HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2313-2026
Submission Date : 04-08-2026 02:32:56 PM
Applicant Type : Company
Project Type: ONGOING




HOMEKRAFT INFRA PRIVATE LIMITED
OCUS MEDLEY, 16TH FLOOR, ATS HOMEKRAFT SECTOR 99, GURUGRAM HARYANA 122001
1207111500
9643007884 (Number Shared by Promoter in Public)
compliance@homekraft.in
Https://homekraft.in
XXXX379L
U70200DL2017PTC314287
 
 


 
 


 
 


 
 







ATS GRANDSTAND PHASE-1
SECTOR 99A, GURUGRAM
GURGAON
GURUGRAM
1207111500
9643007884 (Number Shared by Promoter in Public)
compliance@homekraft.in
MR GOVIND MADHAV SHARMA
1207111500
9356604101 (Number Shared by Promoter in Public)
compliances@atsgreens.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
123712814-07-20181826862KOTAK MAHINDRA BANKHRERA Gurugram
250003628-09-2022433358YES BANKHRERA Gurugram
35202310279928027-10-2023632079YES BANKHRERA Gurugram
459262915-04-2026305883ICICI BANKHRERA Gurugram







11.5875 (Acre)
3.4
3.25
0.815 (Acre)
37 of 2013 Dated 03.06.2013
No
Address     296 FOREST LAND, SAINIK FARMS NEB SARAI, NEW DELHI 110068
Annexure-B- ANNEXURE-B- ANNEXURE B-ATTACHED
YES
Yes
AS PER CALUSE
No
Yes
Yes







19517.43 Lakhs
1941.48 Lakhs
13102.09 Lakhs
1399.00 Lakhs
3074.86 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.292
3CONSTRUCTION OF ROADS 0.387
4PAVEMENTS 0.136
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total0.815




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSALREADY CONNECTEDYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS135.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM242.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE64.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM121.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL72.00AS PER PROJECT REPORT
6STREET LIGHTING30.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING185.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS14.75AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM103.00AS PER PROJECT REPORT
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15STP56.00AS PER PROJECT REPORT
16UNDERGROUND WATER TANK167.00AS PER PROJECT REPORT
17RAIN WATER HARVESTING83.25AS PER PROJECT REPORT
18ELECTRICAL SUB STATION126.00AS PER PROJECT REPORT


NA (date)
10-07-2026 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK 96.06 118 11335.08 98 20 0
2 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK 104.42 114 11903.88 108 6 0
3 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK 116.41 3 349.23 3 0 0
4 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK 128.67 1 128.67 0 1 0
Total23623716.86209270






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
96.06118YET TO BE STARTED
104.42114YET TO BE STARTED
116.413YET TO BE STARTED
128.671YET TO BE STARTED


01-01-2018
27-11-2028
30-06-2031
01-04-2027
0
31-12-2030
DETAILS MENTION IN REP-1 PART C-X
PERT CHART ATTACHED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-04-2027
0.00
31-12-2030


150
0
0
28
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments78.18
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments166.83333.67
Shops00
Plots00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments333.67333.67755.27254.77
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments509.54509.54509.54509.54
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments655.10655.101135.561135.56
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1470.451252.041252.041252.04
Shops0000
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements006.75
Water Supply System0012.10
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other000
STP2.802.802.80
Rain Water Harvesting4.164.164.16
Renewable Energy System5.15

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements6.756.756.7513.50
Water Supply System12.1012.1012.1024.20
Sewerage treatment & garbage disposal3.603.603.603.60
Electricity Supply System6.056.056.056.05
Storm Water Drainage3.203.206.406.40
Parks and Playgrounds0.740.740.740.74
Clubhouse/community centres0000
Shopping area0000
Other0000
Security and fire fighting9.259.259.259.25
Street Lighting1.501.501.501.50
Rain Water Harvesting4.164.164.164.16
Underground water tank8.358.358.358.35
STP2.802.802.802.80
Renewable Energy System5.155.155.1510.30

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.5013.5013.5013.50
Water Supply System24.2024.2024.2024.20
Sewerage treatment & garbage disposal7.207.207.207.20
Electricity Supply System12.1012.1012.1012.10
Storm Water Drainage6.406.406.406.40
Parks and Playgrounds1.481.481.481.48
Clubhouse/community centres0000
Shopping area0000
Other0000
Renewable Energy System10.3010.3010.3010.30
Underground water tank16.7016.7016.7016.70
Rain Water Harvesting4.164.164.168.33
Electrical Sub Station12.6012.6012.60
STP2.802.802.805.60
Street Lighting3.003.003.003.00
Security and fire fighting18.5018.5018.5018.50

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.5013.5013.500
Water Supply System24.2024.2024.200
Sewerage treatment & garbage disposal7.207.207.207.20
Electricity Supply System12.1012.1012.1012.10
Storm Water Drainage6.406.406.400
Parks and Playgrounds1.481.481.481.48
Clubhouse/community centres0000
Shopping area0000
Other0000
Renewable Energy System10.3010.3010.30
Security and fire fighting18.5018.5018.5018.50
Underground water tank16.7016.7016.7016.70
Rain Water Harvesting8.338.338.338.33
Street Lighting3.003.003.003.00
Electrical Sub Station12.6025.2025.2025.20
STP5.605.605.60
SRP5.60












Particulars Remarks, if any
i. No. of Flats/Apartments constructed236
ii. No. of Flats/ Apartments booked209
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter16626.31 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter3669.09 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter11547.49 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application1783.81 Lakhs
Land cost (If any)1544.54 Lakhs
Apartments78.18 Lakhs
Infrastructure0.00 Lakhs
EDC/ Taxes Etc.161.09 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession17733.62 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS1350
II. WATER SUPPLY SYSTEM2420
III. STORM WATER DRAINAGE640
IV. ELECTRICITY SUPPLY SYSTEM1210
V. SEWAGE TREATMENT & GARBAGE DISPOSAL720
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER750.250
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.14.750
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
HDFC BANK LIMITED ADDRESS SCO 36, SECTOR-14, GURGAON, HARYANA 122001
99999055551404
HDFC0000090
110240012
0090
1. Mr. Getamber Anand R/o C-226, Sector-44, Noida, Gautam Buddha Nagar, Uttar Pradesh 201301, 2. Mr. Bani Getamber Anand R/o C-226, SECTOR-44, Noida, Gantam Buddha Nagar, Uttar Pradesh - 201301, 3. Mr. Udaivir Anand R/o C-226, Sector-44, Noida, Gautam Buddha Nagar, Uttar Pradesh 201301, 4. Mr. Mohit Arora R/o House No. 627, Sector 13 Extension, Urban Estate, Karnal, Haryana 132001, 5. Mr. Manish Kumar Gupta R/o Flat N0.-08124, Tower-8, ATS ONE HAMLET, SECTOR-104, Salarpur, Gautam Buddha Nagar, Uttar Pradesh 201304, 6. Mr. Kailash Rathi R/o 1D VICTORIA, Tata Raisaina Residency, Near Ulawas Sector 56, Gurgaon, Haryana 122011, 7. Mr. Yuvraj Singh R/o F-703, Himachali CGHS Ltd., Lot No-08, Dwarka, Sector-3, South West Delhi, Delhi 110078, 8. Mr. Ankit Goenka R/o B 1202, IREO Skyon, Sector 60, Kadarpur(84), Gurgaon, Haryana 122101
YES











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED03-06-2013
II. AAIALREADY BEEN OBTAINED24-07-2019
III. ASSURANCE OF STORM WATERALREADY BEEN OBTAINED08-01-2026
IV. ASSURANCE OF SEWERAGE CONNECTIONALREADY BEEN OBTAINED09-01-2026
V. ASSURANCE FOR WATER SUPPLYALREADY BEEN OBTAINED07-01-2026
VI. CODALREADY BEEN OBTAINED19-06-2026
VII. HUDA CONSTRUCTIONALREADY BEEN OBTAINED04-12-2025
VIII. FOREST NOCALREADY BEEN OBTAINED20-12-2013
IX. BR-IIIALREADY BEEN OBTAINED10-07-2026
X. ELECTRICAL LOADAPPLIED FOR BUT YET TO RECEIVE03-08-2026
XI. ECAPPLIED FOR BUT YET TO RECEIVE19-05-2026
XII. SERVICE PLAN ESTIMATE APPROVALAPPLIED FOR BUT YET TO RECEIVE14-07-2026
XIII. FIRE SCHEME APPROVALAPPLIED FOR BUT YET TO RECEIVE13-07-2026








Yes


Yes


As per Norms













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES FLOORING IN LIVING, DINING & LOBBY WOODEN/ VITRIFIED TILES FLOORING IN BEDROOMS VITRIFIED TILES IN KITCHEN, UTILITY & SERVANT ROOM AND CERAMIC TILES IN TOILETS. BALCONIES WILL BE IN ANTI-SKID CERAMIC FLOORING
2WALL FINISHING DETAILSGLAZED TILES OF REQUIRED HEIGHT IN TOILETS & 600MM HEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATE COLOUR & PAINT
3KITCHEN DETAILSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE, ELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, WASHING MACHINE & FRIDGE TO BE PROVIDED. KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
4BATHROOM FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMAIN ENTRANCE DOORS – PLYWOOD FRAMES WITH POLISHED VENEER ON TOP. ALL INTERNAL DOORS-LAMINATED PLYWOOD FRAMES . WINDOW FRAMES AND WINDOW PANELS OF ALUMINIUM/ UPVC SECTIONS.
7GLASS WORKNA
8ELECTRIC FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MOULDED MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
9CONDUCTING AND WIRING DETAILSALL ELECTRICAL WIRING IN CONCEALED CONDUITS
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSLIFTS TO BE PROVIDED FOR ACCESS TO ALL FLOORS FROM COMMON LOBBY
13EXTERNAL GLAZINGSREFER SR NO 13.1
13.1WINDOWS/GLAZINGSWINDOW PANELS OF SEASONED HARDWOOD/ALUMINIUM/ UPVC SECTIONS. ALL HARDWARE IN POWDER COATED ALUMINIUM. SIZE AND SECTION AS PER DESIGN OF THE ARCHITECT
14DOORSREFER SR NO 14.1 AND 14.2
14.1MAIN DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED; STAINLESS STEEL/ BRASS FINISHED HARDWARE FITTINGS FOR MAIN DOOR & ALUMINIUM POWDER COATED HARDWARE FITTING AND LOCKS OF BRANDED MAKES
14.2INTERNAL DOORSFLUSH DOORS - POLISHED/ENAMEL PAINTED
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSPROVISION FOR ADEQUATE LIGHT & POWER POINTS. TELEPHONE & T.V. OUTLETS IN DRAWING, DINING AND ALL BEDROOM; MOULDED MODULAR PLASTIC SWITCHES & PROTECTIVE MCB'S
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION OF FTTH NETWORK
19EXTERNAL FINISHING/COLOUR SCHEMEAPPROPRIATE FINISH OF TEXTURE PAINT OF EXTERIOR GRADE WATER PROOF PAINT
20INTERNAL FINISHINGOIL BOUND DISTEMPER OF APPROPRIATE COLOUR ON INTERIOR WALLS & CEILINGS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES
1 . 2 WALLSPLASTER WITH OBD
1 . 3 CEILINGPLASTER WITH OBD
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN FLOORING/VITRIFIED TILES
2 . 2 WALLSPLASTER WITH OBD
2 . 3 CEILINGPLASTER WITH OBD
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES
3 . 2 WALLSGLAZED TILES
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
3 . 6 FITTING/FIXTURESPREMIUM CHROME PLATED FITTINGS
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES
4 . 2 WALLSPLASTER WITH OBD
4 . 3 CEILINGPLASTER WITH OBD
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSGLAZED TILES
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSPREMIUM SANITARY FIXTURES, PREMIUM CHROME PLATED FITTINGS
5 . 6 FIXTURESPREMIUM CHROME PLATED FITTINGS
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSGLAZED TILES 600MM HEIGHT ABOVE KITCHEN COUNTER SLAB IN APPROPRIATE COLOUR & PAINT
6 . 3 CEILINGPLASTER WITH OBD
6 . 4 COUNTERSALL KITCHEN COUNTERS IN PRE-POLISHED GRANITE/ MARBLE STONE
6 . 5 FIXTURESELECTRICAL POINTS FOR KITCHEN CHIMNEY & HOB, KITCHEN WILL BE PROVIDED WITH MODULAR CABINETS OF APPROPRIATE FINISH
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES IN UTILITY & SERVANT ROOM
7 . 2 WALLS & CEILINGPLASTER WITH OBD
7 . 3 TOILETGLAZED TILES OF REQUIRED HEIGHT IN TOILETS & CERAMIC TILES IN TOILETS FOR FLOORING
7 . 4 BALCONYBALCONIES WILL BE IN ANTI SKID CERAMIC FLOORING
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 04-08-2026 View Document
2 LOI 04-08-2026 View Document
3 LC-IV 04-08-2026 View Document
4 MUTATION 04-08-2026 View Document
5 JAMABANDI 04-08-2026 View Document
6 NEC 04-08-2026 View Document
7 SALE DEED 04-08-2026 View Document
8 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 04-08-2026 View Document
9 ENVIRONMENT CLEARANCE 04-08-2026 View Document
10 FIRE SCHEME 04-08-2026 View Document
11 SERVICE PLAN ESTIMATE APPLIED 04-08-2026 View Document
12 AAI 04-08-2026 View Document
13 FOREST NOC 04-08-2026 View Document
14 ASSURANCE OF WATER SUPPLY 04-08-2026 View Document
15 ASSURANCE OF SEWERAGE CONNECTION 04-08-2026 View Document
16 ASSURANCE OF STORM WATER 04-08-2026 View Document
17 BANK UNDERTAKING 04-08-2026 View Document
18 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 04-08-2026 View Document
19 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 04-08-2026 View Document
20 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 04-08-2026 View Document
21 DEMARCATION PLAN 04-08-2026 View Document
22 ZONING PLAN 04-08-2026 View Document
23 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 04-08-2026 View Document
24 STILT-1 LVL PLAN PART A 04-08-2026 View Document
25 SITE PLAN FIRE LAYOUT 04-08-2026 View Document
26 STILT-1 LVL PLAN PART B 04-08-2026 View Document
27 STILT-1 AREA DIAGRAM PART B 04-08-2026 View Document
28 STILT-2 LVL PLAN PART B 04-08-2026 View Document
29 STILT-2 AREA DIAGRAM PART B 04-08-2026 View Document
30 GREEN AREA CALCULATION 04-08-2026 View Document
31 STILT 1 FLOOR DRAINAGE LAYOUT 04-08-2026 View Document
32 STILT 2 LVL PLAN DRAINAGE LAYOUT 04-08-2026 View Document
33 SITE PLAN SEWER LAYOUT 04-08-2026 View Document
34 SITE PLAN WATER SUPPLY AND IRRIGATION LAYOUT 04-08-2026 View Document
35 UG TANK AND STP LAYOUT 04-08-2026 View Document
36 BASEMENT DRAINAGE LAYOUT 04-08-2026 View Document
37 SURFACE PARKING CALCULATION 04-08-2026 View Document
38 BASEMENT LVL PLAN 04-08-2026 View Document
39 TYPE-C AND D, TOWER-2 SECTION AND ELEVATIONS 04-08-2026 View Document
40 TYPE-C AND D, TOWER-3 SECTION AND ELEVATIONS 04-08-2026 View Document
41 TYPE-C & D, TOWER-2 3RD FLOOR PLAN AND GROUND COVD. AREA 04-08-2026 View Document
42 TYPE-C & D, TOWER-2 4TH TO 19TH, 21TH TO 29TH AND 31TH TO 32ND TYPICAL FLOOR PLAN AND 20TH AND 30TH REFUGE FLOOR PLAN AND AREA DIAGRAM 04-08-2026 View Document
43 TYPE-C & D, TOWER-2, STILT-1 FLOOR, STILT-2 FLOOR, SECOND FLOOR PLANS & AREA DIAGRAMS 04-08-2026 View Document
44 TYPE-C AND D, TOWER-3 3RD FLOOR PLAN AND GROUND COVD AREA 04-08-2026 View Document
45 TYPE-C & D, TOWER-2 4TH TO 19TH, 21TH TO 29TH AND 31TH TO 32ND TYPICAL FLOOR PLAN AND 20TH AND 30TH REFUGE FLOOR PLAN AND AREA DIAGRAM 04-08-2026 View Document
46 TYPE-C AND D, TOWER-3 STILT-1 FLOOR, STILT-2 FLOOR, SECOND FLOOR PLANS AND AREA DIAGRAMS 04-08-2026 View Document
47 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 04-08-2026 View Document
48 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 04-08-2026 View Document
49 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 04-08-2026 View Document
50 AKS-SHIJRA 04-08-2026 View Document
51 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 04-08-2026 View Document
52 ELECTRICAL LOAD 04-08-2026 View Document