HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-541-2019
Submission Date : 18-06-2019 04:14:37 AM
Applicant Type : Company
Project Type: ONGOING




ANSAL LANDMARK (KARNAL) TOWNSHIP PRIVATE LIMITED
11TH FLOOR, NARAIN MANZIL, 23, BARAKHAMBA ROAD, NEW DELHI-110001
01143621200
9729808756 (Number Shared by Promoter in Public)
INFO@ANSALLANDMARK.IN
http://www.ansallandmark.in/
XXXX414K
U70100DL2011PTC217081
 
 


 
 


 
 


 
 







SUSHANT ROYALE
MILESTONE 119, G.T. ROAD, NEAR SWARAJ MAZDA AGENCY, SECTOR-36
KARNAL
KARNAL
9355491722
9355491722 (Number Shared by Promoter in Public)
dheerajmalik@landmarkholdings.in
DHEERAJ MALIK
9355491722 (Number Shared by Promoter in Public)
dheerajmalik@landmarkholdings.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
124995428-07-2017422340.00AXIS BANK LIMITEDHRERA Panchkula







11.239 (Acre)
Permissible FAR is 1.75 (79594.65 Sqm)
163.20
11.239 (Acre)
LICENSE NO. 458-461 OF 2006 DATED 15.02.2006. License is valid upto 14.02.2019.
No
Address     115, ANSAL BHAWAN, 16 KG MARG, NEW DELHI
Address     115, ANSAL BHAWAN, 16 KG MARG, NEW DELHI
Address     115, ANSAL BHAWAN, 16 KG MARG, NEW DELHI
Address     115, ANSAL BHAWAN, 16 KG MARG, NEW DELHI
Annexure-B- APPLICANT IS APPLYING FOR THE REGISTRATION, AS IT IS THE RESPONSIBLE FOR DEVELOPING THE PROJECT THROUGH EXECUTION OF BELOW MENTIONED COLLABORATION AGREEMENTS: - JOINT VENTURE AGREEMENT DATED 13.09.2004 FOR EXECUTION OF VARIOUS PROJECTS INCLUDING LOCATED AT SECTOR-36 KARNAL. PURSUANT TO THIS AGREEMENT, SPECIAL PURPOSE VEHICLE CALLED "ANSAL LANDMARK TOWNSHIPS PRIVATE LIMITED" WAS FORMED. - DEVELOPMENT AGREEMENT DATED 30.06.2005 EXECUTED BETWEEN VARIOUS LAND OWNING COMPANIES AND ANSAL LANDMARK TOWNSHIPS PVT LTD FOR DEVELOPING THE SAID PROJECT. - SUPPLIMANTRY AGREEMENT DATED 18.01.2006 EXECUTED BETWEEN VARIOUS LAND OWNNING COMPANIES AND ANSAL LANDMARK TOWNSHIPS PVT. LTD. FOR DEVELOPING THE SAID PROEJCT. - BUSINESS TRANSFER AGREEMENT DATED 02.04.2012 EXECUTED FOR THE PURPOSE OF TRANSFERRING THE ENTIRE BUSINESS OF KARNAL PROJECT FORM ANSAL LANDMARK TOWNSHIPS PVT. LTD. TO ANSAL LANDMARK (KARNAL) TOWNSHIPS PVT. LTD.
YES, ALL THE AGREEMENTS WERE MADE REGISTERED BEFORE GRANT OF LICENSE.
No
- JOINT VENTURE AGREEMENT DATED 13.09.2004 FOR EXECUTION OF VARIOUS PROJECTS INCLUDING LOCATED AT SECTOR-36 KARNAL. PURSUANT TO THIS AGREEMENT, SPECIAL PURPOSE VEHICLE CALLED "ANSAL LANDMARK TOWNSHIPS PRIVATE LIMITED" WAS FORMED. - DEVELOPMENT AGREEMENT DATED 30.06.2005 EXECUTED BETWEEN VARIOUS LAND OWNING COMPANIES AND ANSAL LANDMARK TOWNSHIPS PVT LTD FOR DEVELOPING THE SAID PROJECT. - SUPPLEMENTARY AGREEMENT DATED 18.01.2006 EXECUTED BETWEEN VARIOUS LAND OWNING COMPANIES AND ANSAL LANDMARK TOWNSHIPS PVT. LTD. FOR DEVELOPING THE SAID PROJECT. - BUSINESS TRANSFER AGREEMENT DATED 02.04.2012 EXECUTED FOR THE PURPOSE OF TRANSFERRING THE ENTIRE BUSINESS OF KARNAL PROJECT FORM ANSAL LANDMARK TOWNSHIPS PVT. LTD. TO ANSAL LANDMARK (KARNAL) TOWSHIPS PVT. LTD.
No
Yes
Yes







10284.00 Lakhs
353.00 Lakhs
6661.00 Lakhs
706.00 Lakhs
2564.00 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS3.106
3CONSTRUCTION OF ROADS2.20
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS1.74
7VEHICLE PARKINGS3.05
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0.07
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0.828
13CONVENIENT0.045
14NURSERY0.20
Total11.239




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPNo
ELECTRICITYUHBVNLYes
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS118.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM119.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE69.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM82.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL95.00AS PER PROJECT REPORT
6STREET LIGHTING9.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS8.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE75.00AS PER PROJECT REPORT
10SHOPPING AREA18.00AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM9.00AS PER PROJECT REPORT
12SCHOOL97.00AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


NA (date)
NA (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type 2 & 3 BHK02686919926






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
2 & 3 BHK69ANNEXURE-C2 ATTACHED IN THE MAIN FILE. TOWER APPLIED FOR RERA REGISTRATION ARE; TOWER-A7 / B8 (A BLOCK) / A2 / A1 (D BLOCK) / B15 / A15 (E BLOCK) / A13 / A14 / B14 (F BLOCK) / A10 / B11 / A11 (H BLOCK) / A17 (K BLOCK) / A18 / B18 / B19 (M BLOCK) / B22 / A20 / B21 (N BLOCK), TOWERS B3 / B2 / A3 (C BLOCK) AND A5 / B5 / A6 / B6 (B EXTENSION BLOCK)


01-08-2012
31-12-2016
30-08-2023
01-08-2012
21
30-08-2023
ANNEXURE-C5
ANNEXURE-C5


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-08-2012
21
30-08-2023


0
336
0
84
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops00
Plots00

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments389.990389.99389.99
Shops0000
Plots0000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments389.99389.99389.99389.99
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments389.99389.99389.99389.99
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments387.07389.99389.99389.99
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements4.9804.984.98
Water Supply System4.6904.694.69
Sewerage treatment & garbage disposal4.6904.694.69
Electricity Supply System5.8605.865.86
Storm Water Drainage4.3904.394.39
Parks and Playgrounds2.3402.342.34
Clubhouse/community centres0000
Shopping area0000
Other2.3402.342.34

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements4.984.984.984.98
Water Supply System4.694.694.694.69
Sewerage treatment & garbage disposal4.694.694.694.69
Electricity Supply System5.865.865.865.86
Storm Water Drainage4.394.394.394.39
Parks and Playgrounds2.342.342.342.34
Clubhouse/community centres0000
Shopping area0000
Other2.342.342.342.34

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements4.984.984.984.98
Water Supply System4.694.694.694.69
Sewerage treatment & garbage disposal4.694.694.694.69
Electricity Supply System5.865.865.865.86
Storm Water Drainage4.394.394.394.39
Parks and Playgrounds2.342.342.342.34
Clubhouse/community centres0000
Shopping area0000
Other2.342.342.342.34

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements4.944.984.984.98
Water Supply System4.654.694.694.69
Sewerage treatment & garbage disposal4.654.694.694.69
Electricity Supply System5.815.865.865.86
Storm Water Drainage4.364.394.394.39
Parks and Playgrounds2.322.342.342.34
Clubhouse/community centres0000
Shopping area0000
Other2.322.342.342.34












Particulars Remarks, if any
i. No. of Flats/Apartments constructed78
ii. No. of Flats/ Apartments booked69
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter2254 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter1135 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter1119 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter244 Lakhs
vii. Amount invested in the project upto the date of application3336 Lakhs
Land cost (If any)354 Lakhs
Apartments814 Lakhs
Infrastructure267 Lakhs
EDC/ Taxes Etc.1904 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession6951 Lakhs
(a) In respect of existing allottees4921 Lakhs
(b) In respect of rest of the project2034 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 LakhsRepaid Loan.
x. Total liabilities against the project up-to-date. (Annex details in folder C) 1.96 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS11863
II. WATER SUPPLY SYSTEM11948
III. STORM WATER DRAINAGE6945
IV. ELECTRICITY SUPPLY SYSTEM8234
V. SEWAGE TREATMENT & GARBAGE DISPOSAL10025
VI. CLUB HOUSE/COMMUNITY CENTRE7534
VII. SCHOOL970
VIII. ANY OTHER91
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.85
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT2711









Yes
Yes
AXIS BANK STATEMAN HOUSE, BARAKHAMBHA ROAD, NEW DELHI-110001
917020062740644
UTIB0000007
110211002
007
Mr. Rakesh Aggarwal, Mr Naresh Kumar Ghai, Mr. Rajeev Nair and Mr. Gaurav Dalimia.
Attached in Annexure-D-5.











Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LETTER OF INTENTALREADY BEEN OBTAINED30-12-2005
II. LICENSE NO. 458-461 OF 2006ALREADY BEEN OBTAINED15-02-2006
III. RENEWAL OF LICENSE ALREADY BEEN OBTAINED04-10-2017
IV. ZONING PLAN ALREADY BEEN OBTAINED14-11-2006
V. APPROVAL OF BUILDING PLANSALREADY BEEN OBTAINED17-04-2007
VI. BUILDING PLAN RE VALIDATION ALREADY BEEN OBTAINED07-02-2013
VII. REVISED BUILDING PLANS APPROVAL ALREADY BEEN OBTAINED01-02-2008
VIII. FIRE NOCALREADY BEEN OBTAINED29-06-2016
IX. FIRE SCHEME APPROVAL ALREADY BEEN OBTAINED16-04-2008
X. CTEALREADY BEEN OBTAINED14-03-2008
XI. RENEWAL OF CTEALREADY BEEN OBTAINED01-06-2015
XII. CGWA FOR BOREWELL APPROVAL ALREADY BEEN OBTAINED16-05-2008
XIII. LIFTS NOCALREADY BEEN OBTAINED19-04-2012
XIV. GRANT OF PART OCCUPATION CERTIFICATEALREADY BEEN OBTAINED07-10-2010
XV. ELECTRICAL INSPECTION ALREADY BEEN OBTAINED29-01-2018
XVI. OCCUPATION FOR PHASE-IIYET TO FILE FOR APPROVALNA
XVII. OCCUPATION FOR PHASE-IIIYET TO FILE FOR APPROVALNA








Yes


Yes


1. Details of Land Owners; 2. Details of Project Land; 3. Details of the Project 4. Total Price; 5. Payment Plan; 6. Sanctioned Plans Layout Pland and the nature of facilities and amenities. 7. Time of the essence. 8. consequences of Defaoult 9. Possession of the said flat. 10. Conveyance of the said Flat. 11. Misc. provisions and general compliance.













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING/ DINING/ LOBBY: VITRIFIED TILES; BEDROOMS: LAMINATED WOODEN FLOORING/ VITRIFIED TILE; TOILETS; ANTI SKID CERAMIC TILES; KITCHE- CERAMIC TILES/ VITRIFIED TILES.
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT ON WALLS; OIL BOUND DISTEMPER ON CEILING.
3KITCHEN DETAILSCOUNTER: POLISHED GRANITE; CABINETS: MODULAR CABINETS WITH CHIMNEY; HOOD AND STAINLESS STEEL SINK
4BATHROOM FITTINGSCOUNTER: POLISHED GRANITE; FITTINGS/ FIXTURES: SINGLY LEVER MATT FINISHED CP FITTINGS; CHINAWARE: WHITE/ COLORED.
5WOOD WORK ETCALUMINIUM / UPVC SECTION WITH PLAIN GLASS, MACHINE MADE MOLDED SHUTTERS.
6DOORS AND WINDOS FRAMESMETAL DOORS DM = 1000X2100) INTERNAL WOOD DOOR D= 1000X2100, 3NOS.) D1= (900X2100, 1 NOS) D2=800X2100, 4NOS.) ALUMINIUM / UPVC DOOR WITH GLASS GD1= (1555X2650), GD2=(1385X2650), GD3=(2120X2650), GD4=(2135X2650), GD5/PV= (1500X2650), GD6=(1800X2650), GD7=(2500X2650), GD8= (2650X2650), GD9= (1470X2650) GD10= 2065X2650), WINDOW V/PV=(875X1250, 2 NOS.), V2/PV= (900X950)
7GLASS WORKPLAIN GLASS WITH ALLUMINIUM AND UPVC SECTION OUTER DOOR AND WINDOW.
8ELECTRIC FITTINGSCABLES 1 100 VOLTS IN VARIOUS SIZE ISI MARK CLASS-II - 1 SQM, 1.5 SQM, 2.5 SQM, 4 SQM.
9CONDUCTING AND WIRING DETAILSPVC CONDUIT PIPE VARIOUS SIZES MAKE D PLASTE & POLY CAB WIRING IN VARIOUS SIZED MAKE KALINGS.
10CUPBOARD DETAILSNOT APPLICABLE.
11WATER STORAGECHLORINATION PLAN INSTALLED IN GH COMPLEX, TREATED WATER FROM BORE WELLS PROVIDED FOR DRINKING PURPOSE.
12LIFT DETAILSEVERY TOWER HAS ONE PESSANGER LIFT BY JOHNSON LIFT OF 8 PERSON CAPACITY EACH; LIFTS INSTALLED WITH ARD OPERATAION, EMERGENCY LIGHT AND SIREN; REGISTRATION OF LIFTS RENEWED EVERY YEAR BY EXECUTIVE ENGINEER TO CHIEF ELECTORAL INSPECTOR, GOVERNMENT OF HARYANA.
13EXTERNAL GLAZINGSNOT APPLICABLE.
13.1WINDOWS/GLAZINGSALUMINIUM / UPVC SECTION WITH PLAIN GLASS.
14DOORSNA
14.1MAIN DOORSSECURITY METAL DOOR
14.2INTERNAL DOORSMACHINE MADE MOULDED DOORS.
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSD-ART/ SCHNEIDER OR EQUIVALENT MAKE ELECTRICAL FITTINGS.
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMETEXTURE PAINT
20INTERNAL FINISHINGDETAILS GIVEN IN TABLE BELOW.
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES.
1 . 2 WALLSACRYLIC DISTEMPER
1 . 3 CEILINGOIL BOUND DISTEMPER.
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/ WOODEN FLOORING
2 . 2 WALLSACRYLIC DISTEMPER
2 . 3 CEILINGOBD
2 . 4 MODULAR WARDROBESONLY NICHES FOR WARDROBES.
3 . MASTER TOILET
3 . 1 FLOORNON-SKID CERAMIC TILES
3 . 2 WALLSCERAMIC TILES/ ACRYLIC DISTEMPER
3 . 3 CEILINGFALL CEILING.
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSENGLISH TOILET SEAT, WASHBASIN, SHOWER AND TAP, MAKE PARRYWARE, OTHELLO AND / OR CERA.
3 . 6 FITTING/FIXTURESSINGLE LEVER MATT FINISHED CP FITTINGS, GEYZERS, EXHAUST FAN AND LOOKING MIRROR.
4 . BED ROOMS
4 . 1 FLOORVITRIED TILES / WOODEN FLOORING
4 . 2 WALLSACRYLIC DISTEMPER
4 . 3 CEILINGOBD
4 . 4 WARDROBESONLY NICHES FOR WARDROBES.
5 . TOILET
5 . 1 FLOORNON-SKID CERAMIC TILES
5 . 2 WALLSCERAMIC TILES/ ACRYLIC DISTEMPER
5 . 3 CEILINGFALL CEILING
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSENGLISH TOILET SEAT, WASHBASIN, SHOWER AND TAP, MAKE PARRYWARE, OTHELLO AND / OR CERA.
5 . 6 FIXTURESSINGLE LEVER MATT FINISHED CP FITTINGS, GEYZERS, EXHAUST FAN AND LOOKING MIRROR.
6 . KITCHEN
6 . 1 FLOORNON SKID CERAMIC TILES.
6 . 2 WALLSCERAMIC TILES./ OIL BOUND DISTEMPER
6 . 3 CEILINGOBD
6 . 4 COUNTERSPOLISHED GRANITE COUNTER.
6 . 5 FIXTURESGEYZER AND EXHAUST FAN
6 . 6 KITCHEN APPLIANCESMODULAR CABINETS WITH CHIMNEY, HOOD AND STAINLESS STEEL SINK.
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNON SKID CERAMIC TILES.
7 . 2 WALLS & CEILINGCT/ AD/ OBD
7 . 3 TOILETENGLISH TOILET, TAP.
7 . 4 BALCONYSAME AS SIT OUT.
8 . SIT-OUTS
8 . 1 FLOORNON SKID CERAMIC TILES.
8 . 2 WALLS & CEILINGACRYLIC DISTEMPER ON WALLS/ OIL BOUND DISTEMPER
8 . 3 RAILINGSMS STEEL RAILING (HOLLOW PIPE)
8 . 4 FIXTURESNOT APPLICABLE.












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND05-05-2019 View Document
2DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD05-05-2019 View Document
3DEMARCATION PLAN05-05-2019 View Document
4ZONING PLAN05-05-2019 View Document
5NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT05-05-2019 View Document
6CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT05-05-2019 View Document
7SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN05-05-2019 View Document
8CASH FLOW STATEMENT OF THE PROPOSED PROJECT05-05-2019 View Document
9A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS05-05-2019 View Document
10IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN05-05-2019 View Document
11IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN05-05-2019 View Document
12DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.05-05-2019 View Document