HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-615-2019
Submission Date : 06-08-2019 03:49:35 AM
Applicant Type : Company
Project Type: ONGOING




RPS INFRASTRUCTURE LTD.
1117-1120, 11TH FLOOR, TOWER-B, DLF TOWERS, JASOLA DISTRICT CENTER, NEW DELHI-110025
01140543200
1140543200 (Number Shared by Promoter in Public)
info@rpsgroupindia.com
http://www.rpsgroupindia.com
XXXX288F
U45201DL2005PLC140779
 
 


 
 


 
 







RPS AURIA (PHASE-I)
SECTOR-88, VILLAGE PALWALI
FARIDABAD
FARIDABAD
01293211448
9871099619 (Number Shared by Promoter in Public)
ramneek@rpsgroupindia.com
B P SHARMA
01293211448
8860085284 (Number Shared by Promoter in Public)
bpsharma@rpsgroupindia.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
184568729-06-2017419535ORIENTAL BANK OF COMMERCEHRERA Panchkula







2.802 (Acre)
175
175
16.925 (Acre)
124 of 2008 dt. 14.06.2008, License Transfer Permission vide Memo No. LC-920-PB(A)-2014/5636-49 dt. 20.03.2014
Yes







21115 Lakhs
7037 Lakhs
10214 Lakhs
1910 Lakhs
1954 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3.169
3CONSTRUCTION OF ROADS1.180
4PAVEMENTS0
5PARKS AND PLAYGROUNDS4.874
6GREEN BELTS0
7VEHICLE PARKINGS4.459
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0.198
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER1.606
13EWS0.239
14SCHOOL1.2
Total16.925




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSDTCP OR MCF OR HUDANo
WATER SUPPLYDTCP OR MCF OR HUDANo
ELECTRICITYDHBVNLNo
SEWAGE DISPOSALDTCP OR MCF OR HUDANo
STORM WATER DRAINAGEDTCP OR MCF OR HUDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS32SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM117SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE58SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM1093SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL187SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING0SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING28SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS187SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA35SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER142SUBMITTED TO TOWN & COUNTRY PLANNING
15PARKING17SUBMITTED TO TOWN & COUNTRY PLANNING
16SOLID WASTE MANAGEMENT14YET TO BE PREPARED


NA (date)
18-05-2015 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type RESIDENTIAL UNIT89.84232148842
2APARTMENT/SHOPS/OTHER BUILDINGS Type RESIDENTIAL UNIT100.435845131
3APARTMENT/SHOPS/OTHER BUILDINGS Type RESIDENTIAL UNIT111.675843151
4APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT12.151101
5APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT8.831101
6APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT10.922201
7APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT20.689901
8APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT20.712201
9APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT10.741101
10APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT12.61101
11APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL UNIT8.351101






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
RESIDENTIAL UNIT148STRUCTURE OF TOWER COMPLETED, BRICK WORK COMPLETED
RESIDENTIAL UNIT45STRUCTURE OF TOWER COMPLETED, BRICK WORK COMPLETED
RESIDENTIAL UNIT43STRUCTURE OF TOWER COMPLETED, BRICK WORK COMPLETED
COMMERCIAL UNIT1STRUCTURE COMPLETED
COMMERCIAL UNIT1STRUCTURE COMPLETED
COMMERCIAL UNIT2STRUCTURE COMPLETED
COMMERCIAL UNIT9STRUCTURE COMPLETED
COMMERCIAL UNIT2STRUCTURE COMPLETED
COMMERCIAL UNIT1STRUCTURE COMPLETED
COMMERCIAL UNIT1STRUCTURE COMPLETED
COMMERCIAL UNIT1STRUCTURE COMPLETED


01-04-2013
01-04-2017
30-09-2021
31-07-2019
0
30-09-2021


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
31-07-2019
0
30-09-2021


192
50
0
106
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments6893
Shops21
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments216222
Shops11
Plots00

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments232266340324
Shops1111
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments315380375349
Shops1223
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments301
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other20

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other88

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System001820
Sewerage treatment & garbage disposal002832
Electricity Supply System000273
Storm Water Drainage00910
Parks and Playgrounds00028
Clubhouse/community centres0000
Shopping area0000
Other9101312

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements001011
Water Supply System21231916
Sewerage treatment & garbage disposal34373027
Electricity Supply System186197164273
Storm Water Drainage101298
Parks and Playgrounds32343730
Clubhouse/community centres0000
Shopping area0000
Other12141413
Parking56
Solid Waste Management7

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements11
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds26
Clubhouse/community centres0
Shopping area0
Other11
Solid Waste Management7
Parking6
Security System28












Particulars Remarks, if any
i. No. of Flats/Apartments constructed348
ii. No. of Flats/ Apartments booked236
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter18834.07 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter12367.99 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter6466.08 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter1148.61 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)5656.07 Lakhs
Apartments6912.86 Lakhs
Infrastructure20 Lakhs
EDC/ Taxes Etc.1053.26 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession7471.65 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
7000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 7356.72 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS00
II. WATER SUPPLY SYSTEM00
III. STORM WATER DRAINAGE00
IV. ELECTRICITY SUPPLY SYSTEM00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL00
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
INDUSIND BANK, NARIMAN POINT BRANCH, MUMBAI
259818034793
INDB0000006
400234004
00006
1. Mr. Rakesh Chand Gupta, 946, Sector – 15, Faridabad 2. Mr. Shanti Parkash, 399, Sector – 16A, Faridabad
Uploaded











No
Yes
Yes
Yes
Yes
Yes
No
No
No
No


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINEDNA








Yes


Yes









RPS CENTRAL
0.399
74
0
74
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
9360376
Cost of the apartments6900315
Cost of the infrastructure18600
Others costs61061


1828.06 Lakhs
603.96 Lakhs
300 Lakhs
100 Lakhs
No
31-10-2018
30-09-2019










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES / ANTI SKID CERAMIC TILES
2WALL FINISHING DETAILSPLEASANT SHADES OF OBD / CERAMIC TILES AND OBD IN PLEASANT SHADES IN KITCHEN AND TOILETS
3KITCHEN DETAILSGRANITE COUNTER WITH SS SINK
4BATHROOM FITTINGSCP FITTINGS, GRANITE COUNTER / PLEASANT WASH BASIN
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESHARD WOOD FRAMES / UPVC (VARIOUS SIZES & QUANTITY AS PER TYPE OF UNIT)
7GLASS WORKNA
8ELECTRIC FITTINGSISI MARKED FITTINGS
9CONDUCTING AND WIRING DETAILSCONCEALED WIRING WITH ISI MARKED CONDUITS, WIRES AND ACCESSORIES
10CUPBOARD DETAILSNA
11WATER STORAGEOVER HEAD RCC WATER TANKS OF SUFFICIENT CAPACITY
12LIFT DETAILS3 LIFTS IN EACH TOWER
13EXTERNAL GLAZINGSGLAZED DOOR AND SHUTTER WITH UPVC FRAMING
13.1WINDOWS/GLAZINGSGLAZED WINDOWS WITH UPVC FRAMING
14DOORS-
14.1MAIN DOORSPRE LAMINATED SOLID FLUSH SHUTTER WITH HARD WOOD FRAME
14.2INTERNAL DOORSPRE LAMINATED SOLID FLUSH SHUTTER WITH HARD WOOD FRAME
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSISI MARKED FITTINGS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL FINISH IN PERMANENT TEXTURED PAINT IN PLEASANT SHADES
20INTERNAL FINISHINGWALL AND CEILING - PLEASANT SHADES OF OBD / CERAMIC TILES AND OBD IN PLEASANT SHADES IN KITCHEN AND TOILETS FLOORING - VITRIFIED TILES / ANTI SKID CERAMIC TILES
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLEASANT SHADES OF OBD
1 . 3 CEILINGPLEASANT SHADES OF OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES
2 . 2 WALLSPLEASANT SHADES OF OBD
2 . 3 CEILINGPLEASANT SHADES OF OBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI SKID CERAMIC TILES
3 . 2 WALLSCERAMIC TILES AND/OR PLEASANT SHADES OF OBD
3 . 3 CEILINGFALSE CEILING
3 . 4 COUNTERSGRANITE COUNTER / PLEASANT WASH BASIN
3 . 5 SANITARY WARE/CP FITTINGSEWC, WASH BASIN AND CP FITTINGS
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSPLEASANT SHADES OF OBD
4 . 3 CEILINGPLEASANT SHADES OF OBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI SKID CERAMIC TILES
5 . 2 WALLSCERAMIC TILES AND/OR PLEASANT SHADES OF OBD
5 . 3 CEILINGFALSE CEILING
5 . 4 COUNTERSGRANITE COUNTER / PLEASANT WASH BASIN
5 . 5 SANITARY WARE/CP FITTINGSEWC, WASH BASIN AND CP FITTINGS
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSCERAMIC TILES AND/OR PLEASANT SHADES OF OBD
6 . 3 CEILINGPLEASANT SHADES OF OBD
6 . 4 COUNTERSGRANITE COUNTER WITH SS SINK
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES / ANTI SKID CERAMIC TILES IN TOILETS
7 . 2 WALLS & CEILINGPLEASANT SHADE OF OBD
7 . 3 TOILETCP FITTINGS AND WC
7 . 4 BALCONYANTI SKID CERAMIC TILES AND OBD
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN06-08-2019 View Document
2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND02-07-2019 View Document
3DEMARCATION PLAN02-07-2019 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT02-07-2019 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN29-06-2019 View Document
6DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.02-07-2019 View Document
7ZONING PLAN02-07-2019 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 CERTIFICATE OF EXTENSION 02-08-2022 View Document
2 Occupation certificate granted on 25.01.2023 28-06-2023 View Document