Quarterly Schedules

HRERA Gurugram
Project Registration Number : GGM/292/2018/24 DATED 13.11.2018
Project Name : HERO HOMES
Project Number : RERA-GRG-294-2019
Project Type : ONGOING



ParticularsExpenditure already incurred up to the date of registration.
(In Lakhs)
Total Estimated/ Revised cost of project. (In Lakhs)
Land1511715629
Building030151
Infrastructure facilities, etc.08551
Other costs including EDC, IDC, etc.496130420
Total2007884751



Name of the approvalStatusDate
Demarcation PlanObtained Approval on24-07-2018
Zoning PlanRevised approval obtained on21-09-2020
Service PlansObtained Approval on24-07-2018
Electricity PlansObtained Approval on24-07-2018
Site PlansObtained Approval on24-07-2018
Building PlansObtained Approval on24-07-2018
FIre NOCObtained Approval on08-02-2019
Total Expenditure on the project8551
Expenditure made upto the date of Registration0



EDC due as on the date of Registration3918

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance940
2Amount collected from allottees against booked plots and/or apartments2556
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt8
Total3504



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments45
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc2837
Total2882
Balance622



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0
2Amount deposited in Escrow Account2270
3Amount withdrawn during the quarter2270
4Balance at the end of the quarter0
Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)112
23BHK(80.08)21
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)38
53BHK(100.54)76
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)7
9SERVANT QUARTER (16.9)4
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



Total Garages in the colony0
Garages sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments45
3EDC, IDC, etc3856
4Others Expenditure5035



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date3960
2EDC due as on date-42
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 19-01-2021  View 
2 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 19-01-2021  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 19-01-2021  View 
4 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 19-01-2021  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 28-01-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance622
2Amount collected from allottees against booked plots and/or apartments3968
3Amount availed from the bank/financial institutions1140
4Amount contributed by the promoters/his associates0
5Any other receipt7
Total5737



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments588
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc1490
Total2078
Balance3659



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0
2Amount deposited in Escrow Account2649
3Amount withdrawn during the quarter1866
4Balance at the end of the quarter783
Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)27
23BHK(80.08)26
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)28
53BHK(100.54)5
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)1
9SERVANT QUARTER (16.9)1
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



Total Garages in the colony0
Garages sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments633
3EDC, IDC, etc4305
4Others Expenditure6077



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date3960
2EDC due as on date356
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 28-01-2021  View 
2 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 28-01-2021  View 
3 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 28-01-2021  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 28-01-2021  View 
5 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 28-01-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance3659
2Amount collected from allottees against booked plots and/or apartments4763
3Amount availed from the bank/financial institutions409
4Amount contributed by the promoters/his associates0
5Any other receipt37
Total8868



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments763
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc2312
Total3075
Balance5793



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter783
2Amount deposited in Escrow Account3272
3Amount withdrawn during the quarter4055
4Balance at the end of the quarter0
Total Plots in the colony0
Plots sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)9
23BHK(80.08)14
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)10
53BHK(100.54)0
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)0
9SERVANT QUARTER (16.9)0
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



Total Garages in the colony0
Garages sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments1396
3EDC, IDC, etc4664
4Others Expenditure8030



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date4320
2EDC due as on date-4
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 28-01-2021  View 
2 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 28-01-2021  View 
3 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 28-01-2021  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 28-01-2021  View 
5 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 28-01-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance5793
2Amount collected from allottees against booked plots and/or apartments1599
3Amount availed from the bank/financial institutions-957
4Amount contributed by the promoters/his associates0
5Any other receipt51
Total6486



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments427
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc1012
Total1439
Balance5047



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0
2Amount deposited in Escrow Account1208
3Amount withdrawn during the quarter1208
4Balance at the end of the quarter0
Total Plots in the colony0
Plots sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)22
23BHK(80.08)12
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)8
53BHK(100.54)23
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)0
9SERVANT QUARTER (16.9)0
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



Total Garages in the colony0
Garages sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments1823
3EDC, IDC, etc4664
4Others Expenditure9041



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date4320
2EDC due as on date342
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 28-01-2021  View 
2 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 28-01-2021  View 
3 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 28-01-2021  View 
4 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 28-01-2021  View 
5 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 28-01-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance5047
2Amount collected from allottees against booked plots and/or apartments1483
3Amount availed from the bank/financial institutions-307
4Amount contributed by the promoters/his associates0
5Any other receipt36
Total6259



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments321
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc1950
Total2271
Balance3988



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0
2Amount deposited in Escrow Account715
3Amount withdrawn during the quarter715
4Balance at the end of the quarter0
Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)6
23BHK(80.08)4
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)1
53BHK(100.54)7
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)1
9SERVANT QUARTER (16.9)0
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments2144
3EDC, IDC, etc4664
4Others Expenditure10991



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date4320
2EDC due as on date342
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 02-02-2021  View 
2 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 02-02-2021  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 02-02-2021  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 02-02-2021  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 02-02-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance3988
2Amount collected from allottees against booked plots and/or apartments537
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total4525



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments698
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc1783
Total2481
Balance2044



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0
2Amount deposited in Escrow Account558
3Amount withdrawn during the quarter558
4Balance at the end of the quarter0
Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)2
23BHK(80.08)0
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)0
53BHK(100.54)2
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)0
9SERVANT QUARTER (16.9)0
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



Total Garages in the colony0
Garages sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments2841
3EDC, IDC, etc4664
4Others Expenditure12775



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date4320
2EDC due as on date673
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 02-02-2021  View 
2 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 02-02-2021  View 
3 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 02-02-2021  View 
4 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 02-02-2021  View 
5 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 02-02-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance2044
2Amount collected from allottees against booked plots and/or apartments899
3Amount availed from the bank/financial institutions2143
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total5086



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments795
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc1103
Total1898
Balance3188



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0
2Amount deposited in Escrow Account638
3Amount withdrawn during the quarter638
4Balance at the end of the quarter0
Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)12
23BHK(80.08)5
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)7
53BHK(100.54)16
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)0
9SERVANT QUARTER (16.9)0
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



Total Garages in the colony0
Garages sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments3636
3EDC, IDC, etc4664
4Others Expenditure13878



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date4320
2EDC due as on date673
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 02-02-2021  View 
2 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 02-02-2021  View 
3 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 02-02-2021  View 
4 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 02-02-2021  View 
5 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 02-02-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance3188
2Amount collected from allottees against booked plots and/or apartments1568
3Amount availed from the bank/financial institutions3006
4Amount contributed by the promoters/his associates0
5Any other receipt293
Total8055



S.No.Cash OutflowAmount
(In Lakhs)
1Land0
2Cost of construction of apartments2619
3Cost of infrastructure & other structure0
4Other costs including EDC, taxes, etc1751
Total4370
Balance3685



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0
2Amount deposited in Escrow Account1080
3Amount withdrawn during the quarter1080
4Balance at the end of the quarter0
Total Apartments in the colony1103
Apartments sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
12BHK (63.53)17
23BHK(80.08)14
33BHK(2T-1)(80.08)0
43BHK(2T-2)(82.18)9
53BHK(100.54)18
63BHK(2T-1)(100.54)0
7SERVANT QUARTER (16.55)0
8SERVANT QUARTER (16.7)0
9SERVANT QUARTER (16.9)1
10CONVENIENT SHOPPING- 1(A) (22.36)0
11CONVENIENT SHOPPING- 1(B) (22.69)0
12CONVENIENT SHOPPING- 1(C) (21.28)0
13CONVENIENT SHOPPING- 1(D) (22.69)0
14CONVENIENT SHOPPING- 2(A) (22.11)0
15CONVENIENT SHOPPING- 2(B) (22.03)0
16CONVENIENT BUILDING/CLUB0
17NURSERY SCHOOL0



Total Garages in the colony0
Garages sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure0
2Apartments6255
3EDC, IDC, etc5222
4Others Expenditure15071



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date4877
2EDC due as on date433
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 02-02-2021  View 
2 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 02-02-2021  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 02-02-2021  View 
4 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 02-02-2021  View 
5 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 03-02-2021  View