HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-550-2019
Submission Date : 01-06-2019 04:16:12 AM
Applicant Type : Company
Project Type: ONGOING




BPTP LIMITED
M-11, MIDDLE CIRCUS, CONNAUGHT CIRCUS, NEW DELHI-110001
01149572787
9871883334 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
http://bptp.com
XXXX442A
U45201DL2003PLC121733
 
 


 
 


 
 







PARKLAND VILLAS
SECTOR 75 AND 84
FARIDABAD
FARIDABAD
01149572787
9810163594 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
VINOD KUMAR
8800414400
8800414400 (Number Shared by Promoter in Public)
vinod2.kumar@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
168572617-07-2018134000INDUSIND BANKHRERA Panchkula







4.70 (Acre)
1.5
1.5
106.89 (Acre)
License No 60 of 2010 License No 38 of 2011 License no 47 of 2011 for Block L License No. 1210-1261of 2005 for block P, Q and S
No
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address     M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Annexure-B- AS A PROMOTER. (AS PER THE MASTER DEVELOPMENT AGREEMENT DATED AUGUST 03, 2007 WITH THE LICENSE HOLDERS).
APPLICANT IS APPLYING ON THE BASIS OF MASTER DEVELOPMENT AGREEMENT WHICH WAS ENTERED ON AUGUST 03,2007.
No
AS PER POINT (C) OF PARTY RELATED RECITALS OF THE MASTER DEVELOPMENT AGREEMENT THE LAND OWNERS HAVE ENTERED A COLLABORATION AGREEMENTS WITH THE COUNTRYWIDE PROMOTERS PRIVATE LIMITED (HEREIN REFERRED AS COUNTRYWIDE) AND COUNTRYWIDE IN TURN HAD ALSO ENTERED COLLABORATION AGREEMENT WITH BPTP LIMITED (HEREIN REFERRED AS BPTP) WHICH GIVES EXCLUSIVE RIGHT OF THE DEVELOPMENT TO THE BPTP; ATTACHED HEREWITH FOR YOUR KIND PERUSAL.
No
No
Yes







2121.61 Lakhs
419.40 Lakhs
1053.16 Lakhs
188.33 Lakhs
460.72 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 8690.04
3CONSTRUCTION OF ROADS 6062.69
4PAVEMENTS 1741.56
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 2533
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total19027.29




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPYes
WATER SUPPLYHSVPYes
ELECTRICITYHSVPYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS36SUBMITTED TO HUDA
2WATER SUPPLY SYSTEM29.50SUBMITTED TO HUDA
3STORM WATER DRAINAGE16SUBMITTED TO HUDA
4ELECTRICITY SUPPLY SYSTEM67.76SUBMITTED TO HUDA
5SEWAGE TREATMENT & GARBAGE DISPOSAL34SUBMITTED TO HUDA
6STREET LIGHTING5.07SUBMITTED TO HUDA
7SECURITY AND FIRE FIGHTING0SUBMITTED TO HUDA
8PLAYGROUNDS AND PARKS0SUBMITTED TO HUDA
9CLUB HOUSE/COMMUNITY CENTRE0SUBMITTED TO HUDA
10SHOPPING AREA0SUBMITTED TO HUDA
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO HUDA
12SCHOOL0SUBMITTED TO HUDA
13HOSPITAL/DISPENSARY0SUBMITTED TO HUDA
14ANY OTHER0SUBMITTED TO HUDA


10-05-2011 (date)
10-05-2011 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type VILLAS BLOCK L 125.41 17 2131.97 12 5 1
2 APARTMENT/SHOPS/OTHER BUILDINGS Type VILLAS BLOCK P 137.961 15 2069.415 15 0 0
3 APARTMENT/SHOPS/OTHER BUILDINGS Type VILLAS BLOCK Q 275.922 10 2759.22 6 4 0
4 APARTMENT/SHOPS/OTHER BUILDINGS Type VILLAS BLOCK S 346.993 9 3122.937 6 3 0
Total5110083.54239121






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
VILLAS39AS ANNEXED.


01-05-2011
31-08-2014
31-12-2022
01-05-2011
47
31-12-2022
AS MENTIONED.
AS ANNEXED.


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
31-12-2022
0
31-12-2022
AS PROVIDED.
AS MENTIONED.


0
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments657.16
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements12
Water Supply System27
Sewerage treatment & garbage disposal33
Electricity Supply System4.88
Storm Water Drainage13
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.851.62.51
Water Supply System0.250.250.250.1
Sewerage treatment & garbage disposal0000
Electricity Supply System3.254.55.54.95
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.7511.851.95
Water Supply System0.15000
Sewerage treatment & garbage disposal0000
Electricity Supply System05.543.95
Storm Water Drainage4.5000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.851.351.55
Water Supply System0.250.100.2
Sewerage treatment & garbage disposal000
Electricity Supply System5.467
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1.651.751.9
Water Supply System000.75
Sewerage treatment & garbage disposal001
Electricity Supply System2.7535
Storm Water Drainage111
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000












Particulars Remarks, if any
i. No. of Flats/Apartments constructed51
ii. No. of Flats/ Apartments booked39
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter1913 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter1431.8 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter481.2 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter481.2 Lakhs
vii. Amount invested in the project upto the date of application1627.16 Lakhs
Land cost (If any)419.40 Lakhs
Apartments657.16 Lakhs
Infrastructure89.88 Lakhs
EDC/ Taxes Etc.460.72 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession494.45 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 249.85 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS3612
II. WATER SUPPLY SYSTEM29.5027
III. STORM WATER DRAINAGE1613
IV. ELECTRICITY SUPPLY SYSTEM67.763.19
V. SEWAGE TREATMENT & GARBAGE DISPOSAL3433
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER5.071.69
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
IDBI BANK FIRST FLOOR, VIDEOCON TOWER, E-1 JHANDEWALAN EXTENSION NEW DELHI-110055
413102000007573
IBKL0000413
110259037
000413
Rakesh Kumar Agarwal and Inder Singh Bhatia 28, KG Marg, New Delhi
No such defaults











Yes
No
Yes
Yes
Yes
No
No
No
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 60 OF 2010- BLOCK L ALREADY BEEN OBTAINED07-08-2010
II. LICENSE NO 38 OF 2011-BLOCK L ALREADY BEEN OBTAINED28-04-2011
III. LICENSE NO 47 OF 2011 FOR BLOCK L ALREADY BEEN OBTAINED27-05-2011
IV. LICENSE NO. 1210-1261 OF 2005 FOR BLOCK P, Q AND SALREADY BEEN OBTAINED25-10-2006
V. RENEWAL APPLIED-LICENSE NO 60 OF 2010APPLIED FOR BUT YET TO RECEIVE26-11-2018
VI. RENEWAL APPLIED LICENSE NO 38 OF 2011-BLOCK L APPLIED FOR BUT YET TO RECEIVE23-05-2017
VII. RENEWAL APPLIED- LICENSE NO 47 OF 2011 FOR BLOCK L APPLIED FOR BUT YET TO RECEIVE10-01-2019
VIII. RENEWAL APPLIED-LICENSE NO. 1210-1261 OF 2005 FOR BLOCK P, Q AND SAPPLIED FOR BUT YET TO RECEIVE05-12-2017








Yes


Yes









PARK TERRA, SEC 37D GURUGRAM
840305
456
0
373
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
35269.38020987.44
Cost of the apartments000
Cost of the infrastructure000
Others costs000


30900 Lakhs
9500 Lakhs
6500.00 Lakhs
4500.00 Lakhs
Yes
31-12-2012
31-10-2020




PARK SENTOSA, SECTOR 77 FARIDABAD
743720
420
0
159
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
22701.6505630.20
Cost of the apartments000
Cost of the infrastructure000
Others costs000


3600 Lakhs
10100 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2013
30-04-2022




VISSIONAIRE VILLAS, SECTOR 70 GURUGRAM
56233
10
10
5
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
932.830493.28
Cost of the apartments000
Cost of the infrastructure000
Others costs000


1300 Lakhs
1000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020




PEDESTAL FLOORS SECTOR 70A GURUGRAM
303304
174
58
143
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5550.8702718.42
Cost of the apartments000
Cost of the infrastructure000
Others costs000


10200 Lakhs
8000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELAMINATED WOODEN FLOORING
2WALL FINISHING DETAILSOBD, TEXTURE AND EXTERIOR GRADE EMULSION SUPERFINE.
3KITCHEN DETAILSBLACK GRANITE FOR FLOORING, CERAMIC 300*300
4BATHROOM FITTINGSCERAMIC 200*300, BLACK GRANITE, EWC WITH FLOOR MOUNTED- CALIBRE, WASHBASIN WITH WASTE COUPLING - CIRCLE
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMS HOLLOW SECTION AS/ DESIGN
7GLASS WORKNA
8ELECTRIC FITTINGS32 MM , 25 MM AND 20 MM DIA HEAVY CONDUIT, MODULAR SWITCHES , JUNCTION BOX, DISTRIBUTION BOARD.
9CONDUCTING AND WIRING DETAILS32 MM , 25 MM AND 20 MM DIA HEAVY CONDUIT
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSMS HOLLOW SECTION AS/ DESIGN
13.1WINDOWS/GLAZINGSUPVC DOORS AND WINDOWS WITH 5 MM CLEAR TOUGHED FLOAT GLASS.
14DOORS35 MM THE FLUSH DOOR BOTH SIDE COMMERCIAL WITH ENAMEL PAINTED FINISH.
14.1MAIN DOORSMOULDED WITH MESOMINE SKIN WITH HARD WOOD LEAPING.
14.2INTERNAL DOORSSTAINLESS STEEL / SS FINISH(BRUSH FINISH) MORTICE LOCK FOR BEDROOM & BABY LOCK FOR TOILETS.
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGS32 MM , 25 MM AND 20 MM DIA HEAVY CONDUIT, MODULAR SWITCHES , JUNCTION BOX, DISTRIBUTION BOARD.
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC 200*300
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC 200*300
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORBLACK GRANITE FOR FLOORING, CERAMIC 300*300- KAJARIA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESKITCHEN SINK DOUBLE BOWEL WITH DRAIN BOARD
6 . 6 KITCHEN APPLIANCESKITCHEN SINK MIXER
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 30-05-2019 View Document
2 MASTER DEVELOPMENT AGREEMENT 30-05-2019 View Document
3 LICENSE 38 OF 2011 30-05-2019 View Document
4 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 30-05-2019 View Document
5 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 30-05-2019 View Document
6 LICENSE 60 OF 2011 30-05-2019 View Document
7 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 30-05-2019 View Document
8 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 30-05-2019 View Document