HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1830-2024
Submission Date : 17-12-2024 01:14:38 PM
Applicant Type : Company
Project Type: NEW




BPTP LIMITED
OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 FARIDABD FARIDABAD HR 121004 IN
01204492650
9717790021 (Number Shared by Promoter in Public)
Rera.gurugram@bptp.com
http://bptp.com
XXXX442A
U45201HR2003PLC082732
 
 


 
 


 
 


 
 


 
 


 
 







BPTP AMSTORIA VERTI-GREENS
SECTOR 102 GURUGRAM
GURGAON
GURUGRAM
9810810516
9810810516 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com
DEVENDER KUMAR
9810810516
9810810516 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
126604517-12-20243792176INDUSIND BANKHRERA Gurugram
226604417-12-20241344744INDUSIND BANKHRERA Gurugram
382586016-01-20251134985INDUSIND BANKHRERA Gurugram







9.4292 (Acre)
3.65
2.82
12.05 (Acre)
License no 123 of 2014
No
Address     OT 14 3RD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD.
Annexure-B- AS A COLLABORATOR.
BY VIRTUE OF COLLABORATION AGREEMENT.
Yes
AS PER THE ATTACHED COLLABORATION AGREEMENT
No
Yes
Yes







235005.40 Lakhs
1599.27 Lakhs
197264.10 Lakhs
4746 Lakhs
31396.02 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS1.7388
3CONSTRUCTION OF ROADS4.8595
4PAVEMENTS0
5PARKS AND PLAYGROUNDS1.7394
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13BANQUET0.3890
14SPORTSBLOCKPRIMARYANDNURSERYSCHOOL0.4436
15EWS0.2589
Total9.4292




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS155YET TO BE PREPARED
2WATER SUPPLY SYSTEM189YET TO BE PREPARED
3STORM WATER DRAINAGE630YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM840YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL907YET TO BE PREPARED
6STREET LIGHTING30YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING150YET TO BE PREPARED
8PLAYGROUNDS AND PARKS1845YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


NA (date)
08-01-2025 (date)
01-04-2025
14-06-2032
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings20911.6411771
Apartment/Shops/Other Buildings20911.6411771
Apartment/Shops/Other Buildings14933.8111771
Apartment/Shops/Other Buildings14921.6311771
Apartment/Shops/Other Buildings14933.8111771





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Any other840.01
Conversion charges125.19
External Development charges3660.25
Infrastructure Development charges1460.30
Land Cost1599.27
License fee as per LOI501.44
Renewables of approvals118.27

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments69034523452
Shops000
Plots000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2071386645572762
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2071331437282071
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2900290033143728
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments15860162741953011599
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments13849156241278311362
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1562319887
Shops00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System151517
Sewerage treatment & garbage disposal737382
Electricity Supply System000
Storm Water Drainage505057
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0161412
Water Supply System19232628
Sewerage treatment & garbage disposal91109127136
Electricity Supply System67677684
Storm Water Drainage63768894
Parks and Playgrounds000222
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting0003
Security and Fire Fighting001513.5

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16181614
Water Supply System152164
Sewerage treatment & garbage disposal73982719
Electricity Supply System84848484
Storm Water Drainage50691814
Parks and Playgrounds258185166148
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting4233.5
Security and Fire Fighting15151515

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements161893
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System42424242
Storm Water Drainage0000
Parks and Playgrounds222148166166
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and Fire Fighting159157.5
Street Lighting33.534

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System420
Storm Water Drainage00
Parks and Playgrounds12935
Clubhouse/community centres00
Shopping area00
Other00
Street Lighting20
Security and Fire Fighting7.57.5












Yes
No
SCO 59, SECTOR 56, HUDA MARKET, GURGAON , HARYANA, 122002
777705984541
ICIC0003430
110229253
03430
Mr. Kabul Chawla Address: 7, Amrita Shergill Marg Delhi-110003 Mr. Sudhanshu Tripathi Address: 202, 3rd Floor, Jor Bagh, , Delhi -110003 Mr. Manik Malik D- 2/2406, Vasant Kunj, South West Delhi, Delhi- 110070 Mr. Sachin Gupta H.No C-5/32. Yamuna Vihar, Delhi -110053 Mr. Rakesh Kumar Agrawal D-308 , Narwana Apartment , 89, IP Extension , Patparganj Delhi- 110092 Mr. Amit Singhal Address: E3/28, Nand Nagri Mandoli Delhi-110093 Mr. Sanjeev Loknath Agrawal Flat no 32 Sudarshan Apartments IP Extension Delhi -110092
Attached











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 123 OF 2014ALREADY BEEN OBTAINED22-08-2014
II. TOD LICENSEALREADY BEEN OBTAINED18-11-2024
III. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED16-02-2024
IV. FOREST NOCALREADY BEEN OBTAINED27-11-2024
V. WATER ASSURANCEALREADY BEEN OBTAINED27-11-2024
VI. SEWERAGE ASSURANCEALREADY BEEN OBTAINED26-11-2024
VII. STORM WATER ASSURANCEALREADY BEEN OBTAINED26-11-2024
VIII. NOC FOR CONSTRUCTION WATERALREADY BEEN OBTAINED03-12-2024
IX. BUILDING PLAN APPROVALALREADY BEEN OBTAINED08-01-2025
X. ROAD ASSURANCEALREADY BEEN OBTAINED07-11-2024
XI. ELECTRICAL LOAD ASSURANCEALREADY BEEN OBTAINED21-11-2024
XII. ZONING PLAN APPROVALALREADY BEEN OBTAINED18-11-2024
XIII. SITE PLAN APPROVALALREADY BEEN OBTAINED08-01-2025








Yes


Yes


As attached.







102 EDEN ESTATE ( AMSTORIA)
126.674
0
1132
0
1036
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
94160.25093231.62
Cost of the apartments000
Cost of the infrastructure41027.75040099.12
Others costs53132.5053132.5


154475 Lakhs
4409 Lakhs
0 Lakhs
0 Lakhs
Yes
14-01-2011
30-04-2024




102 EDEN ESTATE II
7.03125
0
64
0
64
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1674.6101674.61
Cost of the apartments000
Cost of the infrastructure662.010662.01
Others costs1012.60662.01


10634.34 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-09-2021
31-03-2025




ASTAIRE GARDEN
97.98125
0
1129
0
851
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
93289.01092465.68
Cost of the apartments000
Cost of the infrastructure45761.69044938.36
Others costs47527.32047527.32


158863.30 Lakhs
4257.96 Lakhs
4500 Lakhs
4500 Lakhs
Yes
01-04-2011
31-08-2026




GREEN OAKS
15.5625
0
258
0
197
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6449.4206449.42
Cost of the apartments000
Cost of the infrastructure3676.2003676.20
Others costs2773.2202773.22


41806.28 Lakhs
864.83 Lakhs
9000 Lakhs
9000 Lakhs
No
01-10-2021
27-08-2026




THE OVAL AT ASTAIRE GARDEN
1.872
0
31
0
3
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2578.4502225.48
Cost of the apartments000
Cost of the infrastructure401.35048.38
Others costs2177.102177.1


566 Lakhs
719 Lakhs
0 Lakhs
0 Lakhs
No
01-05-2024
30-11-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELAMINATED WOODDEN/TILE/MARBLE, PERGO/LOTUS KALEEN/ACTION/ NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
2WALL FINISHING DETAILSTILE,NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK/ OR EQUIVALENT ACRYLIC EMULSION/OBD/ ASIAN/BERGER/ NEROLAC OR EQUIVALENT
3KITCHEN DETAILSGREENPLY/SOHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/ANCHO/EURO OR EQUIVALENT MAKE
4BATHROOM FITTINGSJAQUAR/PARRYWARE/HINDWARE/OR EQUIVALENT
5WOOD WORK ETCGREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/ANCHO/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
6DOORS AND WINDOS FRAMESFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
7GLASS WORKCLEAR/TINTED/COATED/FROSTED GLASS SAINT GOBAIN /ASAHI/ GUARDIAN OR EQUIVALENT MAKE
8ELECTRIC FITTINGSSWITCH CONTROL FOR LIGHT, FAN GEYSER AND AC ETC. HOME AUTOMATION IN SELECT AREAS AS PER DESIGN
9CONDUCTING AND WIRING DETAILSFR PVC INSULATED MULTI STRAND COPPER WIRE (1.5-4.0 SQM)
10CUPBOARD DETAILSNA
11WATER STORAGEUPVC, SUPEREME/PRINCE/FINLOEX/ASTRAL/RCC OR EQUIVALENT MAKE
12LIFT DETAILSOTIS/MITSUBISHI/KONE/THYSSENKRUPP OR EQUIVALENT
13EXTERNAL GLAZINGSGLAZED WINDOWS WITH UPVC/AL/MS FRAMES ALUPLAST/DECUNIK/ENCRAFT/ASAHI/KOMMERLING/SHEDA/LG/SCHUCO/ALUK/ALUMIL/REYNAERS/MAHAVIR/HINDALCO/JINDAL/BHORUKA/EQUIVALENT
13.1WINDOWS/GLAZINGSGLAZED WINDOWS WITH UPVC/ALMS FRAMES,ALUPLAST/DECUNIK/ENCRAFT/ASAHI/SHEDA/LG/SCHUCO/ALUK/ALUMIL/REYNAERS/MAHAVIR/HINDALCO/JINDAL/BHORUKA/ EQUIVALENT
14DOORSFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/ DESHBANDHU OR EQUIVALENT MAKE
14.1MAIN DOORSFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
14.2INTERNAL DOORSFLUSH DOOR, GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
15AIR CONDITIONINGVRV / VRF WITH HIGH UNITS IN LIVING/DINING, KITCHEN, BEDROOMS DAIKIN/BLUESTAR/TOSHIBA/HITACHI/LG/SAMSUNG/VOLTAS/PANASONIC OR EQUIVALENT MAKE
16ELECTRICAL FITTINGSSP MCB(6-20AMP) 10KA, 4P MCB(32-63AMP)16KA, LEGRAND/HAGER/ABB/SCHNEDIER/SIEMENS/HAVELLS/L&T OR EQUIVALENT MAKE
17CNG PIPE LINE-
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONS ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE PAINT / TEXTURED PAINT ASIAN/BERGER/AKZONOBEL/JOTUN/KENAI NEROLAC OR EQUIVALENT MAKE
20INTERNAL FINISHINGACRYLIC EMULSION / OBD, ASIAN/BERGER/AKZONOBEL/JOTUN/KENAI NEROLAC OR EQUIVALENT MAKE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORTILE/MARBLE/GRANITE, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT
1 . 2 WALLSACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
1 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGERNEROLAC/OIKOS/ OR EQUIVALENT MAKE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING, PERGO/LOTUSKALEEN/ACTIONTESSA/DECOWOOD/EGGER/EDIFICE/GREENLAM OR EQUIVALENT
2 . 2 WALLSACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
2 . 3 CEILINGACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
2 . 4 MODULAR WARDROBES-
3 . MASTER TOILET
3 . 1 FLOORTILE/MARBLE/GRANITE, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT
3 . 2 WALLSCOMBINATION OF TILES / MARBLE / ACRYLIC EMULSION PAINT & MIRROR, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT PAINT- DULUX/ASIAN/BERGER/AKZONOBEL/JOTUN/KENAINEROLAC/OIKOS/SHERVINWILLIAM OR EQUIVALENT MAKE
3 . 3 CEILINGACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
3 . 4 COUNTERSTILE/QUARTZ UPTO 2' ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA
3 . 5 SANITARY WARE/CP FITTINGSCHINAWARE, JAQUAR/HINDWARE/PARRYWARE OR QUIVALENT MAKE
3 . 6 FITTING/FIXTURESCP FITTINGS (BASIN MIXER, FAUCET, SHOWER, DIVERTER, ANGLE VALVES, ETC.), GROHE/JAQUAR/HINDWARE/PARRYWARE, OR EQUIVALENT MAKE
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING, PERGO/LOTUSKALEEN/ACTIONTESSA/DECOWOOD/EGGER/EDIFICE/GREENLAM OR EQUIVALENT
4 . 2 WALLSACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
4 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
4 . 4 WARDROBES-
5 . TOILET
5 . 1 FLOORTILE/MARBLE/GRANITE,MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
5 . 2 WALLSCOMBINATION OF TILES / MARBLE / ACRYLIC EMULSION PAINT & MIRROR, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT ACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
5 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
5 . 4 COUNTERSMARBLE/QUARTZ COUNTER & EMULSION PAINT IN BALANCE AREA, NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
5 . 5 SANITARY WARE/CP FITTINGSSS, JAYNA/NEELKANTH/FRANKE, OR EQUIVALENT MAKE
5 . 6 FIXTURESCP ANGLE VALVES, GROHE OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORTILE / GRANITE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
6 . 2 WALLSTILE/QUARTZ UP-TO 2' ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA, NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
6 . 3 CEILINGACRYLIC EMULSION, ASIAN/BERGER/NEROLAC OR EQUIVALENT MAKE
6 . 4 COUNTERSQUARTZ/MARBLE/GRANITE
6 . 5 FIXTURES-
6 . 6 KITCHEN APPLIANCES-
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOOR-
7 . 2 WALLS & CEILING-
7 . 3 TOILET-
7 . 4 BALCONYTILE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT - OBD/ SEMI ACRYLIC /TILES, DULUX/ ASIAN/BERGER/EXTERNAL GRADE TEXTURE PAINT OR EQUIVALENT MAKE
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT17-12-2024 View Document
2IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN17-12-2024 View Document
3SEWER ASSURANCE13-02-2025 ------
4WATER SUPPLY ASSURANCE13-02-2025 ------
5GREEN AREA CALCULATION13-02-2025 ------
6SIZRA13-02-2025 ------
7SECTION 1&2 EWS13-02-2025 ------
8GROUND FLOOR PLAN PRIMARY & NURSERY SCHOOL13-02-2025 ------
9TERRACE AND MUMTY PLAN13-02-2025 ------
10ELEVATION B & C EWS13-02-2025 ------
11SUPERIMPOSE DEMARCATION13-02-2025 ------
12BANK UNDERTAKING13-02-2025 ------
13GROUND COVERAGE OF AREA EWS13-02-2025 ------
14COLLABORATION MEGA13-02-2025 ------
15LOI13-02-2025 ------
16NOC - USE OF TREATED WATER13-02-2025 ------
17QUARTERLY EXPENDTURE OF THE PROJECT13-02-2025 ------
18SECTION 02 TOWER-113-02-2025 ------
19ZONING PLAN13-02-2025 View Document
20BRIII13-02-2025 ------
217TH FLOOR PLAN EWS13-02-2025 ------
22ALL FLOOR OF AREA CALCULATION PRIMARY & NURSERY SCHOOL13-02-2025 ------
231ST TO 6TH FLOOR OF AREA EWS13-02-2025 ------
24FLOOR PLAN BANQUET BLOCK13-02-2025 ------
25BPTP LIMITED SIA_HR_INFRA13-02-2025 ------
26ELEVATION SOUTH & WEST GROUND COVERAGE13-02-2025 ------
27BASEMENT 313-02-2025 ------
28REFUGEE PLAN 28TH T 3 4 AND 513-02-2025 ------
29ELECTRICAL ASSURANCE13-02-2025 ------
30BASEMENT 01 AREA DIAGRAM13-02-2025 ------
31REFUGEE PLAN T 3 4 5 F 18 AND 3713-02-2025 ------
32CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT13-02-2025 View Document
33AREA CALCULATION & ELEVATION BANQUET BLOCK13-02-2025 ------
34ELEVATION 02 TOWER 1,2,3,4,513-02-2025 ------
35ELEVATION 03 & 04 TOWER 01& 513-02-2025 ------
36TYPICAL FLOOR CARPET 3 4 513-02-2025 ------
37GROUND FLOOR PLAN EWS13-02-2025 ------
38IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN13-02-2025 View Document
39SPE RECEIVING SEC 102 GGM13-02-2025 ------
40JAMABANDI13-02-2025 ------
41REFUGEE FLOOR PLAN 18 AND 37 T 1 AND 213-02-2025 ------
42SECTION 04 TOWER-413-02-2025 ------
43LC-IV & LC-IVA13-02-2025 ------
44SECTION 01 & 03 BANQUET BLOCK13-02-2025 ------
45POWERLINE13-02-2025 ------
46SITE PLAN13-02-2025 ------
47FIRE SCHEME APPLICATION13-02-2025 ------
48SITE PLAN ALL SERVICES13-02-2025 ------
49TYPICAL FLOOR CARPET 1 AND 213-02-2025 ------
50GF T 3 4 AND 513-02-2025 ------
51TYPICAL FLOOR PLANCALCULATION T1 AND 213-02-2025 ------
521& 2ND FLOOR PLAN PRIMARY & NURSERY SCHOOL13-02-2025 ------
53GROUND COVERAGE AREA CALCULATION13-02-2025 ------
54AAI_PERMISSION13-02-2025 ------
55ALLOTMENT FINAL13-02-2025 ------
56CERTIFICATE FINANCIAL AND INVENTORY13-02-2025 ------
57COLLABORATION13-02-2025 ------
58FOREST NOC13-02-2025 ------
59NON ENCUMBRANCE CERTIFICATE13-02-2025 ------
60SECTION 01 TOWER 1,2,3,4 & 513-02-2025 ------
61ELEVATION 01 TOWER 1,2,3,4,513-02-2025 ------
62BASEMENT 213-02-2025 ------
63GF PLAN T 1 2 3 4 513-02-2025 ------
64MINING13-02-2025 ------
65CA CERTIFICATE COST INCURRED13-02-2025 ------
66DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD13-02-2025 View Document
67NCZ13-02-2025 ------
68BASEMENT 113-02-2025 ------
69TERRACE PLAN 7TH & 8TH FLOOR EWS13-02-2025 ------
70TYPICAL FLOOR PLAN T 3 4 513-02-2025 ------
71BBA13-02-2025 ------
72COPY OF LICENSE ALONG WITH SCHEDULE OF LAND13-02-2025 View Document
73DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.13-02-2025 View Document
74SALE DEED13-02-2025 ------
758TH FLOOR PLAN EWS13-02-2025 ------
76BASEMENT 02 AREA DIAGRAM13-02-2025 ------
77BS 0313-02-2025 ------
78STORM WATER ASSURANCE13-02-2025 ------
79TREECUTTING13-02-2025 ------
80SECTION 01 & 02 PRIMARY & NURSERY SCHOOL13-02-2025 ------
81SECTION 03 TOWER-513-02-2025 ------
82TERRACE AND MUMTY PLAN TOWER 1 AND 213-02-2025 ------
83ELEVATION A&D EWS13-02-2025 ------
843RD FLOOR PLAN & TERRACE PLAN PRIMARY & NURSERY SCHOOL13-02-2025 ------
85BASEMENT 1 SERVICES ONLY13-02-2025 ------
86GF PLA T1 AND T 213-02-2025 ------
87GROUND FLOOR OF AREA EWS13-02-2025 ------
88REFUGEE 28 T1 AND T 213-02-2025 ------
89SERVICE FLOOR PLAN AREA CALCULATION13-02-2025 ------
90TYPICAL FLOOR PLAN EWS13-02-2025 ------