Project Registration Number : HRERA-PKL-PNP-4-2018 | ||
Project Name : HARMONY HOMES | ||
Project Number : RERA-PKL-522-2019 | ||
Project Type : NEW | ||
Report Online Submission Date : 21-Mar-2020 |
S.No. | Particulars | Amount (In Lakhs) |
1 | Cost of the land (if included in the estimated cost) | 250 |
2 | Estimated cost of construction of apartments | 17360.35 |
3 | Estimated cost of infrastructure & other structure | 1239.65 |
4 | Other cost including EDC taxes, levies, etc | 2340 |
Total | 21190 |
Name of the approval | Status | Date |
Layout Plan | Obtained Approval on | 09-11-2017 |
Demarcation Plan | Obtained Approval on | 09-11-2017 |
Zoning Plan | Obtained Approval on | 09-11-2017 |
Service Plans | Obtained Approval on | 09-11-2017 |
Electricity Plans | Obtained Approval on | 09-11-2017 |
Name of the approval | Status | Date |
Demarcation Plan | Obtained Approval on | 16-06-2017 |
Zoning Plan | Obtained Approval on | 16-06-2017 |
Service Plans | Obtained Approval on | 16-06-2017 |
Electricity Plans | Obtained Approval on | 26-06-2018 |
Site Plans | Obtained Approval on | 09-11-2017 |
Building Plans | Obtained Approval on | 09-11-2017 |
FIre NOC | Obtained Approval on | 10-09-2020 |
Total Expenditure on the project | 1239.65 |
Expenditure made upto the date of Registration | 420.67 |
EDC due as on the date of Registration | 96.62 |
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1177.71 |
2 | Amount collected from allottees against booked plots and/or apartments | 803.80 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 154 |
5 | Any other receipt | 17.45 |
Total | 2152.95 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1648.20 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 481.51 |
Total | 2129.71 | |
Balance | 23.25 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 568.91 |
2 | Amount deposited in Escrow Account | 1042.11 |
3 | Amount withdrawn during the quarter | 1600.77 |
4 | Balance at the end of the quarter | 10.25 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 849 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 21 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 21 |
2 | EDC due as on date | 263.10 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 23.25 |
2 | Amount collected from allottees against booked plots and/or apartments | 1014.79 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 39.35 |
Total | 1077.39 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 849.28 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 77.85 |
Total | 927.14 | |
Balance | 150.25 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 10.25 |
2 | Amount deposited in Escrow Account | 1355.59 |
3 | Amount withdrawn during the quarter | 1264.19 |
4 | Balance at the end of the quarter | 101.65 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 21 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 21 |
2 | EDC due as on date | 263.10 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 150.25 |
2 | Amount collected from allottees against booked plots and/or apartments | 1528.72 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | -154 |
5 | Any other receipt | 3.92 |
Total | 1528.89 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1254.65 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 267.46 |
Total | 1522.11 | |
Balance | 6.78 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 101.65 |
2 | Amount deposited in Escrow Account | 1296.78 |
3 | Amount withdrawn during the quarter | 1391.65 |
4 | Balance at the end of the quarter | 6.78 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 170 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 1254.65 |
3 | EDC, IDC, etc | 21 |
4 | Others Expenditure | 246.46 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 21 |
2 | EDC due as on date | 350.96 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 6.78 |
2 | Amount collected from allottees against booked plots and/or apartments | 934.58 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 9.81 |
Total | 951.18 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 597.86 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 273.74 |
Total | 871.60 | |
Balance | 79.58 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 6.78 |
2 | Amount deposited in Escrow Account | 1020.63 |
3 | Amount withdrawn during the quarter | 947.84 |
4 | Balance at the end of the quarter | 79.58 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 597.86 |
3 | EDC, IDC, etc | 85.65 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 403.69 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 79.58 |
2 | Amount collected from allottees against booked plots and/or apartments | 754.26 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 15.11 |
Total | 848.94 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 598.60 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 228.16 |
Total | 826.75 | |
Balance | 22.19 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 79.58 |
2 | Amount deposited in Escrow Account | 846.63 |
3 | Amount withdrawn during the quarter | 904.01 |
4 | Balance at the end of the quarter | 22.19 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 49 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 598.60 |
3 | EDC, IDC, etc | 85.65 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 507.24 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 22.19 |
2 | Amount collected from allottees against booked plots and/or apartments | 1256.41 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 187.21 |
5 | Any other receipt | 10.77 |
Total | 1476.68 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1229.23 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 108.22 |
Total | 1337.45 | |
Balance | 139.13 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 22.19 |
2 | Amount deposited in Escrow Account | 1850.79 |
3 | Amount withdrawn during the quarter | 1733.85 |
4 | Balance at the end of the quarter | 139.13 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 40 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 0 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 139.13 |
2 | Amount collected from allottees against booked plots and/or apartments | 675.13 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 1.14 |
Total | 815.40 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 744.45 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 40.81 |
Total | 785.26 | |
Balance | 30.13 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 139.13 |
2 | Amount deposited in Escrow Account | 890.62 |
3 | Amount withdrawn during the quarter | 999.62 |
4 | Balance at the end of the quarter | 30.13 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 366.83 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 30.13 |
2 | Amount collected from allottees against booked plots and/or apartments | 1156.53 |
3 | Amount availed from the bank/financial institutions | 12.73 |
4 | Amount contributed by the promoters/his associates | -31.82 |
5 | Any other receipt | 3.29 |
Total | 1170.87 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 962.87 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 89.13 |
Total | 1052.01 | |
Balance | 118.86 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 30.13 |
2 | Amount deposited in Escrow Account | 1620.35 |
3 | Amount withdrawn during the quarter | 1531.62 |
4 | Balance at the end of the quarter | 118.86 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 4 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 366.83 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 118.86 |
2 | Amount collected from allottees against booked plots and/or apartments | 1093 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 6.85 |
Total | 1218.71 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1022.99 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 77.25 |
Total | 1100.24 | |
Balance | 118.47 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 118.86 |
2 | Amount deposited in Escrow Account | 1398.09 |
3 | Amount withdrawn during the quarter | 1398.48 |
4 | Balance at the end of the quarter | 118.47 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 517.2 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 118.47 |
2 | Amount collected from allottees against booked plots and/or apartments | 2371.52 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | -35.80 |
5 | Any other receipt | 15.10 |
Total | 2469.29 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1731.39 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 149.30 |
Total | 1880.68 | |
Balance | 588.60 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 118.47 |
2 | Amount deposited in Escrow Account | 2766.06 |
3 | Amount withdrawn during the quarter | 2295.93 |
4 | Balance at the end of the quarter | 588.60 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 6 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 517.2 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 588.60 |
2 | Amount collected from allottees against booked plots and/or apartments | 1715.31 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | -87.90 |
5 | Any other receipt | 67.68 |
Total | 2283.70 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1842.93 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 116.72 |
Total | 1959.66 | |
Balance | 324.04 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 588.60 |
2 | Amount deposited in Escrow Account | 2531.47 |
3 | Amount withdrawn during the quarter | 2796.03 |
4 | Balance at the end of the quarter | 324.04 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 40 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 581.85 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 324.04 |
2 | Amount collected from allottees against booked plots and/or apartments | 1902.22 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 29.45 |
Total | 2255.71 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1268.30 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 442.11 |
Total | 1710.40 | |
Balance | 545.30 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 324.04 |
2 | Amount deposited in Escrow Account | 2345.57 |
3 | Amount withdrawn during the quarter | 2124.31 |
4 | Balance at the end of the quarter | 545.30 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 39 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 581.65 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 545.30 |
2 | Amount collected from allottees against booked plots and/or apartments | 1413.46 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | -5.58 |
5 | Any other receipt | 14.56 |
Total | 1967.74 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1561.05 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 189.49 |
Total | 1750.54 | |
Balance | 217.19 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 545.30 |
2 | Amount deposited in Escrow Account | 1635.70 |
3 | Amount withdrawn during the quarter | 1963.81 |
4 | Balance at the end of the quarter | 217.19 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 10 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 646.5 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 217.19 |
2 | Amount collected from allottees against booked plots and/or apartments | 640.33 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 37.99 |
5 | Any other receipt | 5.30 |
Total | 900.82 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 751.31 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 120.21 |
Total | 871.53 | |
Balance | 29.29 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 217.19 |
2 | Amount deposited in Escrow Account | 803.88 |
3 | Amount withdrawn during the quarter | 991.78 |
4 | Balance at the end of the quarter | 29.29 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 2 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 646.50 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 29.29 |
2 | Amount collected from allottees against booked plots and/or apartments | 386.37 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 1.49 |
Total | 417.16 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 377.85 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 33.67 |
Total | 411.52 | |
Balance | 5.64 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 29.29 |
2 | Amount deposited in Escrow Account | 514 |
3 | Amount withdrawn during the quarter | 537.65 |
4 | Balance at the end of the quarter | 5.64 |
Total Plots in the colony | 1120 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 5 | 15 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 85.65 |
2 | EDC due as on date | 646.50 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 5.64 |
2 | Amount collected from allottees against booked plots and/or apartments | 271.45 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 264.50 |
5 | Any other receipt | 0 |
Total | 541.59 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 17 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 501.30 |
Total | 518.30 | |
Balance | 23.29 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 5.64 |
2 | Amount deposited in Escrow Account | 971.71 |
3 | Amount withdrawn during the quarter | 954.07 |
4 | Balance at the end of the quarter | 23.29 |
Total Plots in the colony | 1120 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 5 | 21 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 21 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 357.21 |
2 | EDC due as on date | 289.29 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 23.29 |
2 | Amount collected from allottees against booked plots and/or apartments | 217.55 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 2.82 |
Total | 243.66 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 208.05 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 27.93 |
Total | 235.98 | |
Balance | 7.68 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 23.29 |
2 | Amount deposited in Escrow Account | 878.09 |
3 | Amount withdrawn during the quarter | 893.70 |
4 | Balance at the end of the quarter | 7.68 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 14 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 357.21 |
2 | EDC due as on date | 289.29 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 7.68 |
2 | Amount collected from allottees against booked plots and/or apartments | 136.16 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | -48.22 |
5 | Any other receipt | 177 |
Total | 272.63 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 104.34 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 132.81 |
Total | 237.15 | |
Balance | 35.48 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 7.68 |
2 | Amount deposited in Escrow Account | 799.07 |
3 | Amount withdrawn during the quarter | 771.27 |
4 | Balance at the end of the quarter | 35.48 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 14 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 429.55 |
2 | EDC due as on date | 216.97 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 35.48 |
2 | Amount collected from allottees against booked plots and/or apartments | 372.79 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 322.50 |
5 | Any other receipt | 99.50 |
Total | 830.27 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 684.75 |
2 | Expenditure on infrastructure & other structure | 0 |
3 | Other costs including EDC, taxes, etc | 121.54 |
Total | 806.29 | |
Balance | 23.98 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 35.48 |
2 | Amount deposited in Escrow Account | 845.02 |
3 | Amount withdrawn during the quarter | 856.52 |
4 | Balance at the end of the quarter | 23.98 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 1120 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 5 | 13 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 429.55 |
2 | EDC due as on date | 216.97 |
|