Lapsed Projects
Serial No. Registration Certificate Number Project ID Project Name Builder Project Location Approval From Approval To Extension Date Due To Covid View Certificate
1 305 OF 2017 DATED 16-10-2017 RERA-PKL-730-2019 1.24 ACRES GROUP HOUSING MEENAL HOUSING PVT. LTD. SURAJKUND
16-Oct-2017 11-Jul-2022 11-Apr-2023



View Corrigendum
2 309 OF 2017 DATED 17-10-2017 RERA-PKL-1265-2023 1.73 ACRES GROUP HOUSING ICON REALCON PVT. LTD. SECTOR-41, MAXHEIGHTS ARAVALI
ONE
17-Oct-2017 31-Jan-2021 31-Oct-2021



View Corrigendum
3 HRERA-PKL-RWR- 10-2018 DATED 28.05.208 RERA-PKL-494-2019 24 HIGH STREET DWARKADHISH PROJECTS PVT. LTD. SECTOE 24 DHARADUN, DISTT REW
ARI, HARYANA
28-May-2018 31-Mar-2022 01-Jan-2023

4 HRERA-PKL-RTK-63-2018 RERA-PKL-472-2019 44 SCO'S AND 1 CLINIC FORMING PART OF COMMERCIAL SITE-I FORTEASIA REALTY PVT. LTD. SECTOR-26 & 28, OMAXE CITY
26-Oct-2018 31-Dec-2019 31-Dec-2019

5 HRERA-PKL-FBD-42-2018 RERA-PKL-771-2019 81 HIGH STREET PURI CONSTRUCTION PVT. LTD. SECTOR-81, FARIDABAD
06-Sep-2018 02-Nov-2018 02-Nov-2018

6 HRERA-PKL-FBD- 13-2018 DATED 04.06.2018 RERA-PKL-584-2019 AANAND VILAS PURI CONSTRUCTION PVT. LTD. SECTOR 81, FARIDABAD
04-Jun-2018 31-Dec-2018 31-Dec-2018

7 HRERA-PKL-KNL-188-2020 RERA-PKL-744-2019 AEGIS SKYHIGH HOUSING CORPORATION PRIVATE LIMITED AEGIS SKYHIGH HOUSING CORPORATION PRIVATE LIMITED SECTOR-32, KARNAL-132001, HAR
YANA
13-Jan-2020 01-Dec-2020 01-Sep-2021

8 23 OF 2017 DATED 17.07.2017 RERA-PKL-742-2019 AFFORDABLE GROUP HOUSING AREA 5.35 ACRES AGRASAIN SPACES LLP SRCTOR-70, VILLAGE MUJERI, TE
HSIL BALABGARH, FARIDABAD
17-Jul-2017 30-Sep-2020 30-Mar-2021



View Corrigendum
9 193 OF 2017 DATED 14-09-2017 RERA-PKL-504-2019 AFFORDABLE GROUP HOUSING COLONY AREA OF 39100 SQ.MTRS AMOLIK HOUSING PVT.LTD. VILLAGE BASEWALA,TEHSIL & DIS
TRICT FARIDABAD,HARYANA
14-Sep-2017 13-Dec-2020 13-Sep-2021

10 188 OF 2017 DATED 14-09-2017 NA AFFORDABLE GROUP HOUSING COLONY AURIC CITY HOMES AREA OF 5 ACRES S3 INFRAREALITY PVT. LTD. SECTOR-82,TEHSIL TIGAON, FARI
DABAD,HARYANA
14-Sep-2017 15-Aug-2020 15-Feb-2021

11 HRERA-PKL-FBD- 8-2018 DATED 21.05.2018 RERA-PKL-396-2019 AFFORDABLE GROUP HOUSING COLONY TERRA LAVINIUM IRIS PLAZA PVT. LTD. SECTOR 75, VILLAGE BADOLI, TE
HSIL & DISTRICT FRIDABAD
21-May-2018 30-Jun-2022 30-Mar-2023

12 334 OF 2017 DATED 24.10.2017 RERA-PKL-833-2020 AFFORDABLE GROUP HOUSING PROJECT ON 5 ACRES MAXHEIGHTS PROMETERS PVT. LTD. SECTOR 61, VILLAGE NAGAL KALA
N , SONEPAT, HARYANA
24-Oct-2017 31-Dec-2018 31-Dec-2018

13 174 OF 2017 DATED 31-08-2017 RERA-PKL-729-2019 AFFORDABLE PLOTTED COLONY VALMAX CONSTRUCTION PVT.LTD. SECTOR-10,DISTRICT & TEHSIL-P
ALWAL,HARYANA,
31-Aug-2017 30-Jun-2022 30-Mar-2023

14 92 OF 2017 DATED 28-08-2017 NA AFFORDABLE PLOTTED COLONY TRUE VILLAS DEVELOPERS PVT.LTD. SECTOR-28 & 28-A,BAHADURGARH,
JHAJJAR HARYANA
28-Aug-2017 31-Dec-2019 31-Dec-2019

15 191 OF 2017 DATED 14.09.2017 RERA-PKL-525-2019 AFFORDABLE PLOTTED COLONY, AREA 14.388 M/S CHD DEVELOPERS LTD VILLAGE UCHANA, SECTOR 45, KA
RNAL, HARYANA
14-Sep-2017 22-May-2022 22-Feb-2023

16 289 OF 2017 DATED 11.10.2017 RERA-PKL-501-2019 AFFORDABLE PLOTTED COLONY, AREA 8.818 SRES EDEN SLF RESIDENCY VILLAGE DODWA, SECTOR-1, TARA
ORI- NILOKHERI, DISTRICT KARNAL, HARYANA.
11-Oct-2017 07-Sep-2022 07-Jun-2023

17 257 OF 2017 DATED 03-10-2017 RERA-PKL-554-2019 AFFORDABLE RESIDENTIAL PLOTTED COLONY SUMAN VILLAS PVT.LTD. SECTOR-8,TEHSIL & DISTRICT JH
AJJAR
03-Oct-2017 31-Aug-2022 03-Jun-2023

18 217 OF 2017 DATED 18.09.2017 RERA-PKL-444-2019 AFFORDABLE RESIDENTIAL PLOTTED COLONY ON 13.75 ACRES OMEX LTD. VILLAGE MAINA, SURARI KALAN,
SUNARI KHURD, SECTOR 22D, DISTRICT ROHTAK ,HARYANA
18-Sep-2017 31-Dec-2021 01-Oct-2022

19 HRERA-PKL-JJR-18-2018 DATED: 02-07-2018 RERA-PKL-912-2021 AFFORDABLE RESIDENTIAL PLOTTED COLONY ON AREA 10.0375 ACRES JBG BUILDCON PVT. LTD. VILLAGE-SARAI AURANGABAD,SECT
OR 3A, BAHADURGARH,JHAJJAR,HARYANA,
02-Jul-2018 30-Jun-2021 30-Mar-2022

20 HRERA-PKL-RWR- 14-2018 DATED 07.06.208 RERA-PKL-507-2019 AFFORDABLE RESIDENTIAL PLOTTED COLONY UNDER DDJAY ON 5.712 ACRES M/S DREAM MERCHANT PROMOTERS PVT. LTD. VILLAGE GARHI ALAWALPUR, SECT
OR 7A, DHARUHERA, DISTT REWARI
07-Jun-2018 31-May-2022 01-Mar-2023

21 HRERA-PKL-KUK-45-2018 RERA-PKL-518-2019 AFFORDABLE RESIDENTIAL PLOTTED COLONY UNDER DDJAY OVER 7.506 ACRES BRAHAM VATIKA REAL ESTATE PVT. LTD. SECTOR-32, KURUKSHETRA
13-Sep-2018 30-Sep-2021 30-Jun-2022

22 89/2017 DATED 23-08-2017 RERA-PKL-616-2019 AFFORTABLE GROUP HOUSING COLONY (BMG ANTRIKSH TOWERS) LAND MEASURING 5.975 ACRES BM GUPTA DEVELOPERS PVT. LTD. SECTOR-26-27, REWARI.
23-Aug-2017 25-Jun-2022 25-Mar-2023



View Corrigendum
23 151 OF 2017, DATED 28-08-2017 NA AFFORTABLE GROUP HOUSING COLONY (HAPPY HOMES) LAND MEASURING 5.00 ACRES ADORE REALTECH PVT. LTD. VILLAGE-BHUDHENA, SECTOR-86,
FARIDABAD.
28-Aug-2017 27-Aug-2019 27-Aug-2019

24 128/2017, DATED 28.08.2017 RERA-PKL-1232-2023 AFFORTABLE PLOTTED COLONY 5.64687 ACRES SHARAD FARMS AND HOLODING PVT. LTD. VILLAGE-PARA, SECTOR-36, ROHT
AK
28-Aug-2017 07-Jun-2022 07-Mar-2023

25 59/2017, DATED 18.08.2017 RERA-PKL-514-2019 AFFORTABLE PLOTTED COLONY (ONE CITY) 10.48906 ACRES ONE POINT REALTY PVT. LTD. SECTOR-37, ROHTAK
18-Aug-2017 17-Aug-2022 17-May-2023

26 185/2017, DATED 14-09-2017 RERA-PKL-767-2019 AFFORTABLE PLOTTED COLONY(ONE CITY) 5.3906256 ACRES ONE POINT REALTY PVT. LTD. SECTOR-37, ROHTAK
14-Sep-2017 13-Sep-2021 13-Jun-2022

27 HRERA-PKL-RTK-25-2018 , DATED 18-07-2018 RERA-PKL-468-2019 AFFORTABLE RESIDENTIAL PLOTTED COLONY 11.475 ACRES FORTEASIA REALTY PVT. LTD. VILLAGE-SUNARI KHURD, SECTOR-
22D, ROHTAK
18-Jul-2018 20-Dec-2020 20-Sep-2021

28 325/2017, DATED 17.10.2017 NA AFFORTABLE RESIDENTIAL PLOTTED COLONY 6.7125 ACRES DWARKADHIS BUILDWELL PVT.LTD. VILLAGE-MAHESWARI, SECTOR-22-
23,DHARUHERA, REWARI
17-Oct-2017 01-Jan-1970 01-Jan-1970

29 HRERA-PKL-FTB-192-2020 RERA-PKL-688-2019 AKASHGANGA TOWNSHIP PRIVATE LIMITED AKASHGANGA TOWNSHIP PRIVATE LIMITED VILLAGE -RATIA SECTOR - 6, SE
HNAL ROAD, RATIA, DISTRICT - FATEHABAD (HARYANA
05-Mar-2020 31-Oct-2020 01-Aug-2021

30 HRERA-PKL-FTB-62-2018 RERA-PKL-731-2019 ALPHA INTERNATIONAL CITY, FATEHABAD ALPHA CORP DEVELOPMENT PRIVATE LIMITED VILLAGE BASTI BHIWAN, SECTOR-
4, DISTT. FATEHABAD, HARYANA
23-Oct-2018 03-May-2018 03-May-2018

31 120 OF 2017 DATED 28.8.2017 RERA-PKL-772-2019 AMANVILAS PURI CONSTRUCTION PVT. LTD SECTOR-88 & 89, FARIDABAD
28-Aug-2017 28-Jan-2021 28-Oct-2021

32 HRERA-PKL-FBD-98-2019 RERA-PKL-410-2019 AMOLIK RESIDENCY AMOLIK RESIDENCY LLP SECTOR 85 - 86 DIVIDING ROAD
, SRS CHOWK , SECTOR 86 , FARIDABAD
25-Feb-2019 17-Jan-2022 17-Oct-2022



View Corrigendum
33 45/2017, DATED 11.08.2017 RERA-PKL-528-2019 "ANANDAM AWAS" M G HOUSING PVT. LTD. SECTOR-19, VILLAGE- GALI ALAW
ARPUR, TEHSIL DHARUHERA, REWARI
11-Aug-2017 30-Sep-2021 30-Jun-2022



View Corrigendum
34 51/2017, DATED 12.08.2017 RERA-PKL-440-2019 ANANDAM AWAS M G HOUSING PVT. LTD. SECTOR-19, VILLAGE-GALI ALAWA
RPUR, TEHSIL DARUHERA, REWARI
12-Aug-2017 30-Sep-2021 30-Jun-2022



View Corrigendum
35 HRERA-PKL-RWR-74-2018 RERA-PKL-337-2018 ANAND LOK (AFFORDABLE RESIDENTIAL PLOTTED COLONY UNDER DDJAY 2016) ANSAL PROPERTIES & INFRASTRUCTURE LTD VILLAGE GARHI, ALWALPUR, SECT
OR-24, DHARUHERRA
03-Dec-2018 31-Dec-2020 01-Oct-2021

36 356 OF 2017 DATED 17-11-2017 RERA-PKL-756-2019 ANAND LOK YAMUNA NAGAR BHAGIRATHI REALTORS PVT. LTD. TEHSIL JAGADHARI DISTRICT YAM
UNA NAGAR,HARYANA
17-Nov-2017 31-Aug-2019 31-Aug-2019

37 HRERA-PKL-KNL-44-2018 RERA-PKL-365-2018 ANSAL TOWN KARNAL (DDJAY SCH-1) ANSAL HOUSING & CONSTRUCTION LTD. SECTOR-36, KARNAL
13-Sep-2018 30-Jun-2022 30-Mar-2023

38 311 OF 2017 DATED 17-10-2017 RERA-PKL-816-2020 ANSAL TOWN YAMUNANAGAR PHASE-2 RESIDENTIAL PLOTTED COLONY ANSAL HOUSING & CONSTRUCTION LTD. SECTOR-20,JAGADHARI,YAMUNANAG
AR,HARYANA
17-Oct-2017 31-Dec-2021 01-Oct-2022

39 40 OF 2017 DATED 10-08-2017 RERA-PKL-793-2019 AREA 70.328 ACRES TDI INFRACORP(INDIA) LTD. SECTOR 36,38 AND 39, VILLAGE
KABRI, FARIDPUR AND RETIPUR, PANIPAT
10-Aug-2017 09-Aug-2020 09-Feb-2021

40 145 OF 2017 RERA-PKL-559-2019 AREA 9.315 JAI NARAIN BANSAL VILLAGE TARAORI
28-Aug-2017 27-Aug-2022 27-May-2023

41 173 OF 2017 DATED 29-08-2017 RERA-PKL-499-2019 ASHA PANCHKULA AREA 10.081 ACRES KONARK RAJHANS ESTATES PVT. LTD. SECTOR-14, KOT BEHLA, PANCHKU
LA
29-Aug-2017 28-Aug-2020 28-Feb-2021

42 291 OF 2017 DATED 12.10.2017 RERA-PKL-887-2020 ASHA ROHTAK DHL INFRATECH PVT. LTD. SECTOR 27-A, VILLAGE KHERI SA
DH CITY, ROHTAK HARYANA
12-Oct-2017 11-Oct-2020 11-Jul-2021



View Corrigendum
43 107 OF 2017 DATED 24-08-2017 RERA-PKL-553-2019 ASHOKA CITY AKSHAT JYOTI REAL ESTATE PVT.LTD. SECTOR-7, DISTRICT-PALWAL, HA
RYANA
24-Aug-2017 05-Jul-2022 05-Apr-2023



View Corrigendum
44 HRERA-PKL-HSR-41-2018 RERA-PKL-586-2019 "AUTO MARKET HANSI" ON LAND MEASURING 30.58 ACRES HARYANA SEHRI VIKAS PRADHIKARAN SECTOR-13 P, HISAR
06-Sep-2018 31-Dec-2019 31-Dec-2019

45 HRERA-PKL-RWR-351-2022 RERA-PKL-805-2020 AVALON RANGOLI, DHARUHERA (PHASE II) AVALON PROJECTS (M/S GRJ DISTRIBUTORS & DEVELOPERS PVT LTD) REVENUE ESTATE OF GARHI ALAWA
LPUR
16-Sep-2022 01-Jan-2021 01-Oct-2021

46 HRERA-PKL-JND-242-2021 RERA-PKL-826-2020 BASANT VIHAR SAHIBA CONSTRUCTIONS PVT LTD SECTOR 19
30-Jun-2021 30-Jun-2022 30-Mar-2023

47 310 OF 2017 DATED 17-10-2017 NA BLOSSOM GREENS AREA 18493.988 SQ. MTRS. GROUP HOUSING COLONY GPM DEVELOPERS PVT. LTD. SECTOR-63, VILLAGE UNCHAGOAN,
TEHSIL BALLABGARH
17-Oct-2017 16-Jun-2019 16-Jun-2019

48 HRERA-PKL-SNP-157-2019 RERA-PKL-703-2019 BLOSSOM PARK AT PARADISE GREENS PUSHPRATTAN DEVELOPERS PRIVATE LIMITED SECTOR -63, TEHSIL RAI & DIST
RICT SONIPAT
24-Sep-2019 31-Dec-2021 01-Oct-2022

49 243/2017 DATED 26.09.2017 RERA-PKL-475-2019 BMG CITY CENTRE 1.685 ACRES RESIDENTIAL PLOTTED COLONY BM GUPTA DEVELOPERS PVT. LTD. SECTOR-26, GADHI BOLNI ROAD,
REWARI
26-Sep-2017 25-Sep-2020 25-Mar-2021

50 HRERA-PKL-RWR-105-2019 RERA-PKL-431-2019 CASA ROMANA DWARKADHIS PROJECTS PRIVATE LIMITED SECTOR-22, DHARUHERA
21-May-2019 31-Mar-2021 01-Jan-2022

51 HRERA-PKL-SNP-164-2019 RERA-PKL-708-2019 CHITRAKOOT TDI MANSION PRIVATE LIMITED PATLA & NANGAL KALAN, SECTOR-
64, SONIPAT, HARYANA
01-Oct-2019 31-Jul-2020 31-Jan-2021

52 HRERA-PKL-FBD-176-2019 RERA-PKL-683-2019 COMMERCE BUSINESS DISTRICT SHREEJI BUILDWELL PVT LTD VILLAGE LAKKARPUR, SECTOR 39
19-Nov-2019 31-Oct-2021 01-Aug-2022

53 79 OF 2017 DATED 23-08-2017 RERA-PKL-696-2019 COMMERCIAL/ RESIDENTIAL COLONY H L RESIDENCY PRIVATE LIMITED SECTOR-37,BAHADURGARH,DISTRIC
T JHAJJAR,HARYANA
23-Aug-2017 27-Jul-2022 27-Apr-2023

54 321 OF 2017 DATED 17-10-2017 RERA-PKL-825-2020 CONNAUGHT ESTATE AREA TDI INFRASTRUCTURE LTD. SECTOR 23, PANIPAT HARYANA
17-Oct-2017 17-Oct-2021 17-Jul-2022



View Corrigendum
55 HRERA-PKL-SNP-197-2020 RERA-PKL-808-2020 CONNAUGHT STREET SANA REALTORS PRIVATE LIMITED VILLAGE PATTI MUSALMAN, SECT
OR-16
20-May-2020 31-Aug-2020 03-Mar-2021

56 HRERA-PKL-FBD-179-2019 RERA-PKL-745-2019 CROWN BUSINESS PARK CROWN REALTECH PRIVATE. LTD. 12/4, DELHI-MATHURA ROAD, NEA
R SARAI KHAWJA, SECTOR-37, FARIDABAD
21-Nov-2019 31-Oct-2020 01-Aug-2021

57 HRERA-PKL-NUH-352-2022 RERA-PKL-937-2021 DEVELOPMENT OF POCKET AT SECTOR 11 TAORU DISTT NUH SH. AMIT KUMAR, ESTATE OFFICER, HSVP FARIDABAD SECTOR 11 TAORU
30-Sep-2022 14-Jan-2022 14-Oct-2022

58 297 OF 2017 DATED 16-10-2017 RERA-PKL-591-2019 DISCOVERY PARK BPTP LTD. SECTOR-80, FARIDABAD
16-Oct-2017 12-Oct-2021 12-Jul-2022



View Corrigendum
59 264 OF 2017 DATED 03-10-2017 RERA-PKL-759-2019 EFAW PLAZA AREA 2.725 ACRES COMMERCIAL COLONY SUNRAYS INFRASTRUCTURE PVT. LTD. SECTOR-79
03-Oct-2017 12-Feb-2020 12-Feb-2020



View Corrigendum
60 HRERA-PKL-SNP-83-2018 RERA-PKL-307-2018 ELDECO HISTREET-1 MAKSAD ESTATE AND HARDWARE LIMITED ELDECO COUNTY, SECTOR-19, G.T
.KARNAL ROAD, SONIPAT
21-Dec-2018 15-Nov-2019 15-Nov-2019



View Corrigendum
61 242/2017, DATED 26.09.2017 RERA-PKL-610-2019 "ELEGANTS HOMES" 4417.938SQ.MTRS. RESIDENTIAL PLOTTED COLONY(7 PLOTS OF RESIDENTIAL PLOTTED COLONY) B M GUPTA DEVELOPERS PVT. LTD. SECTOR-26, GADHI BOLNI ROAD,
REWARI
26-Sep-2017 25-Sep-2021 25-Jun-2022

62 241/2017 DATED 26-09-2017 RERA-PKL-608-2019 ELEGENT HEIGHT (RESIDENTIAL PLOTTED COLONY) 9.943ACRES BM GUPTA DEVELOPERS PVT. LTD. SECTOR-26, GADHI BOLNI ROAD,
REWARI
26-Sep-2017 25-Sep-2020 25-Mar-2021



View Corrigendum
63 HRERA-PKL-SNP-229-2021 RERA-PKL-902-2021 EMPLOYEES ENCLAVE THE POLICE EMPLOYEES CO-OPERATIVE HOUSE BUILDING SOCIETY LTD. SECTOR - 26 SONIPAT, HARYANA
10-Feb-2021 01-Jun-2021 01-Mar-2022



View Corrigendum
64 HRERA-PKL-SNP-161-2019 RERA-PKL-648-2019 ESPANIA 1 TDI INFRASTRUCTURE LIMITED SECTOR 19
15-Nov-2019 31-Dec-2020 01-Oct-2021

65 HRERA-PKL-SNP-162-2019 RERA-PKL-452-2019 ESPANIA- 2 TDI INFRASTRUCTURE LIMITED SECTOR 19
01-Oct-2019 31-Oct-2020 01-Aug-2021

66 HRERA-PKL-FBD-109-2019 RERA-PKL-429-2019 ESPIRE TOWERS (TOWER-A) ESPIRE INFRASTRUCTURE CORPORATION LTD PALLA- TILPAT ROAD, SECTOR- 3
7, FARIDABAD
01-Apr-2019 31-Dec-2021 01-Oct-2022

67 HRERA-PKL-FBD-126-2019 RERA-PKL-535-2019 ESPIRE TOWERS (TOWER-B) ESPIRE INFRASTRUCTURE CORPORATION LTD PALLA- TILPAT ROAD, SECTOR- 3
7, FARIDABAD
28-Jun-2019 30-Apr-2022 30-Jan-2023



View Corrigendum
68 HRERA-PKL-PKL-30-2018 RERA-PKL-607-2019 FLATS FOR DEFENCE PERSONNEL, GH-2, AREA 1.38 ACRES HOUSING BOARD HARYANA SECTOR 31, PANCHKULA
07-Aug-2018 30-Jun-2021 30-Mar-2022



View Corrigendum
69 HRERA-PKL-PKL-31-2018 RERA-PKL-544-2019 FLATS FOR DEFENCE PERSONNEL, GH-2, AREA 1.99 ACRES HOUSING BOARD HARYANA SECTOR 31, PANCHKULA
07-Aug-2018 30-Jun-2021 30-Mar-2022



View Corrigendum
70 HRERA-PKL-PKL-29-2018 RERA-PKL-622-2019 FLATS FOR DEFENCE PERSONNEL, GH-2, AREA 2.07 ACRES HOUSING BOARD HARYANA SECTOR-31 PANCHKULA
07-Aug-2018 31-Aug-2019 31-Aug-2019

71 373 OF 2017 DATED 28.11.2017 RERA-PKL-350-2018 "FOR AN AREA 30306.29 SQ. MTRS." GOLDSOUK INFRASTRUCTURE PVT. LTD. VILLAGE BAROTA, KHANPUR AND K
AWARSIKA, TEHSIL NUH, MEWAT.
28-Nov-2017 10-Sep-2021 10-Jun-2022

72 342 OF 2017 DATED 27-10-2017 RERA-PKL-764-2019 GALAXY COURT, PANIPAT AREA 12100.08 SQ MTRS. ANSAL PROPERTIES & INFRASTRUCTURE LTD. PANIPAT
27-Oct-2017 31-Aug-2020 03-Mar-2021

73 HRERA-PKL-MEW-106-2019 RERA-PKL-381-2018 GOLD SOUK GOLF LINK 12.48 ACRE OF 32.05625 ACRE RESIDENTIAL PLOTTED COLONY GOLD SOUK INFRASTRUCTURE PVT. LTD VILLAGE KHANPUR SECTOR- 17
10-Jul-2019 31-Dec-2020 01-Oct-2021

74 HRERA-PKL-JND-231-2021 RERA-PKL-892-2020 GREEN CITY -1 MADHUKARA DEVELOPERS PRIVATE LIMITED SECTOR 26 A, JIND
12-Feb-2021 05-Sep-2022 05-Jun-2023



View Corrigendum
75 HRERA-PKL-JND-232-2021 RERA-PKL-893-2020 GREEN CITY -2 MADHUKARA DEVELOPERS PRIVATE LIMITED SECTOR - 26A, JIND
12-Feb-2021 05-Sep-2022 05-Jun-2023



View Corrigendum
76 HRERA-PKL-RWR-282-2021 RERA-PKL-958-2021 GREEN CITY 25 GREEN CITY DEVELOPERS SECTOR 25, VILLAGE DAWANA
03-Dec-2021 30-Jun-2022 30-Mar-2023

77 139 OF 2017 DATED 28-08-2017 RERA-PKL-643-2019 GROUP HOUSING COLONY RUHIL PROMOTER PVT.LTD. VILLAGE SARAI AURANGABAD,SECT
OR-3 HARYNA
28-Aug-2017 30-Jun-2022 30-Mar-2023



View Corrigendum
78 85 OF 2017 DATED 23.08.2017 RERA-PKL-824-2020 GROUP HOUSING COLONY, AREA 18081.008 SQ. MTRS. MG HOUSING PVT. LTD SECTOR- 70, VILLAGE MUJERI, F
ARIDABAD
23-Aug-2017 31-Dec-2018 31-Dec-2018



View Corrigendum
79 374 OF 2017 DATED 28-11-2017 RERA-PKL-496-2019 GROUP HOUSING COLONY, AREA 5.08339 SQ. MTRS. RESIDENTIAL EMPERIUM REALTY PVT LTD SECTOR 1A, VILLAGE TARAQF RAJ
PUTTAN, PANIPAT
28-Nov-2017 27-Nov-2021 27-Aug-2022

80 248 OF 2017 DATED 26-09-2017 NA GROUP HOUSING COLONY, AREA 6.356 SQ. MTRS. RESIDENTIAL ULTRATECH TOWNSHIP DEVELOPERS PVT. LTD. SECTOR 32, KARNAL HARYANA.
26-Sep-2017 31-Jul-2022 01-May-2023

81 283 OF 2017 DATED 10-10-2017 RERA-PKL-637-2019 GROUP HOUSING COLONY, AREA 7.006 ACRES RESIDENTIAL RAS DEVELOPMENT PVT LTD KARNAL
10-Oct-2017 25-Jul-2022 25-Apr-2023

82 122 OF 2017 DATED 28-08-2017 RERA-PKL-611-2019 GROUP HOUSING COLONY ("HAPPY HOMES GRAND") AREA OF 5.05625 ACRES VRP BUILDTECH PVT. LTD. VILLAGE- BHATOLA,SECTOR-85,FA
RIDABAD,HARYANA
28-Aug-2017 27-Aug-2021 27-May-2022

83 372/2017 DATED 28.11.2017 RERA-PKL-710-2019 GROUP HOUSING COLONY (PHASE-II), 12050 SQ.METRS. T.G.BUILDWELL PVT. LTD. DHARUHERA, REWARI
28-Nov-2017 28-Aug-2022 28-May-2023

84 22 OF 2017 DATED 13-07-2017 RERA-PKL-763-2019 GROUP HOUSING PROJECT H L PROMOTERS PRIVATE LIMITED SECTOR-37,BHADURGARH,DISTRICT
JHAJJAR,HARYANA
13-Jul-2017 13-Mar-2021 13-Dec-2021

85 87 OF 2017 DATED 23-08-2017 RERA-PKL-758-2019 GROUP HOUSING, (SHREE VARDHMAN GREEN SPACE) GREEN SPACE INFRAHEIGHTS PVT. LTD. VILLAGE KOT BILLAH, PANCHKULA
EXTENSION II,
23-Aug-2017 14-Sep-2021 14-Jun-2022



View Corrigendum
86 HRERA-PKL-KTL-52-2018 RERA-PKL-828-2020 GULMOHAR CITY (PHASE-2) BEST DEAL HOUSING & CONSTRUCTIONS PVT. LTD VILLAGE SHERGARH AND PATTI GA
ADAR
03-Oct-2018 31-Mar-2021 01-Jan-2022

87 HRERA-PKL-KTL-51-2018 RERA-PKL-829-2020 GULMOHAR CITY (PHASE-3) BEST DEAL HOUSING AND CONSTRUCTION PVT. LTD. VILLAGE SHERGARH AND PATTI GA
ADAR, SECTOR-29, KAITHAL
03-Oct-2018 31-Mar-2021 01-Jan-2022

88 209 OF 2017 DATED 15-09-2017 RERA-PKL-609-2019 HAPPY HOMES EXCLUSIVE, GROUP HOUSING ADORE REALTECH PVT. LTD. SECTOR-86
15-Sep-2017 14-Sep-2021 14-Jun-2022

89 HRERA-PKL-PNP-4-2018 RERA-PKL-522-2019 HARMONY HOMES REAL HEIGHTS DEVELOPERS PVT. LTD. SECTOR-40, VILLAGE SIMLI, MUL
LANA
13-Apr-2018 30-Jun-2022 30-Mar-2023

90 HRERA-PKL-AMB-36-2018 , DATED 09-08-2018 RERA-PKL-534-2019 "HERMAN CITY AMBALA"UNDER DDJAY ON LAND MEASURING 13.54ACRES HERMAN PROPERTIES PVT. LTD. SECTOR-42, AMBALA CANTT
09-Aug-2018 30-Dec-2021 30-Sep-2022



View Corrigendum
91 HRERA-PKL-AMB-37-2018 , DATED 08-08-2018 RERA-PKL-530-2019 "HERMAN CITY AMBALA" UNDER DDJAY ON LAND MEASURING 13.60ACRES HERMAN PROPERTIES PVT. LTD. SECTOR-42, AMBALA
08-Aug-2018 30-Dec-2021 30-Sep-2022



View Corrigendum
92 HRERA-PKL-AMB-35-2018 , DATED 08-08-2018 RERA-PKL-532-2019 "HERMAN CITY AMBALA" UNDER DDJAY ON LAND MEASURING 13.91ACRES HERMAN PROPERTIES PVT. LTD. SECTOR-42, AMBALA CANTT
08-Aug-2018 31-Dec-2021 01-Oct-2022



View Corrigendum
93 HRERA-PKL-AMB-34-2018 , DATED 08-08-2018 RERA-PKL-536-2019 HERMAN CITY AMBALA UNDER DDJAY ON LAND MEASURING 6.24ACRES HERMAN PROPERTIES PVT. LTD. SECTOR-42, AMBALA CANTT.
08-Aug-2018 31-Dec-2021 01-Oct-2022



View Corrigendum
94 HRERA-PKL-JJR-88-2019 RERA-PKL-370-2018 HL CITY HL RESIDENCY PVT LTD SECTOR-37, BAHADURGARH DISTT
JHAJJAR, HARYANA
10-Jan-2019 31-Dec-2020 01-Oct-2021



View Corrigendum
95 HRERA-PKL-JJR-85-2019 RERA-PKL-344-2018 HL CITY HL RESIDENCY PRIVATE LIMITED SECTOR 37
10-Jan-2019 31-Dec-2020 01-Oct-2021



View Corrigendum
96 335 OF 2017 DATED 24.10.2017 RERA-PKL-546-2019 IB CITY INDIABULLS ESTATE LTD. SECTOR -26, 26A, 33 & 34 SONE
PAT, HARYANA
24-Oct-2017 31-Oct-2019 31-Oct-2019



View Corrigendum
97 216 OF 2017 RERA-PKL-73-2018 IBIZA TOWN KRRISH SHALIMAR PROJECTS PVT LTD SECTOR-39, SURAJKUND ROAD, FA
RIDABAD.
20-Mar-2019 30-Jun-2021 30-Mar-2022



View Corrigendum
98 135 OF 2017 DATED 28-08-2017 NA INDUSTRIAL COLONY MODEL ECONOMIC TOWNSHIP LTD. VILLAGE,DADRI TOI,BIR DADRI,T
EHSIL BADLI,DISTRICT JHAJJAR,HARYANA
28-Aug-2017 27-Aug-2022 27-May-2023

99 110 OF 2017 DATED 28-08-2017 NA INDUSTRIAL COLONY MODEL ECONOMIC TOWNSHIP LTD. VILLAGE SHEOJIPURA,DADRI TOI,
BIR DADRI,TEHSIL BADLI,DISTRICT JHAJJAR,HARYANA
02-Nov-2017 27-Aug-2022 27-May-2023

100 HRERA-PKL-KNL-33-2018 RERA-PKL-537-2019 INR ROYAL CITY AREA 9.268 INR CONSTRUCTIONS VILLAGE BALDI, SECTOR- 29, KA
RNAL.
07-Aug-2018 30-Jun-2020 30-Dec-2020

101 HRERA-PKL-JJR-57-2018 RERA-PKL-592-2019 JHAJJAR ONE SUMAN VILLAS PVT LTD SECTOR 8
17-Oct-2018 31-Mar-2020 01-Oct-2020

102 21 OF 2017 DATED 06.07.2017 RERA-PKL-1129-2022 KRISHANA HOUSING SCHEME REHEJA DEVELOPERS LTD. SECTOR-14, SOHNA
06-Jul-2017 05-Jul-2022 05-Apr-2023

103 HRERA-PKL-PNP-46-2018 RERA-PKL-316-2018 LA REGENCIA PHASE-II ASTRUM VALUE HOMES PVT. LTD. AND STANZA DEVELOPERS & INFRASTRUCTURE PVT. LTD. SECTOR-19, PANIPAT
17-Sep-2018 29-Jun-2022 29-Mar-2023



View Corrigendum
104 HRERA-PKL-RTK-5-2018 RERA-PKL-508-2019 LOTUS ENCLAVE-ROHTAK KADIAN AGRO VILLAGE BOHAR, SECTOR-35, ROH
TAK
19-Apr-2018 31-Mar-2021 01-Jan-2022

105 HRERA-PKL-SNP-72-2018 RERA-PKL-595-2019 MAPSKO GALLERIA (PROJECT AREA 1.82 ACRES COMMERCIAL, PART OF RESIDENTIAL PLOTTED COLONY) MAPSKO BUILDERS PVT LTD SECTOR - 27
14-Dec-2018 30-Jun-2019 30-Jun-2019

106 314 OF 2017 DATED 17.10.2017 RERA-PKL-581-2019 METRO VIEW MAXHEIGHTS TOWNSHIP AND PROJECTS PVT. LTD. SECTOR 35, TEHSIL RAI, SONEPA
T , HARYANA
17-Oct-2017 30-Nov-2018 30-Nov-2018

107 HRERA-PKL-RWR-95-2019 RERA-PKL-368-2018 MODEL TOWN DREAM BUILD CREATIONS COMPANY VILLAGE HARCHANDPUR, SECTOR-7
7, MBIR (OLD SECTOR 10A), BAWAL
06-Feb-2019 06-Feb-2019 06-Feb-2019



View Corrigendum
108 HRERA-PKL-FBD-55-2018 RERA-PKL-823-2020 MULBERRY COUNTY-PHASE-III (0.46 ACRES) MG HOUSING PRIVATE LIMITED SECTOR 70
05-Oct-2018 31-Dec-2020 01-Oct-2021

109 35 OF 2017 DATED 07.08.2017 RERA-PKL-594-2019 NEXTRA DEVELOPERS LLP NEXTRA DEVELOPERS LLP VILLAGE KHARKHODA, SEC-2, PEE
PLI, SONEPAT
07-Aug-2017 30-Jun-2021 30-Mar-2022



View Corrigendum
110 339 OF 2017 DATED 27-10-2017 NA NINEX RESIDENCY EDGEPONT INFRA DEVELOPERS LLT SECTOR-23, VILLAGE GAUNCHHI
27-Oct-2017 31-Aug-2021 03-Jun-2022

111 HRERA-PKL-RWR-53-2018 RERA-PKL-515-2019 ORANGE SIGNATURE CITY ORANGE HERMITAGE PRIVATE LIMITED SECTOR-83, MBIR BAWAL, VILLAG
E-SABAN
05-Oct-2018 30-Sep-2021 30-Jun-2022

112 HRERA-PKL-JJR-102-2019 RERA-PKL-390-2019 PALM DRIVE BAHADURGARH MICROTEK REALTORS PRIVATE LIMITED SECTOR 3 & 14 BAHADURGARH
18-Mar-2019 31-Mar-2021 01-Jan-2022



View Corrigendum
113 HRERA-PKL-RTK-96-2019 RERA-PKL-339-2018 PALM DRIVE ROHTAK INFORMAGE REALTY PRIVATE LIMITED VILLAGE BOHAR, SECTOR 34 ROHT
AK
28-Feb-2019 31-Mar-2021 01-Jan-2022



View Corrigendum
114 HRERA-PKL-KNL-75-2018 RERA-PKL-320-2018 PALM RESIDENCY SUNIVA PROMOTERS PVT LTD SERCTOR 35
29-Nov-2018 30-Dec-2021 30-Sep-2022

115 48 OF 2017 DATED 11-08-2017 RERA-PKL-796-2019 PANIPAT TOWN CENTRE TDI INFRACORP(INDIA) LTD. SECTOR 33, VILLAGE FARIDPUR &
KABRI, PANIPAT
11-Aug-2017 10-Aug-2020 10-Feb-2021

116 296 OF 2018 DATED 13-10-2017 RERA-PKL-590-2019 PARK SENTOSA BPTP LTD. SECTOR-77
13-Oct-2017 31-Jul-2022 01-May-2023

117 344 OF 2017 DATED 26.10.2017 RERA-PKL-380-2018 PARSVNATH CITY ,(118 ACRES) PARSVNATH DEVELOPERS LTD. SECTOR 8, NH 1, SONEPAT, HARY
ANA
26-Oct-2017 30-Sep-2019 30-Sep-2019

118 141 OF 2017 DATED 28.08.2017 RERA-PKL-378-2018 PARSVNATH CITY CENTER SONEPAT PARSVNATH DEVELOPERS LTD. NEW PWD GUEST HOUSE, RAILWAY
ROAD, SONEPAT, HARYANA
28-Aug-2017 31-Jul-2020 31-Jan-2021

119 332 OF 2017 DATED 24.10.2017 RERA-PKL-384-2019 PARSVNATH CITY , SONEPAT(20.159 ACRES) PARSVNATH DEVELOPERS LTD. SECTOR 8, NH 1, SONEPAT , HAR
YANA
24-Oct-2017 30-Jun-2021 30-Mar-2022

120 HRERA-PKL-PNP-120-2019 RERA-PKL-55-2018 PARSVNATH PALIWAL CITY PANIPAT PARSVNATH DEVELOPERS LIMITED SECTOR 38 & 39, PANIPAT
16-Sep-2019 31-Mar-2020 01-Oct-2020

121 132 OF 2017 DATED 28.08.2017 RERA-PKL-374-2018 PARSVNATH PRESTON SONEPAT PARSVNATH DEVELOPERS LTD. VILLAGE SHAHPUR TURK, SECTOR
9/18, DISTRICT SONEPAT , HARYANA
28-Aug-2017 31-Dec-2019 31-Dec-2019

122 HRERA-PKL-(PKL-16-2018) DATED: 19-06-2018 RERA-PKL-379-2018 PARSVNATH ROYALE "POCKET B" 7.182 ACRES PARSVNATH DEVELOPERS LTD. SECTOR-20, VILLAGE- KUNDI, DI
STRICT-PANCHKULA, HARYANA
19-Jun-2018 29-Jun-2022 29-Mar-2023



View Corrigendum
123 HRERA-PKL-FBD-76-2018 RERA-PKL-359-2018 PHASE-I, PLOTS, SECTOR-81 COUNTYWIDE PROMOTERS PVT. LTD. SECTOR-81, FARIDABAD.
11-Dec-2018 30-Jun-2022 30-Mar-2023



View Corrigendum
124 235 OF 2017 DATED 19-09-2018 RERA-PKL-1227-2023 PLATINUM HEIGHTS KLJ DEVELOPERS PVT LTD KLJ GROUP HOUSING COLONY, SEC
TOR-77, VILLAGE NEEMKA, SUB-TEHSIL TIGAON
19-Sep-2017 31-Dec-2018 31-Dec-2018

125 07 OF 2017 DATED 23.06.2017 NA PLOTTED COLONY AREA 0.8937 RESIDENTIAL M/S CHD DEVELOPERS LTD VILLAGE JHINJHARI TEHSIL JHIN
JHARI, KARNAL
23-Jun-2017 03-May-2022 03-Feb-2023

126 176 OF 2017 DATED 31-08-2017 RERA-PKL-492-2019 PLOTTED COLONY AREA 11.906 ACRES M/S CHD DEVELOPERS LTD VILLAGE UCHANA, SECTOR 45, KA
RNAL HARYANA
31-Aug-2017 14-May-2022 14-Feb-2023

127 33 OF 2017 DATED 07-08-2017 RERA-PKL-487-2019 PLOTTED COLONY AREA 13.294 RESIDENTIAL M/S CHD DEVELOPERS LTD VILLAGE UCHANA, SECTOR 45, KA
RNAL HARYANA.
07-Aug-2017 14-May-2022 14-Feb-2023

128 08 OF 2017 DATED NA PLOTTED COLONY AREA 2.725 RESIDENTIAL M/S CHD DEVELOPERS LTD VILLAGE JHINJHARI TEHSIL JHIN
JHARI, KARNAL
23-Jun-2017 03-May-2022 03-Feb-2023

129 HRERA-PKL-AMB-24-2018 , DATED 13-07-2018 RERA-PKL-585-2019 PLOTTED COLONY ON LAND MEASURING "11.60 ACRES" INFORMATION TV PVT. LTD. VILLAGE-KANWALA, SECTOR-27, A
MBALA CITY
13-Jul-2018 31-Mar-2020 01-Oct-2020

130 HRERA-PKL-NUH-210-2020 RERA-PKL-863-2020 PRECORE CITY 2 (DDJAY) MV BUILDCON PVT LTD FEROJPUR JHIRKA
15-Sep-2020 31-Aug-2021 03-Jun-2022

131 52/2017, DATED 12.08.2017 RERA-PKL-788-2019 PROJECT "5.5125 ACRES AREA" UDAY BHAN SECTOR-32, V.P.O MAJRA GURDAS
, REWARI
12-Aug-2017 15-Mar-2022 15-Dec-2022

132 HRERA-PKL-M/GARH-22-2018 , DATED 12-07-2018 NA PROJECT MEASURING "144.894 ACRES" HARYANA SEHRI VIKAS PRADHIKARAN REWARI SECTOR-9-A(PART), 10 & 11(PAR
T), MAHENDERGARH
12-Jul-2018 31-Mar-2020 01-Oct-2020

133 HRERA-PKL-FBD-146-2019 RERA-PKL-572-2019 PROPEX CITY FARIDABAD XSIS INFRA HOME CONCEPTS PVT LTD SECTOR-70, FARIDABAD
09-Sep-2019 31-Jul-2022 01-May-2023

134 HRERA-PKL-PWL-122-2019 RERA-PKL-400-2019 PROPEX CITY PALWAL PROPEX REALTY SERVICES PVT LTD SOHNA ROAD, SECTOR-8, PALWAL
25-Jun-2019 31-Aug-2022 03-Jun-2023



View Corrigendum
135 HRERA-PKL-FBD-235-2021 RERA-PKL-909-2021 PURI KOHINOOR PURI CONSTRUCTION PVT. LTD. SECTOR 89, FARIDABAD
17-Mar-2021 18-Feb-2021 18-Nov-2021

136 HRERA-PKL-HSR-87-2019 RERA-PKL-324-2018 RAJDARBAR SPACES RAJDARBAR BUILDCON PRIVATE LIMITED FORMERLY KNOWN AS DAFFODIL BUILDCON PRIVATE LIMITED SECTOR 24 HISAR
08-Jan-2019 01-Nov-2021 01-Aug-2022

137 HRERA-PKL-SNP-268-2021 RERA-PKL-353-2018 RANGOLI GREEN RANGOLI BUILDTECH PVT LTD PATTI MUSALMAN AND SHAJANPUR
SECTOR 16 AND 17 SONEPAT
12-Oct-2021 31-Mar-2022 01-Jan-2023

138 295 OF 2017 DATED 13.10.2017 RERA-PKL-841-2020 REGENCY PARK AARCITY BUILDERS PVT. LTD. VILLAGE SATROD KHURD , SECTOR
11A & 17,TEHSIL & DISTRICT HISAR, HARYANA
13-Oct-2017 31-Dec-2021 01-Oct-2022

139 77 OF 2017 DATED 23-08-2017 RERA-PKL-754-2019 RESIDENTIAL/COMMERCIAL PLOTTED COLONY H L RESIDENCY PRIVATE LIMITED SECTOR-37,BAHADURGARH,DISTRIC
T JHAJJAR,HARYANA
23-Aug-2017 22-Aug-2019 22-Aug-2019

140 HRERA-PKL-RTK-107-2019 RERA-PKL-312-2018 RESIDENTIAL GROUP HOUSING COLONY SONIKA PROPERTIES PRIVATE LIMITED SECTOR 36A ROHTAK
27-Mar-2019 20-Aug-2020 20-Feb-2021

141 34 OF 2017 DATED 07-08-2017 RERA-PKL-491-2019 RESIDENTIAL PLOTTED COLONY MANSHA BUILDCON PVT.LTD. NUH ROAD,SECTOR-9,PALWAL
07-Aug-2017 24-Apr-2022 24-Jan-2023

142 16 OF 2017 DATED 04-07-2017 RERA-PKL-593-2019 RESIDENTIAL PLOTTED COLONY H L RESIDENCY PRIVATE LIMITED BHADURGARH, DISTRICT-JHAJJAR
HARYANA
04-Jul-2017 16-Nov-2021 16-Aug-2022

143 15 OF 2017 DATED 04-07-2017 RERA-PKL-753-2019 RESIDENTIAL PLOTTED COLONY H L RESIDENCY PRIVATE LIMITED BHADURGARH,DISTRICT-JHAJJAR H
ARYANA
04-Jul-2017 16-Apr-2022 16-Jan-2023

144 17 OF 2017 DATED 04-07-2017 RERA-PKL-750-2019 RESIDENTIAL PLOTTED COLONY H L RESIDENCY PRIVATE LIMITED BHADURGARH,DISTRICT JHAJJAR H
ARYANA
04-Jul-2017 01-Mar-2022 01-Dec-2022

145 14 OF 2017 DATED 04-07-2017 RERA-PKL-752-2019 RESIDENTIAL PLOTTED COLONY H L RESIDENCY PRIVATE LIMITED BHADURGARH,DISTRICT JHAJJAR H
ARYANA
04-Jul-2017 10-Apr-2022 10-Jan-2023

146 147/2017 NA RESIDENTIAL PLOTTED COLONY 14.663 ACRES BESTECH INDIA PVT. LTD. VILLAGE- MALPURA, SECTOR-7, D
HARUHERA, REWARI
28-Aug-2017 31-Mar-2019 31-Mar-2019

147 71/2017 DATED 21.08.2017 RERA-PKL-768-2019 RESIDENTIAL PLOTTED COLONY 58.08906 ACRES(ONE CITY) ONE POINT REALTY PVT. LTD. SECTOR-37, ROHTAK
21-Aug-2017 20-Aug-2021 20-May-2022



View Corrigendum
148 123/2017, DATED 28.08.2017 RERA-PKL-1228-2023 RESIDENTIAL PLOTTED COLONY 6.72812 ACRES SHARAD FARMS AND HOLODING PVT. LTD. VILLAGE PARA, SECTOR-36, TEHS
IL AND DISTRICT ROHTAK,
28-Aug-2017 07-Jun-2022 07-Mar-2023

149 360/2017 DATED 17.11.2017 RERA-PKL-500-2019 RESIDENTIAL PLOTTED COLONY "GURUTEK CITY" 9338 SQ. MTRS. GURUTEK ESTATE PVT. LTD. SECTOR-25/26, GARI BOLNI ROAD
, REWARI
17-Nov-2017 31-Jul-2022 01-May-2023



View Corrigendum
150 HRERA-PKL-RWR- 9-2018 DATED 28.05.2018 RERA-PKL-510-2019 REWARI GREENS M/S KSL DEVELOPERS PVT. LTD. SEC-26, VILLAGE DHAMLKA, REWA
RI, HARYANA
28-May-2018 31-Aug-2022 03-Jun-2023

151 267 OF 2017 DATED 09-10-2017 RERA-PKL-549-2019 RISE SKY BUNGALOWS AREA 2.64 ACRES RISE PROJECT PVT. LTD. SECTOR-41
09-Oct-2017 08-Jul-2022 08-Apr-2023



View Corrigendum
152 238 OF 2017 DATED 20.09.2017 RERA-PKL-1158-2022 ROHTAK GREEN BESTECH DEVELOPERS PVT. LTD. SECTOR 25D, VILLAGE PEHRAWAR,
TEHSIL & DISTRICT RIHTAK, HARYANA
02-Sep-2017 30-Jun-2021 30-Mar-2022



View Corrigendum
153 HRERA-PKL-FBD-47-2018 RERA-PKL-636-2019 ROYAL HERITAGE PIVOTAL INFRASTRUCTURE PVT LTD SECTOR-70 VILLAGE MUJHERI
14-Sep-2018 31-Dec-2019 31-Dec-2019



View Corrigendum
154 HRERA-PKL-SNP-71-2018 RERA-PKL-114-2018 SAPPHIRE FLOORS AND SAPPHIRE HEIGHTS KAMAL IDEAL INFRATECH PVT. LTD. VILLAGE NAGAL KALAN, SECTOR-6
4, DISTRICT SONEPAT
28-Nov-2018 31-Dec-2021 01-Oct-2022

155 HRERA-PKL-KUK-142-2019 RERA-PKL-408-2019 SATIIJA SMART COLONY - I SAMSUNG OVERSEAS LIMITED SECTOR 5, VILLAGE RATTANGARH,
TEHSIL SHAHBAD
02-Sep-2019 31-Dec-2020 01-Oct-2021

156 HRERA-PKL-FBD-114-2019 RERA-PKL-434-2019 SATTVA HOMES S3 INFRABUILD LLP VILLAGE KHERI KALAN SECTOR -8
5
22-May-2019 30-Sep-2021 30-Jun-2022

157 HRERA-PKL-RWR-66-2018 RERA-PKL-23-2018 SCO BLOCK -C ANSAL TOWN REWARI GEO CONNECT LTD SECTOR-19 REWARI
31-Oct-2018 30-May-2019 30-May-2019

158 HRERA-PKL-SRS-82-2018 RERA-PKL-361-2018 SECTOR 10 DABWALI ESTATE OFFICER SECTOR 10, SIRSA ROAD, DABWAL
I
19-Dec-2018 31-Dec-2021 01-Oct-2022

159 HRERA-PKL-RTK-89-2019 RERA-PKL-383-2018 SECTOR-21 COMMERCIAL ROHTAK ESTATE OFFICER HSVP ROHTAK ESTATE OFFICE, HSVP ROHTAK
23-Jan-2019 31-Mar-2022 01-Jan-2023

160 HRERA-PKL-BWN-70-2018 RERA-PKL-334-2018 SECTOR 23 PART II BHIWANI VIKAS DHANDA SECTOR 23 PART II BHIWANI
21-Nov-2018 31-Mar-2019 31-Mar-2019

161 HRERA-PKL-HSR-125-2019 RERA-PKL-574-2019 SECTOR 24 RAIPUR ROAD HISAR GULAB SINGH GREWAL SECTOR 24 RAIPUR ROAD, HISAR
25-Jun-2019 31-Dec-2020 01-Oct-2021

162 HRERA-PKL-PKL-322-2022 RERA-PKL-955-2021 SECTOR-30, PINJORE CHIEF ADMINISTRATOR C-3, HSVP COMPLEX, SECTOR-6,
PANCHKULA
30-Jun-2022 19-Feb-2018 19-Feb-2018

163 HRERA-PKL-SNP-139-2019 RERA-PKL-423-2019 SECTOR ROAD SCOS ANSAL PROPERTIES & INFRASTRUCTURE LIMITED SECTOR 63, SONIPAT
01-Aug-2019 31-Mar-2021 01-Jan-2022

164 194 OF 2017 DATED 14.09.2017 RERA-PKL-1229-2023 SHARDA FARMS & HOLDING PVT. LTD. SHARAD FARMS & HOLDING PVT. LTD. VILLAGE PARA, SEC-36, TEHSIL
& DISTRICT ROHTAK, HARYANA
14-Sep-2017 07-Jun-2022 07-Mar-2023

165 HRERA-PKL-FBD-64-2018 RERA-PKL-332-2018 SHREE BANKEY BIHARI JI CGHS LTD SHREE BANKEY BIHARI GCHS LTD FLAT NO 3/4 SPRING FIELD COLO
NY SECTOR 31 & 32 FARIDABAD
31-Oct-2018 31-Mar-2019 31-Mar-2019

166 HRERA-PKL-KUK-147-2019 RERA-PKL-656-2019 SHREE VARDHMAN CITY (PLOTS) & SHREE VARDHMAN MY HOMES (FLOORS) SHREE VARDHMAN TOWNSHIP PRIVATE LIMITED VILLAGE UMRI, SECTOR 30, G. T
. ROAD
11-Sep-2019 30-Jun-2022 30-Mar-2023



View Corrigendum
167 HRERA-PKL-KNL-26-2018 , DATED 20-07-2018 RERA-PKL-725-2019 SIGNATURE GLOBAL CITY-II, LAND MEASURING "15 ACRES" MAA VAISHNO NET-TECH PVT. LTD. VILLAGE-KAILASH, SECTOR-28-A,
KARNAL
20-Jul-2018 30-Jun-2022 30-Mar-2023

168 HRERA-PKL-KNL-27-2018 , DATED 20-07-2018 RERA-PKL-726-2019 SIGNATURE GLOBAL CITY-I, LAND MEASURING "15 ACRES" MAA VAISHNO NET-TECH PVT. LTD. VILLAGE-KAILASH, SECTOR-28A,
KARNAL
20-Jul-2018 30-Jun-2022 30-Mar-2023

169 358 OF 2017 DATED 17-11-2017 RERA-PKL-505-2019 SRS HITECH PROJECT AN AREA OF 5 ACRES TRISHUL DREAM HOMES LTD. SECTOR-84
17-Nov-2017 24-Jun-2019 24-Jun-2019

170 303 OF 2017 DATED 16.10.2017 RERA-PKL-765-2019 SUSHANT CITY KUNDLI-ZONE 2 ANSAL PROPERTIES AND INFRASTRUCTURE LTD. TEHSIL RAI, DISTRICT SONEPAT,
HARYANA
16-Oct-2017 31-Dec-2021 01-Oct-2022

171 HRERA-PKL-SNP-172-2019 RERA-PKL-348-2018 SUSHANT CITY ZONE-1 (20.081 ACRE) ANSAL PROPERITIES AND INFRASTRUCTURE LIMITED VILLAGE KUNDLI
22-Oct-2019 31-Aug-2020 03-Mar-2021

172 HRERA-PKL-PNP-48-2018 NA SUSHANT GREENS ANSAL RROPERTIES AND INFRASTRUCTURE LTD VILLAGE AJIJUPUR, PANIPAT
19-Sep-2018 31-Dec-2019 31-Dec-2019

173 355 OF 2017 DATED 17-11-2017 RERA-PKL-760-2019 SUSHANT GREENS, PANIPAT AREA 22.63 ACRES ANSAL PROPERTIES & INFRASTRUCTURE LTD. VILLAGE AZIZULLAPUR, TEHSIL A
ND DISTRICT PANIPAT
17-Nov-2017 30-Sep-2020 30-Mar-2021



View Corrigendum
174 HRERA-PKL-PWL-115-2019 RERA-PKL-526-2019 SWASTIK CITY DREAM HOUSE INFRASTRUCTURE LLP SECTOR-2, HODAL, PALWAL
21-May-2019 30-Sep-2021 30-Jun-2022



View Corrigendum
175 HRERA-PKL-RWR-39-2018 RERA-PKL-599-2019 "THE CUBIX" ON LAND MEASURING 9.40 ACRES ASHIANA REALTECH PVT. LTD. SECTOR-23, DHARUHERA, REWARI
20-Aug-2018 14-Sep-2021 14-Jun-2022



View Corrigendum
176 304 OF 2017 DATED 16.10.2017 RERA-PKL-682-2019 THE GALLERIA KURUKSHETRA GLOBAL CITY JAGRAN DEVELOPERS PVT. LTD. SECTOR 29, THANESAR , KURUKSH
ETRA, HARYANA
16-Oct-2017 31-Dec-2019 31-Dec-2019

177 HRERA-PKL-FBD-19-2018 DATED: 02-06-2018 RERA-PKL-751-2019 THE GRAND RETREAT A PLOTTED COLONY ON AREA 49.643 ACRES, TDI INFRACORP LTD. VILLAGE-BADSHAHPUR,KHERI KALA
N,TIKKWALI AND RIWAJPUR,SECTOR-88-89,TEHSIL AND DISTRICT FARIDABAD,HARYANA
02-Jun-2018 31-Dec-2021 01-Oct-2022

178 276 OF 2017 DATED 09-10-2017 RERA-PKL-627-2019 THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY OZONE GSP INFRATECH SARVOME HOUSE SECTOR-31, VILLAGE ATMADPUR
09-Oct-2017 08-Oct-2020 08-Jul-2021

179 39 OF 2017, DATED 10.08.2017 RERA-PKL-740-2019 "THE RETREAT" TDI INFRACORP(INDIA) LTD. SECTOR-89, VILLAGE-TIKAWALI A
ND RIWAZPUR, FARIDABAD.
10-Aug-2017 01-Jan-1970 01-Jan-1970



View Corrigendum
180 368 OF 2017 DATED 24.11.2017 NA TUSCAN CITY(PHASE 3) TDI INFRASTRUCTURE LTD. SECTOR 58, 59, 60, 61, AND 64
, DISTRICT SONIPAT, HARYANA
24-Nov-2017 31-Jul-2022 01-May-2023

181 HRERA-PKL-JJR-103-2019 RERA-PKL-427-2019 VIJAYLAXMI GREENS VIJAYLAXMI INFRABUILD PRIVATE LIMITED VILLAGE JAUNDHI, SECTOR 29
27-Mar-2019 31-Dec-2020 01-Oct-2021

182 HRERA-PKL-JJR-220-2020 RERA-PKL-832-2020 VIJAYLAXMI GREENS-1 VIJAYLAXMI INFRABUILD PVT LTD VILLAGE JAUNDHI,SECTOR 29
03-Nov-2020 31-Dec-2021 01-Oct-2022



View Corrigendum
183 HRERA-PKL-RWR-3-2018 RERA-PKL-484-2019 VIPUL GARDERS-TOWER 11 MUDRA FINANCE LTD. SECTOR-1, VILLAGE SIWANA MAUJ
A, TEHSIL DHARUHERA
11-Apr-2018 31-Jan-2022 31-Oct-2022



View Corrigendum
184 HRERA-PKL-FBD-49-2018 RERA-PKL-502-2019 VIPUL PLAZA RITWIZ BUILDER &DEVELOPERS; PVT LTD URR CONSTRUCTION AND HOUSING PVT. LTD VILLAGE BHATOLA, SECTOR-81, F
ARIDABAD
25-Sep-2018 31-Jul-2019 31-Jul-2019

185 43 OF 2017 DATED 11.08.2017 RERA-PKL-797-2019 WATER SIDE LFLOORS, LAKE DRIVE, LAKE SIDE HEIGHTS, EWS TDI INFRACORP(INDIA) LIMITED SECTOR 64 VILLAGE PATLA, TEHS
IL SONEPAT,
11-Aug-2017 10-Aug-2022 10-May-2023



View Corrigendum
186 HRERA-PKL-SNP-2-2018 RERA-PKL-601-2019 WHITE LILY AAKARSHAK REALATORS PVT. LTD. SECTOR-8, VILLAGE KAMASPUR, N
EAR TAU DEVI LAL PAR, MAIN NH -1, SONEPAT
28-Mar-2018 31-Dec-2018 31-Dec-2018