| Quarterly Schedules | ||
| HRERA Panchkula | ||
| Project Registration Number : HRERA-PKL-KNL-80-2018 | ||
| Project Name : YET TO BE DECIDED | ||
| Project Number : RERA-PKL-330-2018 | ||
| Project Type : NEW | ||
| Report Online Submission Date : 09-Oct-2019 | 
| S.No. | Particulars | Amount (In Lakhs) | 
| 1 | Cost of the land (if included in the estimated cost) | 2310.00 | 
| 2 | Estimated cost of construction of apartments | 0.00 | 
| 3 | Estimated cost of infrastructure & other structure | 1113.70 | 
| 4 | Other cost including EDC taxes, levies, etc | 140.00 | 
| Total | 3563.70 | 
| Name of the approval | Status | Date | 
| Layout Plan | Obtained Approval on | 18-04-2018 | 
| Demarcation Plan | Obtained Approval on | 30-05-2018 | 
| Zoning Plan | Obtained Approval on | 24-07-2018 | 
| Service Plans | Obtained Approval on | 01-10-2018 | 
| Electricity Plans | Obtained Approval on | 20-09-2022 | 
| Total Expenditure on the project | 3644.19 | 
| Expenditure made upto the date of Registration | 243.31 | 
| EDC due as on the date of Registration | 140.00 | 
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 0.00 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 20.00 | 
| 3 | Amount availed from the bank/financial institutions | 0.00 | 
| 4 | Amount contributed by the promoters/his associates | 0.00 | 
| 5 | Any other receipt | 0.00 | 
| Total | 20.00 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0.00 | 
| 2 | Expenditure on infrastructure & other structure | 407.50 | 
| 3 | Other costs including EDC, taxes, etc | 140.00 | 
| Total | 547.50 | |
| Balance | 3096.69 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0.00 | 
| 2 | Amount deposited in Escrow Account | 20.00 | 
| 3 | Amount withdrawn during the quarter | 20.00 | 
| 4 | Balance at the end of the quarter | 0.00 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | C | 2 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0.00 | 
| 2 | Apartments | 0.00 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140.00 | 
| 2 | EDC due as on date | 0.00 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 567.49 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 13.12 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0.57 | 
| 5 | Any other receipt | 0 | 
| Total | 581.18 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 0.57 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 0.57 | |
| Balance | 3096.12 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 13.12 | 
| 3 | Amount withdrawn during the quarter | 12.62 | 
| 4 | Balance at the end of the quarter | 0.50 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | IRREGULAR PLOT | 1 | 
| 2 | PLOT-110 | 5 | 
| 3 | PLOT-130 | 3 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 581.19 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 147.84 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0.38 | 
| 5 | Any other receipt | 0 | 
| Total | 729.41 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 0.38 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 0.38 | |
| Balance | 3095.74 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0.50 | 
| 2 | Amount deposited in Escrow Account | 147.84 | 
| 3 | Amount withdrawn during the quarter | 148.34 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | IRREGULAR PLOT | 1 | 
| 2 | PLOT-110 | 6 | 
| 3 | PLOT-130 | 7 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 729.41 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 107.45 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 85.63 | 
| 5 | Any other receipt | 0 | 
| Total | 922.49 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 85.63 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 85.63 | |
| Balance | 3010.11 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 107.45 | 
| 3 | Amount withdrawn during the quarter | 107.45 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | IRREGULAR PLOT | 1 | 
| 2 | PLOT-110 | 14 | 
| 3 | PLOT-130 | 1 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 3010.11 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 153.38 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 3163.48 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 90.35 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 724.44 | |
| Balance | 2919.75 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 153.38 | 
| 3 | Amount withdrawn during the quarter | 147.82 | 
| 4 | Balance at the end of the quarter | 5.56 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 7 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 0 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2919.75 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 42.07 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2961.83 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 0.07 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 724.50 | |
| Balance | 2919.69 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 5.56 | 
| 2 | Amount deposited in Escrow Account | 42.07 | 
| 3 | Amount withdrawn during the quarter | 47.63 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 1 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 1 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 0 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2919.69 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 39.91 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2959.60 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 18.25 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 18.25 | |
| Balance | 2901.44 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 39.91 | 
| 3 | Amount withdrawn during the quarter | 39.91 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 4 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 0 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2901.44 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 173.49 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 3074.93 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 15.80 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 758.55 | |
| Balance | 2885.64 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 173.49 | 
| 3 | Amount withdrawn during the quarter | 153.85 | 
| 4 | Balance at the end of the quarter | 19.64 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 11 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2885.64 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 172.17 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 3057.81 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 42.08 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 800.63 | |
| Balance | 2843.56 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 19.64 | 
| 2 | Amount deposited in Escrow Account | 172.17 | 
| 3 | Amount withdrawn during the quarter | 191.81 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 16 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2843.56 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 122.89 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2966.46 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 4.42 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 805.05 | |
| Balance | 2839.14 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 122.89 | 
| 3 | Amount withdrawn during the quarter | 122.89 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 15 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2839.14 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 147.27 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 2310 | 
| 5 | Any other receipt | 0 | 
| Total | 5296.41 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 2324.30 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3129.35 | |
| Balance | 2824.84 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 147.27 | 
| 3 | Amount withdrawn during the quarter | 147.27 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 2 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2824.84 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 160.37 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2985.21 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 2.78 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3132.13 | |
| Balance | 2822.06 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 160.37 | 
| 3 | Amount withdrawn during the quarter | 148.72 | 
| 4 | Balance at the end of the quarter | 11.65 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 0 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2822.06 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 72.27 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2894.33 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 30.81 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3162.93 | |
| Balance | 2791.26 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 11.65 | 
| 2 | Amount deposited in Escrow Account | 72.27 | 
| 3 | Amount withdrawn during the quarter | 83.92 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 0 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2791.26 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 24.09 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2815.35 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 72.47 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3235.40 | |
| Balance | 2718.79 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 24.09 | 
| 3 | Amount withdrawn during the quarter | 24.09 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 0 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2718.79 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 26.53 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2745.32 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 73.05 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3308.45 | |
| Balance | 2645.74 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 26.53 | 
| 3 | Amount withdrawn during the quarter | 26.24 | 
| 4 | Balance at the end of the quarter | 0.29 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 0 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2645.74 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 13.26 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2659 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 50.11 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3358.56 | |
| Balance | 2595.63 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0.29 | 
| 2 | Amount deposited in Escrow Account | 13.26 | 
| 3 | Amount withdrawn during the quarter | 13.55 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 0 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2595.63 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 205.90 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2801.53 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 109.48 | 
| 2 | Expenditure on infrastructure & other structure | 0 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3468.03 | |
| Balance | 2486.16 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 205.90 | 
| 3 | Amount withdrawn during the quarter | 191.00 | 
| 4 | Balance at the end of the quarter | 14.90 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOT | 2 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | - | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | - | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2486.16 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 35.80 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2521.96 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 41.50 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3509.53 | |
| Balance | 2444.66 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 14.90 | 
| 2 | Amount deposited in Escrow Account | 35.80 | 
| 3 | Amount withdrawn during the quarter | 50.33 | 
| 4 | Balance at the end of the quarter | 0.37 | 
| Total Plots in the colony | 243 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | A | 2 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2444.66 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 551.22 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 1000.08 | 
| 5 | Any other receipt | 0 | 
| Total | 3995.97 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 1048.47 | 
| 3 | Other costs including EDC, taxes, etc | 99.68 | 
| Total | 4657.68 | |
| Balance | 3001.59 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0.37 | 
| 2 | Amount deposited in Escrow Account | 551.22 | 
| 3 | Amount withdrawn during the quarter | 501.09 | 
| 4 | Balance at the end of the quarter | 50.50 | 
| Total Plots in the colony | 305 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOT | 53 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 239.68 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 3001.59 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 769.01 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 3770.60 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 75.80 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 4733.48 | |
| Balance | 2925.79 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 50.50 | 
| 2 | Amount deposited in Escrow Account | 769.01 | 
| 3 | Amount withdrawn during the quarter | 793.56 | 
| 4 | Balance at the end of the quarter | 25.96 | 
| Total Plots in the colony | 305 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOT | 83 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | - | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | - | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 239.68 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 2925.79 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 1439.92 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 4365.71 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 20.06 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 4753.55 | |
| Balance | 515.23 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 25.96 | 
| 2 | Amount deposited in Escrow Account | 1439.92 | 
| 3 | Amount withdrawn during the quarter | 1353.01 | 
| 4 | Balance at the end of the quarter | 112.87 | 
| Total Plots in the colony | 305 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOT | 0 | 
| Total Apartments in the colony | 0 | 
| Apartments sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Apartments Sold in the Quarter | 
| 1 | 0 | 
| Total Garages in the colony | 0 | 
| Garages sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Garages Sold in the Quarter | 
| 1 | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 239.68 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 515.23 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 1626.26 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 2141.49 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 41.79 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 4795.33 | |
| Balance | 473.44 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 112.87 | 
| 2 | Amount deposited in Escrow Account | 1626.26 | 
| 3 | Amount withdrawn during the quarter | 1711.36 | 
| 4 | Balance at the end of the quarter | 27.77 | 
| Total Plots in the colony | 305 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOTS | 45 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 239.68 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 473.44 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 1044.29 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 1517.73 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 5.99 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 4801.32 | |
| Balance | 467.46 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 27.77 | 
| 2 | Amount deposited in Escrow Account | 1044.29 | 
| 3 | Amount withdrawn during the quarter | 1030.21 | 
| 4 | Balance at the end of the quarter | 41.84 | 
| Total Plots in the colony | 305 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOT | 1 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 239.68 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 467.46 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 479.17 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 946.63 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 21.90 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 4823.22 | |
| Balance | 445.56 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 41.84 | 
| 2 | Amount deposited in Escrow Account | 479.17 | 
| 3 | Amount withdrawn during the quarter | 521.01 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 305 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOT | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 239.68 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) | 
| 1 | Opening Balance | 379.30 | 
| 2 | Amount collected from allottees against booked plots and/or apartments | 53.63 | 
| 3 | Amount availed from the bank/financial institutions | 0 | 
| 4 | Amount contributed by the promoters/his associates | 0 | 
| 5 | Any other receipt | 0 | 
| Total | 432.93 | 
| S.No. | Cash Outflow | Amount (In Lakhs) | 
| 1 | Expenditure on construction of apartments | 0 | 
| 2 | Expenditure on infrastructure & other structure | 4.31 | 
| 3 | Other costs including EDC, taxes, etc | 0 | 
| Total | 3188.71 | |
| Balance | 374.99 | 
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) | 
| 1 | Opening balance at the beginning of the quarter | 0 | 
| 2 | Amount deposited in Escrow Account | 53.63 | 
| 3 | Amount withdrawn during the quarter | 53.63 | 
| 4 | Balance at the end of the quarter | 0 | 
| Total Plots in the colony | 236 | 
| Plots sold upto the date of Registration | 0 | 
| S.No. | Type/Size | Plots Sold in the Quarter | 
| 1 | PLOTS | 0 | 
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) | 
| 1 | Infrastructure | 0 | 
| 2 | Apartments | 0 | 
| 3 | EDC, IDC, etc | 140.00 | 
| 4 | Others Expenditure | 103.31 | 
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) | 
| 1 | Actual paid as on date | 140.00 | 
| 2 | EDC due as on date | 0 | 
| 
 | ||||||||||||||||||||||||||