8TH FLOOR, WING B, MILESTONE EXPERION CENTRE, SECTOR -15, PART -2, GURUGRAM 122001, HARYANA
01246281630
9560454296 (Number Shared by Promoter in Public)
accounts@experion.net.in
Http://www.experion.co
XXXX138L
U70109DL2006FTC151343
WINDCHANTS PHASE C
SECTOR 112 GURUGRAM
GURGAON
GURUGRAM
01246281630
0124628163 (Number Shared by Promoter in Public)
accounts@experion.net.in
KASHI NATH SHARMA
01246281630
9910024897 (Number Shared by Promoter in Public)
kashi.nath@experion.in
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
50174
19-09-2024
740500
AXIS BANK LIMITED
HRERA Gurugram
1.1965 (Acre)
3.474
3.432
24.6275 (Acre)
210/2008 dated 08.02.2008 and 28 of 2012 dated 07.04.2012 and 99 of 2019 Dated 04.09.2019
No
Address WZ-991, RANI BAGH, DELHI 110038
Address 8TH FLOOR, WING B, MILESTONE EXPERION CENTRE, SECTOR -15, PART -2, GURUGRAM 122001, HARYANA
Annexure-B- COLLABORATOR
YES
Yes
COLLABORATION AGREEMENT ATTACHED
No
Yes
Yes
17147.29 Lakhs
2266.57 Lakhs
11398.67 Lakhs
1625.33 Lakhs
1856.72 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
0.1849
3
CONSTRUCTION OF ROADS
0.3123
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
0.1842
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0.3521
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0.1630
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
Total
1.1965
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
ALREADY CONNECTED
No
WATER SUPPLY
GMDA
Yes
ELECTRICITY
GMDA
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
DHAVPN
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
185.59
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
45.42
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
14.59
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
85.17
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
14.74
AS PER PROJECT REPORT
6
STREET LIGHTING
13.61
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
303.93
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
156.02
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
467.99
AS PER PROJECT REPORT
10
SHOPPING AREA
29.90
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
32.75
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
15
SEWAGE SYSTEM
8.73
AS PER PROJECT REPORT
16
UNDER GROUND WATER TANK
7.10
AS PER PROJECT REPORT
17
RAIN WATER HARVESTING
14.74
AS PER PROJECT REPORT
18
ELECTRICAL SUB STATION
245.05
AS PER PROJECT REPORT
NA (date)
09-08-2024 (date)
01-01-2025
30-06-2030
Plot Area(In Square Meter)
Number of plots in the project
0
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
218.72
60
1
Apartment/Shops/Other Buildings
17.89
4
1
Apartment/Shops/Other Buildings
11.70
1
1
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
Shops
0
Plots
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
17.80
56.18
120.71
116.81
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
311.49
725.11
922.43
551.98
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1057.35
852.53
863.58
470.05
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
819.43
923.34
1016.06
516.37
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
806.95
673.31
508.16
69.04
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
Shops
0
0
Plots
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
22.33
56.76
10.43
5.75
Shopping area
0
0
1.16
1.71
Other
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
10.16
0.27
0
0
Shopping area
3.03
3.91
4.03
2.19
Other
0
0
0
0
STP
2.85
3.78
3.88
2.11
Under Ground Water Tank
2.28
2.34
0.77
Security and Fire Fighting
52.12
29.11
Security and fire fighting
42.64
53.47
Electrical Sub Station
72.29
Rain Water Harvesting
1.04
underground Water Tank
1.71
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
14.85
Water Supply System
0
0
18.67
10.60
Sewerage treatment & garbage disposal
0
0
2.69
0
Electricity Supply System
0
0
5.96
17.89
Storm Water Drainage
0
0
4.50
2.55
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
26.57
92.99
94.20
50.72
Shopping area
0.65
2.72
2.75
1.09
Other
0
0
0
0
Electrical Sub Station
72.29
94.35
78.42
Rain Water Harvesting
4.73
4.73
4.24
Security and fire fighting
52.12
52.12
22.34
STP
2.11
0
0
Sewage System
1.53
Renewable Energy System
1.91
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
71.45
71.45
27.84
0
Water Supply System
16.15
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
32.79
28.53
0
0
Storm Water Drainage
4.68
2.86
0
0
Parks and Playgrounds
0
59.81
96.21
0
Clubhouse/community centres
92.99
4.83
0
0
Shopping area
1.93
2.57
2.17
0
Other
0
0
0
0
Sewage System
2.80
1.71
Street Lighting
5.67
7.94
Renewable Energy System
9.83
Renewable Energy
21.02
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
Water Supply System
0
0
Sewerage treatment & garbage disposal
0
0
Electricity Supply System
0
0
Storm Water Drainage
0
0
Parks and Playgrounds
0
0
Clubhouse/community centres
0
0
Shopping area
0
0
Other
0
0
Yes
Yes
DBS BANK INDIA LIMITED ADDRESS UGF, TOWER C, DLF BUILDING 10, DLF CYBER CITY, GURGAON, 122002
8858210000025337
DBSS0IN0858
110641003
IN0858
Mr. Nagaraju Routhu R/o A-61, 2nd Floor South City 2, Islampur(97), Gurugram-122018, Haryana & Mr. Basavaraddi Krishnaraddi Malagi R/o WB 04 301 Experion Windchants, Sector-112, Dwarka Expressway, Choma(62), Gurgaon-122017, Haryana
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. AAI
ALREADY BEEN OBTAINED
27-11-2019
II. HUDA CONSTRUCTION
ALREADY BEEN OBTAINED
30-07-2024
III. ELECTRICAL LOAD
ALREADY BEEN OBTAINED
22-07-2024
IV. LICENCE 21 OF 2008 DATED 08.02.2008
ALREADY BEEN OBTAINED
08-02-2008
V. BUILDING PLAN
ALREADY BEEN OBTAINED
09-08-2024
VI. WATER ASSURANCE
ALREADY BEEN OBTAINED
10-12-2018
VII. SEWERAGE ASSURANCE
ALREADY BEEN OBTAINED
26-02-2019
VIII. STROM WATER ASSURANCE
ALREADY BEEN OBTAINED
26-02-2019
IX. LICENCE 28 OF 2012 DATED 07.04.2012
ALREADY BEEN OBTAINED
07-04-2012
X. LICENCE 99 OF 2019 DATED 04.09.2019
ALREADY BEEN OBTAINED
04-09-2019
XI. ENVIRONMENT CLEARANCE
APPLIED FOR BUT YET TO RECEIVE
17-07-2024
XII. FIRE SCHEME APPROVAL
APPLIED FOR BUT YET TO RECEIVE
22-08-2024
XIII. SERVICE ESTIMATE AND PLAN
APPLIED FOR BUT YET TO RECEIVE
06-09-2024
Yes
Yes
as per Norms
THE HEARTSONG PHASE-6
0.585
52
0
52
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
2680
2680
2680
Cost of the apartments
2096
2096
2096
Cost of the infrastructure
0
0
0
Others costs
584
584
584
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
19-12-2017
17-12-2017
HUB @108
1.15
0
18
0
18
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
845.46
845.46
740.44
Cost of the apartments
0
0
0
Cost of the infrastructure
340.39
340.39
235.37
Others costs
505.07
505.07
505.07
361.86 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
05-05-2024
05-05-2024
WESTERLIES PHASE-3
10.046125
0
123
0
11
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
1972.00
1972.00
1964.51
Cost of the apartments
0
0
0
Cost of the infrastructure
549.51
549.51
549.51
Others costs
1422.49
1422.49
1415.00
606.19 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-01-2024
30-01-2024
WESTERLIES PHASE-4
16.03125
0
172
0
115
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
2985.33
2985.33
3005.01
Cost of the apartments
0
0
0
Cost of the infrastructure
927.26
927.26
488.38
Others costs
2058.07
2058.07
2516.63
7306.77 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-01-2024
30-01-2024
WESTERLIES PHASE-1
46.2570
0
487
0
220
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
8791.60
8791.60
8791.60
Cost of the apartments
0
0
0
Cost of the infrastructure
2408.92
2408.92
2408.92
Others costs
6382.68
6382.68
6382.68
52721.36 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2017
31-07-2017
WESTERLIES PHASE-2
44.1780
0
203
0
220
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
7703.21
7703.21
7703.21
Cost of the apartments
0
0
0
Cost of the infrastructure
2300.65
2300.65
2300.65
Others costs
5402.56
5402.56
5402.56
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
22-03-2018
22-03-2018
ZEPHYR AT THE WESTERLIES
0.3633
28
0
28
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
1405.93
1405.93
1405.93
Cost of the apartments
1250
1250
1250
Cost of the infrastructure
0
0
0
Others costs
155.93
155.93
155.93
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-08-2024
01-08-2024
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
IMPORTED MARBLE, LAMINATED WOODEN FLOORING, ANTI SKID VITRIFIED TILES
2
WALL FINISHING DETAILS
VITRIFIED TILE UPTO FALSE CEILING
3
KITCHEN DETAILS
VITRIFIED TILES 2' ABOVE KITCHEN COUNTER, REST OF WALLS IN ACRYLIC EMULSION PAINT.
4
BATHROOM FITTINGS
VITRIFIED TILE UPTO FALSE CEILING
5
WOOD WORK ETC
PREFABRICATED MODULAR DOOR WITH FRAME OR FLUSH DOOR WITH LAMINATE / PAINT AND HARDWOOD FRAME.
6
DOORS AND WINDOS FRAMES
MAIN DOOR TO FLAT - HARDWOOD FRAME WITH VENEERED FLUSH DOOR, ALUMINIUM/ UPVC GLAZINGS WITH FLY NET IN ALL SLIDERS AND PERFORMANCE GLASS.
7
GLASS WORK
SINGLE GLAZED
8
ELECTRIC FITTINGS
AS PER DESIGN
9
CONDUCTING AND WIRING DETAILS
1.1 KV GRADE COPPER FLEXIBLEWIRE
10
CUPBOARD DETAILS
N.A
11
WATER STORAGE
NA
12
LIFT DETAILS
2 TO A CORE, TOTAL 60 NOS. FLATS
13
EXTERNAL GLAZINGS
ALUMINIUM / UPVC GLAZING WITH PERFORMANCE GLASS`
13.1
WINDOWS/GLAZINGS
UPVC GLAZINGS WITH FLY NET IN ALL SLIDERS AND PERFORMANCE GLASS.
14
DOORS
MAIN DOOR TO FLAT - HARDWOOD FRAME WITH VENEERED FLUSH DOOR.
14.1
MAIN DOORS
MAIN DOOR TO FLAT - HARDWOOD FRAME WITH VENEERED FLUSH DOOR.
14.2
INTERNAL DOORS
PREFABRICATED MODULAR DOOR WITH FRAME OR FLUSH DOOR WITH LAMINATE / PAINT AND HARDWOOD FRAME.
15
AIR CONDITIONING
HI-WALL IDU
16
ELECTRICAL FITTINGS
AS PER DESIGN
17
CNG PIPE LINE
NA
18
PROVISION OF WIFI AND BROADBAND FACILITY
AS PER DESIGN
19
EXTERNAL FINISHING/COLOUR SCHEME
ACRYLIC EMULSION PAINT
20
INTERNAL FINISHING
HARDWOOD FRAME
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
IMPORTED MARBLE
1 . 2
WALLS
ACRYLIC EMULSION PAINT
1 . 3
CEILING
ACRYLIC EMULSION PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
LAMINATED WOODEN FLOORING
2 . 2
WALLS
ACRYLIC EMULSION PAINT
2 . 3
CEILING
ACRYLIC EMULSION PAINT
2 . 4
MODULAR WARDROBES
PREFABRICATED MODULAR DOOR WITH FRAME OR FLUSH DOOR WITH LAMINATE / PAINT AND HARDWOOD FRAME.
3 . MASTER TOILET
3 . 1
FLOOR
ANTI SKID VITRIFIED TILES
3 . 2
WALLS
VITRIFIED TILE UPTO FALSE CEILING
3 . 3
CEILING
MOISTURE RESISTANT FALSE CEILING WITH ACRYLIC EMULSION PAINT
3 . 4
COUNTERS
NA
3 . 5
SANITARY WARE/CP FITTINGS
AS PER DESIGN
3 . 6
FITTING/FIXTURES
AS PER DESIGN
4 . BED ROOMS
4 . 1
FLOOR
LAMINATED WOODEN FLOORING
4 . 2
WALLS
ACRYLIC EMULSION PAINT
4 . 3
CEILING
ACRYLIC EMULSION PAINT
4 . 4
WARDROBES
PREFABRICATED MODULAR DOOR WITH FRAME OR FLUSH DOOR WITH LAMINATE / PAINT AND HARDWOOD FRAME.
5 . TOILET
5 . 1
FLOOR
ANTI SKID VITIRFIED TILES
5 . 2
WALLS
VITRIFIED TILE UPTO FALSE CEILING
5 . 3
CEILING
MOISTURE RESISTANT FALSE CEILING WITH ACRYLIC EMULSION PAINT
5 . 4
COUNTERS
NA
5 . 5
SANITARY WARE/CP FITTINGS
AS PER DESIGN
5 . 6
FIXTURES
AS PER DESIGN
6 . KITCHEN
6 . 1
FLOOR
VITRIFIED TILES
6 . 2
WALLS
VITRIFIED TILES 2' ABOVE KITCHEN COUNTER, REST OF WALLS IN ACRYLIC EMULSION PAINT.
6 . 3
CEILING
ACRYLIC EMULSION PAINT
6 . 4
COUNTERS
NA
6 . 5
FIXTURES
AS PER DESIGN
6 . 6
KITCHEN APPLIANCES
NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
CERAMIC TILES
7 . 2
WALLS & CEILING
ACRYLIC EMULSION PAINT.
7 . 3
TOILET
ANTI SKID VITIRFIED TILES, MOISTURE RESISTANT FALSE CEILING WITH ACRYLIC EMULSION PAINT
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT