Quarterly Schedules

HRERA Gurugram
Project Registration Number : GGM/308/40/2019/02 DATED 16.01.2019
Project Name : CONSCIENT ONE
Project Number : RERA-GRG-159-2019
Project Type : ONGOING
Report Online Submission Date : 15-Jan-2020



ParticularsExpenditure already incurred up to the date of registration.
(In Lakhs)
Total Estimated/ Revised cost of project. (In Lakhs)
Land39503950
Building607916037.81
Infrastructure facilities, etc.01309
Other costs including EDC, IDC, etc.0685
Total1002921981.81



Name of the approvalStatusDate
Layout PlanHave not applied till dateN/A
Demarcation PlanHave not applied till dateN/A
Zoning PlanHave not applied till dateN/A
Service PlansHave not applied till dateN/A
Electricity PlansHave not applied till dateN/A



Name of the approvalStatusDate
Demarcation PlanObtained Approval on23-01-2019
Zoning PlanObtained Approval on26-02-2019
Service PlansObtained Approval on29-01-2020
Electricity PlansObtained Approval on13-01-2020
Site PlansRevised approval obtained on04-07-2019
Building PlansRevised approval obtained on04-07-2019
FIre NOCObtained Approval on18-02-2020
Total Expenditure on the project17300
Expenditure made upto the date of Registration10029



EDC due as on the date of Registration134.37

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance191.02
2Amount collected from allottees against booked plots and/or apartments1331.26
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total1522.28



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments8010.52
3Cost of infrastructure & other structure935.52
4Other costs including EDC, taxes, etc531.28
Total13427.32
Balance3872.68



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter-10.80
2Amount deposited in Escrow Account1074.50
3Amount withdrawn during the quarter1085.09
4Balance at the end of the quarter-21.39
Total Apartments in the colony358
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER29
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER2
3SERVICED SUITES SOLD DURING THE QUARTER0
4SERVICED SUITES CANCELLED/ SURRENDERED DURING THE QUARTER2



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER14
2CAR PARKING SOLD/ CANCELLED DURING THE QUARTER4



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure935.52
2Apartments1931.52
3EDC, IDC, etc74.54
4Others Expenditure456.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date25.98
2EDC due as on date25.96
Sr. No.Document DescriptionDate of Upload Document View
1 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-01-2020  View 
2 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-01-2020  View 
3 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-01-2020  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-01-2020  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-01-2020  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance3.50
2Amount collected from allottees against booked plots and/or apartments1163.43
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total1166.93



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments8842.23
3Cost of infrastructure & other structure1066.84
4Other costs including EDC, taxes, etc544.40
Total14403.47
Balance2896.53



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter-21.39
2Amount deposited in Escrow Account1130.43
3Amount withdrawn during the quarter1083.14
4Balance at the end of the quarter25.90
Total Plots in the colony455
Plots sold upto the date of Registration310



S.No.Type/SizePlots Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER11
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER3
3SERVICED SUITE SOLD DURING THE QUARTER0
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER5



Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER11
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER3
3SERVICED SUITE SOLD DURING THE QUARTER0
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER5



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER3
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER8



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1066.84
2Apartments2763.23
3EDC, IDC, etc74.54
4Others Expenditure469.86



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date40.56
2EDC due as on date40.54
Sr. No.Document DescriptionDate of Upload Document View
1 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-01-2020  View 
2 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-01-2020  View 
3 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-01-2020  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-01-2020  View 
5 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-01-2020  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance86.91
2Amount collected from allottees against booked plots and/or apartments552.12
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total639.03



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments9634.18
3Cost of infrastructure & other structure1112.66
4Other costs including EDC, taxes, etc544.40
Total15241.24
Balance2058.76



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter25.90
2Amount deposited in Escrow Account938.21
3Amount withdrawn during the quarter958
4Balance at the end of the quarter6.11
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER8
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER0
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER5



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER6
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER5



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1112.66
2Apartments3555.18
3EDC, IDC, etc74.54
4Others Expenditure469.86



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date54.97
2EDC due as on date54.79
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-01-2020  View 
2 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-01-2020  View 
3 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-01-2020  View 
4 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-01-2020  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-01-2020  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance0.42
2Amount collected from allottees against booked plots and/or apartments503.06
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total503.48



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments10242.08
3Cost of infrastructure & other structure1243.56
4Other costs including EDC, taxes, etc569.70
Total16005.34
Balance1294.66



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter6.11
2Amount deposited in Escrow Account884.08
3Amount withdrawn during the quarter889.30
4Balance at the end of the quarter0.89
Total Plots in the colony0
Plots sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
1NA0



Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER15
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER0
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER2



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER4
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER2



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1243.56
2Apartments4163.08
3EDC, IDC, etc88.45
4Others Expenditure481.25



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date68.88
2EDC due as on date0
Sr. No.Document DescriptionDate of Upload Document View
1 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-04-2020  View 
2 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-04-2020  View 
3 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-04-2020  View 
4 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-04-2020  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-04-2020  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance49.85
2Amount collected from allottees against booked plots and/or apartments231.83
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total281.68



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments10631.58
3Cost of infrastructure & other structure1250.10
4Other costs including EDC, taxes, etc583.33
Total16415.01
Balance884.99



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter0.89
2Amount deposited in Escrow Account413.07
3Amount withdrawn during the quarter412.43
4Balance at the end of the quarter1.53
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT/ SERVICED SUITE SOLD DURING THE QUARTER0
2RETAIL UNIT/ SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER0
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1250.10
2Apartments4552.58
3EDC, IDC, etc102.08
4Others Expenditure481.25



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date82.51
2EDC due as on date0
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-07-2020  View 
2 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-07-2020  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-07-2020  View 
4 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-07-2020  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-07-2020  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance9.49
2Amount collected from allottees against booked plots and/or apartments229.60
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates534.08
5Any other receipt0
Total773.17



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments11214.16
3Cost of infrastructure & other structure1309
4Other costs including EDC, taxes, etc684.72
Total17157.88
Balance142.12



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter1.53
2Amount deposited in Escrow Account763.68
3Amount withdrawn during the quarter755.46
4Balance at the end of the quarter9.75
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER10



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1GARAGES/ PARKING SOLD DURING THE QUARTER 0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments5135.16
3EDC, IDC, etc203.47
4Others Expenditure481.25



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date82.51
2EDC due as on date0
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 14-10-2020  View 
2 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 14-10-2020  View 
3 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 14-10-2020  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 14-10-2020  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 14-10-2020  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance-16.89
2Amount collected from allottees against booked plots and/or apartments1840.25
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total1823.36



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments11990.48
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc684.72
Total17977.72
Balance2004.09



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter9.75
2Amount deposited in Escrow Account838
3Amount withdrawn during the quarter819.73
4Balance at the end of the quarter28.02
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER16
2RETAIL UNIT CANCELLED/ SURRENDERED DURING THE QUARTER1
3SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER4



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKINGS SOLD DURING THE QUARTER9
2CAR PARKINGS CANCELLED/ SURRENDERED DURING THE QUARTER5



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments5911.48
3EDC, IDC, etc246.99
4Others Expenditure481.25



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date82.51
2EDC due as on date0
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 29-01-2021  View 
2 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 29-01-2021  View 
3 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 29-01-2021  View 
4 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 29-01-2021  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 29-01-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance251.98
2Amount collected from allottees against booked plots and/or apartments548.69
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total800.67



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments12525.86
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total18552.59
Balance1429.22



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter28.02
2Amount deposited in Escrow Account743
3Amount withdrawn during the quarter756.01
4Balance at the end of the quarter15.01
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER6
2RETAIL UNIT CANCELLED/ SURRENDERED DURING THE QUARTER3
3SERVICED SUITE SOLD DURING THE QUARTER0
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER3



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER0
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER6



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments6446.86
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date12.76
Sr. No.Document DescriptionDate of Upload Document View
1 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-04-2021  View 
2 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-04-2021  View 
3 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-04-2021  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-04-2021  View 
5 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-04-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance38.07
2Amount collected from allottees against booked plots and/or apartments499.75
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total537.82



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments12860.95
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total18887.68
Balance1094.13



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter15.01
2Amount deposited in Escrow Account370
3Amount withdrawn during the quarter343.72
4Balance at the end of the quarter41.29
Total Plots in the colony455
Plots sold upto the date of Registration310



S.No.Type/SizePlots Sold in the Quarter
1FLATS390



Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER1
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER 0
3SERVICED SUITES SOLD DURING THE QUARTER0
4SERVICED SUITES CANCELLED/ SURRENDERED DURING THE QUARTER4



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER0
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER4



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments6781.95
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date25.29
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-07-2021  View 
2 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-07-2021  View 
3 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-07-2021  View 
4 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-07-2021  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-07-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance194.85
2Amount collected from allottees against booked plots and/or apartments440.98
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total635.83



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments13287.02
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total19313.75
Balance668.06



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter41.29
2Amount deposited in Escrow Account516
3Amount withdrawn during the quarter517.19
4Balance at the end of the quarter40.10
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER4
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER0
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER2
5OFFICE SPACE SOLD DURING THE QUARTER3
6OFFICE SPACE CANCELLED/ SURRENDERED DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER3
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER2



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments7208.02
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date37.84
Sr. No.Document DescriptionDate of Upload Document View
1 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 13-10-2021  View 
2 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 13-10-2021  View 
3 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 13-10-2021  View 
4 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 13-10-2021  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 13-10-2021  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance79.76
2Amount collected from allottees against booked plots and/or apartments289.14
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total368.90



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments13754.26
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total19780.99
Balance200.82



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter40.10
2Amount deposited in Escrow Account193
3Amount withdrawn during the quarter230.01
4Balance at the end of the quarter3.09
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER2
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER2
3SERVICED SUITE SOLD DURING THE QUARTER1
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER1
5OFFICE SPACE SOLD DURING THE QUARTER3



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER3
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER3



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments7675.26
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date37.84
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 13-01-2022  View 
2 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 13-01-2022  View 
3 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 13-01-2022  View 
4 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 13-01-2022  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 13-01-2022  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance65.38
2Amount collected from allottees against booked plots and/or apartments148.54
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total213.92



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments13911.19
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total19937.92
Balance43.89



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter3.09
2Amount deposited in Escrow Account113
3Amount withdrawn during the quarter98.49
4Balance at the end of the quarter17.60
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER2
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITES SOLD DURING THE QUARTER3
4SERVICED SUITES CANCELLED/ SURRENDERED DURING THE QUARTER5



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING/ GARAGES SOLD DURING THE QUARTER0
2CAR PARKING/ GARAGES CANCELLED/ SURRENDERED DURING THE QUARTER5



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments7832.19
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date37.84
Sr. No.Document DescriptionDate of Upload Document View
1 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-04-2022  View 
2 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-04-2022  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-04-2022  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-04-2022  View 
5 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-04-2022  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance141.98
2Amount collected from allottees against booked plots and/or apartments505.88
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total647.86



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments14243.30
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total20270.03
Balance711.78



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter17.60
2Amount deposited in Escrow Account219
3Amount withdrawn during the quarter224.19
4Balance at the end of the quarter12.41
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER1
2RETAIL UNIT CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER9
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER0
5OFFICE SPACE SOLD DURING THE QUARTER3
6OFFICE SPACE CANCELLED/ SURRENDERED DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER7
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER 0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments8164.30
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date37.84
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 18-07-2022  View 
2 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 18-07-2022  View 
3 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 18-07-2022  View 
4 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 18-07-2022  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 18-07-2022  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance60.57
2Amount collected from allottees against booked plots and/or apartments471.41
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total531.98



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments14543.35
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total20570.08
Balance411.73



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter12.41
2Amount deposited in Escrow Account233.50
3Amount withdrawn during the quarter217.74
4Balance at the end of the quarter28.17
Total Plots in the colony455
Plots sold upto the date of Registration310



S.No.Type/SizePlots Sold in the Quarter
1RETAIL UNIT310



Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER4
2RETAIL UNIT CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER1
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER0
5OFFICE SPACE SOLD DURING THE QUARTER0
6OFFICE SPACE CANCELLED/ SURRENDERED DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING SOLD DURING THE QUARTER0
2CAR PARKING CANCELLED/ SURRENDERED DURING THE QUARTER0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments8464.35
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date37.84
Sr. No.Document DescriptionDate of Upload Document View
1 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-10-2022  View 
2 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-10-2022  View 
3 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-10-2022  View 
4 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-10-2022  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance12.53
2Amount collected from allottees against booked plots and/or apartments397.91
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total410.44



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments14840.09
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total20866.82
Balance114.99



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter28.17
2Amount deposited in Escrow Account262.50
3Amount withdrawn during the quarter289.27
4Balance at the end of the quarter1.40
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER2
2RETAIL UNIT CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER6
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER1
5OFFICE SPACE SOLD DURING THE QUARTER0
6OFFICE SPACE CANCELLED/ SURRENDERED DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING/ GARAGES ALLOTTED DURING THE QUARTER0
2CAR PARKING/ GARAGES CANCELLED/ SURRENDERED DURING THE QUARTER0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments8761.09
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date109.21
2EDC due as on date37.84
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 18-01-2023  View 
2 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 18-01-2023  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 18-01-2023  View 
4 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 18-01-2023  View 
5 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 18-01-2023  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance4
2Amount collected from allottees against booked plots and/or apartments280.99
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total284.99



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments15084.44
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total21111.17
Balance870.64



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter1.40
2Amount deposited in Escrow Account295
3Amount withdrawn during the quarter284.34
4Balance at the end of the quarter12.06
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNITS SOLD DURING THE QUARTER0
2RETAIL UNITS CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER8
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER0
5OFFICE SPACE SOLD DURING THE QUARTER4
6OFFICE SPACE CANCELLED/ SURRENDERED DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING/ GARAGES ALLOTTED DURING THE QUARTER9
2CAR PARKING/ GARAGES CANCELLED/ SURRENDERED DURING THE QUARTER0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments9005.44
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date94.63
2EDC due as on date27.01
Sr. No.Document DescriptionDate of Upload Document View
1 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 19-04-2023  View 
2 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 19-04-2023  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 19-04-2023  View 
4 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 19-04-2023  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 19-04-2023  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance338.96
2Amount collected from allottees against booked plots and/or apartments207.69
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total546.65



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments15313.76
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total21340.49
Balance641.32



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter12.06
2Amount deposited in Escrow Account330
3Amount withdrawn during the quarter323.57
4Balance at the end of the quarter18.49
Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER1
2RETAIL UNIT CANCELLED/ SURRENDERED DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER3
4SERVICED SUITE CANCELLED/ SURRENDERED DURING THE QUARTER1
5OFFICE SPACE SUB UNIT SOLD DURING THE QUARTER1
6OFFICE SPACE SUB UNIT CANCELLED/ SURRENDERED DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING/ GARAGES ALLOTTED DURING THE QUARTER0
2CAR PARKING/ GARAGES CANCELLED/ SURRENDERED DURING THE QUARTER1



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments9234.76
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date145.43
2EDC due as on date0
Sr. No.Document DescriptionDate of Upload Document View
1 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-07-2023  View 
2 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-07-2023  View 
3 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-07-2023  View 
4 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-07-2023  View 
5 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-07-2023  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance140.35
2Amount collected from allottees against booked plots and/or apartments127.69
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total268.04



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950.00
2Cost of construction of apartments15383.09
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total21409.82
Balance571.99



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter18.49
2Amount deposited in Escrow Account84.00
3Amount withdrawn during the quarter95.02
4Balance at the end of the quarter7.47
Total Plots in the colony0
Plots sold upto the date of Registration0



S.No.Type/SizePlots Sold in the Quarter
10



Total Apartments in the colony455
Apartments sold upto the date of Registration310



S.No.Type/SizeApartments Sold in the Quarter
1RETAIL UNIT SOLD DURING THE QUARTER1
2RETAIL UNIT CANCELLED/ SURRENDER DURING THE QUARTER0
3SERVICED SUITE SOLD DURING THE QUARTER3
4SERVICED SUITE CANCELLED/ SURRENDER DURING THE QUARTER1
5OFFICE SPACE SUB UNIT SOLD DURING THE QUARTER1
6OFFICE SPACE SUB UNIT CANCELLED/SURRENDER DURING THE QUARTER0



Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING/ GARAGES ALLOTTED DURING THE QUARTER0
2CAR PARKING/ GARAGES CANCELLED/ SURRENDERED DURING THE QUARTER0



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309.00
2Apartments9304.09
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date145.43
2EDC due as on date0
Sr. No.Document DescriptionDate of Upload Document View
1 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 16-10-2023  View 
2 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 16-10-2023  View 
3 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 16-10-2023  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 16-10-2023  View 
5 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 16-10-2023  View 

;
S.No.Cash InflowAmount
(In Lakhs)
1Opening Balance60.69
2Amount collected from allottees against booked plots and/or apartments25.92
3Amount availed from the bank/financial institutions0
4Amount contributed by the promoters/his associates0
5Any other receipt0
Total86.61



S.No.Cash OutflowAmount
(In Lakhs)
1Land3950
2Cost of construction of apartments15592.33
3Cost of infrastructure & other structure1352.52
4Other costs including EDC, taxes, etc724.21
Total21619.06
Balance362.75



S.No.Information relating to Escrow AccountAmount
(In Lakhs)
1Opening balance at the beginning of the quarter7.47
2Amount deposited in Escrow Account20
3Amount withdrawn during the quarter20.29
4Balance at the end of the quarter7.18
Total Garages in the colony0
Garages sold upto the date of Registration307



S.No.Type/SizeGarages Sold in the Quarter
1CAR PARKING/ GARAGES SOLD DURING THE QUARTER54
2CAR PARKING/ GARAGES CANCELLED OR SURRENDER DURING THE QUARTER1



S.No.Expenditure on Infrastructure made in the QuarterAmount
(In Lakhs)
1Infrastructure1309
2Apartments9513.33
3EDC, IDC, etc246.99
4Others Expenditure520.74



S.No.Expenditure on Taxes,Levies,EDC etc in the QuarterAmount
(In Lakhs)
1Actual paid as on date757.04
2EDC due as on date0
Sr. No.Document DescriptionDate of Upload Document View
1 SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. 15-01-2024  View 
2 A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. 15-01-2024  View 
3 CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT 15-01-2024  View 
4 CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. 15-01-2024  View 
5 A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. 15-01-2024  View