304, SOUTHERN PARK SAKET DISTRICT CENTRE, SAKET, NEW DELHI 110017
01142654265
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
ASHIANA AAROHAM PHASE III
REVENUE ESTATE OF VILLAGE- HSIIDC PLOT NO GH-04 SECTOR 80 IMT MANESAR GURUGRAM HARYANA
MANESAR
GURUGRAM
01142654265
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
ASHIANA HOUSING LIMITED
01142654265
9971992553 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
518112
26-05-2026
743468
ICICI BANK
HRERA Gurugram
2.56 (Acre)
1.87
186.481
10.80 (Acre)
Allotment No. HSIIDC 221 dated 01-08-2023
Yes
31353.09 Lakhs
7078.80 Lakhs
12353.69 Lakhs
807.99 Lakhs
11112.61 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
1333.463
3
CONSTRUCTION OF ROADS
2039
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
4435
6
GREEN BELTS
2205
7
VEHICLE PARKINGS
325
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
Total
10337.463
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSIIDC
Yes
WATER SUPPLY
HSIIDC
Yes
ELECTRICITY
HSIIDC
Yes
SEWAGE DISPOSAL
HSIIDC
Yes
STORM WATER DRAINAGE
HSIIDC
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
138.40
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
13.29
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
21.58
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
24.41
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
13.29
AS PER PROJECT REPORT
6
STREET LIGHTING
9.33
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
0
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
201.89
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
0
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
15
UNDERGROUND WATER TANK
73.61
YET TO BE PREPARED
16
STP
103.56
YET TO BE PREPARED
17
RAINWATER HARVESTING SYSTEM
23.38
YET TO BE PREPARED
18
ELECTRIC SUB STATION
156.50
YET TO BE PREPARED
19
PARKING
28
YET TO BE PREPARED
08-10-2025 (date)
08-10-2025 (date)
01-08-2027
31-01-2032
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
0
0
Total
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
116.99
41
2
Apartment/Shops/Other Buildings
141.32
43
2
Apartment/Shops/Other Buildings
242.73
2
1
Apartment/Shops/Other Buildings
219.80
1
1
Apartment/Shops/Other Buildings
98.23
43
2
Apartment/Shops/Other Buildings
113.62
45
2
Apartment/Shops/Other Buildings
195.02
2
1
Apartment/Shops/Other Buildings
178.25
1
1
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
304.29
494.15
Shops
0
0
Plots
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
458.71
375.16
679.45
745.77
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1033.48
1420.67
1437.25
988.29
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
988.69
1173.60
1389.79
648.57
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
216.19
Shops
0
Plots
0
Expenditure incurred till the date of application (In Lakhs)
I hereby declare that the aboveinformation and particulars are based onrecord and are true to the best of myknowledge and belief and nothing hasbeen concealed
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
Statutory Approvals
Statutory Approvals Status
Date
I. I. EC
ALREADY BEEN OBTAINED
13-11-2024
II. II. FOREST NOC
ALREADY BEEN OBTAINED
04-04-2024
III. III. ARAVALI NOC
ALREADY BEEN OBTAINED
24-04-2024
IV. IV. PORTABLE WATER ASSURANCE
ALREADY BEEN OBTAINED
18-03-2024
V. V. AIRPORT AUTHORITY OF INDIA NOC
ALREADY BEEN OBTAINED
24-04-2024
VI. VI. CONSTRUCTION WATER NOC
ALREADY BEEN OBTAINED
21-03-2024
VII. VII. BUILDING PLAN APPROVAL
ALREADY BEEN OBTAINED
08-10-2025
VIII. VIII. REVISED ZONING PLAN
ALREADY BEEN OBTAINED
13-08-2025
Yes
Yes
As per RERA norms
ASHIANA ANMOL PHASE-1
3.800
300
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
11823.05
0
11285.86
Cost of the apartments
7465.36
0
6183.79
Cost of the infrastructure
1926.44
0
2422.33
Others costs
2431.25
0
2679.74
23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
03-10-2020
03-10-2020
ASHIANA ANMOL PLAZA-1
0.339
76
0
76
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
216.28
0
216.28
Cost of the apartments
137.92
0
137.92
Cost of the infrastructure
26.26
0
26.26
Others costs
52.1
0
52.1
180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019
ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
14520.61
0
2585.93
Cost of the apartments
7087
0
423.21
Cost of the infrastructure
7087
0
22.98
Others costs
5715
0
1933.83
5764.18 Lakhs
19710.59 Lakhs
4000 Lakhs
4000 Lakhs
No
15-01-2027
15-01-2027
ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
10876.26
0
4319.42
Cost of the apartments
4822.65
0
1640.86
Cost of the infrastructure
634.05
0
99.21
Others costs
5419.57
0
2579.35
6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2026
30-04-2026
ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
300
0
300
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
17555.57
0
4535.57
Cost of the apartments
7371.7
0
5.02
Cost of the infrastructure
1006.43
0
156.61
Others costs
9177.45
0
4373.94
2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
LIVING DINING AREA ENTRANCE FOYER CORRRDORS AND KITCHEN WITH VITRIFIED TILES. BEDROOMS STUDY ROOM AND MASTER BEDROOM WITH WOODEN TEXTURE TILES OR VITRIFIED TILES. BATHROOMS AND BALCONIES WITH CERAMIC TILES OR WOODEN TEXTURE TILES. COMMON AREAS STAIRCASES AND OPEN TERRACES WITH KOTA STONE LOCAL STONE CERAMIC TILES TERRAZZO TILES OR EQUIVALENT FLOORING. BASEMENT CAR PARKS AND RAMPS WITH CEMENT CONCRETE FINISH
2
WALL FINISHING DETAILS
DRAING ROOM DINING ROOM AND BEDROOMS WITH PLASTER OR POP FINISH AND EMULSION PAINT. BATHROOMS AND KITCHEN WITH CERAMIC TILE DADO AND EMULSION PAINT FINISH. INTERNAL COMMON AREAS WITH GRANITE MARBLE STONES TILES OR EMULSION PAINT FINISH. EXTERNAL WALLS ROOF TERRACES WITH PLASTER OR POP FINISH AND EMULSION PAINT.
3
KITCHEN DETAILS
KITCHEN SHALL BE PROVIDED WITH A STAINLESS STEEL SINK, SINK MIXER, PNG OR LPG GAS CONNECTION PROVISION KITCHEN CABINETS HOB CHIMNEY DISHWASHER MICROWAVE OVEN, OTG WATER PURIFIER OR RO UNIT, GEYSER AND EXHAUST FAN. WATER SUPPLY FITTINGS SHALL BE REPUTED EQUIVALENT MAKE
4
BATHROOM FITTINGS
BATHROOMS SHALL BE PROVIDED WITH WASH BASIN, EWC, SHOWER FITTINGS, HEALTH FAUCET, MIRROR, TOWEL RACK, EXHAUST FAN AND GEYSER. MASTER BATHROOMS SHALL HAVE VANITY BELOW THE WASH BASIN COUNTER. STAFF TOILETS, WHEREVER APPLICABLE, SHALL HAVE STANDARD SANITARY AND BATH FITTINGS SHALL BE OF REPUTED EQUIVALENT MAKE.
5
WOOD WORK ETC
ENGINEERED WOOD DOOR FRAMES WITH WOODEN FINISH FLUSH DOOR SHUTTERS SHALL BE PROVIDED FOR BEDROOMS, STUDY ROOMS AND BATHROOMS. VANITY BELOW THE WASH BASIN COUNTER SHALL BE PROVIDED IN THE MASTER BATHROOM. KITCHEN CABINETS SHALL BE PROVIDED AS PER SPECIFICATIONS
6
DOORS AND WINDOS FRAMES
MAIN ENTRANCE DOOR WITH FIRE RATED FRAME AND SHUTTER. BEDROOM STUDY ROOM AND BATHROOM DOORS WITH ENGINEERED WOOD FRAMES AND WOODEN FINISH FLUSH DOOR SHUTTERS. WINDOWS WITH ALUMINIUM OR UPVC FRAMES AND TOUGHENED GLASS. BATHROOM WINDOWS WITH ANODIZED OR POWDER COATED TOP HUNG OR LOUVERED FRAMES WITH FROASTED GLASS
7
GLASS WORK
TOUGHENED GLASS IN WINDOWS AND FROASTED GLASS IN BATHROOM WINDOWS
8
ELECTRIC FITTINGS
MODULAR ELECTRICAL SWITCHES SOCKETS AND FAN REGULATORS OF STANDARD EQUIVALENT MAKE
9
CONDUCTING AND WIRING DETAILS
CONCEALED CONDUIT WIRING WITH COPPER WIRES
10
CUPBOARD DETAILS
KITCHEN CABINETS PROVIDED
11
WATER STORAGE
AS PER APPROVED PLUMBING AND SERVICES DESIGN
12
LIFT DETAILS
LIFT LOBBIES FINISHED WITH SUITABLE FLOOR WALL AND CEILLING FINISHES
13
EXTERNAL GLAZINGS
ALUMINIUM OR UPVC FRAMED WINDOWS WITH TOUGHENED GLASS
13.1
WINDOWS/GLAZINGS
ALUMINIUM OR UPVC SLIDING WINDOWS WITH TOUGHENED GLASS AND PROVISION FOR FLY MESH SHUTTER. BATHROOM WINDOWS WITH FROSTED GLASS
14
DOORS
FIRE RATED MAIN ENTRANCE DOOR ENGINEERED WOOD INTERNAL DOORS AND VENTILATED UTILITY BALCONY DOOR
14.1
MAIN DOORS
FIRE RATED MAIN ENTRANCE DOOR WITH HANDLE LOCK SYSTEM AND MAGIC EYE VIEWER
14.2
INTERNAL DOORS
EMGINEERED WOOD FRAMES WITH WOODEN FINISH FLUSH DOOR SHUTTERS AND STANDARD HARDWARE FITTINGS
15
AIR CONDITIONING
FULLY FITTED INVERTER AIR CONDITIONER WITH COPPER PIPING AND OUTDOOR UNIT BRACKETS AS PER UNIT TYPE
16
ELECTRICAL FITTINGS
MODULAR SWITCHES SOCKETS FAN REGULATORS TV TELEPHONE INTERCOM AND INTERNET PROVISIONS
17
CNG PIPE LINE
PROVISION FOR PIPED PNG OR LPG GAS WITH METER
18
PROVISION OF WIFI AND BROADBAND FACILITY
PROVISION FOR INTERNET ROUTER AND BROADBAND CONECTIVITY INSIDE APARTMENTS
19
EXTERNAL FINISHING/COLOUR SCHEME
CEMENT SAND PLASTER OR POP PUNNING WITH PRIMER TEXTURE COATING AND EMULSION PAINT FINISH
20
INTERNAL FINISHING
SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT ON WALLS AND CEILLINGS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
VITRIFIED TILE FLOORING
1 . 2
WALLS
SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT FINISH
1 . 3
CEILING
PLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
WOODEN TEXTURE VITRIFIED TILE FLOORING
2 . 2
WALLS
SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT
2 . 3
CEILING
PLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
2 . 4
MODULAR WARDROBES
NOT APPLICABLE
3 . MASTER TOILET
3 . 1
FLOOR
CERAMIC TILES OR WOODEN TEXTURE TILES
3 . 2
WALLS
CERAMIC TILE DADO WITH EMULSION PAINT FINISH ABOVE
3 . 3
CEILING
PLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
3 . 4
COUNTERS
MARBLE GRANITE QUARTZ OR VITRIFIED TILE SLAB COUNTER
3 . 5
SANITARY WARE/CP FITTINGS
WASH BASIN EWC BASIN MIXER WALL MIXER SHOWER HEALTH FAUCET AND ANGLE VALVES
3 . 6
FITTING/FIXTURES
GLASS PARTITION VANITY MIRROR TOWEL RACK EXHAUST FAN AND GEYSER
4 . BED ROOMS
4 . 1
FLOOR
WOODEN TEXTURE TILE OR VITRIFIED TILE FLOORING
4 . 2
WALLS
SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT
4 . 3
CEILING
PLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
4 . 4
WARDROBES
NOT APPLICABLE
5 . TOILET
5 . 1
FLOOR
CERAMIC TILES OR WOODEN TEXTURE TILES
5 . 2
WALLS
CERAMIC TILE DADO WITH EMULSION PAINT FINISH ABOVE
5 . 3
CEILING
PLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
5 . 4
COUNTERS
MARBLE GRANITE QUARTZ OR VITRIFIED TILE SLAB COUNTER
5 . 5
SANITARY WARE/CP FITTINGS
WASH BASIN EWC BASIN MIXER SHOWER HEALTH FAUCER AND ANGLE VALVES
5 . 6
FIXTURES
MIRROR TOWEL REACK EXHAUST FAN GEYSER AND GLASS PARTITION
6 . KITCHEN
6 . 1
FLOOR
VITRIFIED TILE FLOORING
6 . 2
WALLS
CERAMIC TILE DADO ABOVE COUNTERTOP WITH EMULSION PAINT FINISH ABOVE
6 . 3
CEILING
PLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH AND FALSE CEILLING
6 . 4
COUNTERS
QUARTZ GRANITE OR TILE COUNTERTOP
6 . 5
FIXTURES
STAINLESS STEEL SINK MIXER ANGLE VALVES AND PNG OR LPG PROVISION
6 . 6
KITCHEN APPLIANCES
KITCHEN CABINETS HOB CHIMNEY DISHWASHER MICROVAVE OVEN OTG WATER PURIFIER GEYSER AND EXHAUST FAN
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
UTILITY BALCONY FLOORING SHALL BE CERAMIC TILES OR WOODEN TEXTURE TILES OF SUITABLE QUALITY AND FINISH
7 . 2
WALLS & CEILING
WALLS SHALL HAVE SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT. CEILING SHALL HAVE PLASTER WITH EMULSION PAINT FINISH
7 . 3
TOILET
STAFF TOILET, WHEREVER, APPLICABLE, SHALL BE PROVIDED WITH FLOOR MOUNTED EWC, WASH BASIN, PTMT FRAMED MIRROR, PILLAR COCK, BIB TAPS, ANGLE VALVES AND OTHER STANDARD SANITARY AND CP FITTINGS
7 . 4
BALCONY
UTILITY BALCONY SHALL BE PROVIDED WITH CERAMIC TILES OR WOODEN TEXTURE TILES WITH GLAZED OR MATT FINISH AND A VENTILATED DOOR
8 . SIT-OUTS
8 . 1
FLOOR
SIT OUT AREAS AND BALCONIES SHALL BE FINISHED WITH CERAMIC TILES OR WOODEN TEXTURE TILES OF SUITABLE QUALITY AND FINISH
8 . 2
WALLS & CEILING
WALLS SHALL HAVE SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT FINISH
8 . 3
RAILINGS
METAL OR WALL RAILINGS SHALL BE PROVIDED AS PER APPROVED ARCHITECTURAL DESIGN AND SPECIFICATIONS
8 . 4
FIXTURES
CLOTH HANGER SHALL BE PROVIDED IN ONE BALCONY ONLY. OTHER FIXTURES, IF ANY, SHALL BE AS PER APPROVED ARCHITECTURAL DESIGN AND PROJECT SPECIFICATIONS
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT