| Serial No. | Registration Certificate Number | Project ID | Project Name | Builder | Project Location | Project District | Approval From | Approval To | View Certificate |
|---|---|---|---|---|---|---|---|---|---|
| 1 | HRERA-PKL-RWR- 10-2018 DATED 28.05.208 | RERA-PKL-494-2019 | 24 HIGH STREET | DWARKADHISH PROJECTS PVT. LTD. | SECTOE 24 DHARADUN, DISTT REW ARI, HARYANA |
REWARI | 28-May-2018 | 31-Mar-2022 | ![]() |
| 2 | HRERA-PKL-RTK-63-2018 | RERA-PKL-472-2019 | 44 SCO'S AND 1 CLINIC FORMING PART OF COMMERCIAL SITE-I | FORTEASIA REALTY PVT. LTD. | SECTOR-26 & 28, OMAXE CITY |
ROHTAK | 26-Oct-2018 | 31-Dec-2019 | ![]() |
| 3 | HRERA-PKL-FBD-42-2018 | RERA-PKL-771-2019 | 81 HIGH STREET | PURI CONSTRUCTION PVT. LTD. | SECTOR-81, FARIDABAD |
FARIDABAD | 06-Sep-2018 | 02-Nov-2018 | ![]() |
| 4 | HRERA-PKL-FBD-104-2019 | RERA-PKL-385-2019 | AAGMAN | AGRASAIN SPACES LLP | SECTOR 70 FARIDABAD |
FARIDABAD | 07-Jun-2019 | 31-Mar-2023 | ![]() |
| 5 | HRERA-PKL-FBD- 13-2018 DATED 04.06.2018 | RERA-PKL-584-2019 | AANAND VILAS | PURI CONSTRUCTION PVT. LTD. | SECTOR 81, FARIDABAD |
FARIDABAD | 04-Jun-2018 | 31-Dec-2018 | ![]() |
| 6 | HRERA-PKL-FBD-717-2025 | RERA-PKL-1489-2024 | ACHIEVERS ELITE ENCLAVE | ACHIEVERS BUILDERS PVT LTD | OWNERSHIP NO 20(PART) AND 21( PART) KALINDI HILLS SECTOR 49 |
FARIDABAD | 24-Jun-2025 | 30-Nov-2025 | ![]() |
| 7 | HRERA-PKL-FBD-68-2018 | RERA-PKL-343-2018 | ADORE SAMRIDDHI | ALESIA BUILDTECH PRIVATE LIMITED | VILLAGE RIWAZPUR AND TIKAWALI , SECTOR 89, FARIDABAD |
FARIDABAD | 22-Nov-2018 | 31-Dec-2022 | ![]() |
| 8 | HRERA-PKL-FBD-223-2020 | RERA-PKL-836-2020 | ADVITYA HOMES | ADVITYA RESIDENCY LLP | VILLAGE SIKRI, SECTOR-143, BA LLABGARH |
FARIDABAD | 16-Dec-2020 | 30-Jun-2025 | ![]() View Corrigendum |
| 9 | 23 OF 2017 DATED 17.07.2017 | RERA-PKL-742-2019 | AFFORDABLE GROUP HOUSING AREA 5.35 ACRES | AGRASAIN SPACES LLP | SRCTOR-70, VILLAGE MUJERI, TE HSIL BALABGARH, FARIDABAD |
FARIDABAD | 17-Jul-2017 | 30-Sep-2020 | ![]() View Corrigendum |
| 10 | 188 OF 2017 DATED 14-09-2017 | NA | AFFORDABLE GROUP HOUSING COLONY AURIC CITY HOMES AREA OF 5 ACRES | S3 INFRAREALITY PVT. LTD. | SECTOR-82,TEHSIL TIGAON, FARI DABAD,HARYANA |
FARIDABAD | 14-Sep-2017 | 15-Aug-2020 | ![]() |
| 11 | 343 OF 2017 DATED 27.10.2017 | RERA-PKL-506-2019 | AFFORDABLE GROUP HOUSING COLONY ON 5 ACRES | SUPER MAX AFFORDABLE HOUSING PVT. LTD. | SECTOR 33, RATHDHANA, SONEPAT |
SONIPAT | 27-Oct-2017 | 26-Feb-2024 | ![]() View Corrigendum |
| 12 | HRERA-PKL-FBD- 8-2018 DATED 21.05.2018 | RERA-PKL-396-2019 | AFFORDABLE GROUP HOUSING COLONY TERRA LAVINIUM | IRIS PLAZA PVT. LTD. | SECTOR 75, VILLAGE BADOLI, TE HSIL & DISTRICT FRIDABAD |
FARIDABAD | 21-May-2018 | 31-Mar-2024 | ![]() View Corrigendum |
| 13 | 334 OF 2017 DATED 24.10.2017 | RERA-PKL-833-2020 | AFFORDABLE GROUP HOUSING PROJECT ON 5 ACRES | MAXHEIGHTS PROMETERS PVT. LTD. | SECTOR 61, VILLAGE NAGAL KALA N , SONEPAT, HARYANA |
SONIPAT | 24-Oct-2017 | 31-Dec-2019 | ![]() View Corrigendum |
| 14 | 174 OF 2017 DATED 31-08-2017 | RERA-PKL-729-2019 | AFFORDABLE PLOTTED COLONY | VALMAX CONSTRUCTION PVT.LTD. | SECTOR-10,DISTRICT & TEHSIL-P ALWAL,HARYANA, |
PALWAL | 31-Aug-2017 | 30-Jun-2022 | ![]() |
| 15 | 191 OF 2017 DATED 14.09.2017 | RERA-PKL-525-2019 | AFFORDABLE PLOTTED COLONY, AREA 14.388 | M/S CHD DEVELOPERS LTD | VILLAGE UCHANA, SECTOR 45, KA RNAL, HARYANA |
KARNAL | 14-Sep-2017 | 22-May-2022 | ![]() |
| 16 | 289 OF 2017 DATED 11.10.2017 | RERA-PKL-501-2019 | AFFORDABLE PLOTTED COLONY, AREA 8.818 SRES | EDEN SLF RESIDENCY | VILLAGE DODWA, SECTOR-1, TARA ORI- NILOKHERI, DISTRICT KARNAL, HARYANA. |
KARNAL | 11-Oct-2017 | 07-Sep-2022 | ![]() |
| 17 | 257 OF 2017 DATED 03-10-2017 | RERA-PKL-554-2019 | AFFORDABLE RESIDENTIAL PLOTTED COLONY | SUMAN VILLAS PVT.LTD. | SECTOR-8,TEHSIL & DISTRICT JH AJJAR |
JHAJJAR | 03-Oct-2017 | 31-Aug-2022 | ![]() |
| 18 | 269 OF DATED 09-10-2017 | RERA-PKL-706-2019 | AFFORDABLE RESIDENTIAL PLOTTED COLONY,AREA 6.5104 ACRES | ROSE BUILDINGNSOLUTION PVT. LTD. | SECTOR 35, VILLAGE KARNAL HAR YANA |
KARNAL | 09-Oct-2017 | 08-Oct-2022 | ![]() |
| 19 | 371 OF 2017 DATED 27.11.2017 | RERA-PKL-890-2020 | AFFORDABLE RESIDENTIAL PLOTTED COLONY ON 14.68 ACRES | RAMA KRISHNA BUILDWELL PVT. LTD. | VILLAGR BARHI AND GARH KESRI , SECTOR 215 TEHSIL GANAUR , DISTRICT SONIPAT, HARYANA |
SONIPAT | 27-Nov-2017 | 26-Nov-2022 | ![]() |
| 20 | 370 OF 2017 DATED 24.11.2017 | RERA-PKL-891-2020 | AFFORDABLE RESIDENTIAL PLOTTED COLONY ON 6.14 ACRES | MERA BABA REAL ESTATE PVT. LTD. | TEHSIL GANAUR, DISTRICT SONIP AT, HARYANA |
SONIPAT | 24-Nov-2017 | 23-Nov-2022 | ![]() |
| 21 | HRERA-PKL-JJR-18-2018 DATED: 02-07-2018 | RERA-PKL-912-2021 | AFFORDABLE RESIDENTIAL PLOTTED COLONY ON AREA 10.0375 ACRES | JBG BUILDCON PVT. LTD. | VILLAGE-SARAI AURANGABAD,SECT OR 3A, BAHADURGARH,JHAJJAR,HARYANA, |
JHAJJAR | 02-Jul-2018 | 30-Jun-2021 | ![]() |
| 22 | HRERA-PKL-RWR- 14-2018 DATED 07.06.208 | RERA-PKL-507-2019 | AFFORDABLE RESIDENTIAL PLOTTED COLONY UNDER DDJAY ON 5.712 ACRES | M/S DREAM MERCHANT PROMOTERS PVT. LTD. | VILLAGE GARHI ALAWALPUR, SECT OR 7A, DHARUHERA, DISTT REWARI |
REWARI | 07-Jun-2018 | 11-Jan-2024 | ![]() View Corrigendum |
| 23 | 151 OF 2017, DATED 28-08-2017 | RERA-PKL-1557-2024 | AFFORTABLE GROUP HOUSING COLONY (HAPPY HOMES) LAND MEASURING 5.00 ACRES | ADORE REALTECH PVT. LTD. | VILLAGE-BHUDHENA, SECTOR-86, FARIDABAD. |
FARIDABAD | 28-Aug-2017 | 27-Aug-2019 | ![]() |
| 24 | 126/2017 DATED 28.08.2017 | RERA-PKL-446-2019 | AFFORTABLE PLOTTED COLONY 5.6125ACRES | OMAXE LTD. | VILLAGE MAINA SUNARI KALAN, S UNARI KHURD, SECTOR-22 D, ROHTAK |
ROHTAK | 28-Aug-2017 | 31-Jan-2025 | ![]() View Corrigendum |
| 25 | 163/2017 DATED 29.08.2017 | RERA-PKL-445-2019 | AFFORTABLE PLOTTED COLONY 8.46875 ACRES | OMAXE LTD. | VILLAGE MAINA, SUNARI KALAN, SUNARI KHURD, SECTOR-22D, ROHTAK |
ROHTAK | 29-Aug-2017 | 19-Feb-2025 | ![]() View Corrigendum |
| 26 | 325/2017, DATED 17.10.2017 | RERA-PKL-1405-2024 | AFFORTABLE RESIDENTIAL PLOTTED COLONY 6.7125 ACRES | DWARKADHIS BUILDWELL PVT.LTD. | VILLAGE-MAHESWARI, SECTOR-22- 23,DHARUHERA, REWARI |
REWARI | 17-Oct-2017 | 16-Oct-2022 | ![]() |
| 27 | HRERA-PKL-HSR-404-2023 | RERA-PKL-1182-2022 | AGROHA ENCLAVE | M/S. AGROHA DEVELOPERS AND PROMOTERS | SECTOR - 2, AGROHA |
HISAR | 13-Feb-2023 | 31-Dec-2025 | ![]() |
| 28 | HRERA-PKL-FTB-192-2020 | RERA-PKL-688-2019 | AKASHGANGA TOWNSHIP PRIVATE LIMITED | AKASHGANGA TOWNSHIP PRIVATE LIMITED | VILLAGE -RATIA SECTOR - 6, SE HNAL ROAD, RATIA, DISTRICT - FATEHABAD (HARYANA |
FATEHABAD | 05-Mar-2020 | 31-Oct-2020 | ![]() |
| 29 | HRERA-PKL-FTB-62-2018 | RERA-PKL-731-2019 | ALPHA INTERNATIONAL CITY, FATEHABAD | ALPHA CORP DEVELOPMENT PRIVATE LIMITED | VILLAGE BASTI BHIWAN, SECTOR- 4, DISTT. FATEHABAD, HARYANA |
FATEHABAD | 23-Oct-2018 | 03-May-2018 | ![]() |
| 30 | 120 OF 2017 DATED 28.8.2017 | RERA-PKL-772-2019 | AMANVILAS | PURI CONSTRUCTION PVT. LTD | SECTOR-88 & 89, FARIDABAD |
FARIDABAD | 28-Aug-2017 | 28-Oct-2023 | ![]() View Corrigendum |
| 31 | HRERA-PKL-RWR-505-2023 | RERA-PKL-1209-2023 | AMOGH | M/S ONE STOP REALTY SOLUTIONS PVT. LTD. | RECTANGLE NO. 22// 19/2, 20, 23// 15/2 16/1 |
REWARI | 04-Oct-2023 | 30-Jun-2026 | ![]() View Corrigendum |
| 32 | 250 OF 2017 DATED 28-09-2017 | NA | ANANDA GREENS | SRS REAL ESTATE LTD. | AFFORDABLE PLOTTED HOUSING SE CTOR 8,PALWAL HARYANA |
PALWAL | 28-Sep-2017 | 27-Sep-2022 | ![]() |
| 33 | 45/2017, DATED 11.08.2017 | RERA-PKL-528-2019 | "ANANDAM AWAS" | M G HOUSING PVT. LTD. | SECTOR-19, VILLAGE- GALI ALAW ARPUR, TEHSIL DHARUHERA, REWARI |
REWARI | 11-Aug-2017 | 30-Sep-2021 | ![]() View Corrigendum |
| 34 | 49/2017, DATED 12.08.2017 | RERA-PKL-471-2019 | ANANDAM ESTATE | M G HOUSING PVT. LTD. | SECTOR-19&24;, VILLAGE GALI A LAWARPUR, TEHSIL DARUHERA, REWARI |
REWARI | 12-Aug-2017 | 30-Sep-2022 | ![]() View Corrigendum |
| 35 | HRERA-PKL-RWR-74-2018 | RERA-PKL-337-2018 | ANAND LOK (AFFORDABLE RESIDENTIAL PLOTTED COLONY UNDER DDJAY 2016) | ANSAL PROPERTIES & INFRASTRUCTURE LTD | VILLAGE GARHI, ALWALPUR, SECT OR-24, DHARUHERRA |
REWARI | 03-Dec-2018 | 31-Dec-2020 | ![]() |
| 36 | HRERA-PKL-SNP-201-2020 | RERA-PKL-846-2020 | ANAND LOK (SONIPAT-11.45625 ACRES) DDJAY | ANSAL PROPERTIES AND INFRASTRUCTURE LIMITED | VILLAGE AKBARPUR BAROTA, JHAT ERI ROAD, SECTOR 35 |
SONIPAT | 04-Jun-2020 | 13-Sep-2024 | ![]() |
| 37 | 356 OF 2017 DATED 17-11-2017 | RERA-PKL-756-2019 | ANAND LOK YAMUNA NAGAR | BHAGIRATHI REALTORS PVT. LTD. | TEHSIL JAGADHARI DISTRICT YAM UNA NAGAR,HARYANA |
YAMUNANAGAR | 17-Nov-2017 | 31-Aug-2019 | ![]() |
| 38 | HRERA-PKL-FBD-28-2018 | RERA-PKL-479-2019 | ANSAL CROWN HEIGHTS AREA 18.05 ACRE | ANSAL CROWN INFRABUILD PVT. LTD. | SECTOR 80, FARIDABAD |
FARIDABAD | 24-Aug-2018 | 30-Sep-2022 | ![]() View Corrigendum |
| 39 | HRERA-PKL-KNL-44-2018 | RERA-PKL-365-2018 | ANSAL TOWN KARNAL (DDJAY SCH-1) | ANSAL HOUSING & CONSTRUCTION LTD. | SECTOR-36, KARNAL |
KARNAL | 13-Sep-2018 | 30-Jun-2022 | ![]() |
| 40 | HRERA-PKL-KNL-43-2018 | RERA-PKL-545-2019 | ANSAL TOWN KARNAL (DDJAY SCH-3) | ANSAL HOUSING & CONSTRUCTION LTD. | SECTOR-36, KARNAL |
KARNAL | 10-Sep-2018 | 30-Jun-2023 | ![]() View Corrigendum |
| 41 | HRERA-PKL-YNR-108-2019 | RERA-PKL-401-2019 | ANSAL TOWN YAMUNA NAGAR DDJAY SCH-1 | ANSAL HOUSING & CONSTRUCTION LTD. | ANSAL TOWN SECTOR-20 YAMUNA N AGAR |
YAMUNANAGAR | 01-Apr-2019 | 24-Feb-2024 | ![]() |
| 42 | HRERA-PKL-YNR-174-2019 | RERA-PKL-707-2019 | ANSAL TOWN YAMUNA NAGAR DDJAY SCH-2 | ANSAL HOUSING LIMITED | ANSAL TOWN YAMUNA NAGAR SEC-2 0 |
YAMUNANAGAR | 15-Nov-2019 | 30-Aug-2024 | ![]() |
| 43 | HRERA-PKL-YNR-257-2021 | RERA-PKL-817-2020 | ANSAL TOWN YAMUNA NAGAR DDJAY SCH-3 | ANSAL HOUSING LIMITED | SEC-20 YAMUNA NAGAR |
YAMUNANAGAR | 26-Aug-2021 | 10-May-2025 | ![]() |
| 44 | HRERA-PKL-YNR-211-2020 | RERA-PKL-849-2020 | ANSAL TOWN YAMUNA NAGAR DDJAY SCH-4 | ANSAL HOUSING LIMITED | ANSAL TOWN YAMUNA NAGAR SEC-2 0 |
YAMUNANAGAR | 18-Sep-2020 | 10-May-2025 | ![]() |
| 45 | 311 OF 2017 DATED 17-10-2017 | RERA-PKL-816-2020 | ANSAL TOWN YAMUNANAGAR PHASE-2 RESIDENTIAL PLOTTED COLONY | ANSAL HOUSING & CONSTRUCTION LTD. | SECTOR-20,JAGADHARI,YAMUNANAG AR,HARYANA |
YAMUNANAGAR | 17-Oct-2017 | 31-Dec-2021 | ![]() |
| 46 | 369 OF 2017 DATED 24-11-2017 | NA | AREA 4.1055 ACRES COMMERCIAL COLONY | ALPHA CORP DEVELOPMENT PVT LTD | VILLAGE BALDI, SECTOR 28, TE HSIL AND DISTRICT KARNAL, HARYANA |
KARNAL | 24-Nov-2017 | 26-Nov-2023 | ![]() |
| 47 | 40 OF 2017 DATED 10-08-2017 | RERA-PKL-793-2019 | AREA 70.328 ACRES | TDI INFRACORP(INDIA) LTD. | SECTOR 36,38 AND 39, VILLAGE KABRI, FARIDPUR AND RETIPUR, PANIPAT |
PANIPAT | 10-Aug-2017 | 09-Aug-2020 | ![]() |
| 48 | HRERA-PKL-KRL-521-2023 | RERA-PKL-1348-2023 | ARMAAN ENCLAVE | ARMAAN ENCLAVE | VILLAGE JHANJHARI, SECTOR -45 ,DISTRICT, KARNAL |
KARNAL | 29-Nov-2023 | 30-Jul-2025 | ![]() |
| 49 | HRERA-PKL-PKL-167-2019 | RERA-PKL-701-2019 | ASHA GULMOHAR | KONARK RAJHANS ESTATES PVT. LTD. | VILLAGE KOT, SECTOR 14, PANCH KULA EXTN. II, DISTRICT PANCHKULA, HARYANA 134118 |
PANCHKULA | 17-Oct-2019 | 31-May-2025 | ![]() View Corrigendum |
| 50 | 291 OF 2017 DATED 12.10.2017 | RERA-PKL-887-2020 | ASHA ROHTAK | DHL INFRATECH PVT. LTD. | SECTOR 27-A, VILLAGE KHERI SA DH CITY, ROHTAK HARYANA |
ROHTAK | 12-Oct-2017 | 11-Oct-2020 | ![]() View Corrigendum |
| 51 | HRERA-PKL-HSR-41-2018 | RERA-PKL-586-2019 | "AUTO MARKET HANSI" ON LAND MEASURING 30.58 ACRES | HARYANA SEHRI VIKAS PRADHIKARAN | SECTOR-13 P, HISAR |
HISAR | 06-Sep-2018 | 31-Dec-2019 | ![]() |
| 52 | HRERA-PKL-JJR-97-2019 | RERA-PKL-405-2019 | AUTOMARKET, SECTOR-12, BGARH | AUTOMARKET, SECTOR-12, BAHADURGARH | E O SECTOR-9, BAHADURGARH |
JHAJJAR | 26-Feb-2019 | 31-Mar-2024 | ![]() |
| 53 | HRERA-PKL-RWR-351-2022 | RERA-PKL-805-2020 | AVALON RANGOLI, DHARUHERA (PHASE II) | AVALON PROJECTS (M/S GRJ DISTRIBUTORS & DEVELOPERS PVT LTD) | REVENUE ESTATE OF GARHI ALAWA LPUR |
REWARI | 16-Sep-2022 | 01-Jan-2021 | ![]() |
| 54 | HRERA-PKL-KRL-247-2021 | RERA-PKL-923-2021 | AVENUE 29 | ALPHA CORP DEVELOPMENT PRIVATE LIMITED | VILLAGE BALDI, SECTOR - 29 |
KARNAL | 30-Jun-2021 | 10-Mar-2026 | ![]() View Corrigendum |
| 55 | HRERA-PKL-BHW-222-2020 | RERA-PKL-852-2020 | BALAJI ENCLAVE | SHRI BALAJE BUILDERS | SECTOR 8 DADRI |
BHIWANI | 08-Dec-2020 | 26-Nov-2025 | ![]() View Corrigendum |
| 56 | HRERA-PKL-JND-242-2021 | RERA-PKL-826-2020 | BASANT VIHAR | SAHIBA CONSTRUCTIONS PVT LTD | SECTOR 19 |
JIND | 30-Jun-2021 | 30-Jun-2022 | ![]() |
| 57 | HRERA-PKL-PKL-392-2023 | RERA-PKL-1172-2022 | BERKELEY PINJORE HEIGHTS | BERKELEY AUTOMOBILES LIMITED | COMPRISED IN KHASRA NO.40/2, 42/2, 34 MIN, 156/33/1 MIN OF REVENUE ESTATE, LOCATED AT VILLAGE DHARAMPUR, PINJORE (PANCHKULA) |
PANCHKULA | 17-Jan-2023 | 31-Dec-2024 | ![]() |
| 58 | 310 OF 2017 DATED 17-10-2017 | RERA-PKL-1130-2022 | BLOSSOM GREENS AREA 18493.988 SQ. MTRS. GROUP HOUSING COLONY | GPM DEVELOPERS PVT. LTD. | SECTOR-63, VILLAGE UNCHAGOAN, TEHSIL BALLABGARH |
FARIDABAD | 17-Oct-2017 | 16-Jun-2019 | ![]() |
| 59 | HRERA-PKL-SNP-157-2019 | RERA-PKL-703-2019 | BLOSSOM PARK AT PARADISE GREENS | PUSHPRATTAN DEVELOPERS PRIVATE LIMITED | SECTOR -63, TEHSIL RAI & DIST RICT SONIPAT |
SONIPAT | 24-Sep-2019 | 31-Dec-2021 | ![]() |
| 60 | 243/2017 DATED 26.09.2017 | RERA-PKL-475-2019 | BMG CITY CENTRE 1.685 ACRES RESIDENTIAL PLOTTED COLONY | BM GUPTA DEVELOPERS PVT. LTD. | SECTOR-26, GADHI BOLNI ROAD, REWARI |
REWARI | 26-Sep-2017 | 25-Jun-2026 | ![]() View Corrigendum |
| 61 | HRERA-PKL-FBD-160-2019 | RERA-PKL-685-2019 | BPTP DISCTRICT 1 BLOCK C | COUNTRYWIDE PROMOTERS PRIVATE LIMITED | VILLAGE BUDENA, SECTOR 81, FA RIDABAD, HARYANA |
FARIDABAD | 24-Sep-2019 | 18-Aug-2024 | ![]() |
| 62 | HRERA-PKL-FBD-158-2019 | RERA-PKL-677-2019 | BPTP NEST 81A | COUNTRYWIDE PROMOTERS PRIVATE LIMITED | VILLAGE-BUDENA, SECTOR-81, FARIDABAD |
FARIDABAD | 17-Sep-2019 | 29-Jul-2024 | ![]() View Corrigendum |
| 63 | HRERA-PKL-FBD-159-2019 | RERA-PKL-666-2019 | BPTP NEST 81 C | COUNTRYWIDE PROMOTERS PRIVATE LIMITED | VILLAGE-BUDENA, SECTOR-81, F ARIDABAD |
FARIDABAD | 17-Sep-2019 | 29-Jul-2024 | ![]() View Corrigendum |
| 64 | HRERA-PKL-FBD-155-2019 | NA | BPTP NEST 83-A | COUNTRYWIDE PROMOTERS PVT LTD | VILLAGE KHERI KHURD, SECTOR-8 3, FARIDABAD |
FARIDABAD | 16-Sep-2019 | 29-Jul-2024 | ![]() |
| 65 | HRERA-PKL-FBD-154-2019 | NA | BPTP NEST 83-B | COUNTRYWIDE PROMOTERS PVT LTD | VILLAGE KHERI KHURD, SECTOR-8 3, FARIDABAD |
FARIDABAD | 16-Sep-2019 | 29-Jul-2024 | ![]() |
| 66 | HRERA-PKL-FBD-153-2019 | NA | BPTP NEST 83-C | COUNTRYWIDE PROMOTERS PVT LTD | VILLAGE KHERI KHURD, SECTOR-8 3, FARIDABAD |
FARIDABAD | 16-Sep-2019 | 29-Jul-2024 | ![]() |
| 67 | HRERA-PKL-FBD-152-2019 | RERA-PKL-672-2019 | BPTP NEST 84B | DESIGNER REALTORS PRIVATE LIMITED | VILLAGE- KHERI KALAN, SECTOR- 84, FARIDABAD |
FARIDABAD | 16-Sep-2019 | 29-Jul-2024 | ![]() View Corrigendum |
| 68 | HRERA-PKL-FBD-147-2019 | RERA-PKL-668-2019 | BPTP NEST 85 A | RIDGECRAFT HOMES PRIVATE LIMITED | VILLAGE-BUDENA, SECTOR-85, FARIDABAD |
FARIDABAD | 09-Sep-2019 | 29-Jul-2024 | ![]() View Corrigendum |
| 69 | HRERA-PKL-FBD-150-2019 | RERA-PKL-674-2019 | BPTP NEST 86A | RIDGECRAFT HOMES PRIVATE LIMITED | VILLAGE-BUDENA, SECTOR-86, FARIDABAD |
FARIDABAD | 16-Sep-2019 | 29-Jul-2024 | ![]() View Corrigendum |
| 70 | HRERA-PKL-SNP-420-2023 | RERA-PKL-1170-2022 | BTW GRAND SQUARE | JBB EVEREST BUILDTECH PVT. LTD. | SECTOR-61 |
SONIPAT | 01-Mar-2023 | 22-Oct-2025 | ![]() View Corrigendum |
| 71 | HRERA-PKL-KNL-101-2019 | RERA-PKL-398-2019 | CHD SPRING VALLEY (DEEN DAYAL JAN AWASH YOJNA)-2016 | CHD DEVELOPERS LTD. | VILLAGE UCHANA, SECTOR-45, KA RNAL |
KARNAL | 18-Mar-2019 | 30-Sep-2024 | ![]() |
| 72 | HRERA-PKL-SNP-164-2019 | RERA-PKL-708-2019 | CHITRAKOOT | TDI MANSION PRIVATE LIMITED | PATLA & NANGAL KALAN, SECTOR- 64, SONIPAT, HARYANA |
SONIPAT | 01-Oct-2019 | 31-Jul-2020 | ![]() |
| 73 | HRERA-PKL-FBD-245-2021 | RERA-PKL-809-2020 | CITY LIFE | AMOLIK INFRASTRUCTURE PVT LTD | METRO PLLER NO. -621 , LINK R OAD , SECTOR -28 , FARIDABAD -121008 |
FARIDABAD | 21-Jun-2021 | 21-Sep-2023 | ![]() View Corrigendum |
| 74 | HRERA-PKL-FBD-241-2021 | RERA-PKL-917-2021 | CITY WALK 81 | AMOLIK BUILDCON LLP | SECTOR 81 FARIDABAD HARYANA 1 21002 |
FARIDABAD | 05-Apr-2021 | 27-May-2026 | ![]() View Corrigendum |
| 75 | HRERA-PKL-FBD-176-2019 | RERA-PKL-683-2019 | COMMERCE BUSINESS DISTRICT | SHREEJI BUILDWELL PVT LTD | VILLAGE LAKKARPUR, SECTOR 39 |
FARIDABAD | 19-Nov-2019 | 31-Oct-2021 | ![]() |
| 76 | 79 OF 2017 DATED 23-08-2017 | RERA-PKL-696-2019 | COMMERCIAL/ RESIDENTIAL COLONY | H L RESIDENCY PRIVATE LIMITED | SECTOR-37,BAHADURGARH,DISTRIC T JHAJJAR,HARYANA |
JHAJJAR | 23-Aug-2017 | 27-Jul-2022 | ![]() |
| 77 | 321 OF 2017 DATED 17-10-2017 | RERA-PKL-825-2020 | CONNAUGHT ESTATE AREA | TDI INFRASTRUCTURE LTD. | SECTOR 23, PANIPAT HARYANA |
PANIPAT | 17-Oct-2017 | 17-Oct-2021 | ![]() View Corrigendum |
| 78 | HRERA-PKL-SNP-197-2020 | RERA-PKL-808-2020 | CONNAUGHT STREET | SANA REALTORS PRIVATE LIMITED | VILLAGE PATTI MUSALMAN, SECT OR-16 |
SONIPAT | 20-May-2020 | 31-Aug-2020 | ![]() |
| 79 | HRERA-PKL-HSR-580-2024 | RERA-PKL-1244-2023 | CONST. OF 756 NOS. EWS FLATS SEC-5, HANSI | HOUSING BOARD HARYANA | SECTOR 5 HANSI |
HISAR | 03-May-2024 | 31-May-2025 | ![]() |
| 80 | HRERA-PKL-SNP-133-2019 | RERA-PKL-576-2019 | CORAL PARK AT PARADISE GREENS | J S BROADCASTING PRIVATE LIMITED | SECTOR -64, TEHSIL RAI & DIST RICT SONIPAT |
SONIPAT | 12-Jul-2019 | 30-Sep-2023 | ![]() View Corrigendum |
| 81 | HRERA-PKL-FBD-179-2019 | RERA-PKL-745-2019 | CROWN BUSINESS PARK | CROWN REALTECH PRIVATE. LTD. | 12/4, DELHI-MATHURA ROAD, NEA R SARAI KHAWJA, SECTOR-37, FARIDABAD |
FARIDABAD | 21-Nov-2019 | 31-Jul-2025 | ![]() View Corrigendum |
| 82 | 6 OF 2017 DATED 23.6.2017 | RERA-PKL-618-2019 | DDJAY (6.81 ACRES) | RAHEJA DEVELOPERS LTD. | SECTOR-14, SOHNA, MEWAT |
NUH | 23-Jun-2017 | 31-Dec-2022 | ![]() |
| 83 | HRERA-PKL-MEW- 11-2018 DATED 24.07.2018 | RERA-PKL-583-2019 | DDJAY-II, AFFORDABLE PLOTTED CLONOY | M/S RAHEJA DEVELOPERS PVT. LTD. | SECTOR 14, SOHANA, DISTT MEWA T, HARYANA |
NUH | 24-Jul-2018 | 31-Dec-2022 | ![]() |
| 84 | HRERA-PKL-NUH-352-2022 | RERA-PKL-937-2021 | DEVELOPMENT OF POCKET AT SECTOR 11 TAORU DISTT NUH | SH. AMIT KUMAR, ESTATE OFFICER, HSVP FARIDABAD | SECTOR 11 TAORU |
NUH | 30-Sep-2022 | 14-Jan-2022 | ![]() |
| 85 | HRERA-PKL-FTB-540-2024 | RERA-PKL-1379-2023 | DEVRACHNA LOK | TILAK COTTON INDUSTRIES | VILLAGE TOHANA (SECTOR-10 RES IDENTIAL) TEHSIL TOHANA DISTRICT FATEHABAD |
FATEHABAD | 16-Jan-2024 | 30-Jun-2026 | ![]() |
| 86 | 297 OF 2017 DATED 16-10-2017 | RERA-PKL-591-2019 | DISCOVERY PARK | BPTP LTD. | SECTOR-80, FARIDABAD |
FARIDABAD | 16-Oct-2017 | 12-Oct-2021 | ![]() View Corrigendum |
| 87 | HRERA-PKL-FBD-237-2021 | RERA-PKL-862-2020 | DISTRICT WALK A | COUNTRYWIDE PROMOTERS PRIVATE LIMITED | SECTOR 81 VILLAGE BUDENA |
FARIDABAD | 07-Apr-2021 | 21-Oct-2025 | ![]() View Corrigendum |
| 88 | HRERA-PKL-FBD-238-2021 | RERA-PKL-858-2020 | DISTRICT WALK B | COUNTRYWIDE PROMOTERS PRIVATE LIMITED | SECTOR 81 VILLAGE BUDENA |
FARIDABAD | 07-Apr-2021 | 01-Aug-2024 | ![]() |
| 89 | HRERA-PKL-FBD-124-2019 | RERA-PKL-421-2019 | DOWNTOWN FARIDABAD | PEBBLE DOWNTOWN INDIA PRIVATE LIMITED AND ASHUTOSH INFRA PRIVATE LIMITED | SECTOR 12 |
FARIDABAD | 21-Jun-2019 | 05-Oct-2022 | ![]() |
| 90 | 264 OF 2017 DATED 03-10-2017 | RERA-PKL-759-2019 | EFAW PLAZA AREA 2.725 ACRES COMMERCIAL COLONY | SUNRAYS INFRASTRUCTURE PVT. LTD. | SECTOR-79 |
FARIDABAD | 03-Oct-2017 | 12-Feb-2020 | ![]() View Corrigendum |
| 91 | HRERA-PKL-PNP- 12-2018 DATED 04.06.2018 | RERA-PKL-364-2018 | ELDECO ESTATE ONE- PHASE THREE | ELDECO INFRASTRUCTURE AND PROPERTIES LIMITED | 201-202, SPLENDOR FORUM, 2ND FLOOR, JASOLA DISTRICT CENTER, NEW DELHI 110025 |
PANIPAT | 04-Jun-2018 | 30-Nov-2023 | ![]() View Corrigendum |
| 92 | HRERA-PKL-PNP-299-2022 | RERA-PKL-992-2021 | ELDECO PARADISO | ELDECO GREEN PARK INFRASTRUCTURE LIMITED | VILLAGE SIMLA MAULANA, SECTOR 40 |
PANIPAT | 24-Mar-2022 | 16-Jan-2025 | ![]() View Corrigendum |
| 93 | HRERA-PKL-PNP-439-2023 | RERA-PKL-1138-2022 | ELDECO PLAZA | ELDECO INFRASTRUCTURE AND PROPERTIES LIMITED | SCO COMMERCIAL SITE 103, SECT OR 40 & 19 A |
PANIPAT | 18-Apr-2023 | 12-Apr-2024 | ![]() View Corrigendum |
| 94 | HRERA-PKL-RWR-494-2023 | RERA-PKL-1336-2023 | EMERALD ESTATE | M/S PYRAMID INFRATECH PRIVATE LIMITED | VILLAGE BAMBAD, SECTOR 22 & 3 3 |
REWARI | 22-Sep-2023 | 30-Jun-2026 | ![]() |
| 95 | HRERA-PKL-SNP-229-2021 | RERA-PKL-902-2021 | EMPLOYEES ENCLAVE | THE POLICE EMPLOYEES CO-OPERATIVE HOUSE BUILDING SOCIETY LTD. | SECTOR - 26 SONIPAT, HARYANA |
SONIPAT | 10-Feb-2021 | 01-Jun-2021 | ![]() View Corrigendum |
| 96 | HRERA-PKL-SNP-161-2019 | RERA-PKL-648-2019 | ESPANIA 1 | TDI INFRASTRUCTURE LIMITED | SECTOR 19 |
SONIPAT | 15-Nov-2019 | 31-Dec-2020 | ![]() |
| 97 | HRERA-PKL-SNP-162-2019 | RERA-PKL-452-2019 | ESPANIA- 2 | TDI INFRASTRUCTURE LIMITED | SECTOR 19 |
SONIPAT | 01-Oct-2019 | 31-Oct-2020 | ![]() |
| 98 | HRERA-PKL-FBD-126-2019 | RERA-PKL-535-2019 | ESPIRE TOWERS (TOWER-B) | ESPIRE INFRASTRUCTURE CORPORATION LTD | PALLA- TILPAT ROAD, SECTOR- 3 7, FARIDABAD |
FARIDABAD | 28-Jun-2019 | 30-Apr-2025 | ![]() View Corrigendum |
| 99 | HRERA-PKL-FBD-390-2023 | RERA-PKL-748-2019 | FERROUS BEVERLY HOMES | FERROUS INFRASTRUCTURE PVT LTD | NEAR MODERN DELHI PUBLIC SCHO OL, SECTOR 89, FARIDABAD |
FARIDABAD | 16-Jan-2023 | 31-Aug-2023 | ![]() |
| 100 | HRERA-PKL-PKL-30-2018 | RERA-PKL-607-2019 | FLATS FOR DEFENCE PERSONNEL, GH-2, AREA 1.38 ACRES | HOUSING BOARD HARYANA | SECTOR 31, PANCHKULA |
PANCHKULA | 07-Aug-2018 | 18-Nov-2021 | ![]() View Corrigendum |
| 101 | HRERA-PKL-PKL-29-2018 | RERA-PKL-622-2019 | FLATS FOR DEFENCE PERSONNEL, GH-2, AREA 2.07 ACRES | HOUSING BOARD HARYANA | SECTOR-31 PANCHKULA |
PANCHKULA | 07-Aug-2018 | 31-Aug-2019 | ![]() |
| 102 | 373 OF 2017 DATED 28.11.2017 | RERA-PKL-350-2018 | "FOR AN AREA 30306.29 SQ. MTRS." | GOLDSOUK INFRASTRUCTURE PVT. LTD. | VILLAGE BAROTA, KHANPUR AND K AWARSIKA, TEHSIL NUH, MEWAT. |
NUH | 28-Nov-2017 | 10-Sep-2021 | ![]() |
| 103 | 342 OF 2017 DATED 27-10-2017 | RERA-PKL-764-2019 | GALAXY COURT, PANIPAT AREA 12100.08 SQ MTRS. | ANSAL PROPERTIES & INFRASTRUCTURE LTD. | PANIPAT |
PANIPAT | 27-Oct-2017 | 31-Aug-2020 | ![]() |
| 104 | HRERA-PKL-SRS-134-2019 | RERA-PKL-372-2018 | GANPATI SMART CITY | VPN REAL ESTATES PRIVATE LIMITED | SECTOR-21 |
SIRSA | 15-Jul-2019 | 31-Jul-2025 | ![]() View Corrigendum |
| 105 | HRERA-PKL-FTB-50-2018 | RERA-PKL-477-2019 | GAWAR CITY | GAWAR INFRA PVT. LTD. | SECTOR-11, RATIA, FATEHABAD |
FATEHABAD | 27-Sep-2018 | 13-Feb-2025 | ![]() View Corrigendum |
| 106 | HRERA-PKL-FBD-165-2019 | RERA-PKL-692-2019 | GLOBAL INDUSTRIAL PARK | VASHISTH BUILDERS AND ENGINEERS LIMITED | SECTOR 72-73, |
FARIDABAD | 04-Oct-2019 | 12-Jan-2023 | ![]() |
| 107 | HRERA-PKL-FBD-219-2020 | RERA-PKL-865-2020 | GODREJ RETREAT AROMA | GODREJ PROPERTIES LIMITED | SECTOR 83 |
FARIDABAD | 16-Oct-2020 | 30-Sep-2022 | ![]() |
| 108 | HRERA-PKL-FBD-215-2020 | RERA-PKL-864-2020 | GODREJ RETREAT SYMPHONY | GODREJ PROPERTIES LIMITED | SECTOR 83 |
FARIDABAD | 08-Oct-2020 | 30-Sep-2022 | ![]() |
| 109 | HRERA-PKL-FBD-204-2020 | RERA-PKL-814-2020 | GREEN AVENUE | S3 INFRABUILD LLP | VILLAGE- KHERI KALAN, SECTOR- 85, FARIDABAD, HARYANA |
FARIDABAD | 24-Jun-2020 | 25-Oct-2025 | ![]() View Corrigendum |
| 110 | HRERA-PKL-AMB-67-2018 | RERA-PKL-578-2019 | GREEN CIRCLE HOMES-5 | SKYLARK SOFTWARE TECHNOLOGIES PVT LTD | VILLAGE KANWALA, SECTOR-27, A MBALA CITY |
AMBALA | 31-Oct-2018 | 14-Jan-2023 | ![]() View Corrigendum |
| 111 | HRERA-PKL-AMB-128-2019 | RERA-PKL-464-2019 | GREEN CIRCLE HOMES-IV | WHITE HOUSE EXPORTS PRIVATE LIMITED | VILLAGE KANWALA & KANWALI, SE CTOR-26, AMBALA CITY |
AMBALA | 03-Jul-2019 | 31-Dec-2024 | ![]() View Corrigendum |
| 112 | HRERA-PKL-AMB-149-2019 | RERA-PKL-645-2019 | GREEN CIRCLE HOMES-VII | WHITE HOUSE EXPORTS PVT LTD | VILLAGE KANWALA, SECTOR-27, A MBALA |
AMBALA | 30-Sep-2019 | 30-Sep-2024 | ![]() View Corrigendum |
| 113 | HRERA-PKL-JND-231-2021 | RERA-PKL-892-2020 | GREEN CITY -1 | MADHUKARA DEVELOPERS PRIVATE LIMITED | SECTOR 26 A, JIND |
JIND | 12-Feb-2021 | 05-Sep-2022 | ![]() View Corrigendum |
| 114 | HRERA-PKL-JND-232-2021 | RERA-PKL-893-2020 | GREEN CITY -2 | MADHUKARA DEVELOPERS PRIVATE LIMITED | SECTOR - 26A, JIND |
JIND | 12-Feb-2021 | 05-Sep-2022 | ![]() View Corrigendum |
| 115 | HRERA-PKL-RWR-282-2021 | RERA-PKL-958-2021 | GREEN CITY 25 | GREEN CITY DEVELOPERS | SECTOR 25, VILLAGE DAWANA |
REWARI | 03-Dec-2021 | 30-Jun-2022 | ![]() |
| 116 | HRERA-PKL-SNP-173-2019 | RERA-PKL-478-2019 | GREEN ESCAPE (T-18, 19, 26, 27, 28, 31, 32, 36, 37, 38, 39 AND PARTIAL EWS-224 UNITS) | ANSAL PROPERTIES & INFRASTRUCTURE LIMITED | VILLAGE AKBARPUR BAROTA, JHAT ERI ROAD, SECTOR 35 |
SONIPAT | 30-Oct-2019 | 30-Sep-2022 | ![]() View Corrigendum |
| 117 | HRERA-PKL-KRK-295-2022 | RERA-PKL-989-2021 | GREEN HOMES | GREEN HOMES INFRA DEVELOPERS PVT LTD | SECTOR 29 |
KURUKSHETRA | 17-Mar-2022 | 31-Dec-2025 | ![]() |
| 118 | HRERA-PKL-ROH-531-2023 | RERA-PKL-1327-2023 | GREEN RESIDENCY | JATIN DHAWAN / OM DEVELOPERS | SECTOR 36-A, ROHTAK, HARYANA |
ROHTAK | 20-Dec-2023 | 30-Jun-2025 | ![]() |
| 119 | HRERA-PKL-JND-332-2022 | RERA-PKL-1094-2022 | GREEN VALLEY | MADHUKARA REAL ESTATE PRIVATE LIMITED | VILLAGE HAIBATPUR SECTOR 11 |
JIND | 12-Aug-2022 | 31-Jul-2024 | ![]() |
| 120 | HRERA-PKL-SNP-15-2018 DATED: 12-06-2018 | RERA-PKL-647-2019 | GREEN WOOD CITY A PLOTTED COLONY ON AREA 137.55 ACRES | JAI KRISHNA ARTEC J.V | SECTOR-26, 26-A & 27,DISTRICT SONEPAT HARYANA |
SONIPAT | 12-Jun-2018 | 30-Sep-2024 | ![]() View Corrigendum |
| 121 | 139 OF 2017 DATED 28-08-2017 | RERA-PKL-643-2019 | GROUP HOUSING COLONY | RUHIL PROMOTER PVT.LTD. | VILLAGE SARAI AURANGABAD,SECT OR-3 HARYNA |
JHAJJAR | 28-Aug-2017 | 30-Jun-2022 | ![]() View Corrigendum |
| 122 | 85 OF 2017 DATED 23.08.2017 | RERA-PKL-824-2020 | GROUP HOUSING COLONY, AREA 18081.008 SQ. MTRS. | MG HOUSING PVT. LTD | SECTOR- 70, VILLAGE MUJERI, F ARIDABAD |
FARIDABAD | 23-Aug-2017 | 31-Dec-2018 | ![]() View Corrigendum |
| 123 | 374 OF 2017 DATED 28-11-2017 | RERA-PKL-496-2019 | GROUP HOUSING COLONY, AREA 5.08339 SQ. MTRS. RESIDENTIAL | EMPERIUM REALTY PVT LTD | SECTOR 1A, VILLAGE TARAQF RAJ PUTTAN, PANIPAT |
PANIPAT | 28-Nov-2017 | 27-Nov-2021 | ![]() |
| 124 | 248 OF 2017 DATED 26-09-2017 | RERA-PKL-1413-2024 | GROUP HOUSING COLONY, AREA 6.356 SQ. MTRS. RESIDENTIAL | ULTRATECH TOWNSHIP DEVELOPERS PVT. LTD. | SECTOR 32, KARNAL HARYANA. |
KARNAL | 26-Sep-2017 | 30-Apr-2026 | ![]() View Corrigendum |
| 125 | 362 OF 2017 DATED 17-11-2017 | RERA-PKL-485-2019 | GROUP HOUSING COLONY, AREA 6.73. RESIDENTIAL | SPLENDER LANDBASE LTD. | SECTOR 19, PANIPAT, HARYANA |
PANIPAT | 17-Nov-2017 | 31-Dec-2024 | ![]() View Corrigendum |
| 126 | 158 OF 2017 DATED 29-08-2017 | RERA-PKL-497-2019 | GROUP HOUSING COLONY AREA OF 6.126 ACRES | EMERALD HOME DEVELOPERS PVT.LTD. | VILLAGE KHERI KALAN AND PALWA LI,SECTOR 88, TEHSIL & DISTRICT-FARIDABAD,HARYANA |
FARIDABAD | 29-Aug-2017 | 28-Oct-2025 | ![]() View Corrigendum |
| 127 | 122 OF 2017 DATED 28-08-2017 | RERA-PKL-611-2019 | GROUP HOUSING COLONY ("HAPPY HOMES GRAND") AREA OF 5.05625 ACRES | VRP BUILDTECH PVT. LTD. | VILLAGE- BHATOLA,SECTOR-85,FA RIDABAD,HARYANA |
FARIDABAD | 28-Aug-2017 | 27-Aug-2021 | ![]() |
| 128 | 202 OF 2017 DATED 20-09-2017 | RERA-PKL-448-2019 | GROUP HOUSING COLONY OF AREA 12.537 ACRES | M/S.OMAXE LTD. | SECTOR-4-A,VILLAGE KASSAR,TEH SIL BAHADURGARH,DISTRICT-JHAJJAR,HARYANA |
JHAJJAR | 20-Sep-2017 | 30-Jun-2026 | ![]() View Corrigendum |
| 129 | 372/2017 DATED 28.11.2017 | RERA-PKL-710-2019 | GROUP HOUSING COLONY (PHASE-II), 12050 SQ.METRS. | T.G.BUILDWELL PVT. LTD. | DHARUHERA, REWARI |
REWARI | 28-Nov-2017 | 28-Aug-2022 | ![]() |
| 130 | 87 OF 2017 DATED 23-08-2017 | RERA-PKL-758-2019 | GROUP HOUSING, (SHREE VARDHMAN GREEN SPACE) | GREEN SPACE INFRAHEIGHTS PVT. LTD. | VILLAGE KOT BILLAH, PANCHKULA EXTENSION II, |
PANCHKULA | 23-Aug-2017 | 14-Sep-2021 | ![]() View Corrigendum |
| 131 | HRERA-PKL-KTL-52-2018 | RERA-PKL-828-2020 | GULMOHAR CITY (PHASE-2) | BEST DEAL HOUSING & CONSTRUCTIONS PVT. LTD | VILLAGE SHERGARH AND PATTI GA ADAR |
KAITHAL | 03-Oct-2018 | 31-Mar-2021 | ![]() |
| 132 | HRERA-PKL-KTL-51-2018 | RERA-PKL-829-2020 | GULMOHAR CITY (PHASE-3) | BEST DEAL HOUSING AND CONSTRUCTION PVT. LTD. | VILLAGE SHERGARH AND PATTI GA ADAR, SECTOR-29, KAITHAL |
KAITHAL | 03-Oct-2018 | 31-Mar-2021 | ![]() |
| 133 | HRERA-PKL-FTB-435-2023 | RERA-PKL-1230-2023 | GULMOHAR PARK | M/S SHRI BALAJI REAL ESTATE AND DEVELOPERS | VILLAGE BANSTI BHIMA, SECTOR 15 |
FATEHABAD | 17-Apr-2023 | 30-Jun-2025 | ![]() View Corrigendum |
| 134 | 209 OF 2017 DATED 15-09-2017 | RERA-PKL-609-2019 | HAPPY HOMES EXCLUSIVE, GROUP HOUSING | ADORE REALTECH PVT. LTD. | SECTOR-86 |
FARIDABAD | 15-Sep-2017 | 14-Sep-2021 | ![]() |
| 135 | HRERA-PKL-FBD-127-2019 | RERA-PKL-571-2019 | HAPPY HOMES EXCLUSIVE PHASE-2 | ADORE REALTECH PRIVATE LIMITED | SECTOR 86, VILLAGE BUDENA, FA RIDABAD |
FARIDABAD | 28-Jun-2019 | 19-Jun-2025 | ![]() View Corrigendum |
| 136 | HRERA-PKL-FBD-145-2019 | RERA-PKL-606-2019 | HAPPY HOMES PRIDE | ADORE REALTECH PRIVATE LIMITED | VILLAGE MURTZAPUR SECTOR 75 F ARIDABAD |
FARIDABAD | 16-Sep-2019 | 31-Dec-2024 | ![]() View Corrigendum |
| 137 | HRERA-PKL-PNP-294-2022 | RERA-PKL-999-2021 | HARMONY CITY | AAWASONLINE PRIVATE LIMITED | SECTOR-39 |
PANIPAT | 03-Mar-2022 | 30-Sep-2024 | ![]() |
| 138 | HRERA-PKL-PNP-4-2018 | RERA-PKL-522-2019 | HARMONY HOMES | REAL HEIGHTS DEVELOPERS PVT. LTD. | SECTOR-40, VILLAGE SIMLI, MUL LANA |
PANIPAT | 13-Apr-2018 | 31-Mar-2024 | ![]() View Corrigendum |
| 139 | HRERA-PKL-AMB-36-2018 , DATED 09-08-2018 | RERA-PKL-534-2019 | "HERMAN CITY AMBALA"UNDER DDJAY ON LAND MEASURING 13.54ACRES | HERMAN PROPERTIES PVT. LTD. | SECTOR-42, AMBALA CANTT |
AMBALA | 09-Aug-2018 | 30-Dec-2021 | ![]() View Corrigendum |
| 140 | HRERA-PKL-AMB-37-2018 , DATED 08-08-2018 | RERA-PKL-530-2019 | "HERMAN CITY AMBALA" UNDER DDJAY ON LAND MEASURING 13.60ACRES | HERMAN PROPERTIES PVT. LTD. | SECTOR-42, AMBALA |
AMBALA | 08-Aug-2018 | 30-Dec-2021 | ![]() View Corrigendum |
| 141 | HRERA-PKL-AMB-35-2018 , DATED 08-08-2018 | RERA-PKL-532-2019 | "HERMAN CITY AMBALA" UNDER DDJAY ON LAND MEASURING 13.91ACRES | HERMAN PROPERTIES PVT. LTD. | SECTOR-42, AMBALA CANTT |
AMBALA | 08-Aug-2018 | 31-Dec-2021 | ![]() View Corrigendum |
| 142 | HRERA-PKL-AMB-34-2018 , DATED 08-08-2018 | RERA-PKL-536-2019 | HERMAN CITY AMBALA UNDER DDJAY ON LAND MEASURING 6.24ACRES | HERMAN PROPERTIES PVT. LTD. | SECTOR-42, AMBALA CANTT. |
AMBALA | 08-Aug-2018 | 31-Dec-2021 | ![]() View Corrigendum |
| 143 | HRERA-PKL-FBD-94-2019 | RERA-PKL-371-2018 | HIGHTECH AFFORDABLE HOMES | HIGHTECH CONSTRUCTION CO. PVT. LTD. | KHERI ROAD, SECTOR-87, FARIDA BAD |
FARIDABAD | 30-Jan-2019 | 30-Sep-2024 | ![]() View Corrigendum |
| 144 | HRERA-PKL-JJR-432-2023 | RERA-PKL-1211-2023 | HL CITY | HL RESIDENCY PRIVATE LIMITED | SECTOR-37, BAHADURGARH |
JHAJJAR | 31-Mar-2023 | 31-Jan-2025 | ![]() |
| 145 | HRERA-PKL-JJR-267-2021 | RERA-PKL-969-2021 | HL CITY GOLD | HL RESIDENCY (PROPRIETORSHIP FIRM) PROPRIETOR SHAILAJA | VILLAGE NUNA MAJRA SECTOR 37 BAHADURGARH |
JHAJJAR | 08-Oct-2021 | 30-Sep-2024 | ![]() View Corrigendum |
| 146 | HRERA-PKL-JJR-175-2019 | RERA-PKL-762-2019 | H L RESIDENCY AFFORDABLE GROUP HOUSING | H.L RESIDENCY (PROPRITORSHIP FIRM) PROPRIETOR SHAILAJA | HL CITY SECTOR 37 |
JHAJJAR | 15-Nov-2019 | 08-Dec-2022 | ![]() |
| 147 | HRERA-PKL-JJR-286-2022 | RERA-PKL-978-2021 | HL RESIDENCY AFFORDABLE GROUP HOUSING | HL RESIDENCY (PROPRIETORSHIP FIRM) | VILLAGE NUNA MAJRA SECTOR 37 HL CITY |
JHAJJAR | 07-Jan-2022 | 29-Jun-2026 | ![]() |
| 148 | HRERA-PKL-FBD-61-2018 | RERA-PKL-319-2018 | HONOR HOMES | FIDATO BUILDCON PRIVATE LIMITED | SECTOR 89, FARIDABAD, HARYANA |
FARIDABAD | 18-Oct-2018 | 30-Nov-2022 | ![]() |
| 149 | 335 OF 2017 DATED 24.10.2017 | RERA-PKL-546-2019 | IB CITY | INDIABULLS ESTATE LTD. | SECTOR -26, 26A, 33 & 34 SONE PAT, HARYANA |
SONIPAT | 24-Oct-2017 | 31-Oct-2019 | ![]() View Corrigendum |
| 150 | 216 OF 2017 | RERA-PKL-73-2018 | IBIZA TOWN | KRRISH SHALIMAR PROJECTS PVT LTD | SECTOR-39, SURAJKUND ROAD, FA RIDABAD. |
FARIDABAD | 20-Mar-2019 | 30-Jun-2021 | ![]() View Corrigendum |
| 151 | 135 OF 2017 DATED 28-08-2017 | NA | INDUSTRIAL COLONY | MODEL ECONOMIC TOWNSHIP LTD. | VILLAGE,DADRI TOI,BIR DADRI,T EHSIL BADLI,DISTRICT JHAJJAR,HARYANA |
JHAJJAR | 28-Aug-2017 | 27-Aug-2022 | ![]() |
| 152 | 110 OF 2017 DATED 28-08-2017 | NA | INDUSTRIAL COLONY | MODEL ECONOMIC TOWNSHIP LTD. | VILLAGE SHEOJIPURA,DADRI TOI, BIR DADRI,TEHSIL BADLI,DISTRICT JHAJJAR,HARYANA |
JHAJJAR | 02-Nov-2017 | 27-Aug-2022 | ![]() |
| 153 | HRERA-PKL-SNP-441-2023 | RERA-PKL-1002-2021 | INDUSTRIAL MODEL TOWNSHIP KHARKHODA | HARYANA STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION | IMT KHARKHODA |
SONIPAT | 25-Apr-2023 | 31-Dec-2024 | ![]() |
| 154 | HRERA-PKL-KNL-33-2018 | RERA-PKL-537-2019 | INR ROYAL CITY AREA 9.268 | INR CONSTRUCTIONS | VILLAGE BALDI, SECTOR- 29, KA RNAL. |
KARNAL | 07-Aug-2018 | 30-Jun-2020 | ![]() |
| 155 | HRERA-PKL-JJR-57-2018 | RERA-PKL-592-2019 | JHAJJAR ONE | SUMAN VILLAS PVT LTD | SECTOR 8 |
JHAJJAR | 17-Oct-2018 | 31-Dec-2025 | ![]() View Corrigendum |
| 156 | HRERA-PKL-SNP-243-2021 | RERA-PKL-894-2020 | JINDAL GLOBAL CITY (PHASE-V) | JINDAL REALTY LIMITED | SECTOR 33-34-35 |
SONIPAT | 08-Jun-2021 | 13-Apr-2026 | ![]() View Corrigendum |
| 157 | HRERA-PKL-ROH-226-2021 | RERA-PKL-806-2020 | JOP PALMS | JOP INTERNATIONAL LIMITED | GARHI BOHAR, SECTOR 28 |
ROHTAK | 08-Feb-2021 | 31-Dec-2022 | ![]() |
| 158 | HRERA-PKL-ROH-788-2025 | RERA-PKL-1826-2025 | KALP-VATIKA | SHRISHTI INFRADEVELOPERS PVT. LTD. | VILLAGE BOHAR SECTOR 3-4 DIVI DING ROAD, SEC 3 |
ROHTAK | 17-Nov-2025 | 12-Jun-2026 | ![]() |
| 159 | HRERA-PKL-SNP-445-2023 | RERA-PKL-1223-2023 | KBD34 | KRISTINA INFRASTRUCTURE PRIVATE LIMITED | SECTOR-26, 26A, 33 & 34 SONIP AT, HARYANA |
SONIPAT | 01-May-2023 | 31-Dec-2023 | ![]() |
| 160 | HRERA-PKL-FTB-305-2022 | RERA-PKL-1023-2022 | KEERAT HOMES | KEERAT DEVELOPERS AND PROMOTERS | SECTOR 15, FATEHABAD |
FATEHABAD | 01-Jun-2022 | 31-Mar-2023 | ![]() |
| 161 | HRERA-PKL-JJR-461-2023 | RERA-PKL-1238-2023 | KIA INDUSTRIAL TOWNSHIP | KIA DEVELOPERS PRIVATE LIMITED | VILLAGE JAKHUDA AND ASSAUDA T ODRAM |
JHAJJAR | 01-Jun-2023 | 31-Mar-2025 | ![]() |
| 162 | HRERA-PKL-JJR-517-2023 | RERA-PKL-1307-2023 | KJS TOWNSHIP | BKS INFRA DEVELOPERS PRIVATE LIMITED | VILLAGE DABODA KHURD |
JHAJJAR | 16-Nov-2023 | 20-Jun-2026 | ![]() View Corrigendum |
| 163 | 21 OF 2017 DATED 06.07.2017 | RERA-PKL-1129-2022 | KRISHANA HOUSING SCHEME | REHEJA DEVELOPERS LTD. | SECTOR-14, SOHNA |
NUH | 06-Jul-2017 | 05-Jul-2022 | ![]() |
| 164 | HRERA-PKL-KUK-113-2019 | RERA-PKL-93-2018 | KRISHNA KUNJ | ANTIQUE INDIA PVT LTD IN COLLABORATION WITH SULTAN SINGH, MULTAN SINGH, KEHAR SINGH | VILLAGE NARKATARI, SEC.46, KU RUKSHETRA |
KURUKSHETRA | 11-Jul-2019 | 30-Sep-2025 | ![]() View Corrigendum |
| 165 | HRERA-PKL-KRK-236-2021 | RERA-PKL-888-2020 | KURUKSHETRA GLOBAL CITY, KURUKSHETRA PHASE-II | JAGRAN DEVELOPERS PRIVATE LIMITED | SECTOR 29-30 |
KURUKSHETRA | 06-Apr-2021 | 17-Apr-2026 | ![]() View Corrigendum |
| 166 | HRERA-PKL-FBD-196-2020 | RERA-PKL-795-2019 | LA DIMORA CITY | LIGHTSTONE DEVELOPERS INDIA PRIVATE LIMITED | SECTOR 97 FARIDABAD |
FARIDABAD | 15-May-2020 | 03-Feb-2025 | ![]() |
| 167 | HRERA-PKL-FBD-240-2021 | RERA-PKL-918-2021 | LA DIMORA CITY PHASE 2 | LIGHTSTONE DEVELOPERS INDIA PVT LTD | SECTOR 97 FARIDABAD |
FARIDABAD | 02-Apr-2021 | 31-Dec-2025 | ![]() View Corrigendum |
| 168 | HRERA-PKL-FBD-91-2019 | RERA-PKL-369-2018 | LAKEVIEW | ZION PROMOTERS & DEVELOPERS PVT. LTD. | BADKHAL ROAD, SECTOR-48, FARI DABAD (HARYANA)-121001 |
FARIDABAD | 23-Jan-2019 | 31-Oct-2025 | ![]() View Corrigendum |
| 169 | HRERA-PKL-KUK-111-2019 | RERA-PKL-432-2019 | LANDMARK CITY | LANDMARK INFONET PVT. LTD. | VILLAGE SHAHABAD, SECTOR 9, S HAHABAD, DISTT. KURUKSHETRA |
KURUKSHETRA | 05-Apr-2019 | 31-Dec-2023 | ![]() View Corrigendum |
| 170 | HRERA-PKL-KUK-110-2019 | RERA-PKL-426-2019 | LANDMARK CITY | LANDMARK INFONET PVT. LTD. | VILLAGE SHAHABAD, SECTOR 9, S HAHABAD DISTT. KURUKSHETRA |
KURUKSHETRA | 05-Apr-2019 | 31-Dec-2023 | ![]() View Corrigendum |
| 171 | HRERA-PKL-PNP-46-2018 | RERA-PKL-316-2018 | LA REGENCIA PHASE-II | ASTRUM VALUE HOMES PVT. LTD. AND STANZA DEVELOPERS & INFRASTRUCTURE PVT. LTD. | SECTOR-19, PANIPAT |
PANIPAT | 17-Sep-2018 | 15-Jun-2025 | ![]() View Corrigendum |
| 172 | HRERA-PKL-RWR-354-2022 | RERA-PKL-1009-2022 | LOTUS GREEN CITY | AMD ESTATES PVT. LTD. | SEC 23-24,DHARUHERA, |
REWARI | 29-Sep-2022 | 11-Aug-2025 | ![]() View Corrigendum |
| 173 | HRERA-PKL-FBD-275-2021 | RERA-PKL-954-2021 | MANSHA VEGA STREET | MANSHA BUILDCON PRIVATE LIMITED | VILLAGE BHATOLA, SECTOR-82 |
FARIDABAD | 22-Oct-2021 | 16-May-2026 | ![]() View Corrigendum |
| 174 | HRERA-PKL-SNP-72-2018 | RERA-PKL-595-2019 | MAPSKO GALLERIA (PROJECT AREA 1.82 ACRES COMMERCIAL, PART OF RESIDENTIAL PLOTTED COLONY) | MAPSKO BUILDERS PVT LTD | SECTOR - 27 |
SONIPAT | 14-Dec-2018 | 30-Jun-2020 | ![]() View Corrigendum |
| 175 | 314 OF 2017 DATED 17.10.2017 | RERA-PKL-581-2019 | METRO VIEW | MAXHEIGHTS TOWNSHIP AND PROJECTS PVT. LTD. | SECTOR 35, TEHSIL RAI, SONEPA T , HARYANA |
SONIPAT | 17-Oct-2017 | 30-Nov-2018 | ![]() |
| 176 | 196 OF 2017, DATED 15-09-2017 | RERA-PKL-563-2019 | "MINDSPACES" (FOR BLOCK C, D &RESTAURENT;) AREA 39948.936 SQ. MTRS. IT PARK COLONY | VATIKA LTD. | SECTOR-27-B, VILLAGE-SARAI KH AWAJA, TEHSIL BADKHAL, FARIDABAD. |
FARIDABAD | 15-Sep-2017 | 14-Sep-2022 | ![]() |
| 177 | HRERA-PKL-RWR-95-2019 | RERA-PKL-368-2018 | MODEL TOWN | DREAM BUILD CREATIONS COMPANY | VILLAGE HARCHANDPUR, SECTOR-7 7, MBIR (OLD SECTOR 10A), BAWAL |
REWARI | 06-Feb-2019 | 06-Feb-2019 | ![]() View Corrigendum |
| 178 | HRERA-PKL-KRL-325-2022 | RERA-PKL-980-2021 | MORINGA DEVELOPERS PVT. LTD. | MORINGA DEVELOPERS PRIVATE LIMITED | VILLAGE BALDI SECTOR 29 |
KARNAL | 22-Jul-2022 | 30-Jun-2026 | ![]() View Corrigendum |
| 179 | HRERA-PKL-FBD-55-2018 | RERA-PKL-823-2020 | MULBERRY COUNTY-PHASE-III (0.46 ACRES) | MG HOUSING PRIVATE LIMITED | SECTOR 70 |
FARIDABAD | 05-Oct-2018 | 31-Dec-2020 | ![]() |
| 180 | HRERA-PKL-FBD-319-2022 | RERA-PKL-1035-2022 | MULBERRY COUNTY PHASE-IV (TOWER-E & F) | MG HOUSING PVT. LTD. | SECTOR 70 |
FARIDABAD | 28-Jun-2022 | 31-Dec-2025 | ![]() |
| 181 | HRERA-PKL-PWL-601-2024 | RERA-PKL-1473-2024 | NARENDRA TOWN SQUARE | NARENDRA INFRA BUILDTECH LLP | SECTOR-6 PALWAL |
PALWAL | 02-Jul-2024 | 30-Jun-2026 | ![]() |
| 182 | HRERA-PKL-JJR-327-2022 | RERA-PKL-812-2020 | NEW HEAVEN, PHASE 1B, BAHADURGARH | HL PROMOTERS PRIVATE LIMITED (HLPPL) | HL PROMOTERS PRIVATE LIMITED SECTOR 37, VILLAGE NUNA MAJRA, BAHADURGARH |
JHAJJAR | 29-Jul-2022 | 31-Mar-2026 | ![]() |
| 183 | HRERA-PKL-SNP-465-2023 | RERA-PKL-1235-2023 | NEXTRA CITY 2 | NEXTRA DEVELOPERS LLP | SECTOR 2, KHARKHODA |
SONIPAT | 08-Jun-2023 | 03-Sep-2025 | ![]() View Corrigendum |
| 184 | 339 OF 2017 DATED 27-10-2017 | NA | NINEX RESIDENCY | EDGEPONT INFRA DEVELOPERS LLT | SECTOR-23, VILLAGE GAUNCHHI |
FARIDABAD | 27-Oct-2017 | 31-Aug-2021 | ![]() |
| 185 | HRERA-PKL-ROH-436-2023 | RERA-PKL-1243-2023 | NV CITY | NV RESIDENCY LLP | SECTOR 21E, ROHTAK |
ROHTAK | 17-Apr-2023 | 31-Mar-2026 | ![]() View Corrigendum |
| 186 | HRERA-PKL-RWR-53-2018 | RERA-PKL-515-2019 | ORANGE SIGNATURE CITY | ORANGE HERMITAGE PRIVATE LIMITED | SECTOR-83, MBIR BAWAL, VILLAG E-SABAN |
REWARI | 05-Oct-2018 | 30-Sep-2021 | ![]() |
| 187 | HRERA-PKL-RTK-96-2019 | RERA-PKL-339-2018 | PALM DRIVE ROHTAK | INFORMAGE REALTY PRIVATE LIMITED | VILLAGE BOHAR, SECTOR 34 ROHT AK |
ROHTAK | 28-Feb-2019 | 31-Mar-2021 | ![]() View Corrigendum |
| 188 | HRERA-PKL-JND-379-2022 | RERA-PKL-1069-2022 | PANDIT HARNAM CITY | PANDIT HARNAM DEVELOPER PVT. LTD | SEC-11 |
JIND | 05-Dec-2022 | 01-Dec-2024 | ![]() |
| 189 | HRERA-PKL-YNR-60-2018 | RERA-PKL-314-2018 | PANDIT HEIGHTS | PANDIT LAND AND INFRASTRUCTURE PRIVATE LIMITED | SEC 20 VILL KHERA AND BHATOLI TEHSIL JAGADHRI |
YAMUNANAGAR | 18-Oct-2018 | 31-Mar-2023 | ![]() |
| 190 | HRERA-PKL-PNP-263-2021 | RERA-PKL-941-2021 | PANIPAT HI-STREET | BAWA KAPOOR | B-BLOCK, SUSHANT CITY, SECTOR 19, PANIPAT |
PANIPAT | 16-Sep-2021 | 14-Aug-2026 | ![]() |
| 191 | 48 OF 2017 DATED 11-08-2017 | RERA-PKL-796-2019 | PANIPAT TOWN CENTRE | TDI INFRACORP(INDIA) LTD. | SECTOR 33, VILLAGE FARIDPUR & KABRI, PANIPAT |
PANIPAT | 11-Aug-2017 | 10-Aug-2020 | ![]() |
| 192 | HRERA-PKL-FBD-249-2021 | RERA-PKL-901-2021 | PARK 81 | COUNTRYWIDE PROMOTERS PRIVATE LIMITED | SECTOR 81 FARIDABAD |
FARIDABAD | 26-Aug-2021 | 31-Mar-2025 | ![]() |
| 193 | HRERA-PKL-FBD-260-2021 | RERA-PKL-870-2020 | PARK ARENA | BPTP LIMITED | SECTOR 80, FARIDABAD |
FARIDABAD | 02-Sep-2021 | 31-Aug-2025 | ![]() |
| 194 | HRERA-PKL-SRS-377-2022 | RERA-PKL-1141-2022 | PARK CITY | MONSOON BUILDWELL (P) LTD. | SECTOR - 1A, SIRSA |
SIRSA | 28-Nov-2022 | 31-Dec-2025 | ![]() |
| 195 | 296 OF 2018 DATED 13-10-2017 | RERA-PKL-590-2019 | PARK SENTOSA | BPTP LTD. | SECTOR-77 |
FARIDABAD | 13-Oct-2017 | 31-Jul-2022 | ![]() |
| 196 | 344 OF 2017 DATED 26.10.2017 | RERA-PKL-380-2018 | PARSVNATH CITY ,(118 ACRES) | PARSVNATH DEVELOPERS LTD. | SECTOR 8, NH 1, SONEPAT, HARY ANA |
SONIPAT | 26-Oct-2017 | 30-Sep-2019 | ![]() |
| 197 | 141 OF 2017 DATED 28.08.2017 | RERA-PKL-378-2018 | PARSVNATH CITY CENTER SONEPAT | PARSVNATH DEVELOPERS LTD. | NEW PWD GUEST HOUSE, RAILWAY ROAD, SONEPAT, HARYANA |
SONIPAT | 28-Aug-2017 | 31-Jul-2020 | ![]() |
| 198 | 332 OF 2017 DATED 24.10.2017 | RERA-PKL-384-2019 | PARSVNATH CITY , SONEPAT(20.159 ACRES) | PARSVNATH DEVELOPERS LTD. | SECTOR 8, NH 1, SONEPAT , HAR YANA |
SONIPAT | 24-Oct-2017 | 30-Jun-2021 | ![]() |
| 199 | HRERA-PKL-PNP-120-2019 | RERA-PKL-55-2018 | PARSVNATH PALIWAL CITY PANIPAT | PARSVNATH DEVELOPERS LIMITED | SECTOR 38 & 39, PANIPAT |
PANIPAT | 16-Sep-2019 | 31-Mar-2020 | ![]() |
| 200 | 132 OF 2017 DATED 28.08.2017 | RERA-PKL-374-2018 | PARSVNATH PRESTON SONEPAT | PARSVNATH DEVELOPERS LTD. | VILLAGE SHAHPUR TURK, SECTOR 9/18, DISTRICT SONEPAT , HARYANA |
SONIPAT | 28-Aug-2017 | 31-Dec-2019 | ![]() |
| 201 | HRERA-PKL-(PKL-16-2018) DATED: 19-06-2018 | RERA-PKL-379-2018 | PARSVNATH ROYALE "POCKET B" 7.182 ACRES | PARSVNATH DEVELOPERS LTD. | SECTOR-20, VILLAGE- KUNDI, DI STRICT-PANCHKULA, HARYANA |
PANCHKULA | 19-Jun-2018 | 29-Jun-2022 | ![]() View Corrigendum |
| 202 | HRERA-PKL-FBD-76-2018 | RERA-PKL-359-2018 | PHASE-I, PLOTS, SECTOR-81 | COUNTYWIDE PROMOTERS PVT. LTD. | SECTOR-81, FARIDABAD. |
FARIDABAD | 11-Dec-2018 | 30-Jun-2022 | ![]() View Corrigendum |
| 203 | HRERA-PKL-RWR-459-2023 | RERA-PKL-1177-2022 | PHONEX MALL | M-CITY INFRASTRUCTURE PRIVATE LIMITED | PHONEX MALL, SECTOR - 20, REW ARI |
REWARI | 31-May-2023 | 31-Dec-2024 | ![]() View Corrigendum |
| 204 | 07 OF 2017 DATED 23.06.2017 | NA | PLOTTED COLONY AREA 0.8937 RESIDENTIAL | M/S CHD DEVELOPERS LTD | VILLAGE JHINJHARI TEHSIL JHIN JHARI, KARNAL |
KARNAL | 23-Jun-2017 | 03-May-2022 | ![]() |
| 205 | 176 OF 2017 DATED 31-08-2017 | RERA-PKL-492-2019 | PLOTTED COLONY AREA 11.906 ACRES | M/S CHD DEVELOPERS LTD | VILLAGE UCHANA, SECTOR 45, KA RNAL HARYANA |
KARNAL | 31-Aug-2017 | 14-May-2022 | ![]() |
| 206 | 33 OF 2017 DATED 07-08-2017 | RERA-PKL-487-2019 | PLOTTED COLONY AREA 13.294 RESIDENTIAL | M/S CHD DEVELOPERS LTD | VILLAGE UCHANA, SECTOR 45, KA RNAL HARYANA. |
KARNAL | 07-Aug-2017 | 14-May-2022 | ![]() |
| 207 | 08 OF 2017 DATED | NA | PLOTTED COLONY AREA 2.725 RESIDENTIAL | M/S CHD DEVELOPERS LTD | VILLAGE JHINJHARI TEHSIL JHIN JHARI, KARNAL |
KARNAL | 23-Jun-2017 | 03-May-2022 | ![]() |
| 208 | 134 OF 2017 DATED 28.08.2017 | RERA-PKL-543-2019 | PLOTTED COLONY AREA 57.654 RESIDENTIAL | ANSAL LANDMARK(KARNAL) TOWNSHIP PVT. LTD | SECTOR 36, KARNAL |
KARNAL | 28-Aug-2017 | 31-Mar-2023 | ![]() View Corrigendum |
| 209 | 140 OF DATED 28-08-2017 | RERA-PKL-542-2019 | PLOTTED COLONY AREA 71.01 ACRES RESIDENTIAL | ANSAL LANDMARK(KARNAL) TOWNSHIP PVT. LTD | SECTOR 36, KARNAL |
KARNAL | 28-Aug-2017 | 31-Mar-2023 | ![]() View Corrigendum |
| 210 | HRERA-PKL-SNP-228-2021 | RERA-PKL-898-2021 | P. P. GREEN CITY | A P REAL ESTATES | VILLAGE SULTANPUR AND AHMADPU R SECTOR-27 |
SONIPAT | 10-Feb-2021 | 09-Sep-2024 | ![]() |
| 211 | HRERA-PKL-SNP-258-2021 | RERA-PKL-786-2019 | PRESIDIA HEIGHTS | RAMA KRISHNA BUILDWELL PVT LTD | DIVINE CITY, NH-1, 16TH MILE STONE, SONIPAT, HARYANA |
SONIPAT | 03-Sep-2021 | 01-Dec-2023 | ![]() View Corrigendum |
| 212 | HRERA-PKL-FBD-470-2023 | RERA-PKL-1055-2022 | PRINCESS PARK ( TOWER A K L M AND EWS) | BPTP LIMITED | SECTOR 86 FARIDABAD |
FARIDABAD | 16-Jun-2023 | 30-Jun-2024 | ![]() |
| 213 | 215 OF 2017 DATED 18-09-2017 | RERA-PKL-495-2019 | PROJECT AREA 10925 ACRES GROUP HOUSING COLONY (SLF ANUSHREE APARTMENTS) | SLF ANUSHREE APARTMENTS | SECTOR -75 & 76 |
FARIDABAD | 18-Sep-2017 | 05-Sep-2025 | ![]() View Corrigendum |
| 214 | HRERA-PKL-M/GARH-22-2018 , DATED 12-07-2018 | NA | PROJECT MEASURING "144.894 ACRES" | HARYANA SEHRI VIKAS PRADHIKARAN REWARI | SECTOR-9-A(PART), 10 & 11(PAR T), MAHENDERGARH |
MAHENDRAGARH | 12-Jul-2018 | 31-Mar-2020 | ![]() |
| 215 | HRERA-PKL-FBD-235-2021 | RERA-PKL-909-2021 | PURI KOHINOOR | PURI CONSTRUCTION PVT. LTD. | SECTOR 89, FARIDABAD |
FARIDABAD | 17-Mar-2021 | 18-Feb-2021 | ![]() |
| 216 | HRERA-PKL-FBD-254-2021 | RERA-PKL-940-2021 | PURI KOHINOOR EMPORIUM | PURI CONSTRUCTION PVT. LTD. | SECTOR 89, FARIDABAD |
FARIDABAD | 02-Sep-2021 | 31-Aug-2025 | ![]() |
| 217 | HRERA-PKL-FBD-135-2019 | RERA-PKL-437-2019 | PYRAMID BUILDTECH PRIVATE LIMITED | PYRAMID BUILDTECH PRIVATE LIMITED | VILLAGE DABUA, SECTOR 49 FARD IABAD |
FARIDABAD | 22-Jul-2019 | 31-Jul-2023 | ![]() |
| 218 | HRERA-PKL-HSR-87-2019 | RERA-PKL-324-2018 | RAJDARBAR SPACES | RAJDARBAR BUILDCON PRIVATE LIMITED FORMERLY KNOWN AS DAFFODIL BUILDCON PRIVATE LIMITED | SECTOR 24 HISAR |
HISAR | 08-Jan-2019 | 01-Nov-2021 | ![]() View Corrigendum |
| 219 | HRERA-PKL-KNL-166-2019 | RERA-PKL-724-2019 | RAJDARBAR SPACES | RAJDARBAR BUILDERS PRIVATE LIMITED | SECTOR - 35 KARNAL |
KARNAL | 17-Oct-2019 | 30-Sep-2025 | ![]() View Corrigendum |
| 220 | HRERA-PKL-HSR-168-2019 | RERA-PKL-720-2019 | RAJDARBAR SPACES | RAJDARBAR BUILDCON PVT. LTD. | SECTOR - 24, HISAR |
HISAR | 25-Oct-2019 | 01-Dec-2023 | ![]() View Corrigendum |
| 221 | HRERA-PKL-HSR-638-2024 | RERA-PKL-1534-2024 | RAJDARBAR SPACES | RAJDARBAR BUILDCON PRIVATE LIMITED | SECTOR 24 |
HISAR | 18-Nov-2024 | 30-Sep-2025 | ![]() View Corrigendum |
| 222 | HRERA-PKL-SNP-268-2021 | RERA-PKL-353-2018 | RANGOLI GREEN | RANGOLI BUILDTECH PVT LTD | PATTI MUSALMAN AND SHAJANPUR SECTOR 16 AND 17 SONEPAT |
SONIPAT | 12-Oct-2021 | 31-Mar-2022 | ![]() |
| 223 | HRERA-PKL-KRL-556-2024 | RERA-PKL-1391-2023 | RBA UPTOWN | RBA HOMES PRIVATE LIMITED | VILLAGE DODWA, SECTOR-1, NILO KHERI-TARAORI |
KARNAL | 05-Mar-2024 | 30-Aug-2025 | ![]() View Corrigendum |
| 224 | HRERA-PKL-RTK-107-2019 | RERA-PKL-312-2018 | RESIDENTIAL GROUP HOUSING COLONY | SONIKA PROPERTIES PRIVATE LIMITED | SECTOR 36A ROHTAK |
ROHTAK | 27-Mar-2019 | 20-May-2026 | ![]() View Corrigendum |
| 225 | 147/2017 | NA | RESIDENTIAL PLOTTED COLONY 14.663 ACRES | BESTECH INDIA PVT. LTD. | VILLAGE- MALPURA, SECTOR-7, D HARUHERA, REWARI |
REWARI | 28-Aug-2017 | 31-Mar-2019 | ![]() |
| 226 | HRERA-PKL-SNP-259-2021 | RERA-PKL-789-2019 | RESIDENTIAL TOWNSHIP | RAMA KRISHNA BUILDWELL PVT LTD | SECTOR-7&13;, 16TH MILE STONE , NH-1, GANAUR, SONIPAT |
SONIPAT | 02-Sep-2021 | 31-Dec-2023 | ![]() View Corrigendum |
| 227 | HRERA-PKL-RWR- 9-2018 DATED 28.05.2018 | RERA-PKL-510-2019 | REWARI GREENS | M/S KSL DEVELOPERS PVT. LTD. | SEC-26, VILLAGE DHAMLKA, REWA RI, HARYANA |
REWARI | 28-May-2018 | 31-Aug-2022 | ![]() |
| 228 | HRERA-PKL-KNL-40-2018 | RERA-PKL-723-2019 | RIDHI SIDHI AVENUE AREA 5.093 ACRES | RIDHISIDHI EMPIRES PVT LTD. | SECTOR 28 A, KARNAL HARYANA |
KARNAL | 24-Aug-2018 | 17-Apr-2023 | ![]() |
| 229 | 267 OF 2017 DATED 09-10-2017 | RERA-PKL-549-2019 | RISE SKY BUNGALOWS AREA 2.64 ACRES | RISE PROJECT PVT. LTD. | SECTOR-41 |
FARIDABAD | 09-Oct-2017 | 08-Jul-2026 | ![]() View Corrigendum |
| 230 | HRERA-PKL-SNP-262-2021 | RERA-PKL-947-2021 | RISHIKA COUNTY | RISHIKA BUILDTECH PRIVATE LIMITED | SECTOR 9 & 18 |
SONIPAT | 03-Sep-2021 | 17-Jun-2026 | ![]() View Corrigendum |
| 231 | 238 OF 2017 DATED 20.09.2017 | RERA-PKL-1158-2022 | ROHTAK GREEN | BESTECH DEVELOPERS PVT. LTD. | SECTOR 25D, VILLAGE PEHRAWAR, TEHSIL & DISTRICT RIHTAK, HARYANA |
ROHTAK | 02-Sep-2017 | 30-Jun-2021 | ![]() View Corrigendum |
| 232 | HRERA-PKL-HSR-265-2021 | RERA-PKL-956-2021 | ROYAL ENCLAVE | TULSI TUBES LIMITED | SECTOR - 38, HISAR |
HISAR | 27-Sep-2021 | 31-Dec-2023 | ![]() |
| 233 | HRERA-PKL-JJR-414-2023 | RERA-PKL-1163-2022 | ROYAL GREEN COUNTY | ETERNAL SUNSHINE INFRA LLP | VILLAGE- BARAKTABAD, SECTOR-4 0, |
JHAJJAR | 24-Mar-2023 | 31-Oct-2025 | ![]() View Corrigendum |
| 234 | HRERA-PKL-JJR-596-2024 | RERA-PKL-1456-2024 | ROYAL GREEN COUNTY | ETERNAL SUNSHINE INFRA LLP | VILLAGE- BARKATABAD, SECTOR-4 0 |
JHAJJAR | 02-Jul-2024 | 31-Dec-2025 | ![]() |
| 235 | HRERA-PKL-JJR-413-2023 | RERA-PKL-1164-2022 | ROYAL GREEN COURTYARD 40 | ETERNAL SUNSHINE INFRA LLP | VILLAGE- BARKATABAD, SECTOR-4 0, BAHADURGARH, |
JHAJJAR | 21-Feb-2023 | 31-Dec-2025 | ![]() |
| 236 | HRERA-PKL-FBD-47-2018 | RERA-PKL-636-2019 | ROYAL HERITAGE | PIVOTAL INFRASTRUCTURE PVT LTD | SECTOR-70 VILLAGE MUJHERI |
FARIDABAD | 14-Sep-2018 | 31-Dec-2020 | ![]() View Corrigendum |
| 237 | HRERA-PKL-FBD-216-2020 | RERA-PKL-877-2020 | SAN FRANCISCO STREET | FBD REAL GROW PRIVATE LIMITED | OMAXE WORLD STREET SECTOR 79 FARIDABAD 121004 HARYANA |
FARIDABAD | 09-Oct-2020 | 31-Oct-2024 | ![]() View Corrigendum |
| 238 | HRERA-PKL-PWL-121-2019 | RERA-PKL-394-2019 | SANTUSHTI ESTATE | RURBAN DEVELOPMENT CORPORATION PRIVATE LIMITED | SECTOR-7 PALWAL |
PALWAL | 02-Jul-2019 | 30-Sep-2024 | ![]() View Corrigendum |
| 239 | HRERA-PKL-SNP-71-2018 | RERA-PKL-114-2018 | SAPPHIRE FLOORS AND SAPPHIRE HEIGHTS | KAMAL IDEAL INFRATECH PVT. LTD. | VILLAGE NAGAL KALAN, SECTOR-6 4, DISTRICT SONEPAT |
SONIPAT | 28-Nov-2018 | 30-Sep-2025 | ![]() View Corrigendum |
| 240 | HRERA-PKL-FBD-114-2019 | RERA-PKL-434-2019 | SATTVA HOMES | S3 INFRABUILD LLP | VILLAGE KHERI KALAN SECTOR -8 5 |
FARIDABAD | 22-May-2019 | 30-Sep-2021 | ![]() |
| 241 | HRERA-PKL-SNP-708-2025 | RERA-PKL-1673-2025 | SAVANAH GREENS | MANAV ASSOCIATESPRIVATE LIMITED | VILLAGE KUMASPUR,SECTOR 81 |
SONIPAT | 06-Jun-2025 | 19-Nov-2025 | ![]() |
| 242 | HRERA-PKL-RWR-66-2018 | RERA-PKL-23-2018 | SCO BLOCK -C ANSAL TOWN REWARI | GEO CONNECT LTD | SECTOR-19 REWARI |
REWARI | 31-Oct-2018 | 29-Sep-2024 | ![]() View Corrigendum |
| 243 | HRERA-PKL-SNP-138-2019 | RERA-PKL-623-2019 | SEAGULL BUILDWELL PVT. LTD. | SEAGULL BUILDWELL PRIVATE LIMITED | VILLAGE BHIGAN, SONIPAT |
SONIPAT | 24-Jul-2019 | 30-Sep-2025 | ![]() View Corrigendum |
| 244 | HRERA-PKL-RTK-90-2019 | RERA-PKL-382-2018 | SECTOR-18 & 18A | EO HSVP ROHTAK | HSVP BUILDING SECTOR-3, ROHTA K |
ROHTAK | 23-Jan-2019 | 31-Mar-2024 | ![]() |
| 245 | HRERA-PKL-JJR-547-2024 | RERA-PKL-1300-2023 | SECTOR 1 PART(A) HSVP BAHADURGARH | HSVP OFFICE OF EO, HSVP, BAHADURGARH | SECTOR 1 PART(A) BAHADURGARH |
JHAJJAR | 23-Feb-2024 | 31-Mar-2025 | ![]() |
| 246 | HRERA-PKL-RTK-89-2019 | RERA-PKL-383-2018 | SECTOR-21 COMMERCIAL ROHTAK | ESTATE OFFICER HSVP ROHTAK | ESTATE OFFICE, HSVP ROHTAK |
ROHTAK | 23-Jan-2019 | 31-Mar-2022 | ![]() |
| 247 | HRERA-PKL-BWN-70-2018 | RERA-PKL-334-2018 | SECTOR 23 PART II BHIWANI | VIKAS DHANDA | SECTOR 23 PART II BHIWANI |
BHIWANI | 21-Nov-2018 | 31-Mar-2019 | ![]() |
| 248 | HRERA-PKL-HSR-125-2019 | RERA-PKL-574-2019 | SECTOR 24 RAIPUR ROAD HISAR | GULAB SINGH GREWAL | SECTOR 24 RAIPUR ROAD, HISAR |
HISAR | 25-Jun-2019 | 31-Dec-2020 | ![]() |
| 249 | HRERA-PKL-ROH-209-2020 | RERA-PKL-392-2019 | SECTOR-25 (RESIDENTIAL) | ESTATE OFFICER | ESTATE OFFICE, HSVP OFFICE BU ILDING, SECTOR-3, ROHTAK |
ROHTAK | 22-Jul-2020 | 31-May-2024 | ![]() |
| 250 | HRERA-PKL-ROH-250-2021 | RERA-PKL-924-2021 | SECTOR 27,28,26,PART-I,II,III | ESTATEOFFICER,HSVP ROHTAK | ESTATE OFFICER, HSVP,SECTOR-3 ,ROHTAK |
ROHTAK | 15-Jul-2021 | 31-Dec-2024 | ![]() |
| 251 | HRERA-PKL-PKL-322-2022 | RERA-PKL-955-2021 | SECTOR-30, PINJORE | CHIEF ADMINISTRATOR | C-3, HSVP COMPLEX, SECTOR-6, PANCHKULA |
PANCHKULA | 30-Jun-2022 | 19-Feb-2018 | ![]() |
| 252 | HRERA-PKL-RWR-342-2022 | RERA-PKL-1086-2022 | SECTOR-7, HSVP, REWARI. | ESTATE OFFICER HSVP REWARI | SECTOR-7, HSVP, REWARI. |
REWARI | 31-Aug-2022 | 31-Mar-2024 | ![]() |
| 253 | HRERA-PKL-JND-429-2023 | RERA-PKL-1043-2022 | SECTOR 8 SAFIDON | ESTATE OFFICER | ESTATE OFFICER HSVP JIND |
JIND | 20-Apr-2023 | 31-Dec-2025 | ![]() |
| 254 | HRERA-PKL-SNP-139-2019 | RERA-PKL-423-2019 | SECTOR ROAD SCOS | ANSAL PROPERTIES & INFRASTRUCTURE LIMITED | SECTOR 63, SONIPAT |
SONIPAT | 01-Aug-2019 | 31-Mar-2021 | ![]() |
| 255 | HRERA-PKL-FBD-64-2018 | RERA-PKL-332-2018 | SHREE BANKEY BIHARI JI CGHS LTD | SHREE BANKEY BIHARI GCHS LTD | FLAT NO 3/4 SPRING FIELD COLO NY SECTOR 31 & 32 FARIDABAD |
FARIDABAD | 31-Oct-2018 | 31-Mar-2019 | ![]() |
| 256 | HRERA-PKL-JIND-21-2018 DATED: 09-07-2018 | RERA-PKL-521-2019 | SHREE DHAM NAGAR ON AREA 10.00 ACRES FOR AFFORDABLE RESIDENTIAL PLOTTED COLON | SHREE DHAM DEVELOPERS PVT.LTD. | VILLAGE HABATPUR,SECTOR-7A,JI ND |
JIND | 09-Jul-2018 | 31-Mar-2023 | ![]() View Corrigendum |
| 257 | HRERA-PKL-JIND-20-2018 DATED: 09-07-2018 | RERA-PKL-520-2019 | SHREE DHAM NAGAR ON AREA 14.92 ACRES FOR AFFORDABLE RESIDENTIAL PLOTTED COLONY | SHREE DHAM DEVELOPERS PVT.LTD. | VILLAGE HABATPUR,SECTOR-7A,JI ND |
JIND | 09-Jul-2018 | 31-Mar-2023 | ![]() View Corrigendum |
| 258 | HRERA-PKL-FBD-112-2019 | RERA-PKL-462-2019 | SHREE HOMES | JOTINDRA STEEL & TUBES LIMITED | VILLAGE MEWLA MAHARAJPUR, SEC TOR 45, FARIDABAD |
FARIDABAD | 11-Apr-2019 | 30-Apr-2024 | ![]() View Corrigendum |
| 259 | HRERA-PKL-FBD-171-2019 | RERA-PKL-727-2019 | SHREE HOMES (PHASE-II) | JOTINDRA STEEL & TUBES LIMITED | VILLAGE MEWLA MAHARAJPUR, SEC TOR 45, FARIDABAD |
FARIDABAD | 18-Oct-2019 | 31-May-2026 | ![]() View Corrigendum |
| 260 | HRERA-PKL-KUK-147-2019 | RERA-PKL-656-2019 | SHREE VARDHMAN CITY (PLOTS) & SHREE VARDHMAN MY HOMES (FLOORS) | SHREE VARDHMAN TOWNSHIP PRIVATE LIMITED | VILLAGE UMRI, SECTOR 30, G. T . ROAD |
KURUKSHETRA | 11-Sep-2019 | 30-Jun-2022 | ![]() View Corrigendum |
| 261 | HRERA-PKL-KUK-143-2019 | RERA-PKL-654-2019 | SHREE VARDHMAN CITY (UNDER DEEN DAYAL JAN AWAS YOJNA) | SHREE VARDHMAN TOWNSHIP PRIVATE LIMITED | VILLAGE UMRI, SECTOR 30, G. T . ROAD |
KURUKSHETRA | 02-Sep-2019 | 28-Nov-2022 | ![]() |
| 262 | HRERA-PKL-SNP-251-2021 | RERA-PKL-916-2021 | SHRI RAM RESIDENCY | SUNFROST FROZEN FOODS LLP | SECTOR 2 |
SONIPAT | 28-Jul-2021 | 27-Jul-2026 | ![]() |
| 263 | HRERA-PKL-SNP-252-2021 | RERA-PKL-903-2021 | SHRI RAM RESIDENCY | SANJEEV SARIN AND OTHERS (LICENSEE) | SECTOR 2 SONIPAT |
SONIPAT | 25-Aug-2021 | 16-Jun-2025 | ![]() |
| 264 | HRERA-PKL-PNP-129-2019 | RERA-PKL-373-2018 | SHUBHANGAN | SUNBREEZE BUILDERS AND DEVELOPERS PRIVATE LIMITED | VILLAGE- NIZAMPUR, SECTOR 40 |
PANIPAT | 03-Jul-2019 | 30-Mar-2026 | ![]() View Corrigendum |
| 265 | HRERA-PKL-KRL-370-2022 | RERA-PKL-1046-2022 | SKY RESIDENCY | SKYHIGH PROPBUILD PVT. LTD. | VILLAGE BUDHA KHERA, SECTOR-3 2 |
KARNAL | 03-Nov-2022 | 30-May-2024 | ![]() |
| 266 | HRERA-PKL-JND-362-2022 | RERA-PKL-1113-2022 | SMART CITY | S SIHAG DEVELOPERS PRIVATE LIMITED | SECTOR - 26A, JIND |
JIND | 19-Oct-2022 | 31-Dec-2024 | ![]() |
| 267 | 265 OF 2017 DATED 09-10-2017 | RERA-PKL-486-2019 | SMART HOMES KARNAL AREA 5.6534 ACRES | AEGIS VALUE HOMES LTD. | SECTOR 32, KARNAL, HARYANA |
KARNAL | 09-Oct-2017 | 23-Jul-2023 | ![]() View Corrigendum |
| 268 | HRERA-PKL-SNP-280-2021 | RERA-PKL-945-2021 | SONIPAT GLOBAL INDUSTRIAL TOWNSHIP | SYSCOM EDUTECH PRIVATE LIMITED | VILLAGE DEVRU & JAWAHAI |
SONIPAT | 29-Oct-2021 | 31-Dec-2024 | ![]() View Corrigendum |
| 269 | HRERA-PKL-PWL-136-2019 | RERA-PKL-438-2019 | SRC INDUSTRIAL PARK | SRC BUILDTECH PRIVATE LIMITED | SECTOR 4A DISTRICT PALWAL |
PALWAL | 22-Jul-2019 | 28-Oct-2023 | ![]() |
| 270 | 358 OF 2017 DATED 17-11-2017 | RERA-PKL-505-2019 | SRS HITECH PROJECT AN AREA OF 5 ACRES | TRISHUL DREAM HOMES LTD. | SECTOR-84 |
FARIDABAD | 17-Nov-2017 | 24-Jun-2019 | ![]() |
| 271 | HRERA-PKL-JJR-357-2022 | RERA-PKL-1078-2022 | STAR CITY | STARSHINE BUILDCON PRIVATE LIMITED | SECTOR 7 |
JHAJJAR | 04-Oct-2022 | 11-Aug-2024 | ![]() |
| 272 | HRERA-PKL-ROH-224-2021 | RERA-PKL-798-2020 | SUNCITY HEIGHTS | SONIKA PROPERTIES PRIVATE LIMITED | SECTOR 36A ROHTAK |
ROHTAK | 19-Jan-2021 | 31-Mar-2026 | ![]() View Corrigendum |
| 273 | HRERA-PKL-ROH-924-2026 | RERA-PKL-1973-2026 | SUNCITY INDEPENDENT FLOORS 36A | SONIKA PROPOERTIES PVT. LTD. | SECTOR 36A |
ROHTAK | 30-Jun-2026 | 17-Jan-2025 | ![]() |
| 274 | HRERA-PKL-ROH-925-2026 | RERA-PKL-1962-2026 | SUNCITY TOWNHSIP SECTOR 36A ROHTAK | SONIKA PROPERTIES PRIVATE LTD | SECTOR 36A ROHTAK |
ROHTAK | 30-Jun-2026 | 17-Jan-2025 | ![]() |
| 275 | HRERA-PKL-ROH-239-2021 | RERA-PKL-886-2020 | SUNCITY TOWNSHIP SECTOR 36A | SONIKA PROPERTIES PVT LTD. | SECTOR 36A ROHTAK |
ROHTAK | 26-Mar-2021 | 31-Mar-2025 | ![]() View Corrigendum |
| 276 | HRERA-PKL-YNR-205-2020 | RERA-PKL-819-2020 | SUNCITY YAMUNA NAGAR | PURANDER BUILDCON PVT. LTD AND AJITESH BUILDCON PVT. LTD. | SECTOR 20, VILLAGE BHATAULI |
YAMUNANAGAR | 24-Jun-2020 | 06-Mar-2024 | ![]() |
| 277 | HRERA-PKL-PNP-518-2023 | RERA-PKL-1360-2023 | SUPARVESH | SUPARVESH BUILDWELL PRIVATE LIMITED | VILLAGE- KABRI, SECTOR-39 |
PANIPAT | 16-Nov-2023 | 30-May-2026 | ![]() |
| 278 | HRERA-PKL-SNP-212-2020 | RERA-PKL-847-2020 | SUSHANT CITY, SONIPAT (3.4187 ACRE PLOTTED) | ANSAL PROPERTIES AND INFRASTRUCTURE LIMITED | SECTOR -61, 62, 63 |
SONIPAT | 09-Oct-2020 | 17-Mar-2025 | ![]() |
| 279 | HRERA-PKL-PNP-48-2018 | NA | SUSHANT GREENS | ANSAL RROPERTIES AND INFRASTRUCTURE LTD | VILLAGE AJIJUPUR, PANIPAT |
PANIPAT | 19-Sep-2018 | 31-Dec-2019 | ![]() |
| 280 | 355 OF 2017 DATED 17-11-2017 | RERA-PKL-760-2019 | SUSHANT GREENS, PANIPAT AREA 22.63 ACRES | ANSAL PROPERTIES & INFRASTRUCTURE LTD. | VILLAGE AZIZULLAPUR, TEHSIL A ND DISTRICT PANIPAT |
PANIPAT | 17-Nov-2017 | 30-Sep-2020 | ![]() View Corrigendum |
| 281 | 338 OF 2017 DATED 17-10-2017 | RERA-PKL-541-2019 | SUSHANT ROYALE, AREA 11.239 ACRES | ANSAL LANDMARK(KARNAL) TOWNSHIP PVT. LTD | SECTOR 36, KARNAL, HARYANA |
KARNAL | 17-Oct-2017 | 31-Aug-2023 | ![]() |
| 282 | HRERA-PKL-KRL-233-2021 | RERA-PKL-904-2021 | SWARNBHOOMI | SHREE MAHALUXMI BUILDERS | VILLAGE KASBA , SECTOR 36 |
KARNAL | 04-Mar-2021 | 10-Jan-2024 | ![]() |
| 283 | HRERA-PKL-PWL-115-2019 | RERA-PKL-526-2019 | SWASTIK CITY | DREAM HOUSE INFRASTRUCTURE LLP | SECTOR-2, HODAL, PALWAL |
PALWAL | 21-May-2019 | 30-Sep-2021 | ![]() View Corrigendum |
| 284 | HRERA-PKL-PWL-184-2019 | RERA-PKL-614-2019 | TARANG RESIDENCY | MAHI BUILDCON PVT LTD | SECTOR-7 |
PALWAL | 16-Dec-2019 | 30-Sep-2024 | ![]() View Corrigendum |
| 285 | HRERA-PKL-PNP-438-2023 | RERA-PKL-1252-2023 | THE ADDRESS PANIPAT | M/S ADDRESS INFRASTRUCTURES PVT. LTD. | PANIPAT |
PANIPAT | 17-Apr-2023 | 31-Mar-2026 | ![]() |
| 286 | HRERA-PKL-RWR-39-2018 | RERA-PKL-599-2019 | "THE CUBIX" ON LAND MEASURING 9.40 ACRES | ASHIANA REALTECH PVT. LTD. | SECTOR-23, DHARUHERA, REWARI |
REWARI | 20-Aug-2018 | 14-Sep-2021 | ![]() View Corrigendum |
| 287 | HRERA-PKL-FBD-183-2019 | RERA-PKL-650-2019 | THE DECK & EWS | BPTP LIMITED | SECTOR 82 FARIDABAD |
FARIDABAD | 20-Dec-2019 | 30-Sep-2025 | ![]() View Corrigendum |
| 288 | 304 OF 2017 DATED 16.10.2017 | RERA-PKL-682-2019 | THE GALLERIA KURUKSHETRA GLOBAL CITY | JAGRAN DEVELOPERS PVT. LTD. | SECTOR 29, THANESAR , KURUKSH ETRA, HARYANA |
KURUKSHETRA | 16-Oct-2017 | 31-Dec-2019 | ![]() |
| 289 | HRERA-PKL-FBD-19-2018 DATED: 02-06-2018 | RERA-PKL-751-2019 | THE GRAND RETREAT A PLOTTED COLONY ON AREA 49.643 ACRES, | TDI INFRACORP LTD. | VILLAGE-BADSHAHPUR,KHERI KALA N,TIKKWALI AND RIWAJPUR,SECTOR-88-89,TEHSIL AND DISTRICT FARIDABAD,HARYANA |
FARIDABAD | 02-Jun-2018 | 31-Dec-2021 | ![]() |
| 290 | HRERA-PKL-HSR-359-2022 | RERA-PKL-1101-2022 | THE GREEN CITY | THE OPAL DEVELOPERS AND CONSTRUCTION PVT. LTD. | SECTOR -2, HNASI |
HISAR | 04-Oct-2022 | 31-Dec-2025 | ![]() View Corrigendum |
| 291 | HRERA-PKL-FBD-132-2019 | RERA-PKL-603-2019 | THE OZONE SOLITAIRE (TOWER-E, TOWER-F1, PART EWS & CONVENIENT SHOPPING-1) | SHIV SAI INFRASTRUCTURE PRIVATE LIMITED | THE OZONE SOLITAIRE, VILLAGE BASELWA, SECTOR - 87, FARIDABAD |
FARIDABAD | 11-Jul-2019 | 31-Jul-2025 | ![]() |
| 292 | HRERA-PKL-FTB-389-2022 | RERA-PKL-1157-2022 | THE PALM DRIVE | S & M DEVELOPERS | SECTOR-6, RATIA ROAD, |
FATEHABAD | 28-Dec-2022 | 30-Nov-2025 | ![]() |
| 293 | HRERA-PKL-RTK-119-2019 | RERA-PKL-436-2019 | THE PLANNETS | SHRISHTI INFRADEVELOPERS PRIVATE LIMITED | VILLAGE BOHAR, SECTOR-3 & 4, ROHTAK |
ROHTAK | 19-Jun-2019 | 28-Feb-2026 | ![]() View Corrigendum |
| 294 | 276 OF 2017 DATED 09-10-2017 | RERA-PKL-627-2019 | THE PRESIDIO IN AREA 1.7444 ACRES GROUP HOUSING COLONY | OZONE GSP INFRATECH SARVOME HOUSE | SECTOR-31, VILLAGE ATMADPUR |
FARIDABAD | 09-Oct-2017 | 08-Oct-2020 | ![]() |
| 295 | 39 OF 2017, DATED 10.08.2017 | RERA-PKL-740-2019 | "THE RETREAT" | TDI INFRACORP(INDIA) LTD. | SECTOR-89, VILLAGE-TIKAWALI A ND RIWAZPUR, FARIDABAD. |
FARIDABAD | 10-Aug-2017 | 01-Jan-1970 | ![]() View Corrigendum |
| 296 | HRERA-PKL-PNP-406-2023 | RERA-PKL-1174-2022 | THE SATKAR CO-OPERATIVE GROUP HOUSING SOCIETY LIMITED, PANIPAT | THE SATKAR CO-OPERATIVE GROUP HOUSING SOCIETY LIMITED, | GHS SITE NO. 7, SECTOR 13-17, PANIPAT-132103 |
PANIPAT | 17-Feb-2023 | 31-Dec-2023 | ![]() |
| 297 | HRERA-PKL-PNP-321-2022 | RERA-PKL-979-2021 | THE VILLAGE BUSINESS PARK | WAVERLY INFRASTRUCTURE LLP | VILLAGE DADAULI, UJHAH, RISAL U AND SIWAH |
PANIPAT | 29-Jun-2022 | 25-Mar-2026 | ![]() View Corrigendum |
| 298 | HRERA-PKL-RWR-186-2019 | RERA-PKL-770-2019 | TIVOLI HOLIDAY VILLAGE PHASE-I (BLOCK-1, 2, 3 (4 UNIT), BLOCK4, 5, VILLA-5 & EWS) FAR 43012.988SQM | T. G. BUILDWELL PVT. LTD. | DHARUHERA |
REWARI | 31-Dec-2019 | 31-Dec-2022 | ![]() |
| 299 | HRERA-PKL-JJR-244-2021 | RERA-PKL-925-2021 | TRILLIUM | INMON BUILDCON PRIVATE LIMITED | SECTOR 28, 28A, BAHADURGARH, JHAJJAR, HARYANA |
JHAJJAR | 17-Jun-2021 | 30-Jun-2025 | ![]() |
| 300 | HRERA-PKL-JJR-274-2021 | RERA-PKL-933-2021 | TRILLIUM II | INMON BUILDCON PRIVATE LIMITED | SECTOR 28A, 29, BAHADURGARH, JHAJJAR, HARYANA |
JHAJJAR | 21-Oct-2021 | 31-Dec-2025 | ![]() |
| 301 | HRERA-PKL-JJR-533-2024 | RERA-PKL-1064-2022 | TRILLIUM-III | INMON BUILDCON PRIVATE LIMITED | SECTOR 29, BAHADURGARH, JHAJJ AR, HARYANA |
JHAJJAR | 01-Jan-2024 | 23-Mar-2026 | ![]() |
| 302 | HRERA-PKL-SNP-140-2019 | RERA-PKL-555-2019 | USHAY TOWER | PARDESI DEVELOPERS PRIVATE LIMITED IN COLLABORATION WITH SMT. SUNITA NARULA | VILLAGE RASOI, SECTOR 61 SONI PAT |
SONIPAT | 25-Jul-2019 | 31-Dec-2022 | ![]() View Corrigendum |
| 303 | HRERA-PKL-SNP-199-2020 | RERA-PKL-827-2020 | VAIKUNTH | PARDESI DEVELOPERS AND INFRASTRUCTURE PVT. LTD. | VILLAGE NAGAL KALAN SECTOR 63 |
SONIPAT | 20-May-2020 | 14-Apr-2026 | ![]() View Corrigendum |
| 304 | HRERA-PKL-FBD-131-2019 | RERA-PKL-557-2019 | VASANT VALLEY | HRH CITY PROJECTS PRIVATE LIMITED | SECTOR 56A FARIDABAD |
FARIDABAD | 03-Jul-2019 | 14-May-2026 | ![]() View Corrigendum |
| 305 | HRERA-PKL-AMB-84-2019 | RERA-PKL-58-2018 | VATIKA CITY CENTRAL | VATIKA LIMITED | SECTOR- 21, 22, 23, AND 25 |
AMBALA | 08-Jan-2019 | 30-Jun-2024 | ![]() |
| 306 | HRERA-PKL-HSR-661-2025 | RERA-PKL-1572-2024 | VDL GREEN CITY | VISHVADHARAM ESTATE LLP | VILLAGE BEED, SECTOR 36-39 DI STRICT HISAR |
HISAR | 28-Jan-2025 | 30-Jun-2026 | ![]() |
| 307 | HRERA-PKL-JJR-457-2023 | RERA-PKL-1181-2022 | VIJAYLAXMI ARCADE | VIJAYLAXMI INFRABUILD PVT. LTD. | VILLAGE JAUNDHI SECTOR 29 |
JHAJJAR | 24-May-2023 | 31-Jan-2024 | ![]() |
| 308 | HRERA-PKL-JJR-220-2020 | RERA-PKL-832-2020 | VIJAYLAXMI GREENS-1 | VIJAYLAXMI INFRABUILD PVT LTD | VILLAGE JAUNDHI,SECTOR 29 |
JHAJJAR | 03-Nov-2020 | 31-Dec-2021 | ![]() View Corrigendum |
| 309 | HRERA-PKL-ROH-513-2023 | RERA-PKL-1316-2023 | VIJAYLAXMI GREENS- ROHTAK | VIJAYLAXMI INFRABUILD PRIVATE LIMITED | VILLAGE MAYNA, TEHSIL & DISTT . ROHTAK |
ROHTAK | 20-Oct-2023 | 31-Mar-2026 | ![]() |
| 310 | HRERA-PKL-JJR-538-2024 | RERA-PKL-1350-2023 | VIJAYLAXMI-PLAZA | VIJAYLAXMI INFRABUILD PVT. LTD. | VILLAGE JAUNDHI SECTOR 29 |
JHAJJAR | 15-Jan-2024 | 31-Dec-2024 | ![]() |
| 311 | HRERA-PKL-FTB-100-2019 | RERA-PKL-395-2019 | VIKAS BUILDMART PRIVATE LIMITED | VIKAS BUILDMART PVT LTD | VILLAGE- MATANA SECTOR -7A |
FATEHABAD | 05-Mar-2019 | 31-Dec-2022 | ![]() View Corrigendum |
| 312 | HRERA-PKL-RWR-3-2018 | RERA-PKL-484-2019 | VIPUL GARDERS-TOWER 11 | MUDRA FINANCE LTD. | SECTOR-1, VILLAGE SIWANA MAUJ A, TEHSIL DHARUHERA |
REWARI | 11-Apr-2018 | 30-Apr-2026 | ![]() View Corrigendum |
| 313 | HRERA-PKL-FBD-49-2018 | RERA-PKL-502-2019 | VIPUL PLAZA | RITWIZ BUILDER &DEVELOPERS; PVT LTD URR CONSTRUCTION AND HOUSING PVT. LTD | VILLAGE BHATOLA, SECTOR-81, F ARIDABAD |
FARIDABAD | 25-Sep-2018 | 31-Jul-2019 | ![]() |
| 314 | 43 OF 2017 DATED 11.08.2017 | RERA-PKL-797-2019 | WATER SIDE LFLOORS, LAKE DRIVE, LAKE SIDE HEIGHTS, EWS | TDI INFRACORP(INDIA) LIMITED | SECTOR 64 VILLAGE PATLA, TEHS IL SONEPAT, |
SONIPAT | 11-Aug-2017 | 10-Aug-2022 | ![]() View Corrigendum |
| 315 | HRERA-PKL-KNL-80-2018 | RERA-PKL-330-2018 | YET TO BE DECIDED | ALPHA CORP DEVELOPMENT PRIVATE LIMITED | VILLAGE KAILASH, SECTOR 28 & 28A, |
KARNAL | 21-Dec-2018 | 13-Mar-2024 | ![]() View Corrigendum |
| 316 | HRERA-PKL-KNL-81-2018 | RERA-PKL-360-2018 | YET TO BE DECIDED | ALPHA CORP DEVELOPMENT PRIVATE LIMITED | VILLAGE BALDI, SECTOR - 29, T EHSIL & DISTRICT KARNAL, HARYANA |
KARNAL | 21-Dec-2018 | 30-Apr-2023 | ![]() View Corrigendum |
| 317 | HRERA-PKL-NUH-269-2021 | RERA-PKL-859-2020 | ZARA FLORA | TEDRE REALCON INDIA PVT LTD. | VILLAGE RAMPUR,ATTA, SOHNA |
NUH | 12-Oct-2021 | 31-Dec-2025 | ![]() View Corrigendum |