HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-591-2019
Submission Date : 24-06-2019 01:17:45 AM
Applicant Type : Company
Project Type: ONGOING




BPTP LIMITED
M-11, MIDDLE CIRCUS, CONNAUGHT CIRCUS, NEW DELHI-110001
01149572787
9871883334 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
http://bptp.com
XXXX442A
U45201DL2003PLC121733
 
 


 
 


 
 







DISCOVERY PARK
SECTOR-80
FARIDABAD
FARIDABAD
8800414400
8800414400 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
VINOD KUMAR
8800414400
8800414400 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
174810028-07-2017760317RBL BANK HRERA Panchkula
221183128-09-2017400STATE BANK OF INDIA HRERA Panchkula







10.82 (Acre)
1.75
1.75
16.331 (Acre)
License No. 44 of 2008 dated 07.03.2008
No
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Annexure-B- AS A PROMOTER. (AS PER THE MASTER DEVELOPMENT AGREEMENT DATED AUGUST 03, 2007 WITH THE LICENSE HOLDERS)
APPLICANT IS APPLYING ON THE BASIS OF MASTER DEVELOPMENT AGREEMENT (MDA) WHICH WAS ENTERED ON AUGUST 03,2007
No
AS PER POINT (C) OF PARTY RELATED RECITALS OF THE MASTER DEVELOPMENT AGREEMENT THE LAND OWNERS HAVE ENTERED A COLLABORATION AGREEMENTS WITH THE COUNTRYWIDE PROMOTERS PRIVATE LIMITED (HEREIN REFERRED AS COUNTRYWIDE) AND COUNTRYWIDE IN TURN HAD ALSO ENTERED COLLABORATION AGREEMENT WITH BPTP LIMITED (HEREIN REFERRED AS BPTP) WHICH GIVES EXCLUSIVE RIGHT OF THE DEVELOPMENT TO THE BPTP; ATTACHED HEREWITH FOR YOUR KIND PERUSAL.
No
No
Yes







32736.2 Lakhs
1941.7 Lakhs
20874.19 Lakhs
5534.96 Lakhs
4366.59 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS6336.83
3CONSTRUCTION OF ROADS10050
4PAVEMENTS3775
5PARKS AND PLAYGROUNDS13102
6GREEN BELTS1000
7VEHICLE PARKINGS3220
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER6300
Total43783.83




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPNo
ELECTRICITYDHBVNNo
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS1209.01SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM1257.7SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE200SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM1356.77SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL100SUBMITTED TO TOWN & COUNTRY PLANNING
6STREET LIGHTING150SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING566.28SUBMITTED TO TOWN & COUNTRY PLANNING
8PLAYGROUNDS AND PARKS185.46SUBMITTED TO TOWN & COUNTRY PLANNING
9CLUB HOUSE/COMMUNITY CENTRE474.74SUBMITTED TO TOWN & COUNTRY PLANNING
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM35SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING


27-06-2012 (date)
27-06-2012 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENTS134687600879
2APARTMENT/SHOPS/OTHER BUILDINGS Type EWS15.80181162191
3APARTMENT/SHOPS/OTHER BUILDINGS Type SHOPS12.515690






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
APARTMENTS600AS ANNEXED.
EWS162AS ANNEXED.
SHOPS6AS ANNEXED.


01-01-2012
28-02-2015
12-10-2020
01-01-2012
51
12-10-2020
AS PROVIDED.
AS ANNEXED.


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
12-10-2020
0
12-10-2020
NA
NA


0
0
515
172
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments19210.97
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments303185180215
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments230270280
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements812.01
Water Supply System793.25
Sewerage treatment & garbage disposal0
Electricity Supply System627.44
Storm Water Drainage120
Parks and Playgrounds110.46
Clubhouse/community centres38
Shopping area0
Other329.31

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements45405050
Water Supply System80505570
Sewerage treatment & garbage disposal15202012
Electricity Supply System117135145130
Storm Water Drainage1520109
Parks and Playgrounds12151012
Clubhouse/community centres75485068
Shopping area0000
Other40.5474234.5

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements758057
Water Supply System856065
Sewerage treatment & garbage disposal15108
Electricity Supply System117124119
Storm Water Drainage15810
Parks and Playgrounds1266
Clubhouse/community centres755562
Shopping area000
Other40.54129












Particulars Remarks, if any
i. No. of Flats/Apartments constructed883
ii. No. of Flats/ Apartments booked768
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter33000.16 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter24000.38 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter8999.78 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter8999.78 Lakhs
vii. Amount invested in the project upto the date of application28433.15 Lakhs
Land cost (If any)1941.69 Lakhs
Apartments19210.97 Lakhs
Infrastructure2830.47 Lakhs
EDC/ Taxes Etc.4450.02 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession4303.05 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
10000 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 2429.26 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS1209.01812.01
II. WATER SUPPLY SYSTEM1257.7793.25
III. STORM WATER DRAINAGE200120
IV. ELECTRICITY SUPPLY SYSTEM1506.77627.44
V. SEWAGE TREATMENT & GARBAGE DISPOSAL1000
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE474.7438
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.185.46110.46
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM566.280
XVII. OTHER FACILITIES AS PER PROJECT REPORT3522









Yes
Yes
ORIENTAL BANK OF COMMERCE, HSIIDC BUILDING, UDYOG VIHAR-V, GURUGRAM-122015
09871131002383
ORBC0100987
110022105
0100987
Mr. Rakesh Kumar Agarwal Mr. Inderbir Singh Bhatia 28, KG Marg, New Delhi.
As Attached.











Yes
No
Yes
Yes
Yes
No
No
No
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLANALREADY BEEN OBTAINED27-06-2012
II. ENVIRONMENTAL CLEARANCE ALREADY BEEN OBTAINED31-12-2012
III. ELECTRICAL LOAD APPROVALALREADY BEEN OBTAINED10-10-2011
IV. 44 OF 2008ALREADY BEEN OBTAINED07-03-2008
V. SERVICE PLAN ESTIMATION APPROVALALREADY BEEN OBTAINED31-10-2018
VI. ZONNING PLANALREADY BEEN OBTAINED20-12-2011
VII. RE VALIDATION OF BUILDING PLAN APPLIED FOR BUT YET TO RECEIVE17-10-2017








Yes


Yes









PARK TERRA, SEC 37D GURUGRAM
840305
456
0
373
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
35269.38020987.44
Cost of the apartments000
Cost of the infrastructure000
Others costs000


30900 Lakhs
9500 Lakhs
6500 Lakhs
4500 Lakhs
Yes
31-12-2012
31-10-2020




PARK SENTOSA, SECTOR 77 FARIDABAD
743720
420
0
159
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22701.6505630.20
Cost of the apartments000
Cost of the infrastructure000
Others costs000


3600 Lakhs
10100 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2013
31-07-2022




VISSIONAIRE VILLAS, SECTOR 70 GURUGRAM
56233
10
10
5
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
932.830493.28
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1300 Lakhs
1000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020




PEDESTAL FLOORS SECTOR 70A GURUGRAM
303304
174
58
143
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5550.8702718.42
Cost of the apartments000
Cost of the infrastructure000
Others costs000


10200 Lakhs
8000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES IN LIVING ROOMS & BEDROOM. LAMINATED WOODEN FLOORING/VITRIFIED TILES IN MASTER BEDROOM. ANTI-SKID CERAMIC TILES IN KITCHEN. ANTI-SKID CERAMIC TILES IN TOILETS AND BALCONY. SELECT GRANITE/MARBLE IN STAIRCASE. VITRIFIED TILES IN LIFT LOBBY (TYPICAL FLOORS)
2WALL FINISHING DETAILSOBD IN IN LIVING ROOM, DINING AND BEDROOM. SELECTED MARBLE/GRANITE CLADDING LIFT / LOBBIES AND ACRYLIC EMULSION. EXTERNAL FAçADE OF TOWERS- TEXTURE PAINTS
3KITCHEN DETAILSDADO: 2.0 INCH ABOVE KITCHEN COUNTER, REST OBD. PLATFORM: GRANITE COUNTER WITH SINGLY BOWL STAINLESS STEEL SINK WITH DRAIN BOARD.
4BATHROOM FITTINGSDADO: SELECT CERAMIC TILES FITTINGS: GRANTE/ MARBLE COUNTERS, WHITE SANITARY FIXTURES, CONTEMPORARY STYLED CP FITTINGS.
5WOOD WORK ETCNOT PROVIDED.
6DOORS AND WINDOS FRAMESWINDOW: UPVC DOORS: LAMINATED DOOR WITH HARDWOOD FRAME.
7GLASS WORKNOT PROVIDED.
8ELECTRIC FITTINGSELECTRICAL COPPER WIRING FOR ALL LIGHTS AND POWER POINTS, MODULAR SWITCHES.
9CONDUCTING AND WIRING DETAILSELECTRICAL COPPER WIRING FOR ALL LIGHTS AND POWER POINTS, MODULAR SWITCHES.
10CUPBOARD DETAILSNOT PROVIDED.
11WATER STORAGEAS PER NORMS
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSBASIC WINDOWS.
13.1WINDOWS/GLAZINGSBASIC WINDOWS.
14DOORSAS MENTIONED IN 14.1 AND 14.2
14.1MAIN DOORSSEASONED WOOD.
14.2INTERNAL DOORSSEASONED WOOD.
15AIR CONDITIONINGNOT PROVIDED.
16ELECTRICAL FITTINGSELECTRICAL COPPER WIRING FOR ALL LIGHTS AND POWER POINTS, MODULAR SWITCHES.
17CNG PIPE LINENOT PROVIDED
18PROVISION OF WIFI AND BROADBAND FACILITYNOT PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEME-
20INTERNAL FINISHING-
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSOBD
1 . 3 CEILINGOBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSOBD
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESNOT PROVIDED.
3 . MASTER TOILET
3 . 1 FLOORANTI- SKID CERAMIC TILES
3 . 2 WALLSGRANITE MARBLE COUNTER
3 . 3 CEILINGPLASTER WITH WHITE WASH.
3 . 4 COUNTERSWHITE SANITARY WARE.
3 . 5 SANITARY WARE/CP FITTINGSWHITE SANITARY WARE.
3 . 6 FITTING/FIXTURESCONTEMPORARY STYLED FITTINGS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES.
4 . 2 WALLSOBD
4 . 3 CEILINGPLASTER WITH WHITE WASH.
4 . 4 WARDROBESNOT PROVIDED.
5 . TOILET
5 . 1 FLOORANTI- SKID CERAMIC TILES
5 . 2 WALLSGRANITE/ MARBLE COUNTER
5 . 3 CEILINGPLASTER WITH WHITE WASH.
5 . 4 COUNTERSGRANITE/ MARBLE COUNTER
5 . 5 SANITARY WARE/CP FITTINGSCONTEMPORARY STYLED CP FITTINGS.
5 . 6 FIXTURESCP FITTINGS.
6 . KITCHEN
6 . 1 FLOORANTI-SKID CERAMIC TILES
6 . 2 WALLSCERAMIC TILES UP TO 2 FT. ABOVE WORKING PLATFORM AND THE REST PAINTED IN OIL BOUND DISTEMPER
6 . 3 CEILINGOIL BOUND DISTEMPER.
6 . 4 COUNTERSGRANITE COUNTER
6 . 5 FIXTURESSINGLE BOWL STAINLESS STEEL SINK AND DRAIN BOARD
6 . 6 KITCHEN APPLIANCESNOT SPECIFIED.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTI-SKID CERAMIC TILES
7 . 2 WALLS & CEILINGNOT SPECIFIED.
7 . 3 TOILETNOT SPECIFIED.
7 . 4 BALCONYNOT SPECIFIED.
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID CERAMIC TILES
8 . 2 WALLS & CEILINGOIL BOUND DISTEMPER
8 . 3 RAILINGSN.A.
8 . 4 FIXTURESN.A.












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND24-06-2019 View Document
2NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT24-06-2019 View Document
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN24-06-2019 View Document
4IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN24-06-2019 View Document
5DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.24-06-2019 View Document
6OC RECEIVED FOR TOWER F G H J K AND EWS (74 UNITS)24-06-2019 ------
7SERVICE PLAN ESTIMATE APPROVAL24-06-2019 ------












Sr. No.Document DescriptionDate of Document UploadView Document
1 Extension of Registration 29-12-2020 View Document