HRERA GurugramTemp Project Id : RERA-GRG-PROJ-801-2021
Submission Date : 12-07-2021 11:38:27 AM
Applicant Type : Company
Project Type: ONGOING




ANANT RAJ LIMITED
CP01, SEC-8, IMT MANESAR, GURUGRAM, HARYANA 122051
01143034473
8527333662 (Number Shared by Promoter in Public)
akhil.kumar@anantrajlimited.com
http://www.anantrajlimited.com
XXXX972B
L45400HR1985PLC021622
 
 


 
 


 
 


 
 







THE ESTATE FLOORS
ANANT RAJ ESTATE, E- BLOCK, SEC-63A, GURUGRAM
GURGAON
GURUGRAM
8527333662
8527333662 (Number Shared by Promoter in Public)
INFO@ANANTRAJLIMITED.COM
AKHIL KUMAR
8527333662 (Number Shared by Promoter in Public)
AKHIL.KUMAR@ANANTRAJLIMITED.COM








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150675909-07-2021418119SBIHRERA Gurugram
250728211-02-2022699000SBIHRERA Gurugram
311833713-04-202258700SBIHRERA Gurugram







10789.31 (Sqr/mtrs)
180
153
405742.54 (Sqr/mtrs)
Licence no.119 of 2011
No
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     H-65, CONNAUGHT CIRCUS, NEW DELHI-110001
Address     W/O RANJAN GUPTA
Address     S/O CHOTE LAL
Address     W/O CHANDER PRAKASH
Annexure-B- LAND FALLING UNDER THE CURRENT PROJECT OF 'THE ESTATE FLOORS' IS OWNED BY WHOLLY OWNED SUBSIDIARY COMPANY OF THE APPLICANT AND THE APPLICANT HAVE EXECUTED DEVELOPMENT AGREEMENT WITH THE LANDOWNERS (LICENSE NO. 1 & 3 TO 8). APPLICANT HAS EXECUTED COLLABORATION AGREEMENT WITH LICENSE NO. 9, 10, 11 DULY REGISTERED.
LANDOWNING COMPANIES (LICENSE NO. 1 & 3 TO 8) ARE WHOLLY OWNED SUBSIDIARY COMPANY OF THE APPLICANT AND THE APPLICANT HAS EXECUTED DEVELOPMENT AGREEMENT WITH THE SAID LANDOWNERS. APPLICANT HAS EXECUTED COLLABORATION AGREEMENT WITH LICENSE NOS. 9, 10, 11 DULY REGISTERED BEFORE GRANT OF LICENSE.
No
COPY OF THE AGREEMENT IS ENCLOSED WITH THE APPLICATION
No
No
No







17189.33 Lakhs
2025.73 Lakhs
8327.83 Lakhs
104.39 Lakhs
6731.38 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS10789.31
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total10789.31




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHUDAYes
WATER SUPPLYHUDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDAYes
STORM WATER DRAINAGEHUDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS52SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM20.6SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE11.3SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL12.2SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING7.6SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0.69SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


07-09-2019 (date)
15-07-2013 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type RESIDENTIAL FLOORS92.4790692130
2APARTMENT/SHOPS/OTHER BUILDINGS Type 1203021910
3APARTMENT/SHOPS/OTHER BUILDINGS Type 173.308082






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
RESIDENTIAL FLOORS 9042 NO. OF PLOTS BEING DEVELOPED AS INDEPENDENT FLOORS, OUT OF WHICH OC HAS BEEN OBTAINED FOR 34 PLOTS, CONSTRUCTION NEAR COMPLETION FOR 06 PLOTS, CONSTRUCTION WORK STARTED FOR 02 PLOTS IN MAR 2021


31-07-2014
31-12-2018
30-09-2024
01-01-2012
100
31-03-2014
SERVICES ALREADY LAID DOWN IN THE BLOCK, PART COMPLETION GRANTED FOR THIS AREA BY DTCP
THE ESTATE FLOORS IS SITUATED IN 'E' BLOCK OF PLOTTED COLONY - ANANT RAJ ESTATE, WHERE SERVIES ARE ALREADY LAID DOWN. SERVICES IN THE OTHER PART/BLOCKS OF THE COLONY IS APPROX. 90% COMPLETE.


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NOT APPLICABLE - (FLOORS BEING DEVELOPED ON RESIDENTIAL PLOTS)
01-01-2012
100
31-03-2014
SERVICES IN THE BLOCK IS ALREADY LAID DOWN


0
176
0
80
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Floors6946.88

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00
Floors100120

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Floors160180200240

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Floors20010080.990




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements52
Water Supply System20.6
Sewerage treatment & garbage disposal12.2
Electricity Supply System7.6
Storm Water Drainage11.3
Parks and Playgrounds0.69
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2023)
Apr-JuneJuly-SepOct-DecJan-Mar












Particulars Remarks, if any
i. No. of Flats/Apartments constructed128Construction of 40 plots (i.e. 40x3=120 Floors) is near completion where OC for 34 plots (i.e.102 Floors) has been obtained, OC applied for 06 plots (i.e.18 floors). Construction of 2 plots (i.e.8 Floors) has commenced from Mar-2021
ii. No. of Flats/ Apartments booked90
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter12705.30 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter10697.91 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter2007.39 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter801.7 Lakhs
vii. Amount invested in the project upto the date of application14313.01 Lakhs
Land cost (If any)2025.73 Lakhs
Apartments6946.88 Lakhs
Infrastructure104.39 Lakhs
EDC/ Taxes Etc.5236.01 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession2876.33 Lakhs
(a) In respect of existing allottees719 Lakhs
(b) In respect of rest of the project2157.33 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS5252
II. WATER SUPPLY SYSTEM20.620.6
III. STORM WATER DRAINAGE11.311.3
IV. ELECTRICITY SUPPLY SYSTEM7.67.6
V. SEWAGE TREATMENT & GARBAGE DISPOSAL00
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER12.8912.89
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
STATE BANK OF INDIA (BRANCH-JAWAHAR VYAPAR BHAWAN, NEW DELHI)
40715752203
SBIN0006199
110002192
006199
Sh. Amit Sarin, Sh. Aman Sarin (Address- H-65, Connaught Circus, New Delhi-110001)
-











Yes
No
Yes
Yes
No
No
No
No
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
No
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLANSALREADY BEEN OBTAINED15-07-2013
II. ENVIRONMENTAL CLEARANCE ALREADY BEEN OBTAINED11-05-2021
III. ELECTRICITY LOAD APPROVAL (LICENSE NO. 119 OF 2011)ALREADY BEEN OBTAINED28-12-2011








Yes


Yes


Copy of the agreement enclosed













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEENTRY LOBBY/LIVING/DINING ROOM/OTHER COMMON AREA - ITALIAN MARBLE (400 SQ YDS) / MARBLE FLOORING (270 SQ YDS), MASTER BEDROOM – LAMINATED WOODEN FLOORING, OTHER BEDROOMS – VITRIFIED TILES, BALCONY – ANTI SKID TILES, SERVANT ROOM – CERAMIC TILES
2WALL FINISHING DETAILSENTRY LOBBY/LIVING/DINING ROOM/OTHER COMMON AREA , BEDROOMS – PLASTIC EMULSION PAINT, BALCONY – WEATHER PROOF PAINT, KITCHEN – TILES UPTO 2’ ABOVE COUNTER, TOILETS – CERAMIC TILES, SERVANT ROOM – OBD
3KITCHEN DETAILSMODULAR KITCHEN WITH HOB, CHIMNEY & CP FITTINGS, STAINLESS STEEL
4BATHROOM FITTINGSFIXTURES EUROPEAN FAUCETS, WC’S & WASH BASIN.
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESENTRANCE DOOR – TEAK VENEERED & POLISHED SHUTTER WITH SEASONED HARDWOOD FRAMES, WINDOW – UPVC (400 SQ YDS) / ALUMINIUM (270 SQ YDS)
7GLASS WORKNA
8ELECTRIC FITTINGSPOWER POINT TV & PHONE SOCKETS WITH PROTECTIVE MCB’S, MODULAR SWITCHES, FANS IN ALL BEDROOMS, LIVING & DINING, EXHAUST IN ALL TOILETS & KITCHEN (270 SQ YDS), MODULAR SWITCHES, DATA & VOICE CONNECTIONS HARD WIRED WITH MULTIPLE SERVICE PROVIDERS, VIDEO OR AUDIO DOOR PHONE (400 SQ YDS)
9CONDUCTING AND WIRING DETAILSCOPPER ELECTRICAL WIRING (270 SQ YDS)COPPER CONDUCTOR WIRING ( 400 SQ YDS)
10CUPBOARD DETAILSNA
11WATER STORAGEOVERHEAD & UNDERGROUND WATER TANKS
12LIFT DETAILS6 PASSENGER EQUIPPED WITH ARD (400 SQ YDS), 4 PASSENGER EQUIPPED WITH ARD (270 SQ YDS), LIFT SHAFT & MACHINE ROOM ON THE TERRACE
13EXTERNAL GLAZINGSFACADE – COMBINATION OF TEXTURED & WEATHER PROOF PAINTS & PERMANENT FINISHING
13.1WINDOWS/GLAZINGSUPVC (400 SQ YDS) & ALUMINIUM (270 SQ YDS)
14DOORSNA
14.1MAIN DOORSTEAK VENEERED & POLISHED SHUTTER WITH SEASONED HARDWOOD FRAMES
14.2INTERNAL DOORSTEAK VENEERED & POLISHED SHUTTER WITH SEASONED HARDWOOD FRAMES
15AIR CONDITIONINGVRV AIR CONDITIONING
16ELECTRICAL FITTINGSPOWER POINT TV & PHONE SOCKETS WITH PROTECTIVE MCB’S, MODULAR SWITCHES, FANS IN ALL BEDROOMS, LIVING & DINING, EXHAUST IN ALL TOILETS & KITCHEN (270 SQ YDS), MODULAR SWITCHES, DATA & VOICE CONNECTIONS HARD WIRED WITH MULTIPLE SERVICE PROVIDERS, VIDEO OR AUDIO DOOR PHONE (400 SQ YDS), ELECTRICITY PANEL/ BOARD, ELECTRICITY & PLUMBING SHAFTS IN COMMON AREAS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMECOMBINATION OF TEXTURED & WEATHER PROOF PAINTS & PERMANENT FINISHING
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORITALIAN MARBLE (400 SQ YDS) / MARBLE FLOORING (270 SQ YDS)
1 . 2 WALLSPLASTIC EMULSION PAINTS
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSPLASTIC EMULSION PAINTS
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORIMPORTED MARBLE FLOORING (400 SQ YDS) / ANTI SKID TILES (270 SQ YDS.)
3 . 2 WALLSCERAMIC TILES AS PER DESIGN
3 . 3 CEILINGOBD
3 . 4 COUNTERSGRANITE
3 . 5 SANITARY WARE/CP FITTINGSSTANDARD SANITARY WARE & FITTINGS (270 SQ YDS) / DESIGNER SANITARY WARE & FITTINGS EQUIVALENT TO INTERNATIONAL STANDARDS (400 SQ YDS)
3 . 6 FITTING/FIXTURESEUROPEAN FAUCETS, WC’S & WASH BASIN.
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSPLASTIC EMULSION PAINTS
4 . 3 CEILINGOBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORIMPORTED MARBLE FLOORING (400 SQ YDS) / ANTI SKID TILES (270 SQ YDS.)
5 . 2 WALLSCERAMIC TILES AS PER DESIGN
5 . 3 CEILINGNA
5 . 4 COUNTERSGRANITE
5 . 5 SANITARY WARE/CP FITTINGSSTANDARD SANITARY WARE & FITTINGS (270 SQ YDS) / DESIGNER SANITARY WARE & FITTINGS EQUIVALENT TO INTERNATIONAL STANDARDS (400 SQ YDS)
5 . 6 FIXTURESEUROPEAN FAUCETS, WC’S & WASH BASIN.
6 . KITCHEN
6 . 1 FLOORANTI SKID TILES
6 . 2 WALLSTILES UPTO 2’ ABOVE COUNTER
6 . 3 CEILINGNA
6 . 4 COUNTERSGRANITE
6 . 5 FIXTURESMODULAR KITCHEN WITH HOB
6 . 6 KITCHEN APPLIANCESCHIMNEY & CP FITTINGS, STAINLESS STEEL
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORCERAMIC TILES (ONLY 400 SQ YDS)
7 . 2 WALLS & CEILINGOBD
7 . 3 TOILETOBD
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORANTI SKID TILES
8 . 2 WALLS & CEILINGWEATHER PROOF PAINT & CEILING AS PER FAçADE
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND07-07-2021 View Document
2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN07-07-2021 View Document
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN07-07-2021 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT09-07-2021 View Document
5DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.22-08-2022 View Document
6OC (ALL COPY OBTAINED)22-08-2022 ------
7AFFIDAVIT22-08-2022 ------
8BR-III AND BUILDING PLAN26-08-2022 ------
9LAYOUT PLAN OF 42 PLOTS26-08-2022 ------