Quarterly Schedules | ||
| HRERA Panchkula | ||
| Project Registration Number : 111 OF 2017 DATED 28.8.2017 | ||
| Project Name : 8093.70 SQ. MTRS. | ||
| Project Number : RERA-PKL-454-2019 | ||
| Project Type : ONGOING | ||
| Report Online Submission Date : 01-Aug-2019 |
| Particulars | Expenditure already incurred up to the date of registration. (In Lakhs) | Total Estimated/ Revised cost of project. (In Lakhs) |
| Land | 484 | 484 |
| Building | 13 | 8870 |
| Infrastructure facilities, etc. | 0 | 596 |
| Other costs including EDC, IDC, etc. | 1335 | 6100 |
| Total | 1832 | 16050 |
| Name of the approval | Status | Date |
| Layout Plan | Have not applied till date | N/A |
| Demarcation Plan | Have not applied till date | N/A |
| Zoning Plan | Have not applied till date | N/A |
| Service Plans | Have not applied till date | N/A |
| Electricity Plans | Have not applied till date | N/A |
| Name of the approval | Status | Date |
| Demarcation Plan | Obtained Approval on | 13-08-2014 |
| Zoning Plan | Obtained Approval on | 24-07-2017 |
| Service Plans | Have not applied till date | N/A |
| Electricity Plans | Have not applied till date | N/A |
| Site Plans | Have not applied till date | N/A |
| Building Plans | Obtained Approval on | 07-01-2019 |
| FIre NOC | Have not applied till date | N/A |
| Total Expenditure on the project | 596 |
| Expenditure made upto the date of Registration | 1832 |
| EDC due as on the date of Registration | 1223 |
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 958.66 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 958.66 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 39.74 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 183.71 |
| Total | 223.45 | |
| Balance | 735.21 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 1398.35 |
| 3 | Amount withdrawn during the quarter | 1369.51 |
| 4 | Balance at the end of the quarter | 28.84 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | NA | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | SHOPS | 70 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | NA | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 0 |
| 2 | Apartments | 13 |
| 3 | EDC, IDC, etc | 1335 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 201 |
| 2 | EDC due as on date | 1022 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 735.21 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 632.69 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 1368 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 132.75 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 370.59 |
| Total | 503.34 | |
| Balance | 864.55 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 28.84 |
| 2 | Amount deposited in Escrow Account | 877.2 |
| 3 | Amount withdrawn during the quarter | 906.05 |
| 4 | Balance at the end of the quarter | 0.39 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | NA | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | SHOPS | 7 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | NA | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 0 |
| 2 | Apartments | 13 |
| 3 | EDC, IDC, etc | 1335 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 201 |
| 2 | EDC due as on date | 1022 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 1367.89 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 237.53 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 1605.42 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 322.16 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 306.72 |
| Total | 628.88 | |
| Balance | 977 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 339.33 |
| 3 | Amount withdrawn during the quarter | 339.33 |
| 4 | Balance at the end of the quarter | 0 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | NA | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | HI FUN LEISURE AND GAMING ZONE | 18 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | NA | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 0 |
| 2 | Apartments | 13 |
| 3 | EDC, IDC, etc | 1335 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 201 |
| 2 | EDC due as on date | 1023 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 1605.43 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 467.38 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 2072.81 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 125.35 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 125.35 | |
| Balance | 1947.46 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 667.69 |
| 3 | Amount withdrawn during the quarter | 667.69 |
| 4 | Balance at the end of the quarter | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 0 |
| 2 | Apartments | 0 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 0 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 701.36 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 701.36 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 115.9 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 115.9 | |
| Balance | -585.46 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 115.8 |
| 3 | Amount withdrawn during the quarter | 115.8 |
| 4 | Balance at the end of the quarter | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | SHOPS | 32 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | NA | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 0 |
| 2 | Apartments | 13 |
| 3 | EDC, IDC, etc | 1335 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 201 |
| 2 | EDC due as on date | 1022 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | -585.46 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 479.65 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 479.65 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 23.46 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 0 | |
| Balance | 23.46 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 35.20 |
| 2 | Amount deposited in Escrow Account | 330 |
| 3 | Amount withdrawn during the quarter | 330 |
| 4 | Balance at the end of the quarter | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | SHOPS | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 0 |
| 2 | Apartments | 0 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 201 |
| 2 | EDC due as on date | 1022 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 89.99 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 89.99 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 0 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 0 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 89.99 |
| 3 | Amount withdrawn during the quarter | 89.99 |
| 4 | Balance at the end of the quarter | 0 |
| Total Plots in the colony | 115 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | AFFORDABLE | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | NA | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 0 |
| 2 | Apartments | 0 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.15 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 232.82 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 232.82 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 232.82 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 0 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 232.82 |
| 3 | Amount withdrawn during the quarter | 232.82 |
| 4 | Balance at the end of the quarter | 0 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 14 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 232.82 |
| 2 | Apartments | 0 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.15 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 1.72 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 1.72 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 106.82 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 106.82 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 1.72 |
| 3 | Amount withdrawn during the quarter | 1.60 |
| 4 | Balance at the end of the quarter | 0.12 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 15 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 5 |
| 2 | Apartments | 1271 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.15 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 10 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 590 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 600 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 413.7 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 413.7 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.7 |
| 2 | Amount deposited in Escrow Account | 413 |
| 3 | Amount withdrawn during the quarter | 413.7 |
| 4 | Balance at the end of the quarter | 0 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 184 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 13 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 40 |
| 2 | Apartments | 1754 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.15 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 341.37 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 341.37 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 259.88 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 259.88 | |
| Balance | 81.49 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0 |
| 2 | Amount deposited in Escrow Account | 341.37 |
| 3 | Amount withdrawn during the quarter | 259.88 |
| 4 | Balance at the end of the quarter | 81.49 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 17 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 184 |
| 2 | Apartments | 2013 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.15 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 25.59 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 408.40 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 433.99 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 318.44 |
| 3 | Cost of infrastructure & other structure | 51 |
| 4 | Other costs including EDC, taxes, etc | 60 |
| Total | 429.44 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 25.59 |
| 2 | Amount deposited in Escrow Account | 408.40 |
| 3 | Amount withdrawn during the quarter | 429.44 |
| 4 | Balance at the end of the quarter | 4.55 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 10 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 2281 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 4.54 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 286.17 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 290.75 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 287.75 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 287.75 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 4.55 |
| 2 | Amount deposited in Escrow Account | 286.17 |
| 3 | Amount withdrawn during the quarter | 287.75 |
| 4 | Balance at the end of the quarter | 2.96 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 416 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 4 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 2634 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 2.97 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 177.71 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 180.68 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 172.97 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 172.97 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 2.96 |
| 2 | Amount deposited in Escrow Account | 177.71 |
| 3 | Amount withdrawn during the quarter | 172.97 |
| 4 | Balance at the end of the quarter | 7.71 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 2606.97 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 7.71 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 413.86 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 421.58 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 207.90 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 207.90 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 7.71 |
| 2 | Amount deposited in Escrow Account | 413.86 |
| 3 | Amount withdrawn during the quarter | 207.90 |
| 4 | Balance at the end of the quarter | 213.67 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 2731.1 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 213.67 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 178.72 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 392.39 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 391.48 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 391.48 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 213.67 |
| 2 | Amount deposited in Escrow Account | 178.72 |
| 3 | Amount withdrawn during the quarter | 391.48 |
| 4 | Balance at the end of the quarter | 0.90 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 239.23 |
| 2 | Apartments | 2966.97 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175 |
| 2 | EDC due as on date | 0.54 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0.9 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 57.8 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 58.7 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 266 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 0 | |
| Balance | 266 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.90 |
| 2 | Amount deposited in Escrow Account | 57.8 |
| 3 | Amount withdrawn during the quarter | 58 |
| 4 | Balance at the end of the quarter | 0.7 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | SCO | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 3238 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0.71 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 87.52 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 88.23 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 119 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 119 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.7 |
| 2 | Amount deposited in Escrow Account | 87.52 |
| 3 | Amount withdrawn during the quarter | 88 |
| 4 | Balance at the end of the quarter | 0.23 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 3357 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0.23 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 36.44 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 36.67 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 209.94 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 209.94 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.23 |
| 2 | Amount deposited in Escrow Account | 36.44 |
| 3 | Amount withdrawn during the quarter | 36 |
| 4 | Balance at the end of the quarter | 0.67 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 401 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 3548.94 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0.57 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 5.67 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 6.24 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 370.59 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 370.59 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.57 |
| 2 | Amount deposited in Escrow Account | 5.67 |
| 3 | Amount withdrawn during the quarter | 6 |
| 4 | Balance at the end of the quarter | 0.25 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 235 |
| 2 | Apartments | 3714 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 31.60 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 31.60 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 292 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 292 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.25 |
| 2 | Amount deposited in Escrow Account | 31.60 |
| 3 | Amount withdrawn during the quarter | 31 |
| 4 | Balance at the end of the quarter | 0.85 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 636.22 |
| 2 | Apartments | 3605.6 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 7 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 7 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 492 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 491 |
| Total | 983 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.85 |
| 2 | Amount deposited in Escrow Account | 7 |
| 3 | Amount withdrawn during the quarter | 7 |
| 4 | Balance at the end of the quarter | 0.85 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 636.22 |
| 2 | Apartments | 4097.24 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 491 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 0 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 0 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 400 |
| 3 | Cost of infrastructure & other structure | 52.66 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 452.66 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.85 |
| 2 | Amount deposited in Escrow Account | 0 |
| 3 | Amount withdrawn during the quarter | 0 |
| 4 | Balance at the end of the quarter | 0.85 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 688.66 |
| 2 | Apartments | 4497 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 28 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 28 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 400 |
| 3 | Cost of infrastructure & other structure | 85.78 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 485.78 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.85 |
| 2 | Amount deposited in Escrow Account | 28 |
| 3 | Amount withdrawn during the quarter | 28 |
| 4 | Balance at the end of the quarter | 0.85 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 774.44 |
| 2 | Apartments | 4890.30 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0.85 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 1.75 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 2.6 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 500 |
| 3 | Cost of infrastructure & other structure | 78.97 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 578.97 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.85 |
| 2 | Amount deposited in Escrow Account | 1.75 |
| 3 | Amount withdrawn during the quarter | 0 |
| 4 | Balance at the end of the quarter | 2.6 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 853.85 |
| 2 | Apartments | 5390.3 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 0 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 0 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 2 |
| 3 | Cost of infrastructure & other structure | 0 |
| 4 | Other costs including EDC, taxes, etc | 0 |
| Total | 2 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 2.6 |
| 2 | Amount deposited in Escrow Account | 0 |
| 3 | Amount withdrawn during the quarter | 2 |
| 4 | Balance at the end of the quarter | 0.6 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 736 |
| 2 | Apartments | 5658.24 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 0 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||
| S.No. | Cash Inflow | Amount (In Lakhs) |
| 1 | Opening Balance | 0 |
| 2 | Amount collected from allottees against booked plots and/or apartments | 0 |
| 3 | Amount availed from the bank/financial institutions | 0 |
| 4 | Amount contributed by the promoters/his associates | 0 |
| 5 | Any other receipt | 0 |
| Total | 0 |
| S.No. | Cash Outflow | Amount (In Lakhs) |
| 1 | Land | 0 |
| 2 | Cost of construction of apartments | 250 |
| 3 | Cost of infrastructure & other structure | 6.30 |
| 4 | Other costs including EDC, taxes, etc | 24.74 |
| Total | 281.04 | |
| Balance | 0 |
| S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
| 1 | Opening balance at the beginning of the quarter | 0.6 |
| 2 | Amount deposited in Escrow Account | 0 |
| 3 | Amount withdrawn during the quarter | 0 |
| 4 | Balance at the end of the quarter | 0 |
| Total Plots in the colony | 0 |
| Plots sold upto the date of Registration | 0 |
| S.No. | Type/Size | Plots Sold in the Quarter |
| 1 | 0 |
| Total Apartments in the colony | 410 |
| Apartments sold upto the date of Registration | 110 |
| S.No. | Type/Size | Apartments Sold in the Quarter |
| 1 | COMMERCIAL | 0 |
| Total Garages in the colony | 0 |
| Garages sold upto the date of Registration | 0 |
| S.No. | Type/Size | Garages Sold in the Quarter |
| 1 | 0 |
| S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
| 1 | Infrastructure | 742.3 |
| 2 | Apartments | 5908.24 |
| 3 | EDC, IDC, etc | 0 |
| 4 | Others Expenditure | 24.74 |
| S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
| 1 | Actual paid as on date | 175.54 |
| 2 | EDC due as on date | 0 |
| ||||||||||||||||||||||||||