HRERA GurugramTemp Project Id : RERA-GRG-PROJ-168-2019
Submission Date : 29-01-2019 02:36:27 AM
Applicant Type : Company
Project Type: ONGOING




EXPERION DEVELOPERS PRIVATE LIMITED
SECOND FLOOR, PLOT NO.-18, SECTOR-32, GURUGRAM, HARYANA
01244422630
9560454296 (Number Shared by Promoter in Public)
suneet.puri@experion.net.in
http://www.experion.co
XXXX138L
U70109DL2006FTC151343
 
 


 
 


 
 


 
 


 
 


 
 







WESTERLIES
SECTOR 108
KADIPUR ST
GURUGRAM
01244422630
9560454296 (Number Shared by Promoter in Public)
suneet.puri@experion.net.in
VAIBHAV KUMAR SHIVHARE
01244422630
9818559575 (Number Shared by Promoter in Public)
vaibhav.shivhare@experion.net.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
14558911-01-2019406572AXIS BANK LIMITEDHRERA Gurugram







10.04625 (Acre)
Not Applicable for Plotted Colony
0
100.48125 (Acre)
57 of 2013 (11-07-2013)
Yes







4188 Lakhs
2216 Lakhs
0 Lakhs
961 Lakhs
1011 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD24275
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS11538.6
4PAVEMENTS0
5PARKS AND PLAYGROUNDS2468.58
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total38282.18




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSG.M.D.A.No
WATER SUPPLYG.M.D.A.Yes
ELECTRICITYD.H.B.V.N.Yes
SEWAGE DISPOSALH.U.D.A.Yes
STORM WATER DRAINAGEH.U.D.A.Yes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS25099000SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM1835000SUBMITTED TO HUDA
3STORM WATER DRAINAGE6229000SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM4696000SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL4377000SUBMITTED TO HUDA
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS4972000SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15STP1468000SUBMITTED TO HUDA


05-11-2015 (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1PLOT Type T5627.871010
2PLOT Type T3377.381010
3PLOT Type T3377.02020
4PLOT Type T4(I)453.121010
5PLOT Type T6782.821010
6PLOT Type T6783.881010
7PLOT Type T6782.221010
8PLOT Type T4(I)528.201010
9PLOT Type T3377120120
10PLOT Type 00000
11PLOT Type 00000
12PLOT Type T4(I)4623030
13PLOT Type T4(I)465.691010
14PLOT Type T2312.727070
15PLOT Type T2300100100
16PLOT Type T2308.751010
17PLOT Type T2310.341020
18PLOT Type T1210250250
19PLOT Type T22452020
20PLOT Type T3392.151010
21PLOT Type T4(II)499.371010
22PLOT Type T23501010






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
0NOT APPLICABLE


N/A
N/A
N/A
05-11-2015
80
30-07-2020
NOT APPLICABLE


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0ANNEXED DETAILS IN FOLDER C
05-11-2015
80
30-07-2020
DETAILS ANNEXED IN FOLDER C


0
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements200.79
Water Supply System14.68
Sewerage treatment & garbage disposal35.02
Electricity Supply System37.57
Storm Water Drainage49.83
Parks and Playgrounds39.78
Clubhouse/community centres0
Shopping area0
Other0
STP14.68

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
STP00

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0017.57
Water Supply System001.28
Sewerage treatment & garbage disposal003.06
Electricity Supply System003.29
Storm Water Drainage004.36
Parks and Playgrounds003.48
Clubhouse/community centres000
Shopping area000
Other000
STP001.28

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements17.577.537.53
Water Supply System1.280.550.55
Sewerage treatment & garbage disposal3.061.311.31
Electricity Supply System3.291.411.41
Storm Water Drainage4.361.811.81
Parks and Playgrounds3.481.491.49
Clubhouse/community centres000
Shopping area000
Other000
STP1.280.550.55












Particulars Remarks, if any
i. No. of Flats/Apartments constructed0This is a residential plotted colony
ii. No. of Flats/ Apartments booked0This is a residential plotted colony
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter0 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter0 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter0 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application3870 Lakhs
Land cost (If any)2216 Lakhs
Apartments0 LakhsThis is a residential plotted colony
Infrastructure853 Lakhs
EDC/ Taxes Etc.801 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession318 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project318 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS250.99200.79
II. WATER SUPPLY SYSTEM18.3514.68
III. STORM WATER DRAINAGE62.2949.83
IV. ELECTRICITY SUPPLY SYSTEM46.9637.57
V. SEWAGE TREATMENT & GARBAGE DISPOSAL62.1349.70
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.49.7239.78
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
STATE BANK OF INDIA, JAWAHAR VYAPAR BHAWAN 1, TOLSTOY MARG, NEW DELHI 110001
33408826587
SBIN0004803
110002095
04803
Rakesh Kaul R/O D 902, NPSC Society, Plot No 5, Sector 2, Dwarka, South West Delhi, Delhi-11075 Suneet Puri R/O B1-151, Regency Park 1, DLF Phase 4, Gurugram, Haryana 122009 Basavaraddi Krishnaraddi Malagi R/O 611B, Central Park 2, Sohna Road, Opp. Raheja Mall, Sector48, Gurgaon, Haryana 122001 Sachin Vora R/O 702, Silver Trove, Off Veera Desai Road, Opp Axis Bank, Andheri West, Mumbai, Maharastra 400058
Attached











Yes
No
Yes
No
Yes
No
No
No
No
No


Yes
Yes
Yes
Yes
No
No
Yes
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 57 OF 2013ALREADY BEEN OBTAINED11-07-2013
II. PART COMPLETION PHASE-1ALREADY BEEN OBTAINED31-07-2017
III. PART COMPLETION PHASE-2ALREADY BEEN OBTAINED22-03-2018
IV. FOREST NOCALREADY BEEN OBTAINED18-03-2013
V. HUDA CONNECTION WATER NOCALREADY BEEN OBTAINED10-12-2018
VI. ELECTRICAL LOAD AVAILABILITY ALREADY BEEN OBTAINED19-10-2016
VII. ELECTRICAL LOAD CONNECTION/ ENERGIZATION ALREADY BEEN OBTAINED17-09-2018
VIII. ZONING PLANALREADY BEEN OBTAINED05-11-2015








Yes


Yes









THE HEARTSONG, SECTOR 108,GURUGRAM
60804.07
811
0
527
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
459194591942968
Cost of the apartments508685086847917
Cost of the infrastructure000
Others costs000


48970 Lakhs
8140 Lakhs
0 Lakhs
0 Lakhs
Yes
31-08-2019
31-08-2019




WINDCHANTS,SECTOR 112,GURUGRAM
94825.26
563
0
258
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10020810020889709
Cost of the apartments10943210943298934
Cost of the infrastructure000
Others costs000


65050 Lakhs
2940 Lakhs
0 Lakhs
0 Lakhs
Yes
01-01-2013
31-08-2019




EXPERION CAPITAL,GOMTI NAGAR,LUCKNOW
17069.98
193
0
166
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
16505165052170
Cost of the apartments19787197875452
Cost of the infrastructure000
Others costs000


3878 Lakhs
14794 Lakhs
0 Lakhs
0 Lakhs
No
01-05-2018
30-04-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.28-01-2019 View Document
2STREET LIGHTING PLAN26-02-2019 ------
3COPY OF LICENSE ALONG WITH SCHEDULE OF LAND29-01-2019 View Document
4PART COMPLETION PHASE 229-01-2019 ------
5DRAFT ALOTMENT LETTER26-02-2019 ------
6DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD29-01-2019 View Document
7DRAFT AGREEMENT26-02-2019 ------
8PART COMPLETION PHASE 129-01-2019 ------
9SITE PLAN 29-01-2019 ------
10ROAD & PAVEMENT PLAN29-01-2019 ------
11ELECTRICITY SUPPLY PLAN29-01-2019 ------
12WATER SUPPLY PLAN29-01-2019 ------
13GIST OF AGGREMENT-WESTERLIES06-03-2019 ------
14SEWERAGE PLAN 29-01-2019 ------
15BALANCE SHEET OF LAST 3 YEARS29-01-2019 ------
16SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN28-01-2019 View Document
17IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN28-01-2019 View Document
18ZONING PLAN28-01-2019 View Document
19IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN28-01-2019 View Document
20CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT28-01-2019 View Document
21NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT28-01-2019 View Document
22DEMARCATION PLAN28-01-2019 View Document
23CASH FLOW STATEMENT OF THE PROPOSED PROJECT28-01-2019 View Document
24BBA26-02-2019 ------
25A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS28-01-2019 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 PROJECT CONTINUATION- RC/REP/HARERA/GGM/67 OF 2019/7(3)/2022/12 DATED 28.11.2022 17-01-2023 View Document
2 CC uploaded. 01-02-2024 View Document