HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-650-2019
Submission Date : 24-07-2019 11:33:33 AM
Applicant Type : Company
Project Type: ONGOING




BPTP LIMITED
BPTP LIMITED, M-11 MIDDLE CIRCLE, CONNAUGHT CIRCUS, NEW DELHI 110001, INDIA
01149572787
9871883334 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
https://www.bptp.com/
XXXX442A
U45201DL2003PLC121733
 
 


 
 


 
 







THE DECK & EWS
SECTOR 82 FARIDABAD
FARIDABAD
FARIDABAD
8800414400
8800414400 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
VINOD KUMAR
8800414400
8800414400 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
174826728-07-2017105569RBL BANK LIMITEDHRERA Panchkula
258443605-06-201879177PNBHRERA Panchkula







1.49 (Acre)
1.75
0.09
17.25 (Acre)
522 - 524 OF 2006 266 OF 2007
No
Address     M-11, MIDDLE CIRCLE, CONNAUGHT PLACE, NEW DELHI
Address     M-11, MIDDLE CIRCLE, CONNAUGHT PLACE, NEW DELHI
Address     M-11, MIDDLE CIRCLE, CONNAUGHT PLACE, NEW DELHI
Address     M-11, MIDDLE CIRCLE, CONNAUGHT PLACE, NEW DELHI
Annexure-B- AS A PROMOTER. (AS PER THE MASTER DEVELOPMENT AGREEMENT DATED AUGUST 03, 2007 WITH THE LICENSE HOLDERS)
APPLICANT IS APPLYING ON THE BASIS OF MASTER DEVELOPMENT AGREEMENT (MDA) WHICH WAS ENTERED ON AUGUST 03,2007. 522 - 524 OF 2006 - MDA AFTER THE GRANT OF LICENSE. 266 OF 2007-MDA BEFORE THE GRANT OF LICENSE.
No
AS PER POINT (C) OF PARTY RELATED RECITALS OF THE MASTER DEVELOPMENT AGREEMENT THE LAND OWNERS HAVE ENTERED A COLLABORATION AGREEMENTS WITH THE COUNTRYWIDE PROMOTERS PRIVATE LIMITED (HEREIN REFERRED AS COUNTRYWIDE) AND COUNTRYWIDE IN TURN HAD ALSO ENTERED COLLABORATION AGREEMENT WITH BPTP LIMITED (HEREIN REFERRED AS BPTP) WHICH GIVES EXCLUSIVE RIGHT OF THE DEVELOPMENT TO THE BPTP; ATTACHED HEREWITH FOR YOUR KIND PERUSAL.
No
No
Yes







4436.93 Lakhs
139.75 Lakhs
3421.23 Lakhs
465.52 Lakhs
410.41 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS10556.920
3CONSTRUCTION OF ROADS0
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total10556.92




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPYes
WATER SUPPLYHSVPYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS30SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM34.71SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE15.83SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM172SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL19SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING20SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING65.94SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS0SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER108.04SUBMITTED TO TOWN & COUNTRY PLANNING


17-11-2011 (date)
17-11-2011 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENTS158.273419151
2APARTMENT/SHOPS/OTHER BUILDINGS Type EWS18.58133117161






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
APARTMENTS19AS MENTIONED IN FOLDER -C
EWS117AS MENTIONED IN FOLDER -C


01-01-2011
30-06-2016
31-12-2022
01-01-2011
0
31-12-2022
AS PROVIDED
APARTMENTS: AS WE HAVE SPENT 1449 LAKHS OUT OF 3421 LAKHS SO THE PERCENTAGE OF COMPLETION IS 42%. INFRASTRUCTURE: WE HAVE SPENT NOTHING OUT OF THE TOTAL BUDGET OF 465.52 LAKHS SO PERCENTAGE COMPLETION IS NOTHING.


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NA
01-01-2011
0
31-12-2022
NA
NA


0
0
27
7
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments1449.02
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments140130135125
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments125142145120
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments120130110115
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments140135160
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.521.51.5
Water Supply System2.32.52.72
Sewerage treatment & garbage disposal1.151.21.251.3
Electricity Supply System1512.81314.7
Storm Water Drainage0.6110.75
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other10.5411.512.311.65

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.52.753.21.6
Water Supply System2.252.752.62.75
Sewerage treatment & garbage disposal1.11.21.451.5
Electricity Supply System12121110
Storm Water Drainage1.250.550.450.35
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other1012.310.511.5

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.51.7522.15
Water Supply System2.62.7522.1
Sewerage treatment & garbage disposal1.21.21.31
Electricity Supply System121214.510
Storm Water Drainage1.71.21.181.65
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other10.512.2510.7512.45

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.651.751.65
Water Supply System1.51.92
Sewerage treatment & garbage disposal1.31.41.6
Electricity Supply System141415
Storm Water Drainage1.51.41.25
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other11.513.512.5












Particulars Remarks, if any
i. No. of Flats/Apartments constructed167
ii. No. of Flats/ Apartments booked136
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter3300.75 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter2183.22 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter1117.53 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter1117.53 Lakhs
vii. Amount invested in the project upto the date of application1999.20 Lakhs
Land cost (If any)139.75 Lakhs
Apartments1449.03 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.410.41 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession2437.73 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
500 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 134.37 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS300
II. WATER SUPPLY SYSTEM34.710
III. STORM WATER DRAINAGE15.830
IV. ELECTRICITY SUPPLY SYSTEM1920
V. SEWAGE TREATMENT & GARBAGE DISPOSAL190
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM65.940
XVII. OTHER FACILITIES AS PER PROJECT REPORT108.040









Yes
Yes
INDUSIND BANK, GOPALDAS BHAWAN, 28, BARAKHAMBA ROAD, NEW DELHI-110001
254957278700
INDB0000005
110234002
000005
Mr. Rakesh Kumar Agarwal Mr. Inderbir Singh Bhatia 28, KG Marg, New Delhi.
As Attached











No
No
Yes
Yes
Yes
No
No
No
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 522 TO 524 OF 2006 DATED 28.02.2006ALREADY BEEN OBTAINED28-02-2006
II. ZONING PLAN APPROVALALREADY BEEN OBTAINED19-06-2008
III. BUILDING PLANS APPROVALALREADY BEEN OBTAINED17-11-2011
IV. SERVICE PLAN ESTIMATES (14.75 ACRESALREADY BEEN OBTAINED25-03-2010
V. SERVICE PLAN ESTIMATES (2.5 ACRES)ALREADY BEEN OBTAINED16-03-2011
VI. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED04-02-2008
VII. RENEWAL OF LICENSE NO. 266 OF 2007ALREADY BEEN OBTAINED16-02-2018
VIII. OCCUPATION CERTIFICATE ISSUED FOR TOWERS C, D, E, AND F OF THE GROUP HOUSING COLONY - RELATED TO THE LICENSE 522-524 OF 2006.ALREADY BEEN OBTAINED03-05-2010
IX. OCCUPATION CERTIFICATE ISSUED FOR TOWER-A, B, P, Q OF THE GROUP HOUSING COLONY-- RELATED TO THE LICENSE 522-524 OF 2006.ALREADY BEEN OBTAINED28-11-2011
X. OCCUPATION CERTIFICATE ISSUED FOR TOWER- G, H, J, K, L, M, CONVENIENT SHOPPING AND COMMUNITY BUILDING OF THE GROUP HOUSING COLONY.-- RELATED TO THE LICENSE 522-524 OF 2006.ALREADY BEEN OBTAINED06-09-2012
XI. LICENSE NO. 266 OF 2007 DATED 03.12.2007ALREADY BEEN OBTAINED13-12-2007








Yes


Yes


AS PER THE GIVEN FORMAT







PARK TERRA, SEC 37D GURUGRAM
840305
456
0
373
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
35269.38020987.44
Cost of the apartments000
Cost of the infrastructure000
Others costs000


30900 Lakhs
9500 Lakhs
6500.00 Lakhs
4500.00 Lakhs
Yes
31-12-2012
31-10-2020




PARK SENTOSA, SECTOR 77 FARIDABAD
743720
420
0
159
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22701.6505630.20
Cost of the apartments000
Cost of the infrastructure000
Others costs000


3600 Lakhs
10100 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2013
31-07-2022




VISSIONAIRE VIALLS, SECTOR 70 GURUGRAM
56233
10
10
5
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
932.830932.83
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1300 Lakhs
1000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020




PEDESTAL FLOORS SECTOR 70A GURUGRAM
303304
174
58
143
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5550.8705550.87
Cost of the apartments000
Cost of the infrastructure000
Others costs000


10200 Lakhs
8000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECERAMIC TILES IN TOILETS
2WALL FINISHING DETAILSPLASTER WITH WHITE WASH
3KITCHEN DETAILSKITCHEN COUNTER – IPS, KITCHEN SINK – BOWL ONLY
4BATHROOM FITTINGSGI PIPING AND CPVC AND UPVC ENGLISH WC SIMPLE TAPS
5WOOD WORK ETCFLUSH DOOR WITH MS FRAME
6DOORS AND WINDOS FRAMESGLASS WINDOW WITH MS FRAME
7GLASS WORKROOMS, KITCHEN AND TOILET
8ELECTRIC FITTINGSCU WIRING AND ORDINARY SWITCHES WITH BAKELITE SHEET
9CONDUCTING AND WIRING DETAILSAS ABOVE
10CUPBOARD DETAILSAS ABOVE
11WATER STORAGERCC TANK
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSGLASS WINDOW WITH MS FRAME
13.1WINDOWS/GLAZINGSGLASS WINDOW WITH MS FRAME
14DOORSL. DROP & TOWER BOLT
14.1MAIN DOORSL. DROP
14.2INTERNAL DOORSTOWER BOLT
15AIR CONDITIONINGNOT PROVIDED.
16ELECTRICAL FITTINGSCU WIRING
17CNG PIPE LINENOT PROVIDED
18PROVISION OF WIFI AND BROADBAND FACILITYNOT PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEPLASTER WITH WHITE WASH
20INTERNAL FINISHINGFLOORING-IPS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIPS & CERAMIC TILES
1 . 2 WALLSPLASTER WITH WHITE WASH
1 . 3 CEILINGPLASTER WITH WHITE WASH
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORIPS
2 . 2 WALLSPLASTER WITH WHITE WASH
2 . 3 CEILINGPLASTER WITH WHITE WASH
2 . 4 MODULAR WARDROBESNOT PROVIDED
3 . MASTER TOILET
3 . 1 FLOORCEREMIC TILES
3 . 2 WALLSPLASTER WITH WHITE WASH
3 . 3 CEILINGPLASTER WITH WHITE WASH
3 . 4 COUNTERSIPS
3 . 5 SANITARY WARE/CP FITTINGSENGLISH WC
3 . 6 FITTING/FIXTURESGI, CPVC, UPVC PIPING SINGLE TAP
4 . BED ROOMS
4 . 1 FLOORCERAMIC TILES
4 . 2 WALLSPLASTER WITH WHITE WASH
4 . 3 CEILINGPLASTER WITH WHITE WASH
4 . 4 WARDROBESNOT PROVIDED.
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSPLASTER WITH WHITE WASH
5 . 3 CEILINGPLASTER WITH WHITE WASH
5 . 4 COUNTERSNOT PROVIDED.
5 . 5 SANITARY WARE/CP FITTINGSGI, CPVC, UPVC PIPING
5 . 6 FIXTURESSINGLE TAP
6 . KITCHEN
6 . 1 FLOORCERAMIC TILES
6 . 2 WALLSPLASTER WITH WHITE WASH
6 . 3 CEILINGPLASTER WITH WHITE WASH
6 . 4 COUNTERSIPS
6 . 5 FIXTURESBOWL ONLY
6 . 6 KITCHEN APPLIANCESNOT PROVIDED.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN.A
7 . 2 WALLS & CEILINGN.A
7 . 3 TOILETN.A
7 . 4 BALCONYN.A
8 . SIT-OUTS
8 . 1 FLOORN.A
8 . 2 WALLS & CEILINGN.A
8 . 3 RAILINGSN.A
8 . 4 FIXTURESN.A












Sr. No.Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT22-07-2019 View Document
2OC OBTAINED FOR OTHER TOWERS23-07-2019 ------
3IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN22-07-2019 View Document
4DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.22-07-2019 View Document
5IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN22-07-2019 View Document
6COPY OF LICENSE ALONG WITH SCHEDULE OF LAND22-07-2019 View Document