HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-702-2019
Submission Date : 27-08-2019 05:40:59 AM
Applicant Type : Company
Project Type: ONGOING




REALTECH INFRASTRUCTURE LTD.
D-22 DEFENCE COLONY, NEW DELHI-110024
01149051697
9971990019 (Number Shared by Promoter in Public)
pardeepgupta84@gmail.com
XXXX608R
U45200DL2006PLC156234
 
 


 
 


 
 







FBD ONE
SECTOR 37
FARIDABAD
FARIDABAD
9971990019 (Number Shared by Promoter in Public)
pardeepgupta84@gmai.com
PARDEEP GUPTA
9971990019 (Number Shared by Promoter in Public)
pardeepgupta84@gmai.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
11802826-08-2019766960.00HDFC BANK LIMITED, NEW DELHIHRERA Panchkula







37734.38 (Sqr/mtrs)
2.50 FOR IT AREA AND 1.5 FOR COMMERCIAL AREA
2.50
82031.27 (Sqr/mtrs)
LICENSE NO. 281 OF 2007 DATED 28.12.2007 IS VALID UPTO 27.12.2017.
No
Address     D-22, DEFENCE COLONY, NEW DELHI-110024
Annexure-B- VIDE AGREEMENT DATED 29.02.2008 AND SHARE HOLDING AGREEMENT EXECUTED VIDE DATED 29.02.2008, THE LAND OWNING COMPANY M/S DOVE INFRASTRUCTURE PVT. LIMITED HAVE EXECUTED AN AGREEMENT WITH REALTECH INFRASTRUCTURE LIMITED. THE PROMOTER COMPANY HAVE RIGHTS TO SELL/ TRANSFER AND CONVEYANCE EXECUTION RIGHTS WITH DEVELOPMENT & MARKETING RIGHTS BY THE LAND OWNING COMPANY I.E. DOVE INFRASTRUCTURE PVT. LTD.
BY VIRTUE OF AGREEMENTS MADE AFTER GRANT OF LICENSE.
No
AGREEMENT IS ANNEXED IN FOLDER -D FOR YOU REVIEW.
No
No
Yes







14105.25 Lakhs
1325.00 Lakhs
8914.80 Lakhs
2801.45 Lakhs
1064.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS36814.03
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13COMMERCIAL 920.35
Total37734.38




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPYes
WATER SUPPLYHSVPYes
ELECTRICITYUHBVNLYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS784.41AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM280.15AS PER PROJECT REPORT
3STORM WATER DRAINAGE280.15AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM896.46AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL280.15AS PER PROJECT REPORT
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS280.15AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


21-01-2011 (date)
21-01-2011 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type BLOCK-B & C (FAR AREA)36814.03241163782
2APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL BLOCK920.350000






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
BLOCK-B163THE OCCUPATION CERTIFICATE FOR THE SAID BOOKED TOWER HAS APPLIED TO DIRECTORATE OF TOWN & COUNTRY PLANNING, HARYANA OFFICE.


29-01-2011
30-12-2017
29-12-2022
29-01-2011
65
29-12-2022
THE DETAILS HAVE ENTERED INTO FORM C-X.
THE CONSTRUCTION OF BLOCK-B IS COMPLETED AND OCCUPATION STANDS APPLIED. THE REMAINING CONSTRUCTION WORKS SHALL BE COMPLETED AS PER RERA TIMELINES.


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
29-01-2011
65
29-12-2022
THE DETAILS HAVE ENTERED INTO FORM C-X.
THE CONSTRUCTION OF BLOCK-B IS COMPLETED AND OCCUPATION STANDS APPLIED. THE REMAINING CONSTRUCTION WORKS SHALL BE COMPLETED AS PER RERA TIMELINES.


328
0
0
198
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments3207.40
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments250.00125.00125.00250.00
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments250.00250.00250.00250.00
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments250.00250.00250.00
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements384.89
Water Supply System137.46
Sewerage treatment & garbage disposal137.46
Electricity Supply System439.87
Storm Water Drainage137.46
Parks and Playgrounds137.46
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements39.9519.9819.9839.95
Water Supply System14.277.137.1314.27
Sewerage treatment & garbage disposal14.277.137.1314.27
Electricity Supply System45.6622.8322.8345.66
Storm Water Drainage14.277.137.1314.27
Parks and Playgrounds14.277.137.1314.27
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements39.9539.9539.9539.95
Water Supply System14.2714.2714.2714.27
Sewerage treatment & garbage disposal14.2714.2714.2714.27
Electricity Supply System45.6645.6645.6645.66
Storm Water Drainage14.2714.2714.2714.27
Parks and Playgrounds14.2714.2714.2714.27
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements39.9539.9539.95
Water Supply System14.2714.2714.27
Sewerage treatment & garbage disposal14.2714.2714.27
Electricity Supply System45.6645.6645.66
Storm Water Drainage14.2714.2714.27
Parks and Playgrounds14.2714.2714.27
Clubhouse/community centres000
Shopping area000
Other000












Particulars Remarks, if any
i. No. of Flats/Apartments constructed241(163 Units Ready for Possession + 78 Units to be constructed)
ii. No. of Flats/ Apartments booked163
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter11180.00 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter9354.00 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter1826.00 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter1826.00 Lakhs
vii. Amount invested in the project upto the date of application6971.00 Lakhs
Land cost (If any)1325.00 Lakhs
Apartments3207.40 Lakhs
Infrastructure1374.60 Lakhs
EDC/ Taxes Etc.1064.00 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession7134.25 Lakhs
(a) In respect of existing allottees2500.00 Lakhs
(b) In respect of rest of the project4634.25 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 LakhsNIL



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS784.41384.89
II. WATER SUPPLY SYSTEM280.15137.46
III. STORM WATER DRAINAGE280.15137.46
IV. ELECTRICITY SUPPLY SYSTEM896.46439.87
V. SEWAGE TREATMENT & GARBAGE DISPOSAL280.15137.46
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.280.15137.46
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
HDFC BANK LIMITED, NEW DELHI
01342320003970
HDFC0000134
110240017
0134
Mr. Yogesh Gupta
Uploaded in upload section.











No
No
No
Yes
Yes
Yes
No
No
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. STP REPORT ON OCCUPATION CERTIFICATE ALREADY BEEN OBTAINED26-06-2019
II. SE, HUDA APPROVAL OF INTERNAL SERVICES FOR OCCUPATION CERTIFICATEALREADY BEEN OBTAINED15-02-2019
III. SE, HUDA APPROVAL OF EXTERNAL SERVICES FOR OCCUPATION CERTIFICATEALREADY BEEN OBTAINED08-03-2019
IV. LICENSE NO. 281 OF 2007ALREADY BEEN OBTAINED28-12-2007
V. APPROVAL OF SLDALREADY BEEN OBTAINED03-06-2019
VI. INSPECTION REPORT 500 KVA AND 62.5 KVAALREADY BEEN OBTAINED05-07-2018
VII. LOAD SANCTION LETTERALREADY BEEN OBTAINED03-04-2019
VIII. FIRE NOCALREADY BEEN OBTAINED24-04-2019
IX. EC APPROVAL ALREADY BEEN OBTAINED08-07-2019
X. RENEWAL OF LICENSE APPLICATIONAPPLIED FOR BUT YET TO RECEIVE28-11-2017
XI. APPROVAL OF SPEAPPLIED FOR BUT YET TO RECEIVE11-08-2015
XII. PART OCCUPATION CERTIFICATE APPLIED FOR BUT YET TO RECEIVE02-07-2018








Yes


Yes


The RERA draft agreement as per Haryana Rera Rules noitified in July, 2017 have been added into Draft agreements.













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE BEING IT COLONY.
2WALL FINISHING DETAILSNOT APPLICABLE BEING IT COLONY.
3KITCHEN DETAILSNOT APPLICABLE BEING IT COLONY.
4BATHROOM FITTINGSNOT APPLICABLE BEING IT COLONY.
5WOOD WORK ETCNOT APPLICABLE BEING IT COLONY.
6DOORS AND WINDOS FRAMESNOT APPLICABLE BEING IT COLONY.
7GLASS WORKNOT APPLICABLE BEING IT COLONY.
8ELECTRIC FITTINGSNOT APPLICABLE BEING IT COLONY.
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE BEING IT COLONY.
10CUPBOARD DETAILSNOT APPLICABLE BEING IT COLONY.
11WATER STORAGENOT APPLICABLE BEING IT COLONY.
12LIFT DETAILSNOT APPLICABLE BEING IT COLONY.
13EXTERNAL GLAZINGSNOT APPLICABLE BEING IT COLONY.
13.1WINDOWS/GLAZINGSNOT APPLICABLE BEING IT COLONY.
14DOORSNOT APPLICABLE BEING IT COLONY.
14.1MAIN DOORSNOT APPLICABLE BEING IT COLONY.
14.2INTERNAL DOORSNOT APPLICABLE BEING IT COLONY.
15AIR CONDITIONINGNOT APPLICABLE BEING IT COLONY.
16ELECTRICAL FITTINGSNOT APPLICABLE BEING IT COLONY.
17CNG PIPE LINENOT APPLICABLE BEING IT COLONY.
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE BEING IT COLONY.
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE BEING IT COLONY.
20INTERNAL FINISHINGNOT APPLICABLE BEING IT COLONY.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
1 . 2 WALLSNOT APPLICABLE BEING IT COLONY.
1 . 3 CEILINGNOT APPLICABLE BEING IT COLONY.
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
2 . 2 WALLSNOT APPLICABLE BEING IT COLONY.
2 . 3 CEILINGNOT APPLICABLE BEING IT COLONY.
2 . 4 MODULAR WARDROBESNOT APPLICABLE BEING IT COLONY.
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
3 . 2 WALLSNOT APPLICABLE BEING IT COLONY.
3 . 3 CEILINGNOT APPLICABLE BEING IT COLONY.
3 . 4 COUNTERSNOT APPLICABLE BEING IT COLONY.
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE BEING IT COLONY.
3 . 6 FITTING/FIXTURESNOT APPLICABLE BEING IT COLONY.
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
4 . 2 WALLSNOT APPLICABLE BEING IT COLONY.
4 . 3 CEILINGNOT APPLICABLE BEING IT COLONY.
4 . 4 WARDROBESNOT APPLICABLE BEING IT COLONY.
5 . TOILET
5 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
5 . 2 WALLSNOT APPLICABLE BEING IT COLONY.
5 . 3 CEILINGNOT APPLICABLE BEING IT COLONY.
5 . 4 COUNTERSNOT APPLICABLE BEING IT COLONY.
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE BEING IT COLONY.
5 . 6 FIXTURESNOT APPLICABLE BEING IT COLONY.
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
6 . 2 WALLSNOT APPLICABLE BEING IT COLONY.
6 . 3 CEILINGNOT APPLICABLE BEING IT COLONY.
6 . 4 COUNTERSNOT APPLICABLE BEING IT COLONY.
6 . 5 FIXTURESNOT APPLICABLE BEING IT COLONY.
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE BEING IT COLONY.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
7 . 2 WALLS & CEILINGNOT APPLICABLE BEING IT COLONY.
7 . 3 TOILETNOT APPLICABLE BEING IT COLONY.
7 . 4 BALCONYNOT APPLICABLE BEING IT COLONY.
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE BEING IT COLONY.
8 . 2 WALLS & CEILINGNOT APPLICABLE BEING IT COLONY.
8 . 3 RAILINGSNOT APPLICABLE BEING IT COLONY.
8 . 4 FIXTURESNOT APPLICABLE BEING IT COLONY.












Sr. No.Document DescriptionDate of Document UploadView Document
1CASH FLOW STATEMENT OF THE PROPOSED PROJECT27-08-2019 View Document
2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN27-08-2019 View Document
3NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT27-08-2019 View Document
4DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.27-08-2019 View Document
5IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN27-08-2019 View Document
6COPY OF LICENSE ALONG WITH SCHEDULE OF LAND27-08-2019 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 Copy of Occupation Certificate 17-08-2022 View Document