TRIL COMMERCIAL CENTRE,
INTELLION EDGE, TOWER A 1ST FLOOR,
SECTOR 72, GURUGRAM 122101 HARYANA.
01276297403
9958488889 (Number Shared by Promoter in Public)
rk.joon@gmail.com
https://www.tatavaluehomes.com/
XXXX401C
U45200DL2013PTC254832
NEW HAVEN BAHADURGARH PHASE 1
HL PROMOTERS PRIVATE LIMITED SECTOR 37, VILLAGE NUNA MAJRA, BAHADURGARH
BAHADURGARH
JHAJJAR
9971711166 (Number Shared by Promoter in Public)
reracompliance@tatahousing.com
ASHOK PAL SINGH
9971711166 (Number Shared by Promoter in Public)
ashoksingh@tatarealty.in
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
924043
07-07-2017
558000
HDFC BANK
HRERA Panchkula
5.252 (Acre)
1.75
1.75
16.431 (Acre)
60 OF 2014 DATED 30-06-2014
Yes
28867.55 Lakhs
2802.54 Lakhs
22393.85 Lakhs
2248.94 Lakhs
1422.22 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
3634.317
3
CONSTRUCTION OF ROADS
2995
4
PAVEMENTS
600
5
PARKS AND PLAYGROUNDS
2525
6
GREEN BELTS
0
7
VEHICLE PARKINGS
2500
8
ELECTRICITY SUB-STATION
315
9
CLUB HOUSE
1805
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
658
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
6108.633
13
CONVENIENT
105.05
Total
21246
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HIGHWAY AUTHORITY AND TOWN PLANNING AUTHORITY
No
WATER SUPPLY
HARYANA SHAHARI VIKAS PRADHIKARAN
Yes
ELECTRICITY
HARYANA VIDYUT PRASARAN NIGAM LTD
No
SEWAGE DISPOSAL
DEPARTMENT OF HEALTH
No
STORM WATER DRAINAGE
URBAN LOCAL BODIES DEPARTMENT/PUBLIC WORKS DEPARTMENT
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
264.35
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
350.37
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
125.56
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
844.31
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
143.63
AS PER PROJECT REPORT
6
STREET LIGHTING
43
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
0
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
150.97
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
326.77
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
0
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
26-02-2015 (date)
26-02-2015 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK SMALL 1
73.12
42
28
14
3
2
APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK SMALL 2
73.90
84
69
15
3
3
APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK LARGE
82.96
90
46
44
3
4
APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK
106.43
117
48
69
2
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
0
0
30-06-2014
31-03-2021
31-03-2021
16-02-2016
21
31-03-2021
AS PROVIDED
AS PROVIDED
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
16-02-2016
0
31-03-2021
AS PROVIDED
AS PROVIDED
363
38
401
116
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
9863.85
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1756
1982
1144
Shops
0
0
0
Plots
0
0
0
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
480
1130
939
327
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
800
554
308
600
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
510
700
700
600
Shops
0
0
0
0
Plots
0
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
25
Water Supply System
0
Sewerage treatment & garbage disposal
14
Electricity Supply System
3
Storm Water Drainage
26
Parks and Playgrounds
67
Clubhouse/community centres
70
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
9.98
5.47
0
Water Supply System
0
0
0
Sewerage treatment & garbage disposal
4.96
0
0
Electricity Supply System
5.93
7.69
8.57
Storm Water Drainage
12.19
0
0
Parks and Playgrounds
5.00
0
0
Clubhouse/community centres
0
0
0
Shopping area
0
0
0
Other
0
0
0
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
11.29
0
0
0
Water Supply System
52.32
0
0
11.79
Sewerage treatment & garbage disposal
19.48
20.67
2.88
0
Electricity Supply System
105.59
1.79
8.57
6.23
Storm Water Drainage
17.63
6.21
4.67
0
Parks and Playgrounds
15
10
15
15
Clubhouse/community centres
22.77
15.71
0
14.57
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
40.00
23.50
11.90
0
Water Supply System
40.00
47.14
66.90
0
Sewerage treatment & garbage disposal
0
19.27
10.98
17.17
Electricity Supply System
100.00
57.87
41.20
21.43
Storm Water Drainage
15.00
5.06
2.01
0
Parks and Playgrounds
3
5
5
5
Clubhouse/community centres
30
27.68
53.44
40
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
27.21
40.00
40
30.00
Water Supply System
22.22
40.00
40
30.00
Sewerage treatment & garbage disposal
3.22
15
10
6
Electricity Supply System
69.44
150.00
150
150.00
Storm Water Drainage
6.79
10.00
10
10.00
Parks and Playgrounds
1
2
1.5
1.47
Clubhouse/community centres
4
30.00
10
8.6
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
333
ii. No. of Flats/ Apartments booked
191
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
13325.69828 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
8629.29022 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
4696.40806 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
340.99493 Lakhs
vii. Amount invested in the project upto the date of application
14293.7 Lakhs
Land cost (If any)
2802 Lakhs
Apartments
9863.85 Lakhs
Infrastructure
205 Lakhs
EDC/ Taxes Etc.
1422 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
9630 Lakhs
(a) In respect of existing allottees
4696.408 Lakhs
(b) In respect of rest of the project
4933.592 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
15295 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
2406 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
264.35
25
II. WATER SUPPLY SYSTEM
350.37
0
III. STORM WATER DRAINAGE
125.56
26
IV. ELECTRICITY SUPPLY SYSTEM
887.31
3
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
143.63
14
VI. CLUB HOUSE/COMMUNITY CENTRE
326.77
70
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
150.97
67
XIII. COVERED PARKING
2657
1600
XIV. OPEN PARKING
357
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
0
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
0
0
Yes
Yes
HDFC BANK LTD, KASTURBA GANDHI MARG, NEW DELHI- 110001
00030310016139
HDFC0000003
110240001
000003
ANNEXED
ANNEXED
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. LICENSE FOR DEVELOPMENT OF GROUP HOUSING
(16.43 ACRES)
ALREADY BEEN OBTAINED
30-06-2014
II. APPROVAL OF ZONING PLAN
ALREADY BEEN OBTAINED
11-08-2014
III. APPROVAL OF BUILDING PLANS FROM DTCP
ALREADY BEEN OBTAINED
26-02-2015
IV. LOI (16.43 ACRES)
ALREADY BEEN OBTAINED
20-06-2014
V. FOREST AND ARAVALI CLEARANCE FROM DC OFFICE
ALREADY BEEN OBTAINED
01-10-2014
VI. ENVIRONMENT CLEARANCE (MOEF)
ALREADY BEEN OBTAINED
22-01-2016
VII. CONSCENT TO ESTABLISH (APPROVAL FROM HSPCB)
ALREADY BEEN OBTAINED
30-03-2016
VIII. NOC FROM FIRE DEPARTMENT
ALREADY BEEN OBTAINED
16-07-2015
IX. ASSURANCE LETTER FROM EE ELECT
ALREADY BEEN OBTAINED
12-01-2015
X. ASSURANCE LETTER FROM EE HUDA FOR WATER
ALREADY BEEN OBTAINED
10-12-2014
XI. NOC FROM HUDA ADMINISTRATOR FOR USING STP WATER FOR CONSTRUCTION
ALREADY BEEN OBTAINED
05-12-2014
XII. BOCWA REGISTRATION
ALREADY BEEN OBTAINED
24-11-2014
XIII. LABOUR LICENSE
ALREADY BEEN OBTAINED
16-03-2015
XIV. APPROVAL FROM MINING DEPT FOR EXCAVATION
ALREADY BEEN OBTAINED
14-10-2016
XV. WATER CONNECTION FROM WATER
ALREADY BEEN OBTAINED
14-05-2018
XVI. NOC FROM AIRPORT AUTHORITY OF INDIA
ALREADY BEEN OBTAINED
20-01-2015
XVII. CGWA APPROVAL FOR OPERATIONAL WATER
APPLIED FOR BUT YET TO RECEIVE
NA
Yes
Yes
AS PROVIDED
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
TILES
2
WALL FINISHING DETAILS
OIL-BOUND DISTEMPER
3
KITCHEN DETAILS
VITRIFIED FLOOR TILES WITH GRANITE PLATFORM AND
CERAMIC DADO TILES ABOVE PLATFORM
4
BATHROOM FITTINGS
BATH AND TOILET WITH SUPERIOR QUALITY FITTINGS AND PROVISION FOR GEYSER
5
WOOD WORK ETC
FLUSH/SKIN DOORS
6
DOORS AND WINDOS FRAMES
FLUSH/SKIN DOORS
7
GLASS WORK
ALUMINIUM/UPVC WINDOWS
8
ELECTRIC FITTINGS
AC POINTS IN LIVING ROOM AND ALL BEDROOMS, PRE-FIT
ELECTRICAL SWITCHES, POWER BACKUP FOR DESIGNATED
AREAS INSIDE THE BUILDING, CONCEALED ELECTRIC WIRING,
PROVISION FOR FANS, CABLE TV/TELEPHONE CONNECTION
POINT
9
CONDUCTING AND WIRING DETAILS
CONCEALED ELECTRIC WIRING
10
CUPBOARD DETAILS
NA
11
WATER STORAGE
COMMON OVERHEAD WATER TANKS
12
LIFT DETAILS
PASSENGER LIFTS FOR ALL BUILDINGS
13
EXTERNAL GLAZINGS
ALUMINIUM/UPVC WINDOWS
13.1
WINDOWS/GLAZINGS
ALUMINIUM/UPVC WINDOWS
14
DOORS
FLUSH/SKIN DOORS
14.1
MAIN DOORS
FLUSH/SKIN DOORS
14.2
INTERNAL DOORS
FLUSH/SKIN DOORS
15
AIR CONDITIONING
AC POINTS IN LIVING ROOM AND ALL BEDROOMS
16
ELECTRICAL FITTINGS
AC POINTS IN LIVING ROOM AND ALL BEDROOMS, PRE-FIT
ELECTRICAL SWITCHES, POWER BACKUP FOR DESIGNATED
AREAS INSIDE THE BUILDING, CONCEALED ELECTRIC WIRING, PROVISION FOR FANS, CABLE TV/TELEPHONE CONNECTION
POINT
17
CNG PIPE LINE
NA
18
PROVISION OF WIFI AND BROADBAND FACILITY
NA
19
EXTERNAL FINISHING/COLOUR SCHEME
EXTERNAL GRADE PAINT
20
INTERNAL FINISHING
TILES WITH OIL BOUND DISTEMPER
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
VITRIFIED FLOOR TILES
1 . 2
WALLS
OIL BOUND DISTEMPER
1 . 3
CEILING
OIL BOUND DISTEMPER
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
VITRIFIED FLOOR TILES
2 . 2
WALLS
OIL BOUND DISTEMPER
2 . 3
CEILING
OIL BOUND DISTEMPER
2 . 4
MODULAR WARDROBES
NA
3 . MASTER TOILET
3 . 1
FLOOR
ANTI-SKID CERAMIC FLOOR TILES
3 . 2
WALLS
CERAMIC DADO TILES UPTO DOOR HEIGHT
3 . 3
CEILING
OIL BOUND DISTEMPER
3 . 4
COUNTERS
NA
3 . 5
SANITARY WARE/CP FITTINGS
SUPERIOR QUALITY FITTING
3 . 6
FITTING/FIXTURES
BATH AND TOILET WITH SUPERIOR QUALITY FITTINGS AND
PROVISION FOR GEYSER AND EXHAUST FAN
4 . BED ROOMS
4 . 1
FLOOR
VITRIFIED FLOOR TILES
4 . 2
WALLS
OIL BOUND DISTEMPER
4 . 3
CEILING
OIL BOUND DISTEMPER
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
ANTI-SKID CERAMIC FLOOR TILES
5 . 2
WALLS
CERAMIC DADO TILES UPTO DOOR HEIGHT
5 . 3
CEILING
OIL BOUND DISTEMPER
5 . 4
COUNTERS
NA
5 . 5
SANITARY WARE/CP FITTINGS
SUPERIOR QUALITY FITTING
5 . 6
FIXTURES
BATH AND TOILET WITH SUPERIOR QUALITY FITTINGS AND PROVISION FOR GEYSER AND EXHAUST FAN
6 . KITCHEN
6 . 1
FLOOR
VITRIFIED FLOOR TILES
6 . 2
WALLS
CERAMIC DADO TILES ABOVE PLATFORM
6 . 3
CEILING
OIL BOUND DISTEMPER
6 . 4
COUNTERS
GRANITE PLATFORM
6 . 5
FIXTURES
SINGLE BOWL STAINLESS STEEL SINK WITH DRAIN BOARD
WITH EXHAUST FAN
6 . 6
KITCHEN APPLIANCES
NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
CERAMIC TILES
7 . 2
WALLS & CEILING
OIL BOUND DISTEMPER
7 . 3
TOILET
NA
7 . 4
BALCONY
NA
8 . SIT-OUTS
8 . 1
FLOOR
NA
8 . 2
WALLS & CEILING
NA
8 . 3
RAILINGS
NA
8 . 4
FIXTURES
NA
Sr. No.
Document Description
Date of Document Upload
View Document
1
A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS
A COPY OF THE DRAFT AGREEMENT WHICH SHALL BE MADE BEFORE SEEKING ANY DEPOSIT EXCEEDING 10% OF THE COST OF THE APARTMENT.(BASED ON THE MODEL AGREEMENT PRESCRIBED IN THE RULES)
09-11-2019
------
3
IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT