HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1332-2023
Submission Date : 29-08-2023 06:34:59 PM
Applicant Type : Company
Project Type: NEW




KAIRAV INFRASTRUCTURE PRIVATE LIMITED
6TH FLOOR, BAANI THE ADDRESS, GOLF COURSE ROAD, SECTOR - 56, GURUGRAM - 122011
01244250610
9911573792 (Number Shared by Promoter in Public)
kairavinfra@gmail.com
https://mapskogardenia.com
XXXX556J
U45201DL2006PTC146213
 
 


 
 


 
 


 
 







MAPSKO GARDENIA
SECTOR - 26A
SONIPAT
SONIPAT
01244250610
9716485051 (Number Shared by Promoter in Public)
kairavinfra@gmail.com
SANJAY SAGAR
01244250610
9716485051 (Number Shared by Promoter in Public)
kairavinfra@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
159539629-08-2023565406PUNJAB NATIONAL BANKHRERA Panchkula







12.25625 (Acre)
1
1
12.25625 (Acre)
165 OF 2023 (21-08-2023)
No
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     6TH FLOOR, BAANI THE ADDRESS, GOLF COURSE ROAD, SECTOR - 56, GURUGRAM - 122011
Address     6TH FLOOR, BAANI THE ADDRESS, GOLF COURSE ROAD, SECTOR - 56, GURUGRAM - 122011
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Address     VILLAGE BANDEPUR, TEHSIL & DISTRICT SONIPAT, HARYANA
Annexure-B- BEING OWNER & COLLABORATION, GPA & SPA
YES
Yes
1. KAIRAV INFRASTRUCTURE PVT LTD HAS PURCHASED LAND MEASURING (8 KANAL- 0 MARLA) 2 ACRE FROM ROHIT KAUSHIK VIDE SALE DEED BEARING VASIKA NO- 9009 DATED 28.11.2022. 2. SAT PAL KAUSHIK HAS EXECUTED COLLABORATION AGREEMENT REGISTERED VIDE VASIKA NO- 9010 DATED 28.11.2022 WITH KAIRAV INFRASTRUCTURE PVT LTD FOR THE UNLICENSED LAND MEASURING (16 KANAL-0 MARLA) 2 ACRE . KAIRAV WILL PROVIDE 1200 SQ YARDS LAND TO SAT PAL KAUSHIK IN THE SHAPE OF PLOT IN THE DEVELOPED LICENSED COLONY . (AS PER CLAUSE NO-5 OF THE COLLABORATION AGREEMENT. KAIRAV WILL BE FREE TO THE CONSTRUCT, CREATE THIRD PARTY RIGHTS, OBTAIN LOAN FACILITY FOR CONSTRUCTION. (AS PER CLAUSE NO-3 OF THE COLLABORATION AGREEMENT). TIME FRAME FOR OBTAINING APPROVALS, CONSTRUCTION AND TO HAND OVER THE POSSESSION OF THE DEVELOPED PLOT TO COLLABORATOR AS PER TIME LINES MENTIONED IN COLLABORATION AGREEMENT.(AS PER CLAUSE NO-6 OF THE COLLABORATION AGREEMENT). THIS AGREEMENT WILL NOT CANCEL OR BACK OUT TILL EITHER OF THE PARTIES IS UNABLE TO PERFORM ANY OF ITS OBLIGATIONS/RESPONSIBILITIES UNDERTAKEN BY IN THE TERMS OF THIS AGREEMENT. (AS PER CLAUSE NO-7 AND 12 OF THE COLLABORATION AGREEMENT). COLLABORATOR HAS FURTHER EXECUTED- SPA VIDE VASIKA NO- 155 DATED 28.11.2022 & GPA VIDE VASIKA NO- 154 DATED- 28.11.2022 IN FAVOR OF KAIRAV INFRASTRUCTURE PVT LTD FOR THE SMOOTH EXECUTION OF THE DEVELOPMENT WORK. 3. SAT PAL KAUSHIK HAS EXECUTED COLLABORATION AGREEMENT REGISTERED VIDE VASIKA NO- 9008 DATED 28.11.2022 WITH KAIRAV INFRASTRUCTURE PVT LTD FOR THE UNLICENSED LAND MEASURING (15 KANAL-15 MARLA) 1.96875 ACRE . KAIRAV WILL PROVIDE 1181 SQ YARDS LAND TO SAT PAL KAUSHIK IN THE SHAPE OF PLOT IN THE DEVELOPED LICENSED COLONY . (AS PER CLAUSE NO-5 OF THE COLLABORATION AGREEMENT. KAIRAV WILL BE FREE TO THE CONSTRUCT, CREATE THIRD PARTY RIGHTS, OBTAIN LOAN FACILITY FOR CONSTRUCTION. (AS PER CLAUSE NO-3 OF THE COLLABORATION AGREEMENT). TIME FRAME FOR OBTAINING APPROVALS, CONSTRUCTION AND TO HAND OVER THE POSSESSION OF THE DEVELOPED PLOT TO COLLABORATOR AS PER TIME LINES MENTIONED IN COLLABORATION AGREEMENT.(AS PER CLAUSE NO-6 OF THE COLLABORATION AGREEMENT). THIS AGREEMENT WILL NOT CANCEL OR BACK OUT TILL EITHER OF THE PARTIES IS UNABLE TO PERFORM ANY OF ITS OBLIGATIONS/RESPONSIBILITIES UNDERTAKEN BY IN THE TERMS OF THIS AGREEMENT. (AS PER CLAUSE NO-7 OF THE COLLABORATION AGREEMENT). COLLABORATOR HAS FURTHER EXECUTED- SPA VIDE VASIKA NO- 153 DATED 28.11.2022 & GPA VIDE VASIKA NO- 152 DATED- 28.11.2022 IN FAVOR OF KAIRAV INFRASTRUCTURE PVT LTD FOR THE SMOOTH EXECUTION OF THE DEVELOPMENT WORK. 4. VIKAS KAUSHIK & SANJU KAUSHIK HAS EXECUTED COLLABORATION AGREEMENT REGISTERED VIDE VASIKA NO- 9008 DATED 28.11.2022 WITH KAIRAV INFRASTRUCTURE PVT LTD EXECUTED BY SHYAM LAL (FATHER OF COLLABORATORS) BEING GPA HOLDER OF COLLABORATORS, FOR THE UNLICENSED LAND MEASURING (16 KANAL-16 MARLA) 2.1 ACRE (EACH). KAIRAV WILL PROVIDE 1260 SQ YARDS LAND (EACH) TO VIKAS KAUSHIK & SANJU KAUSHIK IN THE SHAPE OF PLOT IN THE DEVELOPED LICENSED COLONY . (AS PER CLAUSE NO-5 OF THE COLLABORATION AGREEMENT. KAIRAV WILL BE FREE TO THE CONSTRUCT, CREATE THIRD PARTY RIGHTS, OBTAIN LOAN FACILITY FOR CONSTRUCTION. (AS PER CLAUSE NO-3 OF THE COLLABORATION AGREEMENT). TIME FRAME FOR OBTAINING APPROVALS, CONSTRUCTION AND TO HAND OVER THE POSSESSION OF THE DEVELOPED PLOT TO COLLABORATOR AS PER TIME LINES MENTIONED IN COLLABORATION AGREEMENT.(AS PER CLAUSE NO-6 OF THE COLLABORATION AGREEMENT). THIS AGREEMENT WILL NOT CANCEL OR BACK OUT TILL EITHER OF THE PARTIES IS UNABLE TO PERFORM ANY OF ITS OBLIGATIONS/RESPONSIBILITIES UNDERTAKEN BY IN THE TERMS OF THIS AGREEMENT. (AS PER CLAUSE NO-7 OF THE COLLABORATION AGREEMENT). COLLABORATOR HAS FURTHER EXECUTED- SPA VIDE VASIKA NO- 151 DATED 28.11.2022 IN FAVOR OF KAIRAV INFRASTRUCTURE PVT LTD FOR THE SMOOTH EXECUTION OF THE DEVELOPMENT WORK. 5. SUDESH@ SUDESH KUMAR KAUSHIK, RAKESH @ RAKESHWAR SHARMA, UMESH @ UMESH SHANKER, ADESH @ ADESH KAUSHIK, MAHESH @ MAHESH CHANDER, AJESH @ AJESH KAUSHIK HAS EXECUTED HAS EXECUTED COLLABORATION AGREEMENT REGISTERED VIDE VASIKA NO- 9379 DATED 08.12.2022 WITH KAIRAV INFRASTRUCTURE PVT LTD FOR THE UNLICENSED LAND JOINTLY OWNED MEASURING 30.25 SQ. YARDS (0 KANAL-1 MARLA). SHARE OF EACH COLLABORATOR IN UNLICENSED LAND 5.0416 SQ. YARDS KAIRAV WILL PROVIDE 0.6666 SQ YARDS LAND (EACH) TO COLLABORATORS IN THE SHAPE OF PLOT IN THE DEVELOPED LICENSED COLONY . (AS PER CLAUSE NO-5 OF THE COLLABORATION AGREEMENT. KAIRAV WILL BE FREE TO THE CONSTRUCT, CREATE THIRD PARTY RIGHTS, OBTAIN LOAN FACILITY FOR CONSTRUCTION. (AS PER CLAUSE NO-3 OF THE COLLABORATION AGREEMENT). TIME FRAME FOR OBTAINING APPROVALS, CONSTRUCTION AND TO HAND OVER THE POSSESSION OF THE DEVELOPED PLOT TO COLLABORATOR AS PER TIME LINES MENTIONED IN COLLABORATION AGREEMENT.(AS PER CLAUSE NO-6 OF THE COLLABORATION AGREEMENT). THIS AGREEMENT WILL NOT CANCEL OR BACK OUT TILL EITHER OF THE PARTIES IS UNABLE TO PERFORM ANY OF ITS OBLIGATIONS/RESPONSIBILITIES UNDERTAKEN BY IN THE TERMS OF THIS AGREEMENT. (AS PER CLAUSE NO-7 OF THE COLLABORATION AGREEMENT). COLLABORATOR HAS FURTHER EXECUTED- SPA VIDE VASIKA NO- 169 DATED 08.12.2022 , GPA NO- 168 DATED 08.12.2022 IN FAVOR OF KAIRAV INFRASTRUCTURE PVT LTD FOR THE SMOOTH EXECUTION OF THE DEVELOPMENT WORK.
No
Yes
Yes







4479.52 Lakhs
1462.59 Lakhs
0 Lakhs
860 Lakhs
2156.93 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD7.223
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS2.88825
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0.919
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES1.226
12ANY OTHER0
Total12.25625




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPYes
ELECTRICITYUHBVNNo
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS85.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM200.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE92.50AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM155.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL155.00AS PER PROJECT REPORT
6STREET LIGHTING47.50AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS25.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15BOUNDARY WALL GATE AND GUARD ROOM100AS PER PROJECT REPORT


21-08-2023 (date)
NA (date)
01-10-2023
20-08-2028
Plot Area(In Square Meter)Number of plots in the project
101.561
113.311
117.71
118.5579
119.0154
120.4626
125.051
134.8622
136.801
143.381
147.1311
149.9219
149.971


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
BOUNDARY WALL GATE AND GUARD ROOM41

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System15
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage20
Parks and Playgrounds15
Clubhouse/community centres0
Shopping area0
Other0
BOUNDARY WALL GATE AND GUARD ROOM59

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements252535
Water Supply System606065
Sewerage treatment & garbage disposal707015
Electricity Supply System707015
Storm Water Drainage3537.50
Parks and Playgrounds550
Clubhouse/community centres000
Shopping area000
Other000
STREET LIGHTING2522.50












Yes
No
STATE BANK OF INDIA, 91 IDC, SBIMIDCORPORATE BRANCH, MEHRAULIROAD,GURGAON
42203150760
SBIN0050933
110002777
50933
1. Krishan Singla MG-219B, The Mangolias, DLF Golf Course Road, Gurugram, Haryana - 122009 2. Mohit Singla A-42, ROSEWOOD CITY, SECTOR - 49, GURGAON - 122018 3. PANKAJ SINGLA, A-31, ROSEWOOD CITY, SECTOR - 49, GURGAON - 122018
NO DEFAULT / UPLOADED











Yes
No
No
No
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENCEALREADY BEEN OBTAINED21-08-2023
II. LAYOUT PLANALREADY BEEN OBTAINED21-08-2023








Yes


Yes


AS PER HRERA ACT & RULES







MAPSKO GARDEN ESTATE PHASE - II, SECTOR - 26A, SONIPAT, HARYANA
6.7875
0
62
0
24
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1520.261520.26869.29
Cost of the apartments000
Cost of the infrastructure525.26525.26199.05
Others costs995995670.23


365.78 Lakhs
1215.76 Lakhs
2800 Lakhs
2500 Lakhs
No
31-07-2027
31-07-2027




MAPSKO ASPR GREENZ, SECTOR - 35, SONIPAT, HARYANA
16.4875
0
294
0
156
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3139.663139.661321.84
Cost of the apartments000
Cost of the infrastructure1080108096.87
Others costs2059.662059.661224.98


884.65 Lakhs
4563.76 Lakhs
0 Lakhs
0 Lakhs
No
14-12-2027
14-12-2027










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE AS IT IS PLOTTED COLONY
2WALL FINISHING DETAILSNOT APPLICABLE AS IT IS PLOTTED COLONY
3KITCHEN DETAILSNOT APPLICABLE AS IT IS PLOTTED COLONY
4BATHROOM FITTINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
5WOOD WORK ETCNOT APPLICABLE AS IT IS PLOTTED COLONY
6DOORS AND WINDOS FRAMESNOT APPLICABLE AS IT IS PLOTTED COLONY
7GLASS WORKNOT APPLICABLE AS IT IS PLOTTED COLONY
8ELECTRIC FITTINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE AS IT IS PLOTTED COLONY
10CUPBOARD DETAILSNOT APPLICABLE AS IT IS PLOTTED COLONY
11WATER STORAGENOT APPLICABLE AS IT IS PLOTTED COLONY
12LIFT DETAILSNOT APPLICABLE AS IT IS PLOTTED COLONY
13EXTERNAL GLAZINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
13.1WINDOWS/GLAZINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
14DOORSNOT APPLICABLE AS IT IS PLOTTED COLONY
14.1MAIN DOORSNOT APPLICABLE AS IT IS PLOTTED COLONY
14.2INTERNAL DOORSNOT APPLICABLE AS IT IS PLOTTED COLONY
15AIR CONDITIONINGNOT APPLICABLE AS IT IS PLOTTED COLONY
16ELECTRICAL FITTINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
17CNG PIPE LINENOT APPLICABLE AS IT IS PLOTTED COLONY
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE AS IT IS PLOTTED COLONY
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE AS IT IS PLOTTED COLONY
20INTERNAL FINISHINGNOT APPLICABLE AS IT IS PLOTTED COLONY
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
1 . 2 WALLSNOT APPLICABLE AS IT IS PLOTTED COLONY
1 . 3 CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
2 . 2 WALLSNOT APPLICABLE AS IT IS PLOTTED COLONY
2 . 3 CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
2 . 4 MODULAR WARDROBESNOT APPLICABLE AS IT IS PLOTTED COLONY
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
3 . 2 WALLSNOT APPLICABLE AS IT IS PLOTTED COLONY
3 . 3 CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
3 . 4 COUNTERSNOT APPLICABLE AS IT IS PLOTTED COLONY
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
3 . 6 FITTING/FIXTURESNOT APPLICABLE AS IT IS PLOTTED COLONY
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
4 . 2 WALLSNOT APPLICABLE AS IT IS PLOTTED COLONY
4 . 3 CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
4 . 4 WARDROBESNOT APPLICABLE AS IT IS PLOTTED COLONY
5 . TOILET
5 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
5 . 2 WALLSNOT APPLICABLE AS IT IS PLOTTED COLONY
5 . 3 CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
5 . 4 COUNTERSNOT APPLICABLE AS IT IS PLOTTED COLONY
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
5 . 6 FIXTURESNOT APPLICABLE AS IT IS PLOTTED COLONY
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
6 . 2 WALLSNOT APPLICABLE AS IT IS PLOTTED COLONY
6 . 3 CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
6 . 4 COUNTERSNOT APPLICABLE AS IT IS PLOTTED COLONY
6 . 5 FIXTURESNOT APPLICABLE AS IT IS PLOTTED COLONY
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE AS IT IS PLOTTED COLONY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
7 . 2 WALLS & CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
7 . 3 TOILETNOT APPLICABLE AS IT IS PLOTTED COLONY
7 . 4 BALCONYNOT APPLICABLE AS IT IS PLOTTED COLONY
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE AS IT IS PLOTTED COLONY
8 . 2 WALLS & CEILINGNOT APPLICABLE AS IT IS PLOTTED COLONY
8 . 3 RAILINGSNOT APPLICABLE AS IT IS PLOTTED COLONY
8 . 4 FIXTURESNOT APPLICABLE AS IT IS PLOTTED COLONY












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND29-08-2023 View Document
2DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.29-08-2023 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT29-08-2023 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN29-08-2023 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN29-08-2023 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 Approved standard Designs of SCOs uploaded 31-05-2024 View Document
2 Addendum Issued. 25-06-2024 View Document