HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-709-2019
Submission Date : 05-09-2019 11:15:36 AM
Applicant Type : Company
Project Type: ONGOING




VASHISTH BUILDERS AND ENGINEERS LIMITED
A-11, 1ST FLOOR, PAHSE -1, OKHLA, NEW DELHI -110020
01292987333
8527179990 (Number Shared by Promoter in Public)
ACCOUNTS@VBEGROUP.IN
XXXX687L
U45201DL1990PLC041987
 
 


 
 


 
 


 
 







GLOBAL INDUSTRIAL PARK (PHASE-II)
SECTOR 72-73
FARIDABAD
FARIDABAD
8527179990 (Number Shared by Promoter in Public)
accounts@vbegroup.in
SURENDER KUMAR VASHISTH
8527179990 (Number Shared by Promoter in Public)
accounts@vbegroup.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
137802304-09-2019610000CENTRAL BANK OF INDIA, NEW DELHIHRERA Panchkula







13.230 (Acre)
1.00 for Industrial Plotted as per Rules.
1.00
13.230 (Acre)
License No. 124 of 2012 which is valid upto 19.12.2016.
No
Address     152, 2ND FLOOR, SARAI JULLENA, NEW DELHI
Address     152, 2ND FLOOR, SARAI JULLENA, NEW DELHI
Address     152, 2ND FLOOR, SARAI JULLENA, NEW DELHI
Address     152, 2ND FLOOR, SARAI JULLENA, NEW DELHI
Annexure-B- THE LAND OWNED COMPANIES HAVE ENTERED INTO REGISTERED COLLABORATION WITH THE PROMOTERS VIDE DATED 13.10.2017.
YES THE COLLABORATION AGREEMENT IS REGISTERED ON DATED 13.10.2017.
No
THE COLLABORATOR COMPNIES HAVE ENTERED INTO COLLABORATION AGREEMENT WITH THE PROMOTER DUE TO NON EXPERIENCE OF THE DEVELOPMENT OF A COLONY.
No
No
Yes







2710.225 Lakhs
1887.50 Lakhs
0.00 Lakhs
528.975 Lakhs
293.75 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 6.761
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 3.466
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 1.235
13AREA UNDER RESIDENTIAL PLOTS 1.4120
14COMMERCIAL AREA 0.356
Total13.23




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPNo
ELECTRICITYDHBVNLNo
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS226.867AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM39.893AS PER PROJECT REPORT
3STORM WATER DRAINAGE59.667AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM52.617AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL63.917AS PER PROJECT REPORT
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER86.011AS PER PROJECT REPORT


14-01-2018 (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 PLOT Type POCKET-P-6- F1 TO F3 1114.20 3 3342.6 1 2 0
2 PLOT Type POCKET-P7- G-1 TO G7 3022.08 7 21154.56 6 1 0
3 PLOT Type POCKET-P8-H1 TO H3 959.103 3 2877.309 2 1 0
4 PLOT Type POCKET-9- I 18 TO I 24 547.74 7 3834.18 6 1 0
5 PLOT Type POCKET-10-J1 TO J30 8813.246 30 264397.38 15 15 0
6 PLOT Type POCKET-11- K1 TO K5 3728.391 5 18641.955 3 2 0
7 PLOT Type POCKET-12 4698.571 16 75177.136 11 5 0
8 PLOT Type POCKET-13-M1 TO M2 1611.48 2 3222.96 0 2 0
9 PLOT Type POCKET-N1 1091.894 1 1091.894 0 1 0
10 PLOT Type POCKET-R1- A1 TO A8 1485.194 8 11881.552 7 1 0
11 PLOT Type POCKET-R2- B1 TO B-23 3836.413 23 88237.499 22 1 0
12 PLOT Type CLINIC 391.980 1 391.98 0 1 0
13 PLOT Type COMMERCIAL-C2 1438.86 1 1438.86 0 1 0
Total107495689.86573340






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
00


N/A
N/A
N/A
20-12-2012
80
12-01-2023


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT29RESIDENTIAL PLOTS SOLD TOTAL 29. THE INFRASTRUCTURAL SERVICES WORKS IS IN PROGRESS AT SITE.
PLOT44INDUSTRIAL PLOTS SOLD 44. THE INFRASTRUCTURAL SERVICES WORKS IS IN PROGRESS AT SITE
20-12-2012
80
12-01-2023


0
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements137.84
Water Supply System24.24
Sewerage treatment & garbage disposal13.83
Electricity Supply System40.30
Storm Water Drainage36.25
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other71.85

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.366.36
Water Supply System1.121.12
Sewerage treatment & garbage disposal3.583.58
Electricity Supply System0.880.88
Storm Water Drainage1.671.67
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other1.011.01

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.366.366.366.36
Water Supply System1.121.121.121.12
Sewerage treatment & garbage disposal3.583.583.583.58
Electricity Supply System0.880.880.880.88
Storm Water Drainage1.671.671.671.67
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other1.011.011.011.01

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.366.366.366.36
Water Supply System1.121.121.121.12
Sewerage treatment & garbage disposal3.583.583.583.58
Electricity Supply System0.880.880.880.88
Storm Water Drainage1.671.671.671.67
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other1.011.011.011.01

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.366.366.366.36
Water Supply System1.121.121.121.12
Sewerage treatment & garbage disposal3.583.583.583.58
Electricity Supply System0.880.880.880.88
Storm Water Drainage1.671.671.671.67
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other1.011.011.011.01

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Particulars Remarks, if any
i. No. of Flats/Apartments constructed107Industrial plots=74, Residential Plots=31, Clinic=1, & Commercial Plot=1
ii. No. of Flats/ Apartments booked73Industrial= 44 Plots, and Residential= 29 Plots sold.
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter2449.775 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter2380.573 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter69.202 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter69.202 Lakhs
vii. Amount invested in the project upto the date of application2386.817 Lakhs
Land cost (If any)1887.50 Lakhs
Apartments0 Lakhs
Infrastructure324.317 Lakhs
EDC/ Taxes Etc.175.00 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession204.653 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project204.653 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS226.867137.84
II. WATER SUPPLY SYSTEM39.89324.24
III. STORM WATER DRAINAGE59.66736.253
IV. ELECTRICITY SUPPLY SYSTEM52.61740.303
V. SEWAGE TREATMENT & GARBAGE DISPOSAL63.91713.833
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER86.01171.847
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
CENTRAL BANK OF INDIA, PARLIAMENT STREET, NEW DELHI
3219637746
CBIN0280316
110016015
280316
SURENDER KUMAR VASHISTH, HARPAL SINGH
Uploaded in upload Section











Yes
No
No
No
No
No
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 24 OF 2012ALREADY BEEN OBTAINED20-12-2012








Yes


Yes


The Important Provision of RERA Act and Rules have been incorporated as per Haryana Notified Draft agreement.













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE BEING INDUSTRIAL COLONY.
2WALL FINISHING DETAILSNOT APPLICABLE BEING INDUSTRIAL COLONY.
3KITCHEN DETAILSNOT APPLICABLE BEING INDUSTRIAL COLONY.
4BATHROOM FITTINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
5WOOD WORK ETCNOT APPLICABLE BEING INDUSTRIAL COLONY.
6DOORS AND WINDOS FRAMESNOT APPLICABLE BEING INDUSTRIAL COLONY.
7GLASS WORKNOT APPLICABLE BEING INDUSTRIAL COLONY.
8ELECTRIC FITTINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE BEING INDUSTRIAL COLONY.
10CUPBOARD DETAILSNOT APPLICABLE BEING INDUSTRIAL COLONY.
11WATER STORAGENOT APPLICABLE BEING INDUSTRIAL COLONY.
12LIFT DETAILSNOT APPLICABLE BEING INDUSTRIAL COLONY.
13EXTERNAL GLAZINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
13.1WINDOWS/GLAZINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
14DOORSNOT APPLICABLE BEING INDUSTRIAL COLONY.
14.1MAIN DOORSNOT APPLICABLE BEING INDUSTRIAL COLONY.
14.2INTERNAL DOORSNOT APPLICABLE BEING INDUSTRIAL COLONY.
15AIR CONDITIONINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
16ELECTRICAL FITTINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
17CNG PIPE LINENOT APPLICABLE BEING INDUSTRIAL COLONY.
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE BEING INDUSTRIAL COLONY.
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE BEING INDUSTRIAL COLONY.
20INTERNAL FINISHINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
1 . 2 WALLSNOT APPLICABLE BEING INDUSTRIAL COLONY.
1 . 3 CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
2 . 2 WALLSNOT APPLICABLE BEING INDUSTRIAL COLONY.
2 . 3 CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
2 . 4 MODULAR WARDROBESNOT APPLICABLE BEING INDUSTRIAL COLONY.
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
3 . 2 WALLSNOT APPLICABLE BEING INDUSTRIAL COLONY.
3 . 3 CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
3 . 4 COUNTERSNOT APPLICABLE BEING INDUSTRIAL COLONY.
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
3 . 6 FITTING/FIXTURESNOT APPLICABLE BEING INDUSTRIAL COLONY.
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
4 . 2 WALLSNOT APPLICABLE BEING INDUSTRIAL COLONY.
4 . 3 CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
4 . 4 WARDROBESNOT APPLICABLE BEING INDUSTRIAL COLONY.
5 . TOILET
5 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
5 . 2 WALLSNOT APPLICABLE BEING INDUSTRIAL COLONY.
5 . 3 CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
5 . 4 COUNTERSNOT APPLICABLE BEING INDUSTRIAL COLONY.
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
5 . 6 FIXTURESNOT APPLICABLE BEING INDUSTRIAL COLONY.
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
6 . 2 WALLSNOT APPLICABLE BEING INDUSTRIAL COLONY.
6 . 3 CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
6 . 4 COUNTERSNOT APPLICABLE BEING INDUSTRIAL COLONY.
6 . 5 FIXTURESNOT APPLICABLE BEING INDUSTRIAL COLONY.
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE BEING INDUSTRIAL COLONY.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
7 . 2 WALLS & CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
7 . 3 TOILETNOT APPLICABLE BEING INDUSTRIAL COLONY.
7 . 4 BALCONYNOT APPLICABLE BEING INDUSTRIAL COLONY.
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE BEING INDUSTRIAL COLONY.
8 . 2 WALLS & CEILINGNOT APPLICABLE BEING INDUSTRIAL COLONY.
8 . 3 RAILINGSNOT APPLICABLE BEING INDUSTRIAL COLONY.
8 . 4 FIXTURESNOT APPLICABLE BEING INDUSTRIAL COLONY.












Sr. No.Document DescriptionDate of Document UploadView Document
1 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 05-09-2019 View Document
2 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 05-09-2019 View Document
3 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 05-09-2019 View Document
4 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 05-09-2019 View Document
5 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 05-09-2019 View Document
6 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 05-09-2019 View Document