| Serial No. | Registration Certificate Number | Project ID | Project Name | Builder | Project Location | Project District | Approval From | Approval To | View Certificate |
|---|---|---|---|---|---|---|---|---|---|
| 1 | GGM/486/218/2021/54 DATED 21.09.2021 | RERA-GRG-874-2021 | 102 EDEN ESTATE II | COUNTRYWIDE PROMOTERS PRIVATE LIMITED | SECTOR 102 & 102 A GURUGRAM |
GURUGRAM | 21-Sep-2021 | 31-Mar-2025 | ![]() View Corrigendum |
| 2 | 15 OF 2018 DATED 19.01.2018 | RERA-GRG-494-2019 | 10.5437 ACRES GROUP HOUSING COLONY | CHD DEVELOPERS LTD. | SECTOR-71, GURUGRAM |
GURUGRAM | 19-Jan-2018 | 28-Jul-2021 | ![]() |
| 3 | GGM/314/46/2019/08 DATED 21.02.2019 | RERA-GRG-78-2018 | 106 GOLF AVENUE | EMPIRE REALTECH PVT. LTD. | SECTOR- 106, GURUGRAM |
GURUGRAM | 21-Feb-2019 | 30-Jun-2021 | ![]() |
| 4 | GGM/832/564/2024/59 DATED 03.06.2024 (SUPERSEDES GGM/661/393/2023/05 DATED 12.01.2023) | RERA-GRG-1509-2023 | 24.74375 ACRES DDJAY RESIDENTIAL PLOTTED COLONY | LOON LAND DEVELOPMENT LIMITED | SECTOR-79, GURUGRAM, HARYANA |
GURUGRAM | 03-Jun-2024 | 30-Jun-2026 | ![]() |
| 5 | GGM/661/393/2023/05 DATED 12.01.2023 (SUPERSEDED BY GGM/832/564/2024/59 DATED 03.06.2024) | RERA-GRG-1245-2022 | 45.1625 ACRES DDJAY RESIDENTIAL PLOTTED COLONY | LOON LAND DEVELOPMENT LIMITED | SECTOR 79, GURUGRAM |
GURUGRAM | 12-Jan-2023 | 30-Jun-2026 | ![]() |
| 6 | 249 OF 2017 DATED 26.09.2017 | RERA-GRG-404-2019 | 63 GOLF DRIVE | SUNRAYS HEIGHTS PVT. LTD. | SECTOR 63-A, VILLAGE ULLAHWAS , GURUGRAM |
GURUGRAM | 26-Sep-2017 | 24-Mar-2026 | ![]() View Corrigendum |
| 7 | 337 OF 2017 DATED 27.10.2017 | RERA-GRG-341-2019 | 83 METRO STREET | S.V HOUSING PVT. LTD. | SETOR - 83, GURUGRAM |
GURUGRAM | 27-Oct-2017 | 30-Mar-2021 | ![]() |
| 8 | 391 OF 2017 DATED 22.12.2017 | RERA-GRG-543-2019 | AANGAN | ALTON BUILDTECH INDIA PVT. LTD. | SECTOR 88-A TO 89-A, SUB-TEHS IL HARSARU, GURUGRAM, HARYANA |
GURUGRAM | 22-Dec-2017 | 15-Dec-2022 | ![]() |
| 9 | GGM/269/2018/01 DATED 11.04.2018 (SUPERSEDED BY GGM/554/286/2022/29 DATED 25.04.2022) | NA | AAROHAN COMMERCIAL TOWER | VIPUL LIMITED | SECTOR-53, GURUGRAM |
GURUGRAM | 11-Apr-2018 | 30-Jun-2023 | ![]() |
| 10 | 131 OF 2017 DATED 28.08.2017 (SUPERSEDED BY GGM/554/286/2022/29 DATED 25.04.2022) | RERA-GRG-452-2019 | AAROHAN PHASE I | VIPUL LTD. | SECTOR -53, GURUGRAM |
GURUGRAM | 28-Aug-2017 | 30-Jun-2022 | ![]() |
| 11 | GGM/294/2018/26 DATED 28.11.2018 | RERA-GRG-89-2018 | AASHIYARA | RENUKA TRADERS PVT LTD | SECTOR-37C, GURUGRAM |
GURUGRAM | 01-Jul-2018 | 29-Jul-2025 | ![]() View Corrigendum |
| 12 | GGM/485/217/2021/53 DATED 16.09.2021 | RERA-GRG-872-2021 | AASHIYARA-II | RENUKA TRADERS PRIVATE LIMITED. | SECTOR-37C, VILLAGE-GHAROLI K HURD |
GURUGRAM | 16-Sep-2021 | 08-Dec-2025 | ![]() |
| 13 | GGM/439/171/2021/07 DATED 22.02.2021 | RERA-GRG-388-2019 | ACE PALM FLOORS | BRIGHT BUILTECH PRIVATE LIMITED | SECTOR 89-90, GURUGRAM |
GURUGRAM | 22-Feb-2021 | 31-Dec-2021 | ![]() |
| 14 | GGM/449/181/2021/17 DATED 12.04.2021 | RERA-GRG-832-2021 | ACE PALM FLOORS | BRIGHT BUILDTECH PVT. LTD. | SECTOR 89-90,GURUGRAM |
GURUGRAM | 12-Apr-2021 | 29-Jun-2023 | ![]() View Corrigendum |
| 15 | 178 OF 2017 DATED 01.09.2017 | RERA-GRG-420-2019 | AFFORDABLE GROUP HOUSING COLONY | PIVOTAL INFRASTRUCTURE PVT LTD | SECTOR 62, ULLAHAWAS, GURUGRA M |
GURUGRAM | 01-Sep-2017 | 29-May-2021 | ![]() |
| 16 | 181 OF 2017 DATED 01.09.2017 | NA | AFFORDABLE GROUP HOUSING COLONY | AAR HOUSING PVT LTD | SECTOR 31, VILLAGE ALIPUR, TE HSIL SOHNA, GURUGRAM |
GURUGRAM | 01-Sep-2017 | 16-Jul-2019 | ![]() |
| 17 | 108 OF 2017 DATED 24.08.2017 | RERA-GRG-462-2019 | AFFORDABLE GROUP HOUSING OF 12.11 ACRES | REVITAL REALITY PVT.LTD. | SECTOR-79 &79;,-B |
GURUGRAM | 24-Aug-2017 | 31-Jan-2021 | ![]() View Corrigendum |
| 18 | 105 OF 2017 DATED 24.08.2017 | RERA-GRG-586-2020 | AFFORDABLE GROUP HOUSING OF 5 ACRES | NANI RESORTS & FLORICULTURE PVT. LTD. | SECTOR -102, VILLAGE-DHANKOT, GURUGRAM |
GURUGRAM | 24-Aug-2017 | 01-Jan-1970 | ![]() |
| 19 | GGM/270/2018/02 DATED 23.04.2018 | NA | AMAARA RESIDENCY | STANFORD DEVELOPERS AND INFRASTRUCTURE | SECTOR 12A, GURUGRAM |
GURUGRAM | 23-Apr-2018 | 31-Aug-2022 | ![]() |
| 20 | 18 OF 2017 DATED 06.07.2017 | RERA-GRG-549-2020 | AMALTAAS TOWER (TOWER-B) | RAHEJA DEVELOPERS LTD. | RAHEJA VANYA SECTOR-99-A, GUR UGRAM |
GURUGRAM | 06-Jul-2017 | 05-Jul-2022 | ![]() |
| 21 | 318 OF 2017 DATED 17.10.2017 | RERA-GRG-402-2019 | AMBIENCE CREACIONS | AMBIENCE PROJECTS & INFRASTRUCTURE PVT. LTD. | SECTOR 22, GURUGRAM |
GURUGRAM | 17-Oct-2017 | 29-Sep-2023 | ![]() View Corrigendum |
| 22 | 57 OF 2017 DATED 17.8.2017 | RERA-GRG-573-2020 | AMB SELFIE SQUARE ( COMMERCIAL PROJECT) | VS REALPROJECTS PVT.LTD | SECTOR-37D, HARSARU, GURUGRAM |
GURUGRAM | 17-Aug-2017 | 16-Aug-2022 | ![]() |
| 23 | 142 OF 2017 DATED 28.08.2017 | RERA-GRG-1080-2022 | ANANT RAJ ESTATE | ANANT RAJ LTD. | SECTOR-63-A,GURUGRAM |
GURUGRAM | 28-Aug-2017 | 27-Feb-2026 | ![]() View Corrigendum |
| 24 | GGM/490/222/2021/58 DATED 14.09.2021 | RERA-GRG-4-2018 | ANANT RAJ ESTATE | ANANT RAJ LIMITED | 63 A VILLAGE KADARPUR AND ULL AHAWAS |
GURUGRAM | 14-Sep-2021 | 31-Mar-2026 | ![]() View Corrigendum |
| 25 | 09 OF 2018 DATED 08.01.2018 | RERA-GRG-581-2020 | ANSAL HUB 83 BOULEVARD | ANSAL HOUSING & CONSTRUCTION LTD. | SECTOR-83, GURUGRAM |
GURUGRAM | 08-Jan-2018 | 31-Dec-2020 | ![]() |
| 26 | 308 OF 2017 DATED 17.10.2017 | NA | APPUGHAR RETAIL MALL | INTERNATIONAL RECREATION & AMUSEMENT LTD. | SECTOR 29, GURUGRAM |
GURUGRAM | 17-Oct-2017 | 31-Mar-2019 | ![]() |
| 27 | 251 OF 2017 DATED 29.09.2017 | NA | ARABELLA | SOHNA CITY LLP | SEC- 11&14;, VILLAGE RAIPUR, TEHSIL SOHNA, DIST. GURUGRAM |
GURUGRAM | 29-Sep-2017 | 30-Sep-2019 | ![]() |
| 28 | GGM/411/143/2020/27 DATED 22.06.2020 | RERA-GRG-652-2020 | ARADHYA HOMES | 4S DEVELOPERS PVT. LTD. | SECTOR 67-A, GURUGRAM, HARYAN A |
GURUGRAM | 22-Jun-2020 | 30-Sep-2021 | ![]() |
| 29 | GGM/284/2018/16 DATED 13.10.2018 | RERA-GRG-482-2019 | ARAVILLE | SUPERTECH LIMITED | SECTOR-79,NAURANGPUR,MANESAR, GURGAON |
GURUGRAM | 13-Oct-2018 | 31-Dec-2019 | ![]() |
| 30 | GGM/312/44/2019/06 DATED 08.02.2019 | RERA-GRG-151-2019 | ARETE, PHASE I | INTERNATIONAL LAND DEVELOPERS PVT. LTD. | SECTOR- 33, SOHNA, GURUGRAM |
GURUGRAM | 01-Feb-2019 | 02-Jul-2022 | ![]() |
| 31 | 44 OF 2017 DATED 11.08.2017 | RERA-GRG-438-2019 | ASHIANA MULBERRY PHASE 1[TOWER 1,2, 3 & EWS] | ASHIANA DWELLINGS PVT. LTD. | SEC 2, SOHNA, GURUGRAM |
GURUGRAM | 11-Aug-2017 | 30-Jun-2020 | ![]() |
| 32 | GGM/655/387/2022/130 DATED 23.12.2022 | RERA-GRG-1170-2022 | ASPIRATION | VATIKA LIMITED | SECTOR - 88B |
GURUGRAM | 23-Dec-2022 | 29-Jun-2025 | ![]() View Corrigendum |
| 33 | GGM/287/2018/19 DATED 13.10.2018 | RERA-GRG-415-2019 | ASTER COURT PREMIER | ORRIS INFRASTRUCTURE PVT LTD | SECTOR-85, BADHA, MANESAR |
GURUGRAM | 13-Oct-2018 | 31-Dec-2025 | ![]() View Corrigendum |
| 34 | 239 OF 2017 DATED 20.09.2017 | RERA-GRG-457-2019 | ATHENA | BRAHMA DEVELOPERS PVT. LTD. | SECTOR-16, SITE NO. 02, GURUG RAM |
GURUGRAM | 20-Sep-2017 | 31-Dec-2022 | ![]() View Corrigendum |
| 35 | 205 OF 2017 DATED 15.09.2017 | RERA-GRG-534-2019 | ATHENA | BRAHMA CENTER DEVELOPERS PVT. LTD | SECTOR-16, GURUGRAM |
GURUGRAM | 15-Sep-2017 | 31-Dec-2019 | ![]() |
| 36 | 384 OF 2017 (SUPERSEDED BY 06 OF 2018) | NA | ATS GRANDSTAND PHASE-1 | ATS REALWORTH PRIVATE LIMITED | SECTOR 99A |
GURUGRAM | 02-Jan-2018 | 01-Jan-1970 | ![]() |
| 37 | 41 OF 2017 DATED 10.08.2017 | RERA-GRG-382-2019 | ATS TOURMALINE | ALMOND INFRABUILD PVT. LTD. | SEC 109, VILLAGE BABUPUR, GUR UGRAM |
GURUGRAM | 10-Aug-2017 | 09-Aug-2023 | ![]() |
| 38 | GGM/679/411/2023/23 DATED 30.01.2023 | RERA-GRG-1272-2023 | ATULYAM 83 | PEGASUS DEVELOPERS PRIVATE LIMITED | SECTOR - 83, GURUGRAM |
GURUGRAM | 30-Jan-2023 | 31-Mar-2026 | ![]() |
| 39 | GGM/442/174/2021/10 DATED 01.03.2021 | RERA-GRG-808-2021 | AVENUE 81 | M/S GLS INFRACON PVT. LTD. | SECTOR 81,GURUGRAM, SITUATED IN THE REVENUE ESTATE OF VILLAGE NAWADA FATEHPUR, DISTRICT GURUGRAM, HARYANA |
GURUGRAM | 01-Mar-2021 | 31-Dec-2025 | ![]() |
| 40 | GGM/498/230/2021/66 DATED 19.10.2021 | RERA-GRG-926-2021 | AVENUE 86 | GLS INFRAPROJECTS PVT. LTD. | REVENUE ESTATE OF VILLAGE BAD HA, SECTOR-86 |
GURUGRAM | 19-Oct-2021 | 11-Jul-2026 | ![]() |
| 41 | GGM/380/112/2019/74 DATED 09.12.2019 | RERA-GRG-304-2019 | BESTCEH 92 MARKET PLACE | BESTECH INDIA PVT LTD | SECTOR 92, VILLAGE WAZIRPUR, GURUGRAM |
GURUGRAM | 09-Dec-2019 | 31-Mar-2025 | ![]() |
| 42 | GGM/390/122/2020/06 DATED 27.01.2020 | RERA-GRG-499-2019 | BIRLA NAVYA PHASE-I (AMODA I AND II) | AVARNA PROJECTS LLP | POCKETS D & H, BIRLA NAVYA, S ECTOR-63A, GURUGRAM, HARYANA |
GURUGRAM | 03-Feb-2020 | 30-Jun-2024 | ![]() |
| 43 | GGM/370/102/2019/64 DATED 07.11.2019 | RERA-GRG-240-2019 | CANARY GREENS | TODAY HOMES & INFRASTRUCTURE PVT LTD | VILLAGE- BEHRAMPUR, SECTOR-73 , GURUGRAM. HARYANA |
GURUGRAM | 07-Nov-2019 | 21-Jul-2021 | ![]() |
| 44 | GGM/430/162/2020/46 DATED 18.12.2020 | RERA-GRG-756-2020 | CENTRAL BOULEVARD | BESTECH INDIA PVT. LTD. | PLOTTED COMMERCIAL- SCO , VI LLAGE - HAYATPUR SECTOR 88 GURUGRAM |
GURUGRAM | 18-Dec-2020 | 27-Jul-2025 | ![]() |
| 45 | GGM/624/356/2022/99 DATED 27.10.2022 | RERA-GRG-1084-2022 | CENTRAL PARK FLOWER VALLEY FLOORS AND VILLAS | CENTRAL PARK FLOWER VALLEY | VILLAGE DHUNELA & BERKA, SECT OR-29,30,32 AND 33, SOHNA |
GURUGRAM | 27-Oct-2022 | 31-Dec-2024 | ![]() |
| 46 | 19 OF 2017 DATED 06.07.2017 | RERA-GRG-554-2020 | CHANDAN TOWER(TOWER-D) | RAHEJA DEVELOPERS LTD. | RAHEJA VANYA SECTOR-99-A, GUR UGRAM |
GURUGRAM | 06-Jul-2017 | 01-Jan-1970 | ![]() |
| 47 | 252 OF 2017 DATED 09.10.2017 | RERA-GRG-572-2020 | CITY RESIDENCIES | MAXWORTH INFRASTRUCTURE PVT. LTD. | SECTOR 10-A, VILLAGE KADIPUR, TEHSIL AND DIST. GURUGRAM |
GURUGRAM | 09-Oct-2017 | 08-Oct-2021 | ![]() |
| 48 | 153 0F 2017 DATED 28.08.2017 | RERA-GRG-467-2019 | COMMERCIAL COLONY | AMEYA COMMERICAL PROJECTS PVT.LTD. | VILLAGE HAYATPUR,SECTOR-93,GU RUGRAM |
GURUGRAM | 28-Aug-2017 | 27-Aug-2024 | ![]() |
| 49 | 159 OF 2017 DATED 29.08.2017 | NA | COMMERCIAL COLONY | CHD DEVELOPERS LTD. | SECTOR 34, DHUNELA, SOHNA |
GURUGRAM | 29-Aug-2017 | 28-Jul-2021 | ![]() |
| 50 | 155 OF 2017 DATED 28.08.2017 | RERA-GRG-429-2019 | COMMERCIAL COLONY | AMEYA COMMERCIALS PROJECTS PVT. LTD | SECTOR-92, MEWKA, GURUGRAM |
GURUGRAM | 28-Aug-2017 | 27-Feb-2026 | ![]() View Corrigendum |
| 51 | 273 OF 2017 DATED 09.10.2017 | NA | COMMERCIAL COLONY 2.00625 ACRES | MAHAMAY BUILDING SOLUTION PVT. LTD. | SECTOR-81A, VILLAGE NAKHROLA, TEHSIL MANESAR, GURUGRAM |
GURUGRAM | 09-Oct-2017 | 31-Mar-2021 | ![]() |
| 52 | 102 OF 2017 DATED 24.08.2017 | RERA-GRG-1692-2024 | COMMERCIAL COLONY (MANAGED SERVICED APARTMENTS) | IREO PVT LTD | SECTOR 59 GURUGRAM |
GURUGRAM | 24-Aug-2017 | 30-Jun-2020 | ![]() |
| 53 | 20 OF 2018 DATED 02.02.2018 | RERA-GRG-600-2020 | COMMERCIAL PROJECT | GENTLE REALTORS PVT. LTD & LUMINOS BUILDERS PVT. LTD | SECTOR-66, BADSHAHPUR, GURUGR AM- MANESAR URBAN COMPLEX, GURUGRAM |
GURUGRAM | 02-Feb-2018 | 31-Dec-2024 | ![]() |
| 54 | 187 OF 2017 DATED 14.09.2017 | RERA-GRG-356-2019 | COMMERCIAL PROJECT | GREEN HEIGHTS PROJECTS PVT. LTD. | SECTOR M1D, TEHSIL MANESAR, G URUGRAM, HARYANA |
GURUGRAM | 14-Sep-2017 | 13-Sep-2019 | ![]() |
| 55 | 65 OF 2017 DATED 18.08.2017 | RERA-GRG-566-2020 | COMMERCIAL PROJECT | MAGIC EYE DEVELOPERS PRIVATE LIMITED | SECTOR 106, VILLAGE DAULATABA D, GURUGRAM |
GURUGRAM | 18-Aug-2017 | 31-Dec-2024 | ![]() |
| 56 | 22 OF 2018 DATED 02.02.2018 | RERA-GRG-149-2019 | COMMERCIAL PROJECT | JMS BUILDTECH PVT. LTD | SECTOR-102, DHANKOT, GURUGRAM |
GURUGRAM | 02-Feb-2018 | 17-Jun-2026 | ![]() View Corrigendum |
| 57 | 02 OF 2018 DATED 01.01.2018 | NA | COMMERCIAL PROJECT OF AREA 2.0229 ACRES | CAPITAL SKYSCRAPER PVT. LTD. | SECTOR 66, VILLAGE MAIDAWAS, GURUGRAM, HARYANA |
GURUGRAM | 01-Jan-2018 | 31-Dec-2020 | ![]() |
| 58 | 382 OF 2017 DATED 12.12.2017 | RERA-GRG-371-2019 | COMMERCIAL PROJECT OF AREA 3.725 ACRES | MANISH BUILDWELL PVT. LTD. | SECTOR -91, VILLAGE MEWKA, GU RUGRAM, HARYANA |
GURUGRAM | 12-Dec-2017 | 11-Dec-2022 | ![]() |
| 59 | 229 OF 2017 DATED 19.09.2017 | NA | DEVAAN ( AFFORDABLE GROUP HOUSING PROJECT) | PIVOTAL INFRASTRUCTURE PVT. LTD | SECTOR-84, SIHI, GURUGRAM |
GURUGRAM | 19-Sep-2017 | 09-Jun-2019 | ![]() |
| 60 | 322 OF 2017 DATED 17.10.2017 | NA | DIPLOMATS GOLF LINK | MILLENIUM DIPLOMATS PVT. LTD. | SECTOR-110, GURUGRAM, HARYANA |
GURUGRAM | 17-Oct-2017 | 31-Dec-2021 | ![]() |
| 61 | GGM/465/197/2021/33 DATED 10.08.2021 | RERA-GRG-763-2020 | DIPLOMATS GOLF LINK | MILLENNIUM DIPLOMATS PVT.LTD. | VILLAGE SARAI ALWARDI,SECTOR- 110 |
GURUGRAM | 10-Aug-2021 | 04-Sep-2024 | ![]() |
| 62 | 144 OF 2017 DATED 28.08.2017 | RERA-GRG-751-2020 | EASY HOMES | TULSIANI CONSTRUCTIONS AND DEVELOPERS PVT.LTD. | VILLAGE SOHNA SECTOR-35 GURUG RAM |
GURUGRAM | 28-Aug-2017 | 27-Aug-2022 | ![]() |
| 63 | GGM/469/201/2021/37 DATED 27.07.2021 (SUPERSEDED BY GGM/736/468/2023/80 DATED 24.07.2023) | RERA-GRG-852-2021 | ELAN EMPIRE | ELAN CITY LLP | REVENUE ESTATE VILLAGE MAIDAW AS , SECTOR-66 , GURUGRAM , HARYANA |
GURUGRAM | 27-Jul-2021 | 14-Apr-2026 | ![]() |
| 64 | GGM/447/179/2021/15 DATED 22.03.2021 (SUPERSEDED BY GGM/584/316/2022/59 DATED 04.07.2022) | RERA-GRG-813-2021 | ELAN PARADISE | ELAN LIMITED | REVENUE ESTATE OF VILLAGE ADA MPUR, SUB TEHSIL- WAZIRABAD, SECTOR-50, DISTRICT GURUGRAM, HARYANA |
GURUGRAM | 22-Mar-2021 | 30-Sep-2025 | ![]() |
| 65 | 81 OF 2017 DATED 23.08.2017 | RERA-GRG-247-2019 | ELDECO ACCOLADE | ELDECO SOHNA PROJECTS LTD | GURUGRAM |
GURUGRAM | 23-Aug-2017 | 30-Jun-2025 | ![]() |
| 66 | GGM/387/119/2020/03 DATED 27.01.2020 | RERA-GRG-453-2019 | EMERALD NUEVO | EMAAR MGF LAND LTD. | SECTOR 65 & 62 BADSHAHPUR NAN GLI MAIDAWAS |
GURUGRAM | 27-Jan-2020 | 31-Dec-2022 | ![]() |
| 67 | 346 OF 2017 DATED 08.11.2017 | NA | ENIGMA, PHASE-1 | VARALI PROPERTIES LTD. | SECTOR-110, VILLAGE PAWALA KH USRUPUR, GURUGRAM, HARYANA |
GURUGRAM | 08-Nov-2017 | 31-Aug-2018 | ![]() |
| 68 | 354 OF 2017 DATED 17.11.2017 | RERA-GRG-537-2019 | ENIGMA, PHASE-2 | ATHENA INFRASTRUCTURE LTD. | SECTOR-110, VILLAGE PAWALA KH USRUPUR, GURUGRAM |
GURUGRAM | 17-Nov-2017 | 30-Sep-2018 | ![]() |
| 69 | 313 OF 2017 DATED 17.10.2017 | RERA-GRG-754-2020 | ESENCIA | ANSAL INFRASTRUCTURE PRIVATE LIMITED | SECTOR 67 GURUGRAM |
GURUGRAM | 17-Oct-2017 | 31-Oct-2018 | ![]() |
| 70 | 336 OF 2017 DATED 27.10.2017 | NA | ESENCIA | ANSAL PHALAK INFRASTRUCTURE PVT. LTD. | SECTOR-67, GURUGRAM, HARYANA |
GURUGRAM | 27-Oct-2017 | 31-Dec-2019 | ![]() |
| 71 | 319 OF 2017 DATED 23.10.2017 | RERA-GRG-569-2020 | EWS | AMBIENCE DEVELOPERS & INFRASTRUCTURE PVT. LTD. | AMBIENCE ISLAND, VILLAGE NATH UPUR, GURUGRAM |
GURUGRAM | 23-Oct-2017 | 31-Mar-2022 | ![]() |
| 72 | 301 OF 2017 DATED 13.10.2017 | NA | EXPRESSWAY TOWERS | OCEAN SEVEN BUILDTECH PVT. LTD. | SECTOR 109, GURUGRAM |
GURUGRAM | 13-Oct-2017 | 12-Oct-2021 | ![]() |
| 73 | 392 OF 2017 DATED 22.12.2017 | RERA-GRG-719-2020 | FERNHILL (PHASE I) | ANSAL PROPERTIES & INFRASTRUCTURE LTD. | SECTOR 91, GURUGRAM, HARYANA |
GURUGRAM | 22-Dec-2017 | 31-Dec-2019 | ![]() |
| 74 | 389 OF 2017 DATED 22.12.2017 | RERA-GRG-718-2020 | FERNHILL (PHASE II) | ANSAL PROPERTIES & INFRASTRUCTURE LTD. | SECTOR 91, GURUGRAM, HARYANA |
GURUGRAM | 22-Dec-2017 | 31-Dec-2020 | ![]() |
| 75 | GGM/674/406/2023/18 DATED 23.01.2023 | RERA-GRG-1271-2023 | FLORA AVENUE 88A | GCC INFRA | SECTOR-88A, VILLAGE-HARSARU, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA-122505 |
GURUGRAM | 23-Jan-2023 | 30-Dec-2025 | ![]() View Corrigendum |
| 76 | GGM/621/353/2022/96 DATED 27.10.2022 (SUPERSEDED BY GGM/674/406/2023/18 DATED 23.01.2023) | RERA-GRG-1145-2022 | FLORA AVENUE 88A | GCC INFRA | VILLAGE-HARSARU, SECTOR-88A, GURUGRAM MANESAR URBAN COMPLEX |
GURUGRAM | 27-Oct-2022 | 31-Dec-2024 | ![]() |
| 77 | 287 OF 2017 DATED 10.10.2017 | RERA-GRG-618-2020 | FLORENCE ESTATE | ANGLE INFRASTRUCTURE PVT. LTD. | SECTOR 70, GURUGRAM |
GURUGRAM | 10-Oct-2017 | 31-Dec-2018 | ![]() |
| 78 | 231 OF 2017 DATED 19.09.2017 | RERA-GRG-646-2020 | FLORENCE ESTATE, PHASE-2( TOWER D& E) | ANGLE INFRASTRUCTURE PVT. LTD | SECTOR-70, GURUGRAM |
GURUGRAM | 19-Sep-2017 | 31-Dec-2019 | ![]() |
| 79 | GGM/901/633/2025/04 DATED 14.01.2025 | RERA-GRG-1779-2024 | GANGA VALLEY | GANGA GLOBAL HOMES PRIVATE LIMITED | VILLAGE NAURANGPUR, SECTOR-78 |
GURUGRAM | 14-Jan-2025 | 06-Mar-2026 | ![]() |
| 80 | 210 OF 2017 DATED 18.09.2017 | NA | GH-24 (GROUP HOUSING SOCIETY) | THE BAJRANG CO-OPERATIVE GROUP HOUSING SOCIETY LTD | SECTOR- 43, GURUGRAM |
GURUGRAM | 18-Sep-2017 | 31-Dec-2019 | ![]() |
| 81 | GGM/563/295/2022/38 DATED 23.05.2022 (SUPERSEDED BY GGM/815/547/2024/42 DATED 15.04.2024) | RERA-GRG-998-2022 | GLS COURTYARD | GLS INFRAPROJECTS PVT. LTD. | 707, 7TH FLOOR, JMD PACIFIC S QUARE |
GURUGRAM | 23-May-2022 | 31-Mar-2025 | ![]() |
| 82 | GGM/654/386/2022/129 DATED 23.12.2022 | RERA-GRG-1209-2022 | GOKULAM | NB BUILDCON PVT. LTD. | SECTOR 7 , SOHNA |
GURUGRAM | 23-Dec-2022 | 30-Aug-2025 | ![]() View Corrigendum |
| 83 | GGM/285/2018/17 DATED 12.10.2018 | RERA-GRG-456-2019 | GOLF HEIGHTS | OCEAN SEVEN BUILDTECH PVT. LTD. | SECTOR-69, BADSHAHPUR, GURUGR AM |
GURUGRAM | 12-Oct-2018 | 20-Apr-2023 | ![]() |
| 84 | GGM/311/43/2019/05 DATED 23.01.2019 | RERA-GRG-165-2019 | GREENOPOLIS | RADHA ESTATES PVT. LTD. ,ORRIS INFRASTRUCTURES PVT. LTD. & THREE C SHELTERS PVT. LTD. | SECTOR-89, MANESAR, GURUGRAM |
GURUGRAM | 01-Jan-2019 | 31-Dec-2020 | ![]() |
| 85 | 161 OF 2017 DATED 29.08.2017 | RERA-GRG-373-2019 | GROUP HOUSING COLONY | RAM AVTAR YADAV | SECTOR 67, GURUGRAM |
GURUGRAM | 29-Aug-2017 | 31-Jul-2022 | ![]() |
| 86 | 175 OF 2017 DATED 30.08.2017 | NA | GROUP HOUSING COLONY | RAMPRASTHA SARE GURUGRAM PRIVATE LIMITED | SECTOR 92, GURUGRAM |
GURUGRAM | 30-Aug-2017 | 30-Sep-2021 | ![]() |
| 87 | 100 OF 2017 DATED 28.08.2017 | RERA-GRG-578-2020 | GROUP HOUSING COLONY | SONI INFRATECH PVT LTD | SECTOR 68, BADSHAHPUR, GURUGR AM |
GURUGRAM | 28-Aug-2017 | 31-Dec-2023 | ![]() |
| 88 | 20 OF 2017 DATED 06.07.2017 | RERA-GRG-428-2019 | GROUP HOUSING PROJECT ( TOWER A,B,C, D AND E) | RAHEJA DEVELOPERS LTD. | RAHEJA MAHESHWARA SECTOR-11 A ND 14, SOHNA, GURUGRAM |
GURUGRAM | 06-Jul-2017 | 05-Jul-2022 | ![]() |
| 89 | 68 OF 2017 DATED 18.8.2017 | NA | GSR DRIVE BY ILD- PHASE I | INTERNATIONAL LAND DEVELOPERS PVT. LTD | SECTOR- 36, SOHNA, GURUGRAM |
GURUGRAM | 18-Aug-2017 | 17-Dec-2021 | ![]() |
| 90 | 8(A) OF 2018 DATED 01.02.2018 | RERA-GRG-444-2019 | GULMOHAR TOWER (TOWER-A) | RAHEJA DEVELOPERS LTD | SECTOR- 99A |
GURUGRAM | 01-Feb-2018 | 31-Dec-2022 | ![]() |
| 91 | 222 OF 2017 DATED 18.09.2017 | RERA-GRG-385-2019 | GURGAON SPECTRUM CENTRE (PHASE-1) ( COMMERCIAL PROJECT) | BURMAN GSC ESTATE PVT. LTD | SECTOR- 82A, GURUGRAM |
GURUGRAM | 18-Sep-2017 | 30-Jun-2020 | ![]() |
| 92 | 263 OF 2017 DATED 03.10.2017 | RERA-GRG-500-2019 | HIGH STREET (PHASE I) | VATIKA LTD. | SECTOR-83, VILLAGE SHIKOHPUR, SUB-TEHSIL MANESAR, DIST. GURUGRAM |
GURUGRAM | 03-Oct-2017 | 02-Oct-2022 | ![]() |
| 93 | 258 OF 2017 DATED 03.10.2017 | RERA-GRG-551-2020 | HILL CREST/OFFICER ENCLAVE(LOW RISE FLOOR) | SUPERTECH LTD. | SECTOR -02, GURUGRAM |
GURUGRAM | 03-Oct-2017 | 02-Oct-2020 | ![]() |
| 94 | GGM/433/165/2021/01 DATED 08.01.2021 | RERA-GRG-784-2020 | HILL ESTATE | SUPERTECH LIMITED | SECTOR-2, SOHNA |
GURUGRAM | 08-Jan-2021 | 30-Nov-2025 | ![]() |
| 95 | 97 OF 2017 DATED 24.08.2017 | RERA-GRG-486-2019 | HILL VIEW PROJECT (TOWER 1 TO 8) | SUPERTECH LTD | SECTOR 2, SOHNA, GURUGRAM |
GURUGRAM | 24-Aug-2017 | 30-Jun-2021 | ![]() |
| 96 | GGM/615/347/2022/90 DATED 03.10.2022 | RERA-GRG-1154-2022 | HUB 108 | EXPERION DEVELOPERS PRIVATE LIMITED | SECTOR 108, GURUGRAM, HARYANA |
GURUGRAM | 03-Oct-2022 | 05-May-2024 | ![]() |
| 97 | 182 OF 2017 DATED 04.09.2017 | RERA-GRG-450-2019 | HUES TOWERS AND AZALIA TOWERS | SUPERTECH LIMITED | VILLAGE BADSHAHPUR, SECTOR 68 , GURUGRAM |
GURUGRAM | 04-Sep-2017 | 31-Dec-2021 | ![]() |
| 98 | GGM/771/503/2023/115 DATED 11.12.2023 | RERA-GRG-1415-2023 | ICONIC | CELESTIAL ESTATE PRIVATE LIMITED | C25H+X7W, BEHRAMPUR VILLAGE, SECTOR 71, GURUGRAM, HARYANA 122004 |
GURUGRAM | 11-Dec-2023 | 31-Dec-2025 | ![]() |
| 99 | 62 OF 2017 DATED 17.8.2017 | RERA-GRG-557-2020 | ILD GRAND CENTRA ( TOWER 1) | ILD MILLENNIUM PVT. LTD | SECTOR- 37C, GURUGRAM |
GURUGRAM | 17-Aug-2017 | 16-Feb-2020 | ![]() |
| 100 | 298 OF 2017 DATED 13.10.2017 | RERA-GRG-1611-2024 | INDIABULLS ONE09 | CITRA PROPERTIES LTD. | SECTOR 109, GURUGRAM |
GURUGRAM | 13-Oct-2017 | 31-May-2026 | ![]() View Corrigendum |
| 101 | GGM/436/168/2021/04 DATED 18.01.2021 | RERA-GRG-798-2021 | INFINITY | PYRAMID DREAM HOMES LLP | VILLAGE BADSHAHPUR, SECTOR-70 |
GURUGRAM | 18-Jan-2021 | 24-Sep-2025 | ![]() |
| 102 | 327 OF 2017 DATED 23.10.2017 | RERA-GRG-520-2019 | INSPIRE | BRAHMA CITY PVT. LTD. | SECTOR-60, TEHSIL-WAZIRABAD, GURUGRAM, HARYANA |
GURUGRAM | 23-Oct-2017 | 20-Aug-2025 | ![]() View Corrigendum |
| 103 | 367 OF 2017 DATED 24.11.2017 | RERA-GRG-1789-2024 | IREO SKYON | IREO PVT.LTD. | SECTOR -60, VILLAGE ULLHAWAS, GURUGRAM,HARYANA |
GURUGRAM | 24-Nov-2017 | 21-Nov-2018 | ![]() |
| 104 | 13 OF 2018 DATED 11.01.2018 | RERA-GRG-528-2019 | ISHAN SINGH ( COMMERCIAL) | SPAZE TOWERS PVT. LTD | SECTOR-78, VILLAGE- NAURANGPU R |
GURUGRAM | 11-Jan-2018 | 31-Dec-2025 | ![]() View Corrigendum |
| 105 | GGM/555/287/2022/30 DATED 25.04.2022 | RERA-GRG-762-2020 | JMD SUBURBIO-1 | JMD LIMITED | SECTOR 67 |
GURUGRAM | 25-Apr-2022 | 30-Dec-2024 | ![]() |
| 106 | 312 OF 2017 DATED 17.10.2017 | RERA-GRG-399-2019 | JMD SUBURBIO-II | JMD LTD. | SECTOR 67, GURUGRAM |
GURUGRAM | 17-Oct-2017 | 31-Dec-2019 | ![]() |
| 107 | GGM/291/2018/23 DATED 27.11.2018 | RERA-GRG-639-2020 | KAVYAM-PHASE-1 | AGRANTE REALTY LTD | SECTOR-108, DHARAMPUR, GURUGR AM |
GURUGRAM | 22-Nov-2018 | 30-Nov-2022 | ![]() |
| 108 | GGM/371/103/2019/65 DATED 22.10.2019 | RERA-GRG-221-2019 | KRRISH WORLD | KRRISH REALTECH PVT. LTD | VILLAGE MAIDAWAS & ULLAWAS |
GURUGRAM | 22-Oct-2019 | 22-Oct-2019 | ![]() View Corrigendum |
| 109 | GGM/432/164/2020/48 DATED 22.12.2020 | RERA-GRG-711-2020 | LA CENTRAL | DIVINE VISION INFRA RETAIL PVT. LTD. | REVENUE ESTATE OF VILLAGE BEG AMPUR KHATOLA, SECTOR 74A, DISTRICT GURUGRAM. |
GURUGRAM | 22-Dec-2020 | 31-Dec-2024 | ![]() View Corrigendum |
| 110 | GGM/367/99/2019/61 DATED- 25.11.2019 | RERA-GRG-220-2019 | LANDMARK CYBERPARK | LANDMARK APARTMENTS PVT. LTD. | SECTOR 67, GURGAON |
GURUGRAM | 01-Feb-2011 | 26-Dec-2018 | ![]() |
| 111 | GGM/468/200/2021/36 DATED 16.07.2021 | RERA-GRG-844-2021 | LANDMARK THE HOMES 81 | SRV AUTOMOTIVES PVT. LTD. | SECTOR 81, GURUGRAM |
GURUGRAM | 16-Jul-2021 | 28-Feb-2026 | ![]() View Corrigendum |
| 112 | 272 OF 2017 DATED 09.10.2017 | RERA-GRG-491-2019 | LIFESTYLE HOMES | VATIKA LTD. | SECTOR 83, VILLAGE HARSARU, G URUGRAM |
GURUGRAM | 09-Oct-2017 | 31-Dec-2019 | ![]() |
| 113 | GGM/428/160/2020/44 DATED 24.11.2020 | RERA-GRG-773-2020 | LUXURY VILLA | LUXURY INFRASTRUCTURE PVT. LTD. | PLOT NO 4 VIJAY VIHAR SILOKHA RA ROAD SECTOR 30 GURGAON |
GURUGRAM | 24-Nov-2020 | 26-Mar-2021 | ![]() |
| 114 | GGM/833/565/2024/60 DATED 03.06.2024 (SUPERSEDES GGM/662/394/2023/06 DATED 12.01.2023) | RERA-GRG-1521-2023 | M3M ANTALYA HILLS PHASE II | LOON LAND DEVELOPMENT LIMITED | SECTOR-79, GURUGRAM, HARYANA |
GURUGRAM | 03-Jun-2024 | 30-Jun-2026 | ![]() |
| 115 | GGM/662/394/2023/06 DATED 12.01.2023 (SUPERSEDED BY GGM/833/565/2024/60 DATED 03.06.2024) | RERA-GRG-1248-2022 | M3M ANTALYA HILLS PHASE II | LOON LAND DEVELOPMENT LIMITED | SECTOR 79, GURUGRAM |
GURUGRAM | 12-Jan-2023 | 30-Jun-2026 | ![]() |
| 116 | GGM/299/2018/31 DATED 14.12.2018 (SUPERSEDED BY GGM/700/432/2023/44 DATED 02.03.2023) | RERA-GRG-101-2018 | M3M BROADWAY | ROSHNI BUILDERS PVT. LTD. | VILLAGE- FAZILPUR JHARSA, SEC TOR-71, GURUGRAM |
GURUGRAM | 14-Dec-2018 | 31-Oct-2023 | ![]() |
| 117 | GGM/635/367/2022/110 DATED 28.11.2022 (SUPERSEDED BY GGM/722/454/2023/66 DATED 29.05.2023) | RERA-GRG-1199-2022 | M3M JEWEL | LEKH BUILDTECH PRIVATE LIMITED | SECTOR-25, GURUGRAM |
GURUGRAM | 28-Nov-2022 | 30-Mar-2026 | ![]() |
| 118 | 227 OF 2017 DATED 19.09.2017 | RERA-GRG-464-2019 | MAGNUM CITY CENTRE ( COMMERCIAL PROJECT) | GALAXY MONNET INFRAHEIGHTS LTD | SECTOR-63A, ULLHAWAS, GURUGRA M |
GURUGRAM | 19-Sep-2017 | 31-Dec-2022 | ![]() |
| 119 | 225 OF 2017 DATED 19.09.2017 | RERA-GRG-631-2020 | MAGNUM TOWERS ( TOWER A & C) | GALAXY MONNET INFRAHEIGHTS LTD | SECTOR-58, BEHRAMPUR, GURUGRA M |
GURUGRAM | 19-Sep-2017 | 31-Dec-2018 | ![]() |
| 120 | GGM/422/154/2020/38 DATED 26.10.2020 | RERA-GRG-306-2019 | MARKET WALK | VATIKA LIMITED | VILLAGE SHIKOHPUR, SECTOR- 82 A |
GURUGRAM | 26-Oct-2020 | 31-Jul-2025 | ![]() View Corrigendum |
| 121 | GGM/279/2018/11 DATED 21.11.2018 | RERA-GRG-272-2019 | MARUTI KUNJ | IRW DEVELOPERS PVT LTD | SECTOR-1, PATAUDI, GURUGRAM |
GURUGRAM | 21-Nov-2018 | 20-Nov-2021 | ![]() View Corrigendum |
| 122 | GGM/968/700/2025/71 DATED 10.07.2025 | RERA-GRG-1403-2023 | METRO WORLD MALL | CORAL REALTORS PRIVATE LIMITED | MULTIPLEX SITE, SECTOR 55-56, DISTRICT CENTRE, GURUGRAM - 122011, HARYANA |
GURUGRAM | 10-Jul-2025 | 31-Dec-2024 | ![]() |
| 123 | 01 OF 2017 DATED 14.06.2017 (SUPERSEDED BY GGM/688/420/2023/32 DATED 02.02.2023) | RERA-GRG-552-2020 | MIXED LAND USE COLONY FOR 14.4125 ACRES | MANGLAM MULTIPLEX PVT LTD | VILLAGE BADSHAPUR AND MAIDAWA S, SECTOR-65, GURUGRAM |
GURUGRAM | 14-Jun-2017 | 01-May-2024 | ![]() |
| 124 | GGM/315/47/2019/09 DATED 21.02.2019 | RERA-GRG-100-2018 | MKS COUNTRY-PHASE I | METRO TECHNO BUILD PVT. LTD. | SECTOR-2, SOHNA, GURUGRAM |
GURUGRAM | 21-Feb-2019 | 19-May-2024 | ![]() |
| 125 | GGM/568/300/2022/43 DATED 25.05.2022 | RERA-GRG-1043-2022 | MKS COUNTY | METRO TECHNOBUILD PRIVATE LIMITED | SECTOR-2, SOHNA |
GURUGRAM | 25-May-2022 | 24-Apr-2026 | ![]() |
| 126 | 266 OF 2017 DATED 09.10.2017 | NA | MONDE-DE-PROVENCE, PHASE-1 (TOWER B & D) | KRRISH REALTYNIRMAN PVT. LTD. | SECTOR-02, |
GURUGRAM | 09-Oct-2017 | 30-Jun-2019 | ![]() |
| 127 | 230 OF 2017 DATED 19.09.2017 | NA | MONDE-DE-PROVENCE, PHASE-II ( TOWER-C) | KRRISH REALTYNIRMAN PVT. LTD | SECTOR-2, GURUGRAM FARIDABAD ROAD, GURUGRAM |
GURUGRAM | 19-Sep-2017 | 30-Jun-2020 | ![]() |
| 128 | 121 OF 2017 DATED 28.08.2017 | RERA-GRG-1580-2024 | MONSOON BREEZE PHASE -I ABLM TOWERS | UMANG REALTECH PVT. LTD | VILLAGE NAURANGPUR ,SECTOR 78 , GURUGRAM |
GURUGRAM | 28-Aug-2017 | 05-Mar-2019 | ![]() View Corrigendum |
| 129 | 14 OF 2018 DATED 16.01.2018 | RERA-GRG-1581-2024 | MONSOON BREEZE PHASE-II | UMANG REALTECH PVT. LTD. | SECTOR-78 |
GURUGRAM | 16-Jan-2018 | 31-Dec-2020 | ![]() |
| 130 | 116 OF 2017 (SUPERSEDED BY 14 OF 2018) | NA | MONSSON BREEZE PHASE-II | UMANG REALTECH PRIVATE LIMITED | SECTOR - 78 |
GURUGRAM | 16-Jan-2018 | 31-Dec-2020 | ![]() |
| 131 | 109 OF 2017 DATED 24.08.2017 | RERA-GRG-545-2020 | NEO SQUARE | NEO DEVELOPERS PVT.LTD. | VILLAGE PAWALA KHUSRPUR,SECTO R-109, GURUGRAM |
GURUGRAM | 24-Aug-2017 | 22-Feb-2025 | ![]() View Corrigendum |
| 132 | GGM/570/302/2022/45 DATED 30.05.2022 | RERA-GRG-1054-2022 | NEW LOOK B1 B2 108 | NEW LOOK BUILDERS AND DEVELOPERS PRIVATE LIMITED | SECTOR 67A GURUGRAM |
GURUGRAM | 30-May-2022 | 31-Mar-2023 | ![]() |
| 133 | GGM/330/62/2019/24 DATED 13.05.2019 | RERA-GRG-239-2019 | OM APARTMENTS | PAREENA BUILDERS & PROMOTERS PVT. LTD. | SECTOR-112, GURUGRAM |
GURUGRAM | 13-May-2019 | 30-Sep-2025 | ![]() View Corrigendum |
| 134 | GGM/515/247/2021/83 DATED 16.11.2021 | RERA-GRG-960-2021 | ONE GOOD EARTH | RAJ BUILDWELL PRIVATE LIMITED | VILLAGE-FAZILPUR JHARSA, DIST RICT-GURUGRAM IN RESIDENTIAL SECTOR-71- GURGAON MANESAR URBAN COMPLEX, GURUGRAM |
GURUGRAM | 16-Nov-2021 | 31-Dec-2025 | ![]() View Corrigendum |
| 135 | GGM/517/249/2021/85 DATED 20.12.2021 | RERA-GRG-961-2021 | ORRIS GATEWAY | ORRIS INFRASTRUCTURE PVT. LTD. | VILLAGE SHIKOHPUR, SECTOR-82 A GURUGRAM, DISTRICT- GURUGRAM, HARYANA |
GURUGRAM | 20-Dec-2021 | 31-Dec-2024 | ![]() |
| 136 | GGM/476/208/2021/44 DATED 24.08.2021 | RERA-GRG-786-2020 | OYSTER ARCADE | ADANI M2K PROJECTS LLP | VILLAGE KHERKI MAJRA, SECTOR 102 GURUGRAM |
GURUGRAM | 24-Aug-2021 | 24-Nov-2025 | ![]() |
| 137 | 37 OF 2017 DATED 10.08.2017 | RERA-GRG-544-2019 | OYSTER GRANDE-TOWER G | ADANI M2K PROJECTS LLP | SECTOR 102/102A, VILLAGE KHED KI MAZRA, GURUGRAM |
GURUGRAM | 10-Aug-2017 | 30-Sep-2024 | ![]() |
| 138 | 7(A) OF 2018 DATED 01.02.2018 | RERA-GRG-521-2019 | PALASH TOWER (TOWER-C) | RAHEJA DEVELOPERS LTD | SECTOR 99A |
GURUGRAM | 01-Feb-2018 | 31-Dec-2022 | ![]() |
| 139 | GGM/347/79/2019/41 DATED 30.07.2019 | RERA-GRG-216-2019 | PARK STREET | KS PROPMART PVT. LTD. | SECTOR-85, GURUGRAM |
GURUGRAM | 30-Jul-2019 | 30-Jun-2023 | ![]() View Corrigendum |
| 140 | 16 OF 2018 DATED 19.01.2018 | NA | PARKWOOD WESTEND PHASE - I PART OF GROUP HOUSING COLONY | PARKWOOD INFRASTRUCTURE PVT. LTD | SECTOR-92, GURUGRAM |
GURUGRAM | 19-Jan-2018 | 31-Dec-2019 | ![]() |
| 141 | 383 OF 2017 DATED 14.12.2017 | RERA-GRG-414-2019 | PHASE 1,TOWER C1,C2,C3 COMMERCIAL(SHOPS), EWS AND COMMUNITY BUILDING | SATYA TOWNSHIPS PVT. LTD. | SECTOR 99A , VILLAGE GOPALPU, GURUGRAM, HARYANA |
GURUGRAM | 14-Dec-2017 | 13-Dec-2022 | ![]() |
| 142 | 275 OF 2017 DATED 09.10.2017 | NA | PHASE SHOPS (SHOP. 1-36) | RAMPRASTHA SARE REALTY PVT. LTD. | SECTOR 92, VILLAGE WAZIRPUR A ND MEWKA, GURUGRAM |
GURUGRAM | 09-Oct-2017 | 30-Sep-2021 | ![]() |
| 143 | GGM/282/2018/14 DATED 06.09.2018 | RERA-GRG-351-2019 | PICASSO CENTRE | ERA RESORTS PVT. LTD. | SECTOR-61, GOLF COURSE EXTENS ION ROAD |
GURUGRAM | 06-Sep-2018 | 30-Dec-2020 | ![]() View Corrigendum |
| 144 | GGM/556/288/2022/31 DATED 02.05.2022 | RERA-GRG-953-2021 | PLAZA 106 DDJAY | MAGIC EYE DEVELOPERS PVT LTD | PLAZA 106 DDJAY , SECTOR 106, NEAR DAULTABAD VILLAGE, GURGAON |
GURUGRAM | 02-May-2022 | 31-Dec-2024 | ![]() |
| 145 | 93 OF 2017 DATED 28.08.2017 | RERA-GRG-570-2020 | PLOTTED COLONY (RAHEJA ARANYA PHASE - II) | RAHEJA DEVELOPERS LTD | SECTOR 11 AND 14 OF SOHNA, GU RUGRAM |
GURUGRAM | 28-Aug-2017 | 27-Aug-2022 | ![]() |
| 146 | GGM/435/167/2021/03 DATED 18.01.2021 | RERA-GRG-788-2020 | PRIMELAND | JMS BUILDWELL REALTY PRIVATE LIMITED | SECTOR 95A GURUGRAM |
GURUGRAM | 18-Jan-2021 | 28-Dec-2025 | ![]() |
| 147 | 282 OF 2017 DATED 09.10.2017 | NA | PROVENCE ESTATE (PH-1, TOWER A &B) | JASMINE BUILDMART PVT. LTD. | SECTOR 2 GURUGRAM |
GURUGRAM | 09-Oct-2017 | 30-Mar-2019 | ![]() View Corrigendum |
| 148 | GGM/372/104/2019/66 DATED 31.10.2019 | RERA-GRG-318-2019 | RAHEJA MARKET SECTOR- 83 & RAHEJA MARKET SECTOR- 84 | RAHEJA DEVELOPERS LIMITED | VILLAGE SIHI, SECTOR-83 & 84 |
GURUGRAM | 31-Oct-2019 | 13-Sep-2024 | ![]() |
| 149 | 90 OF 2017 DATED 28.08.2017 | RERA-GRG-656-2020 | RAHEJA SHILAS LOW RISE IN RAHEJA ATHARVA | RAHEJA DEVELOPERS LTD | SECTOR 109, GURUGRAM |
GURUGRAM | 28-Aug-2017 | 27-Aug-2022 | ![]() |
| 150 | 24 OF 2017 DATED 25.07.2017 | RERA-GRG-387-2019 | RAHEJA TRINITY | RAHEJA DEVELOPERS LTD. | SECTOR-84, GURUGRAM |
GURUGRAM | 25-Jul-2017 | 25-Jul-2022 | ![]() |
| 151 | GGM/397/129/2020/13 DATED 05.06.2020 | RERA-GRG-298-2019 | RAMPRASTHA CITY - SECTOR 92, 93 & 95 | RAMPRASTHA ESTATES PVT. LTD. | SECTOR 92, 93 & 95 GURUGRAM |
GURUGRAM | 05-Jun-2020 | 31-Dec-2024 | ![]() |
| 152 | 32 OF 2017 DATED 04.08.2017 | RERA-GRG-362-2019 | REVANTA | RAHEJA DEVELOPERS LTD. | SECTOR -78, GURUGRAM |
GURUGRAM | 04-Aug-2017 | 04-Aug-2022 | ![]() |
| 153 | 236 OF 2017 DATED 19.09.2017 | RERA-GRG-411-2019 | RIDDHI SIDDHI | PIVOTAL INFRASTRUCTURE PVT. LTD. | SECTOR-99, VILLAGE KHERKI MAJ RA DHANKOT, DIST GURUGRAM |
GURUGRAM | 19-Sep-2017 | 31-Aug-2020 | ![]() View Corrigendum |
| 154 | 278 OF 2017 DATED 09.10.2017 | RERA-GRG-447-2019 | RISE | RAMPRASTHA PROMOTERS AND DEVELOPERS PVT. LTD. | VILLAGE GADAULI KALAN |
GURUGRAM | 09-Oct-2017 | 31-Dec-2023 | ![]() View Corrigendum |
| 155 | 206 OF 2017 DATED 15.09.2017 | RERA-GRG-85-2018 | RMG RESIDENCY ( AFFORDABLE GROUP HOUSING) | RMG DEVELOPERS PVT. LTD | SECTOR-37C, GURUGRAM |
GURUGRAM | 15-Sep-2017 | 31-Dec-2019 | ![]() |
| 156 | GGM/437/169/2021/05 DATED 29.01.2021 | RERA-GRG-785-2020 | ROF ATULYAS | PEGASUS LAND AND HOUSING PRIVATE LIMITED | VILLAGE HYATPUR, SECTOR 93 |
GURUGRAM | 29-Jan-2021 | 31-Dec-2025 | ![]() |
| 157 | GGM/514/246/2021/82 DATED 16.11.2021 | RERA-GRG-932-2021 | ROF INSIGNIA PARK | DIVERSE DEVELOPERS LLP | VILLAGE- BADHA &HAYATPUR;, SE CTOR-93 |
GURUGRAM | 16-Nov-2021 | 31-May-2026 | ![]() |
| 158 | GGM/492/224/2021/60 DATED 11.10.2021 | RERA-GRG-886-2021 | ROF INSIGNIA SOUK | DIVERSE DEVELOPERS LLP | SECTOR-93, BADHA |
GURUGRAM | 11-Oct-2021 | 31-Mar-2026 | ![]() |
| 159 | GGM/637/369/2022/112 DATED 28.11.2022 | RERA-GRG-1181-2022 | ROF JBP GREEN MEADOWS | JBP PROMOTERS AND BUILDERS PRIVATE LIMITED | VILLAGE-DHUNELA SECTOR-35 & 3 6 |
GURUGRAM | 28-Nov-2022 | 08-Feb-2024 | ![]() |
| 160 | GGM/319/51/2019/13 DATED 26.03.2019 | RERA-GRG-185-2019 | SAMSARA PART V | ADANI BRAHMA SYNERGY PVT. LTD. | PLOT NO. 83 SECTOR 32 GURUGRA M |
GURUGRAM | 26-Mar-2019 | 30-Sep-2023 | ![]() |
| 161 | GGM/526/258/2022/01 DATED 19.01.2022 | RERA-GRG-904-2021 | SAPPHIRE57 | AMEYA COMMERCIAL PROJECTS PVT LTD. | SECTOR 57 |
GURUGRAM | 19-Jan-2022 | 30-Apr-2026 | ![]() |
| 162 | GGM/566/298/2022/41 DATED 23.05.2022 | RERA-GRG-927-2021 | SAPPHIRE 82A | AMEYA COMMERCIAL PROJECTS PVT. LTD. | VILLAGE SHIKOHPUR , SECTOR 82 A |
GURUGRAM | 23-May-2022 | 30-Apr-2026 | ![]() |
| 163 | GGM/450/182/2021/18 DATED 12.04.2021 | RERA-GRG-783-2020 | SHIVA-SOM VALLEY | NISHANT LUTHRA | SECTOR 2 & 35, SOHNA |
GURUGRAM | 12-Apr-2021 | 29-Jun-2026 | ![]() View Corrigendum |
| 164 | GGM/403/135/2020/19 DATED 04.08.2020 | RERA-GRG-666-2020 | SHREE VARDHMAN | SHREE VARDHMAN DEVELOPERS PVT LTD | SECTOR 2, SOHNA |
GURUGRAM | 27-Jul-2020 | 31-Mar-2024 | ![]() |
| 165 | 88 OF 2017 DATED 23.08.2017 | RERA-GRG-727-2020 | SHREE VARDHMAN FLORA | SHREE VARDHMAN INFRAHOME PVT. LTD | SECTOR 90, HAYATPUR, GURUGRAM |
GURUGRAM | 23-Aug-2017 | 30-Jun-2019 | ![]() View Corrigendum |
| 166 | GGM/573/305/2022/48 DATED 06.06.2022 | RERA-GRG-1065-2022 | SIGNATUEGLOBAL PARK V (2) | SIGNATUREGLOBAL HOMES PRIVATE LIMITED | VILLAGE DHUNELA, SECTOR 36, S OHNA DISTRICT,GURUGRAM |
GURUGRAM | 06-Jun-2022 | 30-Sep-2024 | ![]() |
| 167 | GGM/462/194/2021/30 DATED 13.07.2021 | RERA-GRG-863-2021 | SIGNATURE GLOBAL CITY 37D | SIGNATUREGLOBAL DEVELOPERS PVT. LTD. | VILLAGE GADULI KALAN, SECTOR- 37D, GURUGRAM |
GURUGRAM | 13-Jul-2021 | 28-Apr-2025 | ![]() View Corrigendum |
| 168 | GGM/463/195/2021/31 DATED 13.07.2021 | RERA-GRG-877-2021 | SIGNATURE GLOBAL CITY 37D - 1 | SIGNATUREGLOBAL DEVELOPERS PVT LTD | VILLAGE GADULI KALAN, SECTOR- 37D, GURUGRAM |
GURUGRAM | 13-Jul-2021 | 28-Sep-2025 | ![]() View Corrigendum |
| 169 | GGM/754/486/2023/98 DATED 30.10.2023 | RERA-GRG-1455-2023 | SIGNATURE GLOBAL CITY 37D-2 | SIGNATUREGLOBAL DEVELOPERS PVT. LTD. | VILLAGE - GADAULI KALAN, SECT OR-37D, GURUGRAM, HARYANA |
GURUGRAM | 30-Oct-2023 | 28-Feb-2026 | ![]() |
| 170 | GGM/622/354/2022/97 DATED 27.10.2022 | RERA-GRG-1140-2022 | SIGNATURE GLOBAL CITY 37D-(2) | SIGNATUREGLOBAL DEVELOPERS PVT. LTD. | VILLAGE GADULI KALAN, SECTOR- 37D, GURUGRAM |
GURUGRAM | 27-Oct-2022 | 28-Feb-2026 | ![]() |
| 171 | GGM/545/277/2022/20 DATED 31.03.2022 | RERA-GRG-1022-2022 | SIGNATUREGLOBAL CITY 37D II | ROSE BUILDING SOLUTIONS PRIVATE LIMITED | VILLAGE-GADOLI KALAN, SECTOR- 37D, GURUGRAM |
GURUGRAM | 31-Mar-2022 | 25-Feb-2026 | ![]() View Corrigendum |
| 172 | GGM/618/350/2022/93 DATED 04.10.2022 | RERA-GRG-1136-2022 | SIGNATURE GLOBAL CITY 37D II(2) | ROSE BUILDING SOLUTIONS PRIVATE LIMITED | VILLAGE-GADOLIKALAN, SECTOR-3 7/D, GURUGRAM |
GURUGRAM | 04-Oct-2022 | 28-Feb-2026 | ![]() |
| 173 | GGM/546/278/2022/21 DATED 31.03.2022 | RERA-GRG-1023-2022 | SIGNATURE GLOBAL CITY 63A | SIGNATUREGLOBAL (INDIA) PRIVATE LIMITED | VILLAGE KADARPUR SECTOR 63 |
GURUGRAM | 31-Mar-2022 | 25-Feb-2026 | ![]() View Corrigendum |
| 174 | GGM/619/351/2022/94 DATED 04.10.2022 | RERA-GRG-1132-2022 | SIGNATURE GLOBAL CITY 63A(2) | SIGNATUREGLOBAL (INDIA) LIMITED | VILLAGE-KADARPUR, SECTOR-63A, GURUGRAM |
GURUGRAM | 04-Oct-2022 | 28-Feb-2026 | ![]() |
| 175 | GGM/656/388/2022/131 DATED 23.12.2022 | RERA-GRG-1200-2022 | SIGNATURE GLOBAL CITY 79B | JMK HOLDINGS PVT. LTD. | VILLAGE, NAUNGRANPUR, SECTOR- 79B GURUGRAM, HARYANA |
GURUGRAM | 23-Dec-2022 | 28-Apr-2026 | ![]() View Corrigendum |
| 176 | GGM/477/209/2021/45 DATED 27.07.2021 | RERA-GRG-880-2021 | SIGNATURE GLOBAL CITY 81 | STERNAL BUILDCON PRIVATE LIMITED | VILLAGE NAKHDOLA, SECTOR 81 |
GURUGRAM | 27-Jul-2021 | 27-Jun-2026 | ![]() View Corrigendum |
| 177 | GGM/478/210/2021/46 DATED 27.07.2021 | RERA-GRG-887-2021 | SIGNATURE GLOBAL CITY 81-(1) | STERNAL BUILDCON PRIVATE LIMITED | VILLAGE NAKHDOLA, SECTOR 81 |
GURUGRAM | 27-Jul-2021 | 26-Feb-2026 | ![]() View Corrigendum |
| 178 | GGM/470/202/2021/38 DATED 27.07.2021 | RERA-GRG-860-2021 | SIGNATURE GLOBAL CITY 92 | SIGNATURE INFRBUILD PVT. LTD. | VILLAGE MEVKA, WAZIRPUR, SECT OR-92, GURUGRAM |
GURUGRAM | 27-Jul-2021 | 27-Apr-2026 | ![]() View Corrigendum |
| 179 | GGM/664/396/2023/08 DATED 13.01.2023 | RERA-GRG-1221-2022 | SIGNATURE GLOBAL CITY 92-2 | SIGNATURE INFRABUILD PVT. LTD. | VILLAGE MEVKA, WAZIRPUR, SECT OR-92, GURUGRAM |
GURUGRAM | 13-Jan-2023 | 28-Mar-2026 | ![]() View Corrigendum |
| 180 | GGM/666/398/2023/10 DATED 13.01.2023 | RERA-GRG-1220-2022 | SIGNATURE GLOBAL CITY 92-(II) | SIGNATURE INFRABUILD PVT. LTD. | VILLAGE MEVKA, WAZIRPUR, SECT OR-92, GURUGRAM |
GURUGRAM | 13-Jan-2023 | 26-Feb-2026 | ![]() View Corrigendum |
| 181 | GGM/438/170/2021/06 DATED 29.01.2021 | RERA-GRG-780-2020 | SIGNATURE GLOBAL PARK -III EXT. | SIGNATUREGLOBAL HOMES PRIVATE LIMITED | VILLAGE DHUNELA, SECTOR 36 |
GURUGRAM | 01-Feb-2021 | 29-Dec-2025 | ![]() View Corrigendum |
| 182 | GGM/495/227/2021/63 DATED 13.10.2021 | RERA-GRG-922-2021 | SIGNATURE GLOBAL PARK III EXT.(PHASE-2) | SIGNATUREGLOBAL HOMES PVT LTD | VILLAGE DHUNELA, SECTOR-36, S OHNA, GURUGRAM |
GURUGRAM | 13-Oct-2021 | 30-Jun-2025 | ![]() View Corrigendum |
| 183 | GGM/496/228/2021/64 DATED 13.10.2021 | RERA-GRG-862-2021 | SIGNATURE GLOBAL PARK III-(PHASE-2) | SIGNATUREGLOBAL HOMES PVT LTD | VILLAGE DHUNELA, SECTOR 36, S OHNA, DISTT. GURUGRAM |
GURUGRAM | 13-Oct-2021 | 30-Aug-2025 | ![]() View Corrigendum |
| 184 | GGM/474/206/2021/42 DATED 27.07.2021 | RERA-GRG-859-2021 | SIGNATURE GLOBAL PARK -II (PHASE II) | SINATUREGLOBAL HOMES PVT LTD | VILLAGE DHUNELA, SECTOR-36 |
GURUGRAM | 27-Jul-2021 | 29-Mar-2025 | ![]() View Corrigendum |
| 185 | GGM/572/304/2022/47 DATED 06.06.2022 | RERA-GRG-1064-2022 | SIGNATURE GLOBAL PARK IV(2) | SIGNATUREGLOBAL HOMES PRIVATE LIMITED | VILLAGE HARIYAHARA, SECTOR 36 , SOHNA, DISTT. GURUGRAM |
GURUGRAM | 06-Jun-2022 | 29-Sep-2025 | ![]() View Corrigendum |
| 186 | GGM/414/146/2020/30 DATED 08.10.2020 | RERA-GRG-738-2020 | SIGNATURE GLOBAL PARK V | SIGNATUREGLOBAL HOMES PRIVATE LIMITED | VILLAGE HARIYAHARA, SECTOR-36 |
GURUGRAM | 08-Oct-2020 | 29-Jul-2023 | ![]() View Corrigendum |
| 187 | 320 OF 2017 DATED 17.10.2017 | RERA-GRG-451-2019 | SKYZ | RAMPRASTHA PROMOTERS & DEVELOPERS PVT. LTD. | VILLAGE GADAULI KALAN, GURUGR AM, HARYANA |
GURUGRAM | 17-Oct-2017 | 31-Dec-2023 | ![]() View Corrigendum |
| 188 | GGM/506/238/2021/74 DATED 03.11.2021 | RERA-GRG-957-2021 | SMARTWORLD ORCHARD | SUPOSHAA REALCON PRIVATE LIMITED | SECTOR -61, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA. |
GURUGRAM | 03-Nov-2021 | 31-Dec-2024 | ![]() |
| 189 | GGM/505/237/2021/73 DATED 27.10.2021 | RERA-GRG-948-2021 | SMARTWORLD ORCHARD | SUPOSHAA REALCON PRIVATE LIMITED | SECTOR -61, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA. |
GURUGRAM | 27-Oct-2021 | 31-Oct-2023 | ![]() |
| 190 | GGM/280/2018/12 DATED 27.07.2018 | RERA-GRG-401-2019 | SOBHA CITY (PHASE-2, PART-1) | SOBHA LIMITED | SECTOR-108, GURUGRAM |
GURUGRAM | 27-Jul-2018 | 31-Oct-2022 | ![]() |
| 191 | GGM/638/370/2022/113 DATED 28.11.2022 | RERA-GRG-1183-2022 | SOHNA GREENS | V K DEVELOPERS | SECTOR-4,VILLAGE KHAILKA, SOH NA |
GURUGRAM | 28-Nov-2022 | 30-Apr-2025 | ![]() |
| 192 | 280 OF 2017 DATED 09.10.2017 | RERA-GRG-501-2019 | SOVEREIGN NEXT | VATIKA LTD. | SECTOR 82A, VILLAGE SHIKOHPUR , GURUGRAM |
GURUGRAM | 09-Oct-2017 | 31-Mar-2021 | ![]() |
| 193 | 285 OF 2017 DATED 10.10.2017 | RERA-GRG-466-2019 | SOVEREIGN PARK | VATIKA SOVEREIGN PARK PVT. LTD. | SECTOR 99, GURUGRAM |
GURUGRAM | 10-Oct-2017 | 31-Mar-2025 | ![]() View Corrigendum |
| 194 | 376 OF 2017 DATED 07.12.2017 | RERA-GRG-623-2020 | SPLENDOR SPECTRUMONE | SPLENDOR BUILDWELL PVT. LTD | SECTOR-58, GURUGRAM |
GURUGRAM | 07-Dec-2017 | 31-Dec-2018 | ![]() |
| 195 | 228 OF 2017 DATED 19.09.2017 | RERA-GRG-542-2019 | SPORTS VILLE ( AFFORDABLE GROUP HOUSING PROJECT) | HCBS PROMOTERS & DEVELOPERS PVT. LTD | SECTOR 2 & 35, GURUGRAM |
GURUGRAM | 19-Sep-2017 | 18-Sep-2021 | ![]() |
| 196 | GGM/405/137/2020/21 DATED 17.08.2020 | RERA-GRG-705-2020 | SS 100 | SS GROUP PRIVATE LIMITED | SOUTHERN PERIPHERAL ROAD, VIL L. BADSHAHPUR,SECTOR-49, GURUGRAM, HARYANA |
GURUGRAM | 17-Aug-2020 | 30-Sep-2024 | ![]() |
| 197 | GGM/342/74/2019/36 DATED 05.07.2019 | RERA-GRG-255-2019 | SS HIGH POINT | SS GROUP PVT. LTD. | SECTOR-86, GURUGRAM |
GURUGRAM | 05-Jul-2019 | 29-Jun-2025 | ![]() View Corrigendum |
| 198 | GGM/717/449/2023/61 DATED 15.05.2023 | RERA-GRG-1266-2023 | SS STRADA | SS GROUP PRIVATE LIMITED | SECTOR -84, GURUGRAM |
GURUGRAM | 15-May-2023 | 31-Mar-2026 | ![]() |
| 199 | GGM/384/116/2019/78 DATED 23.12.2019 | RERA-GRG-271-2019 | SUNCITY AVENUE 76 | SUNCITY PROJECTS PVT. LTD. | SECTOR 76, VILLAGE KHERKI DAU LA |
GURUGRAM | 06-Nov-2019 | 30-Sep-2024 | ![]() |
| 200 | GGM/510/242/2021/78 DATED 09.11.2021 | RERA-GRG-942-2021 | SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 1 | NAMDEV CONSTRUCTION PVT. LTD. | GUAL PAHARI |
GURUGRAM | 09-Nov-2021 | 30-Jan-2025 | ![]() |
| 201 | GGM/660/392/2023/04 DATED 12.01.2023 | RERA-GRG-1196-2022 | SUNCITY VATSAL VALLEY INDEPENDENT FLOORS 2 | NAMDEV CONSTRUCTION PVT. LTD. | GUAL PAHARI |
GURUGRAM | 12-Jan-2023 | 30-Jan-2025 | ![]() |
| 202 | GGM/527/259/2022/02 DATED 24.01.2022 | RERA-GRG-745-2020 | THE CITYSCAPE | FRENCH BUILDMART PRIVATE LIMITED | VILLAGE- MAIDAWAS, SECTOR- 66 , GURUGRAM, HARYANA |
GURUGRAM | 24-Jan-2022 | 30-Sep-2022 | ![]() |
| 203 | 381 OF 2017 DATED 12.12.2017 | RERA-GRG-525-2019 | THE CORALWOOD AND ALMERIA | SS GROUP PVT. LTD. | SECTOR 84, VILLAGE SIHI,GURUG RAM,HARYANA |
GURUGRAM | 12-Dec-2017 | 31-Dec-2019 | ![]() |
| 204 | 379 OF 2017 DATED 22.12.2017 | RERA-GRG-1679-2024 | THE CORRIDORS (PHASE 3) | IREO GRACE REALTECH PVT.LTD. | SECTOR 67-A, VILLAGE DHUMASPU R AND MAIDAWAS, TEHSIL SOHNA,GURUGRAM, HARYANA |
GURUGRAM | 07-Dec-2017 | 31-Dec-2023 | ![]() |
| 205 | GGM/467/199/2021/35 DATED 14.07.2021 | RERA-GRG-833-2021 | THE LEAF | NAVI ESTATES LLP | VILLAGE DHUNELA, SEC 34 |
GURUGRAM | 14-Jul-2021 | 29-Jun-2026 | ![]() View Corrigendum |
| 206 | 245 OF 2017 DATED 03.09.2017 | RERA-GRG-323-2019 | THE MERIDIAN | MRG INFRABUILD PVT. LTD. | SECTOR-89, VILLAGE HAYATPUR, GURUGRAM |
GURUGRAM | 26-Sep-2017 | 24-Mar-2025 | ![]() View Corrigendum |
| 207 | GGM/643/375/2022/118 DATED 13.12.2022 | RERA-GRG-1186-2022 | THE PRIDE | JMS BUILDWELL REALTY PRIVATE LIMITED | SECTOR 95 A |
GURUGRAM | 13-Dec-2022 | 16-Oct-2025 | ![]() View Corrigendum |
| 208 | GGM/466/198/2021/34 DATED 20.07.2021 | RERA-GRG-873-2021 | THE SKYLINE | MRG CASTLE REALITY LLP | VILLAGE BABUPUR, SECTOR-106 |
GURUGRAM | 20-Jul-2021 | 29-Jun-2026 | ![]() View Corrigendum |
| 209 | GGM/423/155/2020/39 DATED 27.10.2020 | RERA-GRG-629-2020 | THE VENETIAN | OCEAN SEVEN BUILDTECH PVT LTD | SECTOR-70,BADSHAHPUR |
GURUGRAM | 27-Oct-2020 | 02-Sep-2024 | ![]() |
| 210 | 364 OF 2017 DATED 21.11.2017 | NA | TOWER NO. T17, PHASE-VI | SARE GURUGRAM PVT. LTD. | SECTOR-92, VILLAGE WAZIRPUR A ND MEWKA, GURUGRAM, HARYANA |
GURUGRAM | 21-Nov-2017 | 30-Jun-2022 | ![]() |
| 211 | GGM/277/2018/09 DATED 24.07.2018 | NA | TOWN PLAZA | SAMYAK PROJECTS PVT. LTD. | SECTOR-63, VILLAGE BEHRAMPUR, GURUGRAM |
GURUGRAM | 24-Jul-2018 | 31-Jul-2021 | ![]() |
| 212 | 366 OF 2017 DATED 22.11.2017 | RERA-GRG-503-2019 | TOWN SQUARE (BLOCK D) | VATIKA LTD. | SECTOR -82-A, VILLAGE SHIKOHP UR, TEHSIL MANESAR,DISTRICT GURUGRAM, HARYANA |
GURUGRAM | 22-Nov-2017 | 31-Dec-2018 | ![]() |
| 213 | 359 OF 2017 DATED 17.11.2017 | RERA-GRG-506-2019 | TRANQUIL HEIGHTS, PHASE-1 | VATIKA LTD. | SECTOR-82A, VILLAGE SHIKOHPUR , TEHSIL MANESAR, GURUGRAM, HARYANA |
GURUGRAM | 17-Nov-2017 | 30-Apr-2021 | ![]() |
| 214 | 375 OF 2017 DATED 28.11.2017 | RERA-GRG-601-2020 | TRUMP TOWERS DELHI NCR | OLIVE REALCON PVT. LTD. AND MANGLAM MULTIPLEX PVT LTD | SECTOR 65, GURUGRAM, HARYANA |
GURUGRAM | 28-Nov-2017 | 31-Dec-2024 | ![]() |
| 215 | GGM/324/56/2019/18 DATED 01.04.2019 | RERA-GRG-154-2019 | TULIP PURPLE PHASE 2 | TULIP INFRATECH PVT. LTD. | SECTOR-69-70, GURUGRAM |
GURUGRAM | 01-Apr-2019 | 30-Dec-2023 | ![]() |
| 216 | GGM/304/2018/36 DATED 18.12.2018 | RERA-GRG-649-2020 | TULIP VIOLET PHASE-II | TULIP INFRATECH PVT. LTD. | SECTOR-69 & 70, BADSHAHPUR,GU RUGRAM |
GURUGRAM | 18-Dec-2018 | 31-Dec-2020 | ![]() |
| 217 | 213 OF 2017 DATED 15.09.2017 | RERA-GRG-502-2019 | TURNING POINT ( GROUP HOUSING) | VATIKA LTD | SECTOR-88B, HARSARU, GURUGRAM |
GURUGRAM | 15-Sep-2017 | 15-Feb-2024 | ![]() |
| 218 | GGM/530/262/2022/05 DATED 31.01.2022 | RERA-GRG-989-2021 | ULTIMUS | BD INFRADEVELOPERS LLP | SECTOR 90 GURUGRAM |
GURUGRAM | 31-Jan-2022 | 14-Jul-2026 | ![]() |
| 219 | GGM/529/261/2022/04 DATED 31.01.2022 | RERA-GRG-979-2021 | ULTIMUS 2.0 | MRG WORLD LLP | SECTOR 90 GURUGRAM |
GURUGRAM | 31-Jan-2022 | 14-Jul-2026 | ![]() |
| 220 | GGM/535/267/2022/10 DATED 21.02.2022 | RERA-GRG-976-2021 | VALENCIA | AB REALTY PRIVATE LTD | 77-B, IFFCO ROAD,SECTOR-18,GU RUGRAM,HARYANA |
GURUGRAM | 21-Feb-2022 | 14-Jul-2026 | ![]() |
| 221 | GGM/630/362/2022/105 DATED 21.11.2022 | RERA-GRG-1160-2022 | VANYA CITY | BETTERCHOICE REALTORS PVT LTD | SECTOR 99A |
GURUGRAM | 21-Nov-2022 | 31-Oct-2025 | ![]() |
| 222 | GGM/680/412/2023/24 DATED 30.01.2023 | RERA-GRG-1192-2022 | VATIKA CROSSOVER | M/S VATIKA ONE INDIA NEXT PVT. LTD. | SECTOR-82A, VILLAGE-SHIKOHPUR , GURUGRAM |
GURUGRAM | 30-Jan-2023 | 29-Jun-2025 | ![]() View Corrigendum |
| 223 | 271 OF 2017 DATED 09.10.2017 | RERA-GRG-504-2019 | VATIKA EXPRESS CITY | VATIKA LTD. | SECTOR-88-A & B, VILLAGE HARS ARU, GURUGRAM |
GURUGRAM | 09-Oct-2017 | 08-Oct-2022 | ![]() |
| 224 | GGM/775/507/2024/02 DATED 08.01.2024 (SUPERSEDED BY GGM/927/659/2025/30 DATED 25.03.2025) | RERA-GRG-1419-2023 | VEDATTAM | SPJ PROPERTIES PRIVATE LIMITED | REVENUE ESTATE OF VILLAGE GUR UGRAM, SECTOR-14, GURUGRAM, HARYANA |
GURUGRAM | 08-Jan-2024 | 31-Mar-2026 | ![]() |
| 225 | 154 OF 2017 DATED 28.08.2017 | RERA-GRG-84-2018 | VERSALIA | ANSAL PHALAK INFRASTRUCTURE PVT. | SECTOR -67,GURUGRAM |
GURUGRAM | 28-Aug-2017 | 31-Aug-2020 | ![]() |
| 226 | GGM/356/88/2019/50 DATED 04.09.2019 | RERA-GRG-207-2019 | VERSALIA PHASE A1 | ANSAL PROPERTIES AND INFRASTRUCTURE LIMITED | SECTOR 67A, GURUGRAM |
GURUGRAM | 03-Sep-2019 | 31-Mar-2023 | ![]() |
| 227 | GGM/353/85/2019/47 DATED 04.09.2019 | RERA-GRG-208-2019 | VERSALIA PHASE A2 | ANSAL PROPERTIES AND INFRASTRUCTURE LIMITED | SECTOR 67A, GURUGRAM |
GURUGRAM | 03-Sep-2019 | 31-Mar-2023 | ![]() |
| 228 | GGM/354/86/2019/48 DATED 04.09.2019 | RERA-GRG-189-2019 | VERSALIA PHASE - B1 | ANSAL PROPERTIES AND INFRASTRUCTURE LIMITED | SECTOR 67A, GURUGRAM |
GURUGRAM | 03-Sep-2019 | 31-Mar-2023 | ![]() |
| 229 | GGM/355/87/2019/49 DATED 04.09.2019 | RERA-GRG-209-2019 | VERSALIA PHASE B2 | ANSAL PROPERTIES AND INFRASTRUCTURE LIMITED | SECTOR 67 A, GURUGRAM |
GURUGRAM | 03-Sep-2019 | 31-Mar-2023 | ![]() |
| 230 | GGM/283/2018/15 DATED 11.09.2018 | RERA-GRG-309-2019 | VIPUL LAVANYA APARTMENTS-TOWER 2&3 | VIPUL LIMITED | SECTOR-81,GURUGRAM |
GURUGRAM | 11-Sep-2018 | 31-Aug-2019 | ![]() |
| 231 | 112 OF 2017 DATED 28.08.2017 | RERA-GRG-378-2019 | WINDCHANTS PHASE -4,NURSERY SCHOOL SITE | EXPERION DEVELOPERS PVT.LTD. | VILLAGE CHOMA,SECTOR-112,GURU GRAM |
GURUGRAM | 28-Aug-2017 | 30-Aug-2020 | ![]() View Corrigendum |
| 232 | GGM/278/2018/10 DATED 25.07.2018 | RERA-GRG-1585-2024 | WINTER HILLS -77 (PHASE-I) | UMANG REALTECH PVT. LTD. | SECTOR - 77, GURUGRAM |
GURUGRAM | 25-Jul-2018 | 31-Dec-2019 | ![]() |
| 233 | GGM/418/150/2020/34 DATED 06.10.2020 | RERA-GRG-640-2020 | WOODVIEW RESIDENCIES | ORRIS INFRASTRUCTURE PRIVATE LIMITED | SECTOR 89-90, GURUGRAM |
GURUGRAM | 06-Oct-2020 | 15-Jul-2023 | ![]() |
| 234 | GGM/327/59/2019/21 DATED 01.04.2019 | RERA-GRG-169-2019 | ZARA AAVAAS- 2 | PERFECT BUILDWELL PVT. LTD. | SECTOR-104, GURUGRAM |
GURUGRAM | 01-Apr-2019 | 14-Feb-2024 | ![]() View Corrigendum |
| 235 | GGM/582/314/2022/57 DATED 27.06.2022 (REGISTRATION SUSPENDED) | RERA-GRG-1030-2022 | ZARA ROMA | MEGA INFRATECH PRIVATE LIMITED | SECTOR-95B |
GURUGRAM | 27-Jun-2022 | 06-Oct-2025 | ![]() |
| 236 | GGM/400/132/2020/16 DATED 22.06.2020 | RERA-GRG-483-2019 | ZEPHYR AT THE WESTERLIES | EXPERION DEVELOPERS PVT LTD | SECTOR 108, GURUGRAM |
GURUGRAM | 22-Jun-2020 | 10-Jul-2024 | ![]() |