HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1902-2025
Submission Date : 12-12-2025 01:51:00 PM
Applicant Type : Firm
Project Type: NEW


AARIZE TOWNSHIP LLP
507, 5TH FLOOR, SPAZE BOULEVARD SECTOR-47, GURUGRAM 122002, HARYANA, INDIA
01244505778
8527563355 (Number Shared by Promoter in Public)
info@karnelya.in
ACB1334
ACBFA9597R













KARNELYA
SECTOR-34, DISTRICT KARNAL, KARNAL-132001 HARYANA
KARNAL
KARNAL
8448286291
8448286291 (Number Shared by Promoter in Public)
info@karnelya.in
ANIL KUMAR GAUTAM
8448286291
8448286291 (Number Shared by Promoter in Public)
info@karnelya.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151131310-12-202511500ICICI BANKHRERA Panchkula







9.4166 (Acre)
N.A
0
9.4166 (Acre)
206 OF 2025 Dated 15.10.2025 valid upto 14.10.2030
Yes







7390.10 Lakhs
3451.14 Lakhs
0 Lakhs
1716.91 Lakhs
2222.05 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 4.848
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 1.525
4PAVEMENTS 0.691
5PARKS AND PLAYGROUNDS 0.543
6GREEN BELTS 0.423
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0.0377
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0.942
12ANY OTHER 0
13SERVICEROADPARTOFGREENBELT 0.0309
14COMMERCIALUSE 0.376
Total9.4166




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPNo
ELECTRICITYUHBVNLNo
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS531.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM88.50AS PER PROJECT REPORT
3STORM WATER DRAINAGE123.90AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM207.68AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL100.30AS PER PROJECT REPORT
6STREET LIGHTING43.66AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING11.80AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS21.24AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER126.27AS PER PROJECT REPORT
15BOUNDARY WALL64.90AS PER PROJECT REPORT
16ELECTRICAL SUB SATION167.56AS PER PROJECT REPORT
17STP82.60AS PER PROJECT REPORT
18RAIN WATER HARVESTING59.0AS PER PROJECT REPORT
19UNDERGROUND WATER TANK88.50AS PER PROJECT REPORT


16-10-2025 (date)
NA (date)
01-12-2025
30-09-2030
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 111.61 1
2 125.79 1
3 130.45 1
4 123.86 1
5 117.24 1
6 110.62 1
7 104.61 1
8 104.78 1
9 104.38 1
10 104.30 1
11 104.62 1
12 104.25 1
13 104.64 1
14 125.18 1
15 134.19 1
16 433.26 3
17 2146.40 20
18 149.69 1
19 310.68 3
20 329.43 3
21 2006.72 16
22 899.64 6
23 1799.28 12
24 2974.60 20
25 376.44 3
26 125.49 1
27 125.42 1
28 125.44 1
29 99.36 1
30 104.73 1
31 104.35 1
32 104.57 1
33 104.41 1
34 104.70 1
35 104.41 1
36 104.21 1
37 104.67 1
38 140.00 1
39 575.72 4
40 2880.98 23
41 1151.91 9
42 126.09 1
43 115.71 1
44 102.44 1
45 89.16 1
46 1521.80 1
Total156


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other6.73

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.62
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Boundary wall1.30

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements26.5526.5526.5526.55
Water Supply System2.662.663.544.43
Sewerage treatment & garbage disposal004.015.02
Electricity Supply System02.084.156.23
Storm Water Drainage0002.48
Parks and Playgrounds0001.06
Clubhouse/community centres0000
Shopping area0000
Other2.5303.385.05
Boundary Wall2.602.603.893.89
STP1.652.483.303.30
Rain Water Harvesting1.181.772.362.95
Under Ground Water Tank2.662.663.544.43
Electrical Sub Station6.708.38
Security Fire Fighting0.59

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements26.5526.5526.5526.55
Water Supply System4.435.315.315.31
Sewerage treatment & garbage disposal5.028.028.028.02
Electricity Supply System6.2316.6116.6116.61
Storm Water Drainage9.919.919.9112.39
Parks and Playgrounds1.061.061.061.70
Clubhouse/community centres0000
Shopping area0000
Other5.057.587.587.58
Security Fire Fighting0.590.940.940.94
STP4.136.616.616.61
Street Light03.493.493.49
Electrical Sub Station8.3813.4013.4013.40
Rain Water Harvesting2.953.544.724.72
Under Ground Water Tank4.437.087.087.08
Boundary Wall3.893.894.544.54

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements31.8631.8637.1737.17
Water Supply System7.087.087.087.08
Sewerage treatment & garbage disposal8.028.028.028.02
Electricity Supply System16.6116.6116.6116.61
Storm Water Drainage12.3912.399.919.91
Parks and Playgrounds1.701.701.701.70
Clubhouse/community centres0000
Shopping area0000
Other7.587.587.587.58
Electrical Sub Station13.4013.4013.4013.40
Security Fire Fighting0.940.940.940.94
Street Light3.493.493.493.49
Rain Water Harvesting4.724.724.724.72
Boundary Wall4.544.544.544.54
Under Ground Water Tank7.087.087.087.08
STP6.616.616.616.61

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements37.1737.1737.1737.17
Water Supply System7.087.087.085.29
Sewerage treatment & garbage disposal8.028.028.024.01
Electricity Supply System16.6116.6116.6116.61
Storm Water Drainage9.919.919.914.97
Parks and Playgrounds1.701.701.701.70
Clubhouse/community centres0000
Shopping area0000
Other10.1010.1010.1010.10
Street Light3.495.245.243.49
STP6.616.616.611.64
Security Fire Fighting0.940.940.940.94
Boundary Wall4.544.544.541.98
Electrical Sub Station13.4013.4010.058.38
Rain Water Harvesting4.724.724.721.77
Under Ground Water Tank5.315.315.315.29

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements21.240
Water Supply System00
Sewerage treatment & garbage disposal2.040
Electricity Supply System6.280
Storm Water Drainage00
Parks and Playgrounds1.700
Clubhouse/community centres00
Shopping area00
Other10.070
Street Light1.77
Security Fire Fighting0.28
Electrical Sub Station5.07












Yes
No
HDFC BANK, VATIKA BUSINESS PARK, SECTOR-49, SOHNA ROAD GURGAON BRANCH
99998527563355
HDFC0001098
110240138
001098
1. Vivek Jain, R/o H No.2, Ground Floor, Block-A, South City-II, Sector-49,Gurugram-122018. 2.Sanjeev Kumar, R/o R Z F 100/47, Gali No. 41, Sadh Nagar 2, Palam Colony, Palam Village, South West Delhi-110045
Uploaded











Yes
Yes
Yes
No
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED15-10-2025
II. FOREST NOCALREADY BEEN OBTAINED14-05-2025
III. LAYOUT PLANALREADY BEEN OBTAINED16-10-2025
IV. ZONING PLANALREADY BEEN OBTAINED12-12-2025








Yes


Yes


AS PER HARERA NORMS













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEN.A. BEING A PLOTTED DEVELOPMENT
2WALL FINISHING DETAILSN.A. BEING A PLOTTED DEVELOPMENT
3KITCHEN DETAILSN.A. BEING A PLOTTED DEVELOPMENT
4BATHROOM FITTINGSN.A. BEING A PLOTTED DEVELOPMENT
5WOOD WORK ETCN.A. BEING A PLOTTED DEVELOPMENT
6DOORS AND WINDOS FRAMESN.A. BEING A PLOTTED DEVELOPMENT
7GLASS WORKN.A. BEING A PLOTTED DEVELOPMENT
8ELECTRIC FITTINGSN.A. BEING A PLOTTED DEVELOPMENT
9CONDUCTING AND WIRING DETAILSN.A. BEING A PLOTTED DEVELOPMENT
10CUPBOARD DETAILSN.A. BEING A PLOTTED DEVELOPMENT
11WATER STORAGEN.A. BEING A PLOTTED DEVELOPMENT
12LIFT DETAILSN.A. BEING A PLOTTED DEVELOPMENT
13EXTERNAL GLAZINGSN.A. BEING A PLOTTED DEVELOPMENT
13.1WINDOWS/GLAZINGSN.A. BEING A PLOTTED DEVELOPMENT
14DOORSN.A. BEING A PLOTTED DEVELOPMENT
14.1MAIN DOORSN.A. BEING A PLOTTED DEVELOPMENT
14.2INTERNAL DOORSN.A. BEING A PLOTTED DEVELOPMENT
15AIR CONDITIONINGN.A. BEING A PLOTTED DEVELOPMENT
16ELECTRICAL FITTINGSN.A. BEING A PLOTTED DEVELOPMENT
17CNG PIPE LINEN.A. BEING A PLOTTED DEVELOPMENT
18PROVISION OF WIFI AND BROADBAND FACILITYN.A. BEING A PLOTTED DEVELOPMENT
19EXTERNAL FINISHING/COLOUR SCHEMEN.A. BEING A PLOTTED DEVELOPMENT
20INTERNAL FINISHINGN.A. BEING A PLOTTED DEVELOPMENT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
1 . 2 WALLSN.A. BEING A PLOTTED DEVELOPMENT
1 . 3 CEILINGN.A. BEING A PLOTTED DEVELOPMENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
2 . 2 WALLSN.A. BEING A PLOTTED DEVELOPMENT
2 . 3 CEILINGN.A. BEING A PLOTTED DEVELOPMENT
2 . 4 MODULAR WARDROBESN.A. BEING A PLOTTED DEVELOPMENT
3 . MASTER TOILET
3 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
3 . 2 WALLSN.A. BEING A PLOTTED DEVELOPMENT
3 . 3 CEILINGN.A. BEING A PLOTTED DEVELOPMENT
3 . 4 COUNTERSN.A. BEING A PLOTTED DEVELOPMENT
3 . 5 SANITARY WARE/CP FITTINGSN.A. BEING A PLOTTED DEVELOPMENT
3 . 6 FITTING/FIXTURESN.A. BEING A PLOTTED DEVELOPMENT
4 . BED ROOMS
4 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
4 . 2 WALLSN.A. BEING A PLOTTED DEVELOPMENT
4 . 3 CEILINGN.A. BEING A PLOTTED DEVELOPMENT
4 . 4 WARDROBESN.A. BEING A PLOTTED DEVELOPMENT
5 . TOILET
5 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
5 . 2 WALLSN.A. BEING A PLOTTED DEVELOPMENT
5 . 3 CEILINGN.A. BEING A PLOTTED DEVELOPMENT
5 . 4 COUNTERSN.A. BEING A PLOTTED DEVELOPMENT
5 . 5 SANITARY WARE/CP FITTINGSN.A. BEING A PLOTTED DEVELOPMENT
5 . 6 FIXTURESN.A. BEING A PLOTTED DEVELOPMENT
6 . KITCHEN
6 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
6 . 2 WALLSN.A. BEING A PLOTTED DEVELOPMENT
6 . 3 CEILINGN.A. BEING A PLOTTED DEVELOPMENT
6 . 4 COUNTERSN.A. BEING A PLOTTED DEVELOPMENT
6 . 5 FIXTURESN.A. BEING A PLOTTED DEVELOPMENT
6 . 6 KITCHEN APPLIANCESN.A. BEING A PLOTTED DEVELOPMENT
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
7 . 2 WALLS & CEILINGN.A. BEING A PLOTTED DEVELOPMENT
7 . 3 TOILETN.A. BEING A PLOTTED DEVELOPMENT
7 . 4 BALCONYN.A. BEING A PLOTTED DEVELOPMENT
8 . SIT-OUTS
8 . 1 FLOORN.A. BEING A PLOTTED DEVELOPMENT
8 . 2 WALLS & CEILINGN.A. BEING A PLOTTED DEVELOPMENT
8 . 3 RAILINGSN.A. BEING A PLOTTED DEVELOPMENT
8 . 4 FIXTURESN.A. BEING A PLOTTED DEVELOPMENT












Sr. No.Document DescriptionDate of Document UploadView Document
1 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 08-12-2025 View Document
2 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 08-12-2025 View Document
3 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 08-12-2025 View Document
4 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 08-12-2025 View Document
5 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 10-12-2025 View Document
6 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 10-12-2025 View Document
7 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 10-12-2025 View Document
8 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 10-12-2025 View Document
9 5% PROCESSING FEE DD 11-12-2025 ------
10 LLP PAN CARD 11-12-2025 ------
11 4 2 L D AFFIDAVIT 11-12-2025 ------
12 AKS SAZRA 11-12-2025 ------
13 NEC 11-12-2025 ------
14 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 10-12-2025 View Document
15 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 11-12-2025 View Document
16 MAINTENANCE AFFIDAVIT 11-12-2025 ------
17 AADHAR PARTNER 1 11-12-2025 ------
18 AADHAR PARTNER 2 11-12-2025 ------
19 MUTATION 11-12-2025 ------
20 SALE DEED-2 11-12-2025 ------
21 PAYMENT PLAN 11-12-2025 ------
22 FOREST NOC 11-12-2025 ------
23 LOI 11-12-2025 ------
24 LLP AGREEMENT 11-12-2025 ------
25 SALE DEED-1 11-12-2025 ------
26 CASH FLOW 11-12-2025 ------
27 LC-IVBILATRAL 11-12-2025 ------
28 BR FOR AUTHORIZATION TO ADVERTISE, MARKET 11-12-2025 ------
29 BR FOR BANK 11-12-2025 ------
30 DEMARCATION PLAN 12-12-2025 View Document
31 ZONING PLAN 12-12-2025 View Document