HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1058-2022
Submission Date : 12-05-2022 12:07:09 PM
Applicant Type : Company
Project Type: NEW




ASHIANA HOUSING LIMITED
5F, EVEREST, 46/C, CHOWRINGHEE ROAD, KOLKATA 70071 WEST BENGAL
01142654265
9650524421 (Number Shared by Promoter in Public)
ayush.gupta@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
 
 


 
 


 
 


 
 







ASHIANA AMARAH PHASE I & IA
VILL. WAZIRPUR , SEC 93 , GURUGRAM
HARSARU ST
GURUGRAM
0124352100
9828023733 (Number Shared by Promoter in Public)
ms.chauhan@ashianahousing.com
MS CHAUHAN
0124352100
9828023733 (Number Shared by Promoter in Public)
ms.chauhan@ashianahousing.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152428429-03-2022995086ICICI BANKHRERA Gurugram
252483513-07-20222030102ICICI BANKHRERA Gurugram







5.041 (Acre)
1.84
0.399
22.1 (Acre)
41 of 2010
Yes







20635.00 Lakhs
3636.13 Lakhs
7087.00 Lakhs
1005.00 Lakhs
8906.87 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3223.115
3CONSTRUCTION OF ROADS4675.21
4PAVEMENTS0
5PARKS AND PLAYGROUNDS6649.53
6GREEN BELTS0
7VEHICLE PARKINGS1475
8ELECTRICITY SUB-STATION0
9CLUB HOUSE2391.0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13SECURITY AND FIRE FIGHTING132.712
14SEWAGE128.0
15ELECTRIC SUB STATION220.0
16TWELVE MTR ROAD987.43
17LEARNING HUB518.0
Total20399.997




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP- ALREADY CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS190SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM50SUBMITTED TO HUDA
3STORM WATER DRAINAGE43SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM70SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL67SUBMITTED TO HUDA
6STREET LIGHTING14SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING59SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS12SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM6SUBMITTED TO HUDA
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15UNDERGROUND WATER TANK136.0SUBMITTED TO HUDA
16CONSTRUCTION OF ROADS75.00SUBMITTED TO HUDA
17STP21.00SUBMITTED TO HUDA
18RAIN WATER HARVESTING14.00SUBMITTED TO HUDA
19ELECTRIC SUB STATION121.00SUBMITTED TO HUDA
20PARKING127.00SUBMITTED TO HUDA


NA (date)
17-05-2022 (date)
15-07-2022
15-01-2027
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings92.901122
Apartment/Shops/Other Buildings111.95561
Apartment/Shops/Other Buildings130.81561
Apartment/Shops/Other Buildings17.671201
Apartment/Shops/Other Buildings13.3561
Apartment/Shops/Other Buildings11.34101





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00
Others cost189.13449.07
Cost of construction203.37482.87

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Cost of construction628.86549.57536.87623.30
Others cost584.84511.10503.05585.30

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Others cost705.14864.08829.15592.26
Cost of construction752.16923.06789.42463.00
Cost of construction of community facilities96.0896.08

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Cost of construction452.28430.81233.4018.02
Cost of construction of community facilities96.0896.0896.0896.08
Others cost630.70848.80480.94206.98

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00
Cost of construction of community facilities96.0840.57
Others cost154.8555.66
Cost of construction00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal34
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Underground Water Tank39
Street Lighting14

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0014050
Water Supply System05000
Sewerage treatment & garbage disposal33000
Electricity Supply System0000
Storm Water Drainage222200
Parks and Playgrounds01200
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain Water Harvesting77
Security and Fire Fighting82525
Parking127
STP399
Underground Water Tank5839
Electrical Sub Station13404028
Construction of Circulation Roads2828
Electrical Supply System14

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Renewable Energy System51
Electrical Supply System4214
Construction of Circulation Roads19












Yes
No
ICICI BANK , PREET VIHAR , NEW DELHI
777705227006
ICICI0000037
110229006
000037
Vishal Gupta, MD, Address-W-177 GK II NEW DELHI Ankur Gupta, JMD Address-C8 3rd floor Maharani Bagh Delhi. Varun Gupta, Director, Address-W-177 GK II NEW DELHI Vikas Dagar, CFO, Address-2nd Floor, Rattan Park, Ramesh Nagar, West Delhi
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ENVIRONMENTAL CLEARANCE ALREADY BEEN OBTAINED26-11-2021
II. RENEWAL OF LICENSEALREADY BEEN OBTAINED19-08-2021
III. BUILDING PLANALREADY BEEN OBTAINED17-05-2022
IV. DRINING WATER ASSURANCEALREADY BEEN OBTAINED04-08-2021
V. SEWAGE DISPOSALALREADY BEEN OBTAINED23-07-2021
VI. STROM WATERALREADY BEEN OBTAINED23-07-2021
VII. ZONING PLANALREADY BEEN OBTAINED01-02-2022
VIII. AIRPORT HEIGHT CLEARANCEALREADY BEEN OBTAINED06-08-2021








Yes


Yes















SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES (600X600) OR (800X800).
2WALL FINISHING DETAILSSAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
3KITCHEN DETAILSTILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMES2 TO 3 TRACK ALUMINIUM/UPVC FRAMED WINDOW, WITH 2 TO 3 SLIDING PANELS DEPENDING UPON SIZE WITH CLEAR FLOAT GLASS AND PROVISION FOR FLY MESH SHUTTER.
7GLASS WORKGLASS, PLAIN/CLEAR/FROSTED, IS WIDELY USED IN RESIDENTIAL DEVELOPMENTS AND MAY BREAK/ SHATTER DUE TO ACCIDENTAL KNOCKS OR OTHER CAUSES.
8ELECTRIC FITTINGSMODULAR ELECTRICAL SWITCHES WITH SOCKETS AND FAN REGULATORS OF SSK/ANCHOR/NORTH WEST/LEGRAND OR EQUIVALENT
9CONDUCTING AND WIRING DETAILS ALL ELECTRICAL WIRING IN CONCEALED CONDUITS WITH COPPER WIRES. CONVENIENT POSITION & DISTRIBUTION OF LIGHT AND POWER PLUGS AND PROVISION FOR ELECTRICAL CHIMNEY ABOVE PLATFORM AND WATER PURIFIER POINT IN KITCHEN
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORS1 HOUR FIRE RATED MS/ WOODEN SHUTTER WITH HANDLE AND LOCK SYSTEM, MAIN DOOR FRAME ARE EITHER ENAMEL PAINTED/POWDER COATED / POLISH FINISH.
14.2INTERNAL DOORSFLUSH DOOR OR MOULDED SKIN DOORS, OTHER DOOR FRAMES ARE ENAMEL PAINTED
15AIR CONDITIONINGPROVISION FOR FIXING OF WINDOW/SPLIT AIR CONDITIONER IN DRAWING DINING AREA & BEDROOMS ARE BEING PROVIDED. FOR SPLIT A/C ASSIGNED SPACES ARE EARMARKED ON THE ELEVATION OF THE BUILDING FOR EASE OF ACCESS AND TO CREATE UNIFORMITY FOR AESTHETIC PURPOSE
16ELECTRICAL FITTINGSNA
17CNG PIPE LINEPIPED LPG GAS WITH LPG METER WILL BE PROVIDED
18PROVISION OF WIFI AND BROADBAND FACILITYIF THE PURCHASER REQUIRES INTERNET ACCESS & CABLE TELEVISION, THE PURCHASER WILL HAVE TO MAKE DIRECT ARRANGEMENTS WITH THE SERVICE PROVIDER /OR SUCH RELEVANT ENTITIES/AUTHORITIES FOR SERVICES TO THE UNIT AND TO MAKE ALL NECESSARY PAYMENT.
19EXTERNAL FINISHING/COLOUR SCHEME ALL EXTERNAL WALLS INCLUDING ROOF TERRACE, OPEN TERRACE, BALCONY: CEMENT SAND PLASTER WITH SPRAY TEXTURE/COATING AND/OR EMULSION PAINT FINISH.
20INTERNAL FINISHINGLIFT LOBBY IN BASEMENT, STILT/GROUND FLOOR AND UPPER FLOORS: GRANITE AND/OR MARBLE AND/OR QUARTZ STONE AND /VITRIFIED TILES AND/OR CERAMIC TILES AND/OR CEMENT SAND PLASTER AND/OR OTHER LOCAL STONE AND/OR COMBINATION OF ANY TWO OR MORE ITEMS WITH EMULSION PAINT FINISH (WHEREVER APPLICABLE).
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES (600X600) OR (800X800)
1 . 2 WALLSINTERNAL: BRICK WALL OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCK/HOLLOW CONCRETE BLOCK
1 . 3 CEILINGPLASTERED WITH EITHER SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM. PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES (600X600) OR (800X800)
2 . 2 WALLSBRICK WALL OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCK/HOLLOW CONCRETE BLOCK
2 . 3 CEILINGPLASTERED WITH EITHER SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES (300X300 OR OTHER SIZES UP TO 600X600) AND/OR COMBINATION
3 . 2 WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT
3 . 3 CEILINGPLASTERED WITH EITHER SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGS1 WASH BASIN FITTED UNDER/OVER MARBLE/GRANITE QUARTZ STONE COUNTER OR 1 RECESSED WASH BASIN FACTORY MOULDED WITH SAME VITRIFIED COUNTER LEDGE (B) 1 FLOOR MOUNTED EWC WITH 6 LITER CAPACITY DUAL FLUSH TYPE VITRIFIED CISTERN WITH SEAT AND SEAT COVER. (C) A GLASS CURTAIN AS PER DESIGN OF THE ARCHITECT (500MM TO 700MM) AS A PARTITION TO SEGREGATE SHOWER AREA FROM REST OF THE AREA SHALL BE PROVIDED IN MASTER BATHROOM ONLY.
3 . 6 FITTING/FIXTURESA SINGLE LEVER HALF/QUARTER TURN CP BASIN MIXER IN WASH BASIN, A SINGLE LEVER WALL MIXER WITH OVER HEAD SHOWER AND A SPOUT IN SHOWER AREA. (E) 1 CP ANGLE VALVE ALONG WITH CHROME PLATED PVC SEMI RIGID/FLEXIBLE HEALTH FAUCET OF STANDARD MAKE. (F) 2 CP ANGLE VALVE OF STANDARD MAKE FOR IN AND OUT OF HOT WATER GEYSER (G) 2 ANGLE VALVES FOR WATER CONNECTION TO WASH BASIN AND 1 ANGLE VALVE FOR WATER CONNECTION TO FLUSHING CISTERN AND 1 BOTTLE TRAP OF STANDARD MAKE PTMT MATERIAL
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES (600X600) OR (800X800).
4 . 2 WALLSBRICK WALL OF CLAY BRICKS/FLY ASH BRICKS/AAC BLOCKS/SOLID CONCRETE BLOCK/HOLLOW CONCRETE BLOCK
4 . 3 CEILINGPLASTERED WITH EITHER SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC TILES (300X300 OR OTHER SIZES UP TO 600X600) AND/OR COMBINATION
5 . 2 WALLSCERAMIC TILES UP TO 2.0 TO 2.1 M HEIGHT FROM FLOOR LEVEL AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT.
5 . 3 CEILINGPLASTERED WITH EITHER SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGS1 WASH BASIN FITTED UNDER/OVER MARBLE/GRANITE QUARTZ STONE COUNTER OR 1 RECESSED WASH BASIN FACTORY MOULDED WITH SAME VITRIFIED COUNTER LEDGE (B) 1 FLOOR MOUNTED EWC WITH 6 LITER CAPACITY DUAL FLUSH TYPE VITRIFIED CISTERN WITH SEAT AND SEAT COVER.
5 . 6 FIXTURES1 CP ANGLE VALVE ALONG WITH CHROME PLATED PVC SEMI RIGID/FLEXIBLE HEALTH FAUCET OF STANDARD MAKE. (F) 2 CP ANGLE VALVE OF STANDARD MAKE FOR IN AND OUT OF HOT WATER GEYSER 1 TOWEL ROD, A 3 TO 5 MM THICK MIRROR OF MIN SIZE 450MMX550 MM (I) 1 TOWEL RACK INSTEAD OF TOWEL ROD SHALL BE PROVIDED IN MASTER TOILET ONLY
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES (600X600) OR (800X800)
6 . 2 WALLSCERAMIC TILES 0.60 METER FROM COUNTERTOP AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT
6 . 3 CEILINGPLASTERED WITH EITHER SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
6 . 4 COUNTERSNA
6 . 5 FIXTURES2 CP ANGLE VALVE FOR IN AND OUT OF HOT WATER GEYSER. (D) 1 CP ANGLE VALVE FOR WATER PURIFIER UNIT/RO (E) NO TAP IS PROVIDED BELOW SINK.
6 . 6 KITCHEN APPLIANCES1 STAINLESS STEEL SINK WITH ONE BOWL A DRAIN BOARD. (B) 1 SWIVAL TYPE SINK MIXER PIPED LPG GAS WITH LPG METER WILL BE PROVIDED
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES (300X300 OR OTHER SIZES UP TO 450X450 AND/OR COMBINATION) SUITABLE QUALITY GLAZED/MATT FINISH
7 . 2 WALLS & CEILINGCERAMIC TILES 0.60 METER FROM COUNTERTOP AND ABOVE THE TILES - SAND-CEMENT PLASTER AND A COAT OF POP WITH COATING OF EMULSION PAINT PLASTERED WITH EITHER SAND-CEMENT MORTAR AND A COAT OF PLASTER OF PARIS OR GYPSUM PLEASING SHADE EMULSION PAINT (PLASTIC/ACRYLIC AS PER ARCHITECT'S RECOMMENDATION) FINISH OF APPROPRIATE QUALITY
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND12-05-2022 View Document
2ZONING PLAN12-05-2022 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT12-05-2022 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN12-05-2022 View Document
5DEMARCATION PLAN12-05-2022 View Document
6ENVIRONMENT CLEARNACE ASHIANA AMARHA07-07-2022 ------
7CONSTRUCTION WATER NOC07-07-2022 ------
8BR III07-07-2022 ------
9FIRE SCHEME APPLIED07-07-2022 ------
10FOREST NOC FOR AHL DT 29.12.202107-07-2022 ------
11FOREST NOC07-07-2022 ------
12DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.07-07-2022 View Document
13SERVICE ESTIMATES APPLIED07-07-2022 ------
14IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN07-07-2022 View Document
15BUILDING PLAN-3 + 2T TYPE SECTIONS 1 AND 2 A-1611-07-2022 ------
16BUILDING PLAN-3 + 3T TYPE ELEVATIONS A AND B A-2011-07-2022 ------
17BUILDING PLAN-3 + 3T TYPE ELEVATIONS A AND B A-2011-07-2022 ------
18BUILDING PLAN-4 + 4T TYPE ELEVATIONS A AND B A-2611-07-2022 ------
19SITE PLAN - SERVICES A-01.112-07-2022 ------
20SITE PLAN - PARKING A-01.212-07-2022 ------
21SITE PLAN - GREEN A-01.312-07-2022 ------
223 + 2T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS A-1120-07-2022 ------
23BASEMENT 1 AND 2 PLAN AND AREA CALCULATIONS A-0220-07-2022 ------
243 + 2T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS A-1220-07-2022 ------
253 + 3T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS A-1720-07-2022 ------
263 + 3T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS A-1820-07-2022 ------
274 + 4T TYPE STILT & FIRST FLOOR PLAN & AREA CALCULATIONS A-2320-07-2022 ------
284 + 4T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS A-2420-07-2022 ------
294 + 4T TYPE TYPICAL & TERRACE PLAN & AREA CALCULATIONS A-2420-07-2022 ------
30COMMUNITY BUILDING AND LEARNING HUB A-4120-07-2022 ------
31COMMUNITY BUILDING AND LEARNING HUB A-4220-07-2022 ------
32STRUCTURE PLAN20-07-2022 ------
33DRAIN PLAN20-07-2022 ------
34WATER AND FIRE PLAN20-07-2022 ------
35ROAD NETWORK PLAN20-07-2022 ------
36SEWER PLAN20-07-2022 ------
37CO-ORDINATION PLAN-EXT. COMBINED20-07-2022 ------
38INVENTORY CERTIFICATE20-07-2022 ------
39DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD20-07-2022 View Document
40CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT20-07-2022 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 Rectification in Validity of Registration 29-09-2022 View Document