HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1157-2022
Submission Date : 14-09-2022 01:30:42 PM
Applicant Type : Company
Project Type: ONGOING




UNION BUILDMART PRIVATE LIMITED
6TH FLOOR, M3M TEE POINT, NORTH BLOCK, SECTOR-65, GURUGRAM, HARYANA 122101
01244732000
9711348349 (Number Shared by Promoter in Public)
Unionbuildmart0207@gmail.com
http://unionbuildmart.com
XXXX843M
U70100HR2012PTC089615
 
 


 
 


 
 


 
 







M3M CAPITAL
SECTOR -113, GURUGRAM MANESAR URBAN COMPLEX, GURUGRAM, HARYANA.
GURGAON
GURUGRAM
9711348349
9711348349 (Number Shared by Promoter in Public)
unionbuildmart0207@gmail.com
LALIT TYAGI
9711348349
9711348349 (Number Shared by Promoter in Public)
unionbuildmart0207@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150099714-09-202288800ICICI BANKHRERA Gurugram
250039918-01-2022931200ICICI BANKHRERA Gurugram
350040018-01-2022677800ICICI BANKHRERA Gurugram
450099914-09-2022108700ICICI BANKHRERA Gurugram
550058128-09-2022677800ICICI BANKHRERA Gurugram
65010014-09-202267650TO BE ADJUSTED FROM FEE PAID IN PROJECT TEMP ID. 1153-2022HRERA Gurugram
750099814-09-202226100TO BE ADJUSTED FROM FEE PAID IN PROJECT TEMP ID. 1153-2022HRERA Gurugram







5.004 (Acre)
3.812
1.34
15.03125 (Acre)
106 of 2021 dated 16.12.2021
No
Address     CABIN-2,LGF,F-22,SUSHANTSHOPPING ARCADE,SUSHANT LOK PHASE-1,GURUGRAM-122002HARYANA
Address     CABIN-1,LGF,F-22,SUSHANTSHOPPING ARCADE,SUSHANT LOK PHASE-1,GURUGRAM-122002HARYANA
Address     6TH FLOOR, M3M TEE POINT, NORTH BLOCK, SECTOR-65, GURUGRAM, HARYANA 122101
Annexure-B- COLLABORATOR VIDEDEVELOPMENT RIGHTSAGREEMENT 7322 DATED7.10.2019
BEFORE GRANT OFLICENCE
Yes
AS ATTACHED IN FOLDER A
No
Yes
Yes







66517.11 Lakhs
19323.8 Lakhs
30624.5 Lakhs
3531.73 Lakhs
13037.09 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.45
3CONSTRUCTION OF ROADS 2.75
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 1.56
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0.24
Total5




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDA-CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS743.79AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM182.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE68.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM150.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL353.00AS PER PROJECT REPORT
6STREET LIGHTING45.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING206.23AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS651.27AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15ELECTRICAL SUB STATION 251.70AS PER PROJECT REPORT
16BOUNDARY WALL192.90AS PER PROJECT REPORT
17MAIN ENTRANCE WORK GUARD HOUSE243.79AS PER PROJECT REPORT
18PARKING 38.46AS PER PROJECT REPORT
19STP312.59AS PER PROJECT REPORT
20UNDERGROUND TANK93.00AS PER PROJECT REPORT


08-07-2022 (date)
12-09-2022 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK, 2 BHK+STUDY, 3 BHK, 3 BHK+STUDY 59614.9 750 44711175 529 221 0
Total750447111755292210






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2BHK, 2 BHK+STUDY, 3 BHK, 3 BHK+STUDY5290


18-01-2022
30-06-2026
30-06-2026
18-01-2022
14
30-06-2026


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
18-01-2022
14
30-06-2026


0
0
859
8
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments334.97636.5
Shops00
Plots00

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments732.381898.651521.71402.74
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2271.782225.662316.152400.19
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3105.791932.212279.751277.7
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements37.1922.31
Water Supply System9.15.46
Sewerage treatment & garbage disposal17.6510.59
Electricity Supply System7.504.50
Storm Water Drainage4.083.4
Parks and Playgrounds39.0832.56
Clubhouse/community centres00
Shopping area00
Other00
Firefighting services8.477.06
Electrical sub station15.105.03
Parking1.921.15
Street Light4.500
Underground tank5.581.86
Security3.903.25
STP18.766.25












Particulars Remarks, if any
i. No. of Flats/Apartments constructed0
ii. No. of Flats/ Apartments booked529
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter92035.64 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter19310.45 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter72725.19 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application11140.95 Lakhs
Land cost (If any)2166.29 Lakhs
Apartments6288.34 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.2039.61 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession27867.89 Lakhs
(a) In respect of existing allottees27867.89 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS743.790
II. WATER SUPPLY SYSTEM182.000
III. STORM WATER DRAINAGE68.000
IV. ELECTRICITY SUPPLY SYSTEM150.000
V. SEWAGE TREATMENT & GARBAGE DISPOSAL353.000
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.651.270
XIII. COVERED PARKING38.460
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM206.230
XVII. OTHER FACILITIES AS PER PROJECT REPORT1383.670









Yes
No
ICICI BANK LIMITED AND BRANCH SUNCITY, SECTOR-54, GURGAON-122002
777705001441
ICIC0000399
110229060
000399
1. Mr. Vyom Shakti Nigam-D3/103 Paras city E3 Arera Colony Bhopal M.P. 462016 2. Ms. Amarjot Kaur Sahni-3/66 Subhash Nagar West Delhi 110027 3. Ms. Shubhra Bakshi- House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon, Haryana- 122002 4. Ms. Surbhi- Flat No-3-905, 9th floor, Sector-103, grandiva, Daultabad, Gurgaon, Haryana-122006 5. Mr. Vidya Sagar -3G-208, Faridabad, NIT Faridabad, Haryana- 121001 6. Mr. Pratap Singh- 10A Pocket 2 Mayur Vihar East Delhi 110096 7. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, Uttar Pradesh
UPLOAD











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENCEALREADY BEEN OBTAINED16-12-2021
II. BUILDING PLAN APPROVALALREADY BEEN OBTAINED18-01-2022
III. FOREST NOCALREADY BEEN OBTAINED07-08-2018
IV. ARAVALI NOCALREADY BEEN OBTAINED27-08-2018
V. BUILDING PLAN APPROVAL -REVISEDALREADY BEEN OBTAINED12-09-2022








Yes


Yes


AS PER HARERA NORMS













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATED WOODEN FLOOR/CERAMIC TILE
2WALL FINISHING DETAILSPLASTER WITH OBD
3KITCHEN DETAILSN.A.
4BATHROOM FITTINGSN.A.
5WOOD WORK ETCN.A.
6DOORS AND WINDOS FRAMESEXTERNAL ALUMINIUM WITH GLASS INTERNAL – WOODEN
7GLASS WORKONLY EXTERNAL DOOR/WINDOW
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSN.A.
11WATER STORAGEAS PER NORMS
12LIFT DETAILSAS PER TRAFFIC STUDY/ APPROVED MAKE
13EXTERNAL GLAZINGSGLASS WITH ALUMINIUM FRAMING SLIDING
13.1WINDOWS/GLAZINGSGLASS WITH ALUMINIUM FRAMING SLIDING
14DOORSN.A.
14.1MAIN DOORSHARD WOOD DOOR FRAME WITH FLUSH DOOR /LAMINATE
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITH FLUSH DOOR /LAMINATE
15AIR CONDITIONINGN.A.
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINESERVICE PROVIDER
18PROVISION OF WIFI AND BROADBAND FACILITYN.A.
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER PROOF PAINT
20INTERNAL FINISHINGN.A.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER /OBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
2 . 2 WALLSPLASTER + OBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESN.A.
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER +DADO
3 . 3 CEILINGGRID FALSE CEILING/OBD
3 . 4 COUNTERSN.A.
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/LAMINATE WOODEN FLOORING
4 . 2 WALLSPLASTER /OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESN.A.
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER +DADO
5 . 3 CEILINGGRID FALSE CEILING/OBD
5 . 4 COUNTERSN.A.
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER+DADO
6 . 3 CEILINGOBD
6 . 4 COUNTERSSTONE / MARBLE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESN.A.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI SKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER + PAINT
7 . 3 TOILETANTI SKID CERAMIC TILES
7 . 4 BALCONYANTI SKID CERAMIC TILES
8 . SIT-OUTS
8 . 1 FLOORN.A.
8 . 2 WALLS & CEILINGN.A
8 . 3 RAILINGSN.A.
8 . 4 FIXTURESN.A












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 14-09-2022 View Document
2 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 14-09-2022 View Document
3 LOI 14-09-2022 View Document
4 ENVIRONMENT CLEARANCE 14-09-2022 View Document
5 BUILDING PLAN APPROVAL 14-09-2022 View Document
6 NON- ENCUMBRANCE CERTIFICATE 14-09-2022 View Document
7 HEIGHT NOC 14-09-2022 View Document
8 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 14-09-2022 View Document
9 DEMAND DRAFTS 14-09-2022 View Document
10 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 14-09-2022 View Document
11 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 14-09-2022 View Document
12 DEMARCATION PLAN 14-09-2022 View Document
13 ZONING PLAN 14-09-2022 View Document
14 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 14-09-2022 View Document
15 ELEVATION-3 T-3 A & B 28-09-2022 View Document
16 TOWER 3C STILT & 1ST 28-09-2022 View Document
17 ELECTRICITY & STREET LIGHT PLAN 28-09-2022 View Document
18 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 28-09-2022 View Document
19 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 28-09-2022 View Document
20 ELEVATION-1 T-3 A & B 28-09-2022 View Document
21 ELEVATION-1, T-1 & 2 28-09-2022 View Document
22 ELEVATION-1, T-3C 28-09-2022 View Document
23 ELEVATION-2 & 3, T-3C 28-09-2022 View Document
24 ELEVATION-2 T-1 & 2 28-09-2022 View Document
25 ELEVATION-2 T-3 A & B 28-09-2022 View Document
26 STRUCTURAL DRAWINGS 28-09-2022 View Document
27 PARKING PLAN 28-09-2022 View Document
28 LANDSCAPE PLAN 28-09-2022 View Document
29 WATER LAYOUT 28-09-2022 View Document
30 SUPER-IMPOSED KHASRA ON LAYOUT 28-09-2022 View Document
31 TOWER 3C TYPICAL & REFUGE FLOOR 28-09-2022 View Document
32 TOWER 3C TERRACE MUMTY WATER TANK 28-09-2022 View Document
33 TOWER 3A 3B TYPICAL FLOOR 28-09-2022 View Document
34 SOLID WASTE MANAGEMENT PLAN 28-09-2022 View Document
35 TOWER 1 & 2 1ST TO 4TH FLOOR 28-09-2022 View Document
36 TOWER 1 & 2 5TH FLOOR 28-09-2022 View Document
37 TOWER 1 & 2 6TH FLOOR 28-09-2022 View Document
38 TOWER 1 & 2 MUMTY WATER TANK 28-09-2022 View Document
39 TOWER 1 & 2 REFUGE FLOOR 28-09-2022 View Document
40 TOWER 1 & 2 STILT PLAN 28-09-2022 View Document
41 TOWER 1 & 2 TERRACE MUMTY WATER TANK 28-09-2022 View Document
42 TOWER 1 & 2 TYPICAL FLOOR 28-09-2022 View Document
43 TOWER 3A 3B 1ST FLOOR 28-09-2022 View Document
44 TOWER 3A 3B MUMTY WATER TANK 28-09-2022 View Document
45 TOWER 3A 3B REFUGE FLOOR 28-09-2022 View Document
46 TOWER 3A 3B STILT 28-09-2022 View Document
47 TOWER 3A 3B TERRACE MUMTY WATER TANK 28-09-2022 View Document
48 BR-III- APPROVAL OF BUILDING PLANS 28-09-2022 View Document
49 COMMERCIAL 2ND FLOOR PLANS AREA DETAIL FIRE FIGHTING LAYOUT 30-09-2022 View Document
50 TOWER 1&2 (TYPICAL FLOOR) 30-09-2022 View Document
51 C-8_ TOWER 3C SECTION YY 01-10-2022 View Document
52 COMMERCIAL 1ST FLOOR PLANS AREA DETAIL FIRE FIGHTING LAYOUT 30-09-2022 View Document
53 COMMERCIAL GROUND FLOOR PLANS FIRE FIGHTING LAYOUT 30-09-2022 View Document
54 COMMERCIAL LOWER GROUND PLANS FIRE FIGHTING LAYOUT 30-09-2022 View Document
55 COMMERCIAL TERRACE PLAN FIRE FIGHTING LAYOUT 30-09-2022 View Document
56 UPPER BASEMENT PLAN DETAIL FIRE FIGHTING LAYOUT 30-09-2022 View Document
57 LOWER BASEMENT PLAN FIRE DEDICATION LAYOUT 30-09-2022 View Document
58 LOWER BASEMENT PLAN 30-09-2022 View Document
59 TOWER 1&2 (6TH FLOOR) 30-09-2022 View Document
60 TOWER 1&2 (TERRACE FLOOR) 30-09-2022 View Document
61 TOWER 1-2 (5TH FLOOR) 30-09-2022 View Document
62 TOWER 3A&3B; (1ST FLOOR LAYOUT) 30-09-2022 View Document
63 TOWER 3A&3B; (STILT LAYOUT) 30-09-2022 View Document
64 TOWER 3A&3B; (TERRACE LAYOUT) 30-09-2022 View Document
65 TOWER 3A&3B; (TYPICAL FLOOR LAYOUT) 30-09-2022 View Document
66 TOWER 3A&3B; (TERRACE) 30-09-2022 View Document
67 TOWER 3C (STILT LAYOUT) 30-09-2022 View Document
68 TOWER 3C (TERRACE FLOOR) 30-09-2022 View Document
69 TOWER 3C (TERRACE LAYOUT) 30-09-2022 View Document
70 TOWER 3C (TYPICAL) 30-09-2022 View Document
71 TOWER-1&2 (TERRACE FLOOR) 30-09-2022 View Document
72 TOWER-1-2 (1ST-4TH FLOOR) 30-09-2022 View Document
73 TOWER-1-2 (STILT LAYOUT) 30-09-2022 View Document
74 C-8_ TOWER 1 & 2 SECTION A 01-10-2022 View Document
75 C-8_ TOWER 1 & 2 SECTION B 01-10-2022 View Document
76 C-8_ TOWER 3 (A & B) SECTION AA 01-10-2022 View Document
77 C-8_ TOWER 3 (A & B) SECTION BB 01-10-2022 View Document
78 C-8_ TOWER 3C SECTION XX 01-10-2022 View Document
79 SITE PLAN & AREA SHEET-DOMESTIC WATER LAYOUT 01-10-2022 View Document
80 SITE PLAN & AREA SHEET-DRAINAGE LAYOUT 01-10-2022 View Document
81 SITE PLAN & AREA SHEET-FIRE FIGHTING 01-10-2022 View Document
82 SITE PLAN & AREA SHEET-FLUSHING LAYOUT 01-10-2022 View Document
83 SITE PLAN & AREA SHEET-ROAD LAYOUT 01-10-2022 View Document
84 SITE PLAN & AREA SHEET-SEWER LAYOUT 01-10-2022 View Document