HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-651-2019
Submission Date : 24-07-2019 11:11:13 AM
Applicant Type : Company
Project Type: ONGOING




BPTP LIMITED
M-11 MIDDLE CIRCLE, CONNAUGHT CIRCUS, NEW DELHI 110001, INDIA
01149572787
9871883334 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
https://www.bptp.com/
XXXX442A
U45201DL2003PLC121733
 
 


 
 


 
 







PARK ARENA
SECTOR 80, FARIDABAD
FARIDABAD
FARIDABAD
9818002513
9818002513 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
ANIL PANDEY
9818002513
9818002513 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
174826428-07-2017311603RBLHRERA Panchkula







4.4 (Acre)
1.75
0.4142
10.63 (Acre)
1269-1271 of 2006 Applied for renewal on June 07, 2018
No
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Annexure-B- AS A PROMOTER. (AS PER THE MASTER DEVELOPMENT AGREEMENT DATED AUGUST 03, 2007 WITH THE LICENSE HOLDERS).
APPLICANT IS APPLYING ON THE BASIS OF MASTER DEVELOPMENT AGREEMENT (MDA) WHICH WAS ENTERED ON AUGUST 03,2007.
No
AS PER POINT (C) OF PARTY RELATED RECITALS OF THE MASTER DEVELOPMENT AGREEMENT THE LAND OWNERS HAVE ENTERED A COLLABORATION AGREEMENTS WITH THE COUNTRYWIDE PROMOTERS PRIVATE LIMITED (HEREIN REFERRED AS COUNTRYWIDE) AND COUNTRYWIDE IN TURN HAD ALSO ENTERED COLLABORATION AGREEMENT WITH BPTP LIMITED (HEREIN REFERRED AS BPTP) WHICH GIVES EXCLUSIVE RIGHT OF THE DEVELOPMENT TO THE BPTP; ATTACHED HEREWITH FOR YOUR KIND PERUSAL.
No
No
Yes







11063.58 Lakhs
689.60 Lakhs
7645.22 Lakhs
1143.28 Lakhs
1585.49 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 31160
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total31160




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPNo
ELECTRICITYDHBVNNo
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS245.34SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM343.47SUBMITTED TO HUDA
3STORM WATER DRAINAGE0SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM368.01SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL39.25SUBMITTED TO HUDA
6STREET LIGHTING0SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING147.186YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


31-05-2011 (date)
31-05-2011 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 7 4 BHK 106.32 30 3189.6 8 22 1
2 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 8 3 BHK 94.10 30 2823 13 17 1
3 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 9 3 BHK 128.66 1 128.66 0 0 1
4 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 9 3 BHK 128.66 11 1415.26 2 9 1
5 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 11 3 BHK 165.24 24 3965.76 8 16 1
6 APARTMENT/SHOPS/OTHER BUILDINGS Type EWS 16.50 111 1831.5 0 0 1
7 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 1 3 BHK 79.96 26 2078.96 17 9 1
8 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 2 APARTMENTS 3 BHK 80.31 40 3212.4 25 15 1
9 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 3 2 BHK 65.89 40 2635.6 21 19 1
10 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 4 2 BHK 63.36 40 2534.4 17 23 1
11 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 5 3 BHK 79.59 2 159.18 0 2 1
12 APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE 6 3 BHK 79.59 12 955.08 7 5 0
13 APARTMENT/SHOPS/OTHER BUILDINGS Type EWS 16.50 109 1798.5 105 4 0
Total47626727.922314111






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2 3 AND 4 BHK118AS ANNEXED.
EWS105AS ANNEXED.


01-01-2012
31-03-2014
31-12-2022
01-01-2012
5
31-12-2022
PROVIDED IN CX.
APARTMENTS: AS WE HAVE SPENT 3306.86 LAKHS OUT OF THE 7645.22 LAKHS ON CONSTRUCTION OF APARTMENTS SO THE COMPLETION PERCENTAGE IS 43%. INFRASTRUCTURE : WE HAVE COMPLETED 5% WORK OF THE INFRASTRUCTURE.


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NA
01-01-2012
5
31-12-2022
NA
NA


0
0
192
64
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments3306.86
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments420390393321
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments270285290235
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments350250225300
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments200225185
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System7.03
Sewerage treatment & garbage disposal0
Electricity Supply System20.28
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements15.5151716.5
Water Supply System20202522
Sewerage treatment & garbage disposal4.42.53.62.1
Electricity Supply System25242520
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other891112

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements22.517.518.520.5
Water Supply System26.152021.525.15
Sewerage treatment & garbage disposal1.14.12.61.5
Electricity Supply System20252124
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other5876

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.513.521.515.5
Water Supply System21222420
Sewerage treatment & garbage disposal2.61.151.252.25
Electricity Supply System17293031
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other71198

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements141114
Water Supply System182525
Sewerage treatment & garbage disposal2.63.21.5
Electricity Supply System181920
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres0100
Shopping area000
Other1107












Particulars Remarks, if any
i. No. of Flats/Apartments constructed365
ii. No. of Flats/ Apartments booked223
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter5200.58 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter3310.32 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter1890.26 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter1890.26 Lakhs
vii. Amount invested in the project upto the date of application5609.2 Lakhs
Land cost (If any)689.60 Lakhs
Apartments3306.86 Lakhs
Infrastructure27.32 Lakhs
EDC/ Taxes Etc.1585.49 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession5454.31 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 769.18 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS245.340
II. WATER SUPPLY SYSTEM343.477.03
III. STORM WATER DRAINAGE00
IV. ELECTRICITY SUPPLY SYSTEM368.0120.28
V. SEWAGE TREATMENT & GARBAGE DISPOSAL39.250
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.1.730
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM147.180
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
ALLAHABAD BANK, 17 PARLIAMENT STREET, INDUSTRIAL FINANCE BRANCH, NEW DELHI-110001
50067283807
ALLA0211893
110010037
211893
Mr. Rakesh Kumar Aggarwal and Mr. Inderbir Singh Bhatia Add: 28, ECE House, KG Marg, , New Delhi-110001.
As Attached.











No
No
Yes
Yes
Yes
No
No
No
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. ZONING PLANALREADY BEEN OBTAINED28-06-2007
II. ENVIRONMENTAL CLEARNCEALREADY BEEN OBTAINED31-12-2012
III. BUILDING PLAN APPROVALALREADY BEEN OBTAINED31-05-2011
IV. LICENSE NO (1269-1271 OF 2006ALREADY BEEN OBTAINED11-11-2006
V. SERVICE PLANAPPLIED FOR BUT YET TO RECEIVE13-02-2014
VI. RENEWAL OF LICENSE NO (1269-1271 OF 2006)APPLIED FOR BUT YET TO RECEIVE07-06-2018
VII. FIRE FIGHTING SCHEMEAPPLIED FOR BUT YET TO RECEIVE18-12-2014








Yes


Yes


AS PROVIDED IN THE FORMAT.







PARK TERRA, SEC 37D GURUGRAM
840305
456
0
373
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
35269.38035269.38
Cost of the apartments000
Cost of the infrastructure000
Others costs000


30900 Lakhs
9500 Lakhs
6500.00 Lakhs
4500.00 Lakhs
Yes
31-12-2012
31-10-2020




PARK SENTOSA, SECTOR 77 FARIDABAD
743720
420
0
159
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22701.6505630.20
Cost of the apartments000
Cost of the infrastructure000
Others costs000


3600 Lakhs
10100 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2013
31-07-2022




VISSIONAIRE VILLAS, SECTOR 70 GURUGRAM
56233
10
10
5
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
932.830493.28
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1300 Lakhs
1000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020




PEDESTAL FLOORS SECTOR 70A GURUGRAM
303304
174
58
143
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5550.8702718.42
Cost of the apartments000
Cost of the infrastructure000
Others costs000


10200 Lakhs
8000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES IN LIVING ROOMS & BEDROOM. LAMINATED WOODEN FLOORING/VITRIFIED TILES IN MASTER BEDROOM. ANTI-SKID CERAMIC TILES IN KITCHEN. ANTI-SKID CERAMIC TILES IN TOILETS AND BALCONY. SELECT GRANITE/MARBLE IN STAIRCASE. VITRIFIED TILES IN LIFT LOBBY (TYPICAL FLOORS)
2WALL FINISHING DETAILSOBD IN IN LIVING ROOM, DINING AND BEDROOM. SELECTED MARBLE/GRANITE CLADDING LIFT / LOBBIES AND ACRYLIC EMULSION. EXTERNAL FAçADE OF TOWERS- TEXTURE PAINTS
3KITCHEN DETAILSDADO: 2.0 INCH ABOVE KITCHEN COUNTER, REST OBD. PLATFORM: GRANITE COUNTER WITH SINGLY BOWL STAINLESS STEEL SINK WITH DRAIN BOARD.
4BATHROOM FITTINGSDADO: SELECT CERAMIC TILES FITTINGS: GRANTE/ MARBLE COUNTERS, WHITE SANITARY FIXTURES, CONTEMPORARY STYLED CP FITTINGS
5WOOD WORK ETCNOT PROVIDED.
6DOORS AND WINDOS FRAMESWINDOW: UPVC DOORS: LAMINATED DOOR WITH HARDWOOD FRAME.
7GLASS WORKNOT PROVIDED.
8ELECTRIC FITTINGSELECTRICAL COPPER WIRING FOR ALL LIGHTS AND POWER POINTS, MODULAR SWITCHES.
9CONDUCTING AND WIRING DETAILSAS ABOVE
10CUPBOARD DETAILSNOT PROVIDED.
11WATER STORAGEAS PER NORMS.
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSBASIC WINDOWS
13.1WINDOWS/GLAZINGSBASIC WINDOWS
14DOORSSEASONED WOOD.
14.1MAIN DOORSSEASONED WOOD.
14.2INTERNAL DOORSSEASONED WOOD.
15AIR CONDITIONINGNOT PROVIDED.
16ELECTRICAL FITTINGSLECTRICAL COPPER WIRING FOR ALL LIGHTS AND POWER POINTS, MODULAR SWITCHES.
17CNG PIPE LINENOT PROVIDED
18PROVISION OF WIFI AND BROADBAND FACILITYNOT PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEME-
20INTERNAL FINISHING-
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSOBD
1 . 3 CEILINGAS ABOVE.
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSOBD
2 . 3 CEILINGAS ABOVE.
2 . 4 MODULAR WARDROBESNOT PROVIDED.
3 . MASTER TOILET
3 . 1 FLOORANTI- SKID CERAMIC TILES
3 . 2 WALLSGRANITE MARBLE COUNTER
3 . 3 CEILINGPLASTER WITH WHITE WASH.
3 . 4 COUNTERSWHITE SANITARY WARE.
3 . 5 SANITARY WARE/CP FITTINGSWHITE SANITARY WARE.
3 . 6 FITTING/FIXTURESCONTEMPORARY STYLED FITTINGS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES.
4 . 2 WALLSOBD
4 . 3 CEILINGPLASTER WITH WHITE WASH.
4 . 4 WARDROBESNOT PROVIDED.
5 . TOILET
5 . 1 FLOORANTI- SKID CERAMIC TILES
5 . 2 WALLSGRANITE/ MARBLE COUNTER
5 . 3 CEILINGPLASTER WITH WHITE WASH.
5 . 4 COUNTERSGRANITE/ MARBLE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSCONTEMPORARY STYLED CP FITTINGS.
5 . 6 FIXTURESCP FITTINGS
6 . KITCHEN
6 . 1 FLOORANTI-SKID CERAMIC TILES
6 . 2 WALLSCERAMIC TILES UP TO 2 FT. ABOVE WORKING PLATFORM AND THE REST PAINTED IN OIL BOUND DISTEMPER
6 . 3 CEILINGOIL BOUND DISTEMPER.
6 . 4 COUNTERSGRANITE COUNTER
6 . 5 FIXTURESSINGLE BOWL STAINLESS STEEL SINK AND DRAIN BOARD
6 . 6 KITCHEN APPLIANCESNOT SPECIFIED
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI-SKID CERAMIC TILES
7 . 2 WALLS & CEILINGNOT SPECIFIED.
7 . 3 TOILETNOT SPECIFIED.
7 . 4 BALCONYNOT SPECIFIED.
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID CERAMIC TILES
8 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
8 . 3 RAILINGSN.A.
8 . 4 FIXTURESN.A.












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 22-07-2019 View Document
2 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 22-07-2019 View Document
3 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 22-07-2019 View Document
4 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 22-07-2019 View Document
5 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 22-07-2019 View Document