNo
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS81.85AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM215.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE67.29AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM201.87AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL67.29AS PER PROJECT REPORT
6STREET LIGHTING10.76AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING80.75AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS10.76AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE204.26AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM21.5AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY15.00AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15RAIN WATER HARVESTING 10.00AS PER PROJECT REPORT
16STP100.00AS PER PROJECT REPORT
17UNDERGROUND TANK 105.00AS PER PROJECT REPORT
18SWIMMING POOL38.62AS PER PROJECT REPORT
19COMMERCIAL224.63AS PER PROJECT REPORT
20ELECTRIFICATION COST UPTO PROJECT SITE200.00AS PER PROJECT REPORT
21PARKING30.00AS PER PROJECT REPORT
22MESS25.00AS PER PROJECT REPORT
23GYMNASIUM30.00AS PER PROJECT REPORT
24LAUNDARY30.00AS PER PROJECT REPORT


15-05-2026 (date)
15-05-2026 (date)
01-07-2026
31-12-2031
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings18236.471422
Apartment/Shops/Other Buildings695.27021





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments186.76186.76
Shops00
Plots00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments357.21357.21394.57618.68
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments576.29627.10613.49394.72
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments680.69798.50697.85685.43
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments173.57247.88247.88114.54
Shops089.8567.3967.39
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments114.54
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP0025.0025.00
Underground Tank0026.2526.25

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0016.8216.82
Electricity Supply System0000
Storm Water Drainage0016.8216.82
Parks and Playgrounds0000
Clubhouse/community centres051.0651.0651.06
Shopping area0000
Other0000
Rain Water Harvesting0002.50
Underground Tank26.2526.2500
STP25.0025.0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0020.4620.46
Water Supply System53.8353.8353.8353.83
Sewerage treatment & garbage disposal16.8216.8200
Electricity Supply System50.8650.8650.8650.86
Storm Water Drainage16.8216.8200
Parks and Playgrounds004.504.50
Clubhouse/community centres51.06000
Shopping area0000
Other0000
Dispensary0003.75
Renewable Energy System00010.75
Electrification cost upto project site000120.00
Security and Fire Fighting Services20.1820.1820.1820.18
Street Light002.692.69
Laundary0007.50
Swimming Pool0015.4515.45
Rain Water Harvesting2.502.502.500

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements20.4620.46
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds4.504.50
Clubhouse/community centres00
Shopping area00
Other00
Street Light2.692.69
Parking22.507.50
Electrification cost upto project site60.0020.00
Dispensary3.757.50
Gymnasium22.507.50
Mess20.005.00
Laundary7.5015.00
Renewable Energy System10.750
Swimming Pool7.720












Yes
No
PUNJAB NATIONAL BANK , KANHAI, SECTOR-45, GURUGRAM-122003
5167102900000023
PUNB0516710
NA
516710
RAHUL MITTAL and ABHISHEK MITTAL, B-62 South Ex part-1, Andrewsganj, South Delhi, Delhi-110049
YES











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE ALREADY BEEN OBTAINED24-10-2024
II. ZONING PLANALREADY BEEN OBTAINED24-10-2024
III. BUILDING PLANALREADY BEEN OBTAINED15-05-2026
IV. AAI NOCALREADY BEEN OBTAINED07-11-2025








Yes


Yes









ROF NORMANTON PARK, VILLAGE DHUNELA, SEC-36, SOHNA, GURUGRAM
14.775
0
233
0
192
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3888.943888.945013.05
Cost of the apartments000
Cost of the infrastructure1658.11658.11935.95
Others costs2230.832230.833077.10


20263.31 Lakhs
800 Lakhs
0 Lakhs
12696.32 Lakhs
No
31-03-2026
31-03-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEBEDROOM AND LIVING ROOM- VITRIFIED TILE FLOOR, TOILET AND BALCONY- ANTISKID CEREMIC TILE, KITCHEN VITRIFIED TILE
2WALL FINISHING DETAILSPUTTY + PRIMER+ 2 COAT OF ACRYLIC EMULSION PAINT
3KITCHEN DETAILSVITIRFIED TILE, PAINT, GRANITE MARBLE AND SINK AND MODULAR KITCHEN WITH CHIMNEY AND HOB
4BATHROOM FITTINGSCP FITTING AND CHINA WARE
5WOOD WORK ETCMAIN DOOR AND INTERNAL DOOR
6DOORS AND WINDOS FRAMESALUMINUM/UPVC DOOR AND WINDOWS
7GLASS WORKEXTERNAL ALUMINUM/UPVC DOOR AND WINDOW WITH 5 MM TOUGHNED GLASS
8ELECTRIC FITTINGSSWITCH BOARDS, LIGHT POINT, FAN POINT
9CONDUCTING AND WIRING DETAILSPVC CONDUIT AND COPPER WIRES
10CUPBOARD DETAILSNA
11WATER STORAGEOVERHEAD WATER TANK
12LIFT DETAILSTWO NO. OF LIFT EACH TOWER
13EXTERNAL GLAZINGS ALUMINUM/UPVC
13.1WINDOWS/GLAZINGS ALUMINUM/UPVC
14DOORS WOODEN
14.1MAIN DOORS WOODEN
14.2INTERNAL DOORS WOODEN
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSSWITCHES AND COMMON AREA LIGHTS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYYES
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR PAINT- ASIAN PAINT OR EQUIVALENT BRAND
20INTERNAL FINISHING PUTTY + PRIMER+ 2 COAT OF ACRYLIC EMULSION
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOOR VITRIFIED TILE
1 . 2 WALLSACRYLIC EMULSION
1 . 3 CEILINGACRYLIC EMULSION
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION
2 . 3 CEILINGACRYLIC EMULSION
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTISKID CEREMIC TILE
3 . 2 WALLSVITRIFIED TILE
3 . 3 CEILINGACRYLIC EMULSION
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSYES
3 . 6 FITTING/FIXTURESWC WASH BASIN SHOWER POINTS AND DIVERTERS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILE
4 . 2 WALLSACRYLIC EMULSION
4 . 3 CEILINGACRYLIC EMULSION
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTISKID CEREMIC TILE
5 . 2 WALLSVITRIFIED TILE
5 . 3 CEILINGACRYLIC EMULSION
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSYES
5 . 6 FIXTURESWC WASH BASIN SHOWER POINTS AND DIVERTERS
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE
6 . 2 WALLSFULL BODY TILE UPTO 2FT ABOVE COUNTER AND ACRYLIC EMULSION PAINT
6 . 3 CEILINGACRYLIC EMULSION PAINT
6 . 4 COUNTERSGRANITE STONE OR FULL BODY TILE
6 . 5 FIXTURESMODULAR KITCHEN WITH SINGLE BOWL SINK
6 . 6 KITCHEN APPLIANCESCHIMNEY AND HOB
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCEREMIC TILE
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT
7 . 3 TOILETVITRIFIED TILE
7 . 4 BALCONYCEREMIC TILE
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DEMARCATION PLAN 18-05-2026 View Document
2 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 18-05-2026 View Document
3 ZONING PLAN 18-05-2026 View Document
4 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 18-05-2026 View Document
5 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 18-05-2026 View Document
6 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 18-05-2026 View Document
7 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 18-05-2026 View Document
8 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 18-05-2026 View Document
9 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 18-05-2026 View Document
10 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 18-05-2026 View Document
11 TOWER -02 CATEGORY LAYOUT 1 03-07-2026 View Document
12 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 07-07-2026 View Document
13 TOWER -02 CATEGORY LAYOUT 03-07-2026 View Document
14 NEC 03-07-2026 View Document
15 19TH LOWER PENTHOUSE 03-07-2026 View Document
16 LOI 03-07-2026 View Document
17 SECOND FLOOR AREA CALCULATION 03-07-2026 View Document
18 TYPICAL FLOOR 5TH, 10TH & 15TH FLOOR 03-07-2026 View Document
19 20TH UPPER PENTHOUSE 03-07-2026 View Document
20 DEFICIT FEE DD ADVIK BY ROF 03-07-2026 View Document
21 TOWER -01 ELEVATION 03-07-2026 View Document
22 TERRACE LAYOUT PLAN 03-07-2026 View Document
23 SIZRA 03-07-2026 View Document
24 4(2)(L)(D) AFFIDAVIT 07-07-2026 View Document
25 LC IV AND LC IV-A 03-07-2026 View Document
26 ASSURANCE STP CONSTRUCTION WATER 03-07-2026 View Document
27 GREEN AREA CALCULATION 03-07-2026 View Document
28 ASSURANCE SEWRAGE CONNECTION 03-07-2026 View Document
29 TOWER -01 & TOWER-02 SECTION 03-07-2026 View Document
30 FOREST NOC 03-07-2026 View Document
31 BASEMENT LAYOUT PLAN 03-07-2026 View Document
32 NO LITIGATION AFFIDAVIT 03-07-2026 View Document
33 ASSURANCE STORM WATER 03-07-2026 View Document
34 TOWER -02 CATEGORY LAYOUT 03-07-2026 View Document
35 GROUND STILT LAYOUT PLAN 03-07-2026 View Document
36 TYPICAL FLOOR 17TH FLOOR REFUSE FLOOR 03-07-2026 View Document
37 TOWER -01 CATEGORY LAYOUT 03-07-2026 View Document
38 TYPICAL FLOOR 3RD TO 4TH, 6TH TO 9TH, 11TH TO 14TH, 16 TO 18TH FLOOR 03-07-2026 View Document
39 AAI NOC 03-07-2026 View Document
40 FIRST FLOOR AMENITIES LAYOUT PLAN 03-07-2026 View Document
41 DD ADVIK BY ROF 03-07-2026 View Document
42 COMMERCIAL AREA CALCULATION 03-07-2026 View Document
43 BANK UNDERTAKING 03-07-2026 View Document
44 ASSURANCE DRINKING WATER 03-07-2026 View Document
45 ALLOTMENT LETTER ADVIK BY ROF 03-07-2026 View Document
46 AFFIDAVIT NO LOAN 03-07-2026 View Document
47 TOWER -02 ELEVATION 03-07-2026 View Document
48 UNDERTAKING AUTO CREDIT 10% RECEIPT 03-07-2026 View Document
49 UNDERTAKING FOR MINING 03-07-2026 View Document
50 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 07-07-2026 View Document