HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-2182-2026
Submission Date : 07-10-2026 05:31:38 PM
Applicant Type : Company
Project Type: NEW




MODEL ECONOMIC TOWNSHIP LIMITED
3RD FLOOR, 77-B, IFFCO ROAD, GURUGRAM- 122015
01243527369
9910612499 (Number Shared by Promoter in Public)
shankar.mukkavilli@ril.com
http://www.modeleconomictownship.com
XXXX037Q
U70109HR2006PLC036416
 
 


 
 


 
 


 
 


 
 


 
 


 
 







POCKET D, F & G
SECTOR-8, YAKUBPUR AND FATEHPUR, MODEL ECONOMIC TOWNSHIP LIMITED
BADLI
JHAJJAR
01243527369
9998987100 (Number Shared by Promoter in Public)
rakesh.b.sinha@ril.com
RAKESH B SINHA
01243527369
9998987100 (Number Shared by Promoter in Public)
rakesh.b.sinha@ril.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150705707-10-2026792000ICICI BANKHRERA Panchkula







39.11059 (Acre)
2.64
2.64
1296.75625 (Acre)
16 of 2018, 64 of 2022, 47 of 2026
Yes







10213.96 Lakhs
3544.79 Lakhs
0 Lakhs
6581.92 Lakhs
87.24 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 18.74
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 14.89059
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 5.48
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total39.11059




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSDTCPYes
WATER SUPPLYDTCPYes
ELECTRICITYUHBVNYes
SEWAGE DISPOSALDTCPYes
STORM WATER DRAINAGEDTCPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1614.38AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM784.75AS PER PROJECT REPORT
3STORM WATER DRAINAGE523.13AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM1451.45AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL841.57AS PER PROJECT REPORT
6STREET LIGHTING159.94AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS329.51AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15CONSULTANCY FEE GATE COMPLEX SITE ETC877.19AS PER PROJECT REPORT
16STATUTORY CHARGES87.24AS PER PROJECT REPORT


13-03-2026 (date)
NA (date)
01-09-2026
01-09-2031
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 150.00 262
2 123.92 3
3 131.58 1
4 126.68 1
5 149.57 1
6 147.53 1
7 118.93 1
8 146.63 2
9 127.84 238
10 126.73 15
11 27.50 1
12 2031.52 1
13 830.62 1
Total528


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Statutory Charges87.24

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements080.72
Water Supply System039.24
Sewerage treatment & garbage disposal042.08
Electricity Supply System072.57
Storm Water Drainage026.16
Parks and Playgrounds016.48
Clubhouse/community centres00
Shopping area00
Other00
Consultancy Fee Gate Complex Site Overheads etc43.86
Street Lighting8.00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements80.7280.7280.7280.72
Water Supply System39.2439.2439.2439.24
Sewerage treatment & garbage disposal42.0842.0842.0842.08
Electricity Supply System72.5772.5772.5772.57
Storm Water Drainage26.1626.1626.1626.16
Parks and Playgrounds16.4816.4816.4816.48
Clubhouse/community centres0000
Shopping area0000
Other0000
Consultancy Fee Gate Complex Site Overheads etc43.8643.8643.8643.86
Street Lighting8.008.008.008.00

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements80.7280.7280.7280.72
Water Supply System39.2439.2439.2439.24
Sewerage treatment & garbage disposal42.0842.0842.0842.08
Electricity Supply System72.5772.5772.5772.57
Storm Water Drainage26.1626.1626.1626.16
Parks and Playgrounds16.4816.4816.4816.48
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting8.008.008.008.00
Consultancy Fee Gate Complex Site Overheads etc43.8643.8643.8643.86

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements80.7280.7280.7280.72
Water Supply System39.2439.2439.2439.24
Sewerage treatment & garbage disposal42.0842.0842.0842.08
Electricity Supply System72.5772.5772.5772.57
Storm Water Drainage26.1626.1626.1626.16
Parks and Playgrounds16.4816.4816.4816.48
Clubhouse/community centres0000
Shopping area0000
Other0000
Consultancy Fee Gate Complex Site Overheads etc43.8643.8643.8643.86
Street Lighting8.008.008.008.00

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements80.7280.7280.7280.72
Water Supply System39.2439.2439.2439.24
Sewerage treatment & garbage disposal42.0842.0842.0842.08
Electricity Supply System72.5772.5772.5772.57
Storm Water Drainage26.1626.1626.1626.16
Parks and Playgrounds16.4816.4816.4816.48
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting8.008.008.008.00
Consultancy Fee Gate Complex Site Overheads etc43.8643.8643.8643.86

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements80.7280.7280.72
Water Supply System39.2439.2439.24
Sewerage treatment & garbage disposal42.0842.0842.08
Electricity Supply System72.5772.5772.57
Storm Water Drainage26.1626.1626.16
Parks and Playgrounds16.4816.4816.48
Clubhouse/community centres000
Shopping area000
Other000
Street Lighting8.008.008.00
Consultancy Fee Gate Complex Site Overheads etc43.8643.8643.86












Yes
Yes
ICICI BANK SECTOR 5, VILLAGE DADRI TOE, JHAJJAR HARYANA- 124515
777705005440
ICICI0004594
124229056
4594
1. Shri Shrivallabh Goyal 2. Sh. Gulshan Kumar 3. Shri Ashish Jain 4. Shri Amit Kumar Garg Address: Model Economic Township Limited, 3rd Floor, 77-B, IFFCO Road, Sector-18, Gurugram-122015 (HR)
Attached











Yes
Yes
Yes
No
No
No
No
No
No
No


Yes
Yes
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ELECTRICITY PLAN ALREADY BEEN OBTAINED14-09-2026
II. LICENSE 129 OF 2019ALREADY BEEN OBTAINED04-12-2019
III. LICENSE 11 OF 2021ALREADY BEEN OBTAINED12-03-2021
IV. LICENSE 64 OF 2022 ALREADY BEEN OBTAINED25-05-2022
V. LICENSE 111 OF 2022 ALREADY BEEN OBTAINED10-08-2022
VI. LICENSE 47 OF 2026ALREADY BEEN OBTAINED13-03-2026
VII. CONSENT TO ESTABLISH PERMISSIONALREADY BEEN OBTAINED17-05-2021
VIII. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED12-05-2026
IX. EXISTING SERVICE PLAN ESTIMATEALREADY BEEN OBTAINED10-04-2024
X. LICENSE 16 OF 2018 ALREADY BEEN OBTAINED23-02-2018
XI. APPROVED LAYOUT PLANALREADY BEEN OBTAINED10-03-2026
XII. NEW SERVICE PLAN ESTIMATEYET TO FILE FOR APPROVALNA








Yes


Yes









INDUSTRIAL COLONY FOR 125.36 ACRES SECTOR – 2B, IN VILLAGE SHEOJIPURA, DIST. JHAJJAR
125.36
0
87
0
83
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
876511420.427558.92
Cost of the apartments000
Cost of the infrastructure838210830.156973.28
Others costs383590.27585.64


51048 Lakhs
262 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2027
31-07-2027




MET CITY POCKET – L, SECTOR-8, 79.756 ACRES IN VILLAGE YAKUBPUR, SONDHI & FATEHPUR, DIST. JHAJJAR
79.756
0
812
0
808
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1323714934.1713918.67
Cost of the apartments000
Cost of the infrastructure1236314585.3813569.88
Others costs874348.79348.79


33865 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2026
30-10-2027




INDUSTRIAL COLONY OF 258.44 ACRES SECTOR-3, IN VILLAGE DADRI TOE AND BIR DADRI, DIST. JHAJJAR
258.44
0
121
0
113
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14246.0825904.9024801.85
Cost of the apartments000
Cost of the infrastructure13251.8824431.3324431.33
Others costs994.201473.571473.57


46274 Lakhs
194 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2023
30-10-2027




MET HABITAT, 20.395 ACRES, SECTOR-3 IN VILLAGE DADRI TOE, DIST. JHAJJAR
20.395
0
105
0
68
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
26355185.114836.69
Cost of the apartments000
Cost of the infrastructure25935138.364789.94
Others costs4246.7546.75


17446 Lakhs
897 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2028
31-07-2028




INDUSTRIAL COLONY OF 580.722 ACRES IN SECTOR-4, 5, 7A, 7B, VILLAGE DADRI TOE YAKUBPUR AND SONDHI, DIST. JHAJJAR
580.722
0
385
0
359
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5481354531.3145582.74
Cost of the apartments000
Cost of the infrastructure5303851777.4742879.19
Others costs17752753.842703.55


113801 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
11-05-2024
11-06-2027




A COMMERCIAL PLOT (HIGHWAY MART) OF 4.96 ACRES, PART OF INDUSTRIAL TOWNSHIP OF 1296.75625 ACRES IN VILLAGE YAKUBPUR, DIST. JHAJJAR
4.96
0
69
0
38
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11241645.751631.98
Cost of the apartments000
Cost of the infrastructure11081611.701597.93
Others costs1634.0534.05


2765 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-06-2024
01-10-2027




NDUSTRIAL COLONY OF 85.703 ACRES SECTOR-10A, IN VILLAGE SONDHI, DIST. JHAJJAR
85.703
0
52
0
47
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6535.8118725.996891.41
Cost of the apartments000
Cost of the infrastructure6366.128558.066723.48
Others costs169.690167.93167.93


34540 Lakhs
70 Lakhs
0 Lakhs
0 Lakhs
No
30-03-2028
30-03-2028




INDUSTRIAL COLONY OF 148.69 ACRES SECTOR-11, IN VILLAGE NIMANA, DIST. JHAJJAR
148.69
0
143
0
131
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
9920.2414383.8110420.25
Cost of the apartments000
Cost of the infrastructure9642.9213858.039894.47
Others costs277.32525.78525.78


79731 Lakhs
184 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2029
30-04-2029




MET CITY POCKET – C & D, SECTOR-8, 34.931 ACRES IN VILLAGE YAKUBPUR & FATEHPUR, DIST. JHAJJAR
34.931
0
540
0
516
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4152.069515.968072.90
Cost of the apartments000
Cost of the infrastructure4077.139384.587941.52
Others costs74.93131.38131.38


41586 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-03-2028
30-03-2028




MET CITY POCKET – E, SECTOR-8, 14.194 ACRES IN VILLAGE YAKUBPUR, DIST. JHAJJAR
14.194
0
281
0
272
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
15804043.213056.14
Cost of the apartments000
Cost of the infrastructure15453983.422996.35
Others costs3559.7959.79


31906 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2029
30-04-2029




MET CITY POCKET – J & K, SECTOR-8, 54.638 ACRES IN VILLAGE YAKUBPUR & SONDHI, DIST. JHAJJAR
54.638
0
684
0
684
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6052.1210441.427421.45
Cost of the apartments000
Cost of the infrastructure5872.210166.787156.33
Others costs172.92274.64265.12


42849 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2027
30-09-2027




A COMMERCIAL PLOT (SUPERMART) OF 3.356 ACRES, PART OF INDUSTRIALTOWNSHIP OF 1296.75625 ACRES IN VILLAGE YAKUBPUR, DIST. JHAJJAR
3.356
0
50
0
41
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11241257.011080.59
Cost of the apartments000
Cost of the infrastructure11081236.831060.41
Others costs1620.1820.18


4347 Lakhs
44 Lakhs
0 Lakhs
0 Lakhs
No
30-10-2027
30-10-2027




METROPOLIS BY MET CITY RESIDENTIAL COMPONENT
42.009
0
478
0
233
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
912410751.455508.66
Cost of the apartments000
Cost of the infrastructure900310627.495384.70
Others costs123.79123.96123.96


14745 Lakhs
21571 Lakhs
0 Lakhs
0 Lakhs
No
30-10-2029
30-10-2029




MET CITY CELESTE, D-243 - D-252, POCKET C & D, SECTOR-08, VILLAGE FATEHPUR, MODEL ECONOMIC TOWNSHIP LIMITED
1299.60
40
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
02214.32956.32
Cost of the apartments01865.01643.84
Cost of the infrastructure0329.14292.31
Others costs020.1720.17


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-10-2027
30-10-2027




METROPOLIS BY MET CITY INDUSTRIAL COMPONENT
56.818
0
86
0
18
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
56539579.225619.89
Cost of the apartments000
Cost of the infrastructure54889414.175454.84
Others costs165165.05165.05


7685 Lakhs
4138 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2029
30-04-2029




MET CITY POCKET SECTOR 2A, 49.584 ACRES IN VILLAGE SHEOJIPURA, DIST. JHAJJAR
49.584
0
523
0
523
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
64259697.68216.81
Cost of the apartments000
Cost of the infrastructure63059472.327991.51
Others costs120225.30225.30


45126 Lakhs
1962 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2029
30-04-2029










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 07-10-2026 View Document
2 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 07-10-2026 View Document
3 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 07-10-2026 View Document
4 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 07-10-2026 View Document
5 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 07-10-2026 View Document