HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1149-2022
Submission Date : 12-10-2022 07:21:27 PM
Applicant Type : Company
Project Type: NEW




MODEL ECONOMIC TOWNSHIP LIMITED
3RD FLOOR, 77-B, IFFCO ROAD, GURUGRAM- 122015
1243527369
9910612499 (Number Shared by Promoter in Public)
shankar.mukkavilli@ril.com
http://www.modeleconomictownship.com
XXXX037Q
U70109HR2006PLC036416
 
 


 
 


 
 


 
 


 
 


 
 







INDUSTRIAL COLONY 85.70375 ACRES
VILLAGE SODHI, SECTOR-10A
BADLI
JHAJJAR
01243527369
9998987100 (Number Shared by Promoter in Public)
rakesh.b.sinha@ril.com
RAKESH B SINHA
01243527369
9998987100 (Number Shared by Promoter in Public)
rakesh.b.sinha@ril.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
145447912-10-20221740000HDFC BANK HRERA Panchkula







85.70375 (Acre)
NIL
0
92.54375 (Acre)
111 of 2022 dated 10.08.2022
Yes







15069.599 Lakhs
8533.788 Lakhs
0 Lakhs
6366.120 Lakhs
169.69017 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD54.69000
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS20.11375
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS7.93000
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13PUBLIC2.97000
Total85.70375




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSDTCP,HARYANANo
WATER SUPPLYDTCP,HARYANANo
ELECTRICITYUHBVNNo
SEWAGE DISPOSALDTCP,HARYANANo
STORM WATER DRAINAGEDTCP,HARYANANo
LICENSEDTCP,HARYANANo
LAYOUTDTCP,HARYANANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1682.7360YET TO BE PREPARED
2WATER SUPPLY SYSTEM673.3580YET TO BE PREPARED
3STORM WATER DRAINAGE610.5990YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM2161.5670YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL676.3680YET TO BE PREPARED
6STREET LIGHTING100.0000YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15HORTICULTURE130.0000YET TO BE PREPARED
16PMC CONSULTANCY GATE COMMUNITY FACILITY CONTINGENCY ETC331.4920YET TO BE PREPARED


10-08-2022 (date)
NA (date)
01-12-2022
30-11-2027
Plot Area(In Square Meter)Number of plots in the project
12181.0491
12302.4541
10683.7101
11209.8021
8741.2181
7729.5031
9348.2471
7729.5031
8538.8751
7972.3141
5706.0731
5584.6671
5584.6671
5625.1351
6596.3821
6677.3191
6232.1641
5463.2611
3318.4251
3318.4251
3318.4251
4694.3581
3561.2371
3561.2371
3561.2371
3561.2371
1011.7151
1011.7151
1011.7151
1011.7151
1011.7151
1011.7151
1011.7151
2104.3671
2994.6761
2023.4301
2023.4301
2023.4301
2023.4301
1740.1501
1740.1501
1740.1501
1740.1501
2306.7101
2306.7101
2306.7101
2306.7101
2185.3041
2225.7731
2994.6761
2630.4591
2023.4301


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements67.309
Water Supply System26.934
Sewerage treatment & garbage disposal27.055
Electricity Supply System0
Storm Water Drainage24.424
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Street lighting0
Consultancy Fees Gate complex etc13.260
Horticulture0

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements50.48275.72375.72384.137
Water Supply System20.20130.30130.30133.668
Sewerage treatment & garbage disposal20.29130.43730.43733.818
Electricity Supply System0086.46364.847
Storm Water Drainage18.31827.47727.47730.530
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Consultancy Fees Gate complex etc9.94514.91714.91716.575
Horticulture0000
Street lighting004.0003.000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements67.309100.964109.378109.378
Water Supply System26.93440.40243.76843.768
Sewerage treatment & garbage disposal27.05540.58243.96443.964
Electricity Supply System129.694129.694140.502118.886
Storm Water Drainage24.42436.63639.68939.689
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Consultancy Fees Gate complex etc13.26019.89021.54721.547
Street lighting6.0006.0006.5005.500
Horticulture0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements100.96484.13784.137100.964
Water Supply System40.40233.66833.66840.402
Sewerage treatment & garbage disposal40.58233.81833.81840.582
Electricity Supply System162.118172.925172.925162.118
Storm Water Drainage36.63630.53030.53036.636
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Consultancy Fees Gate complex etc19.89016.57516.57519.890
Horticulture013.00013.00013.000
Street lighting7.5008.0008.0007.500

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements67.309100.964100.964100.964
Water Supply System26.93447.13547.13547.135
Sewerage treatment & garbage disposal27.05547.34647.34647.346
Electricity Supply System140.502140.502162.118118.886
Storm Water Drainage24.42442.74242.74242.742
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Horticulture10.40013.00013.00013.000
Street lighting6.5006.5007.5005.500
Consultancy Fees Gate complex etc13.26019.89019.89019.890

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements84.13767.30950.4820
Water Supply System33.66826.93400
Sewerage treatment & garbage disposal33.81827.05500
Electricity Supply System108.07886.46364.8470
Storm Water Drainage30.53024.42400
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street lighting5.0004.0003.0000
Consultancy Fees Gate complex etc16.57513.2609.9450
Horticulture10.40010.4007.80013.000












Yes
No
HDFC BANK LTD. A-12THE SHOPPING MALL,DLF QUTUB ENCLAVE, GURGAON-122002
00440310000259
HDFC0000044
110240006
000044
1) Shri Shrivallabh Goyal 2) Shri Sudhir Kumar Jain 3) Shri Gagan Agarwal 4) Shri Ashish Jain 5) Shri Amit Kumar Garg Address:- Model Economic Township Limited, 3rd Floor, 77-B, IFFCO Road, Sector-18, Gurugram-122015 (HR)
Attached in Folder D











Yes
No
No
No
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LAYOUT PLAN ALREADY BEEN OBTAINED10-08-2022
II. LICENSE ALREADY BEEN OBTAINED10-08-2022








Yes


Yes









INDUSTRIAL COLONY OVER 246.431 ACRES IN VILLAGE DADRI TOE, SHEOJIPURA AND BIR DADRI ,DIST. JHAJJAR (AS ON 30 SEP, 2022)
246.431
0
85
0
76
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14246.0814246.0812859.62
Cost of the apartments000
Cost of the infrastructure13251.8813251.8811867.19
Others costs994.20994.20992.43


22424.06 Lakhs
13631.00 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2022
30-06-2023




A COMMERCIAL PLOT OF 3.96 ACRES, PART OF INDUSTRIAL TOWNSHIP OF 1034.59375 ACRE IN VILLAGE DADRI TOE, SONDHI, YAKUBPUR, DISTRICT JHAJJAR (AS ON 30 SEP, 2022)
3.96
0
45
0
38
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1124.001344.71656.55
Cost of the apartments0.000.000.00
Cost of the infrastructure1108.001332.69645.12
Others costs16.0012.0111.43


2406.91 Lakhs
305.90 Lakhs
0.00 Lakhs
0.00 Lakhs
No
01-03-2024
01-03-2024




INDUSTRIALCOLONYFOR 79.756 ACRES IN VILLAGEDADRI TOE, SONDHI,YAKUBPUR,DIST.JHAJJAR (AS ON 30 SEP, 2022)
79.756
0
806
0
803
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
13237.009790.383762.51
Cost of the apartments000
Cost of the infrastructure12363.009578.483550.61
Others costs874.00211.90211.90


14629.20 Lakhs
13731.80 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2026
30-06-2026




INDUSTRIAL COLONY FOR 68.325 ACRES IN VILLAGE DADRI TOE, SONDHI,YAKUBPUR,DIST.JHAJJAR (AS ON 30 SEP, 2022
68.325
0
103
0
81
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3410.005557.153596.84
Cost of the apartments000
Cost of the infrastructure3245.005360.733431.38
Others costs165.00196.42165.46


17545.64 Lakhs
938.36 Lakhs
0 Lakhs
0 Lakhs
No
03-12-2024
03-09-2025




INDUSTRIAL COLONY FOR 557.77 ACRES IN VILLAGE DADRI TOE SONDHI YAKUBPUR, DIST. JHAJJAR (AS ON 30 SEP, 2022)
557.77
0
280
0
260
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
31729.0037710.9425292.77
Cost of the apartments000
Cost of the infrastructure30156.0036132.2623818.53
Others costs1573.001578.681474.24


82334.11 Lakhs
4049.89 Lakhs
0 Lakhs
0 Lakhs
No
11-05-2024
11-02-2025




INDUSTRIAL COLONY FOR 134.36 ACRES IN SECTOR-2B, VILLAGE SHEOJIPURA, DIST. JHAJJAR (AS ON 30 SEP, 2022)
134.36
0
87
0
33
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
8765.009495.151853.95
Cost of the apartments000
Cost of the infrastructure8382.009106.751465.55
Others costs383.00388.40388.40


4725.52 Lakhs
9890.48 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2027
31-03-2027




INDUSTRIAL COLONY FOR 54.638 ACRES IN SECTOR-8, POCKET J & K, YAKUBPUR & SONDHI, DIST. JHAJJAR (AS ON 30 SEP, 2022)
54.638
0
684
0
600
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6052.126050.80638.09
Cost of the apartments000
Cost of the infrastructure5872.205872.20469.01
Others costs179.92178.60169.08


4799.48 Lakhs
31414.52 Lakhs
0 Lakhs
0 Lakhs
No
31-05-2027
31-05-2027




"A COMMERCIAL PLOT OF 3.356 ACRES, PART OF INDUSTRIAL TOWNSHIP OF 1034.59375 ACRE IN VILLAGE YAKUBPUR, DISTRICT JHAJJAR (AS ON 30 SEP, 2022) "
3.356
0
50
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1124.001118.0259.27
Cost of the apartments000
Cost of the infrastructure1108.001108.0049.25
Others costs16.0010.0210.02


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2027
30-06-2027










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND12-10-2022 View Document
2NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT12-10-2022 View Document
3DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.12-10-2022 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN12-10-2022 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN12-10-2022 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 Corrigendum of bank account change is uploaded. 12-12-2024 View Document