HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2256-2026
Submission Date : 23-06-2026 02:50:50 PM
Applicant Type : Company
Project Type: NEW




ASHIANA HOUSING LIMITED
304, SOUTHERN PARK SAKET DISTRICT CENTRE, SAKET, NEW DELHI 110017
01142654265
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







ASHIANA AAROHAM PHASE III
REVENUE ESTATE OF VILLAGE- HSIIDC PLOT NO GH-04 SECTOR 80 IMT MANESAR GURUGRAM HARYANA
MANESAR
GURUGRAM
01142654265
9829068251 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com
ASHIANA HOUSING LIMITED
01142654265
9971992553 (Number Shared by Promoter in Public)
abhijit.joshi@ashianahousing.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
151811226-05-2026743468ICICI BANKHRERA Gurugram







2.56 (Acre)
1.87
186.481
10.80 (Acre)
Allotment No. HSIIDC 221 dated 01-08-2023
Yes







31353.09 Lakhs
7078.80 Lakhs
12353.69 Lakhs
807.99 Lakhs
11112.61 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1333.463
3CONSTRUCTION OF ROADS 2039
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 4435
6GREEN BELTS 2205
7VEHICLE PARKINGS 325
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total10337.463




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSIIDCYes
WATER SUPPLYHSIIDCYes
ELECTRICITYHSIIDCYes
SEWAGE DISPOSALHSIIDCYes
STORM WATER DRAINAGEHSIIDCYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS138.40AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM13.29AS PER PROJECT REPORT
3STORM WATER DRAINAGE21.58AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM24.41AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL13.29AS PER PROJECT REPORT
6STREET LIGHTING9.33AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS201.89AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15UNDERGROUND WATER TANK73.61YET TO BE PREPARED
16STP103.56YET TO BE PREPARED
17RAINWATER HARVESTING SYSTEM23.38YET TO BE PREPARED
18ELECTRIC SUB STATION156.50YET TO BE PREPARED
19PARKING28YET TO BE PREPARED


08-10-2025 (date)
08-10-2025 (date)
01-08-2027
31-01-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings116.99412
Apartment/Shops/Other Buildings141.32432
Apartment/Shops/Other Buildings242.7321
Apartment/Shops/Other Buildings219.8011
Apartment/Shops/Other Buildings98.23432
Apartment/Shops/Other Buildings113.62452
Apartment/Shops/Other Buildings195.0221
Apartment/Shops/Other Buildings178.2511





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments304.29494.15
Shops00
Plots00

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments458.71375.16679.45745.77
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1033.481420.671437.25988.29
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments988.691173.601389.79648.57
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments216.19
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal5.32
Electricity Supply System1.22
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Electrical Substation7.82

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00055.36
Water Supply System000.665.31
Sewerage treatment & garbage disposal7.98000
Electricity Supply System2.447.328.544.88
Storm Water Drainage02.1619.430
Parks and Playgrounds0020.1960.57
Clubhouse/community centres0000
Shopping area0000
Other0000
STP7.2515.5320.7118.64
RAINWATER HARVESTING11.69
Electrical Substation15.6546.9554.7731.30
UNDERGROUND WATER TANK5.1511.0414.7213.25
RAIN WATER HARVESTING11.69
PARKING11.5017.25
Street Light1.87

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements83.0400
Water Supply System7.3100
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds60.5760.570
Clubhouse/community centres000
Shopping area000
Other000
UNDERGROUND WATER TANK14.7211.043.68
STP20.7115.535.18
Street Light7.46












Yes
Yes
SHOP NO. 75 & 76, JMS CROSSWALK, SECTOR 93, GURUGRAM, HARYANA - 122005
777705019650
ICIC0005891
ICIC0005891
5891
Shop No. 75 & 76, JMS Crosswalk, Sector 93, Gurugram, Haryana - 122005
I hereby declare that the aboveinformation and particulars are based onrecord and are true to the best of myknowledge and belief and nothing hasbeen concealed











Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. I. ECALREADY BEEN OBTAINED13-11-2024
II. II. FOREST NOCALREADY BEEN OBTAINED04-04-2024
III. III. ARAVALI NOCALREADY BEEN OBTAINED24-04-2024
IV. IV. PORTABLE WATER ASSURANCEALREADY BEEN OBTAINED18-03-2024
V. V. AIRPORT AUTHORITY OF INDIA NOCALREADY BEEN OBTAINED24-04-2024
VI. VI. CONSTRUCTION WATER NOCALREADY BEEN OBTAINED21-03-2024
VII. VII. BUILDING PLAN APPROVALALREADY BEEN OBTAINED08-10-2025
VIII. VIII. REVISED ZONING PLANALREADY BEEN OBTAINED13-08-2025








Yes


Yes


As per RERA norms







ASHIANA ANMOL PHASE-1
3.800
300
0
300
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11823.05011285.86
Cost of the apartments7465.3606183.79
Cost of the infrastructure1926.4402422.33
Others costs2431.2502679.74


23173.30 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
03-10-2020
03-10-2020




ASHIANA ANMOL PLAZA-1
0.339
76
0
76
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
216.280216.28
Cost of the apartments137.920137.92
Cost of the infrastructure26.26026.26
Others costs52.1052.1


180.18 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019




ASHIANA AMARAH PHASE-1 & 1A
5.041
224
0
224
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14520.6102585.93
Cost of the apartments70870423.21
Cost of the infrastructure7087022.98
Others costs571501933.83


5764.18 Lakhs
19710.59 Lakhs
4000 Lakhs
4000 Lakhs
No
15-01-2027
15-01-2027




ASHIANA ANMOL PHASE-2
2.49
180
0
180
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
10876.2604319.42
Cost of the apartments4822.6501640.86
Cost of the infrastructure634.05099.21
Others costs5419.5702579.35


6784.92 Lakhs
10536.84 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2026
30-04-2026




ASHIANA ANMOL PHASE-3 & PLAZA PHASE II
6.7879
300
0
300
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17555.5704535.57
Cost of the apartments7371.705.02
Cost of the infrastructure1006.430156.61
Others costs9177.4504373.94


2710.57 Lakhs
15121.27 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2028
31-12-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSELIVING DINING AREA ENTRANCE FOYER CORRRDORS AND KITCHEN WITH VITRIFIED TILES. BEDROOMS STUDY ROOM AND MASTER BEDROOM WITH WOODEN TEXTURE TILES OR VITRIFIED TILES. BATHROOMS AND BALCONIES WITH CERAMIC TILES OR WOODEN TEXTURE TILES. COMMON AREAS STAIRCASES AND OPEN TERRACES WITH KOTA STONE LOCAL STONE CERAMIC TILES TERRAZZO TILES OR EQUIVALENT FLOORING. BASEMENT CAR PARKS AND RAMPS WITH CEMENT CONCRETE FINISH
2WALL FINISHING DETAILSDRAING ROOM DINING ROOM AND BEDROOMS WITH PLASTER OR POP FINISH AND EMULSION PAINT. BATHROOMS AND KITCHEN WITH CERAMIC TILE DADO AND EMULSION PAINT FINISH. INTERNAL COMMON AREAS WITH GRANITE MARBLE STONES TILES OR EMULSION PAINT FINISH. EXTERNAL WALLS ROOF TERRACES WITH PLASTER OR POP FINISH AND EMULSION PAINT.
3KITCHEN DETAILSKITCHEN SHALL BE PROVIDED WITH A STAINLESS STEEL SINK, SINK MIXER, PNG OR LPG GAS CONNECTION PROVISION KITCHEN CABINETS HOB CHIMNEY DISHWASHER MICROWAVE OVEN, OTG WATER PURIFIER OR RO UNIT, GEYSER AND EXHAUST FAN. WATER SUPPLY FITTINGS SHALL BE REPUTED EQUIVALENT MAKE
4BATHROOM FITTINGSBATHROOMS SHALL BE PROVIDED WITH WASH BASIN, EWC, SHOWER FITTINGS, HEALTH FAUCET, MIRROR, TOWEL RACK, EXHAUST FAN AND GEYSER. MASTER BATHROOMS SHALL HAVE VANITY BELOW THE WASH BASIN COUNTER. STAFF TOILETS, WHEREVER APPLICABLE, SHALL HAVE STANDARD SANITARY AND BATH FITTINGS SHALL BE OF REPUTED EQUIVALENT MAKE.
5WOOD WORK ETCENGINEERED WOOD DOOR FRAMES WITH WOODEN FINISH FLUSH DOOR SHUTTERS SHALL BE PROVIDED FOR BEDROOMS, STUDY ROOMS AND BATHROOMS. VANITY BELOW THE WASH BASIN COUNTER SHALL BE PROVIDED IN THE MASTER BATHROOM. KITCHEN CABINETS SHALL BE PROVIDED AS PER SPECIFICATIONS
6DOORS AND WINDOS FRAMESMAIN ENTRANCE DOOR WITH FIRE RATED FRAME AND SHUTTER. BEDROOM STUDY ROOM AND BATHROOM DOORS WITH ENGINEERED WOOD FRAMES AND WOODEN FINISH FLUSH DOOR SHUTTERS. WINDOWS WITH ALUMINIUM OR UPVC FRAMES AND TOUGHENED GLASS. BATHROOM WINDOWS WITH ANODIZED OR POWDER COATED TOP HUNG OR LOUVERED FRAMES WITH FROASTED GLASS
7GLASS WORKTOUGHENED GLASS IN WINDOWS AND FROASTED GLASS IN BATHROOM WINDOWS
8ELECTRIC FITTINGSMODULAR ELECTRICAL SWITCHES SOCKETS AND FAN REGULATORS OF STANDARD EQUIVALENT MAKE
9CONDUCTING AND WIRING DETAILSCONCEALED CONDUIT WIRING WITH COPPER WIRES
10CUPBOARD DETAILSKITCHEN CABINETS PROVIDED
11WATER STORAGEAS PER APPROVED PLUMBING AND SERVICES DESIGN
12LIFT DETAILSLIFT LOBBIES FINISHED WITH SUITABLE FLOOR WALL AND CEILLING FINISHES
13EXTERNAL GLAZINGSALUMINIUM OR UPVC FRAMED WINDOWS WITH TOUGHENED GLASS
13.1WINDOWS/GLAZINGSALUMINIUM OR UPVC SLIDING WINDOWS WITH TOUGHENED GLASS AND PROVISION FOR FLY MESH SHUTTER. BATHROOM WINDOWS WITH FROSTED GLASS
14DOORSFIRE RATED MAIN ENTRANCE DOOR ENGINEERED WOOD INTERNAL DOORS AND VENTILATED UTILITY BALCONY DOOR
14.1MAIN DOORSFIRE RATED MAIN ENTRANCE DOOR WITH HANDLE LOCK SYSTEM AND MAGIC EYE VIEWER
14.2INTERNAL DOORSEMGINEERED WOOD FRAMES WITH WOODEN FINISH FLUSH DOOR SHUTTERS AND STANDARD HARDWARE FITTINGS
15AIR CONDITIONINGFULLY FITTED INVERTER AIR CONDITIONER WITH COPPER PIPING AND OUTDOOR UNIT BRACKETS AS PER UNIT TYPE
16ELECTRICAL FITTINGSMODULAR SWITCHES SOCKETS FAN REGULATORS TV TELEPHONE INTERCOM AND INTERNET PROVISIONS
17CNG PIPE LINEPROVISION FOR PIPED PNG OR LPG GAS WITH METER
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION FOR INTERNET ROUTER AND BROADBAND CONECTIVITY INSIDE APARTMENTS
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT SAND PLASTER OR POP PUNNING WITH PRIMER TEXTURE COATING AND EMULSION PAINT FINISH
20INTERNAL FINISHINGSAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT ON WALLS AND CEILLINGS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILE FLOORING
1 . 2 WALLSSAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT FINISH
1 . 3 CEILINGPLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN TEXTURE VITRIFIED TILE FLOORING
2 . 2 WALLSSAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT
2 . 3 CEILINGPLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORCERAMIC TILES OR WOODEN TEXTURE TILES
3 . 2 WALLSCERAMIC TILE DADO WITH EMULSION PAINT FINISH ABOVE
3 . 3 CEILINGPLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
3 . 4 COUNTERSMARBLE GRANITE QUARTZ OR VITRIFIED TILE SLAB COUNTER
3 . 5 SANITARY WARE/CP FITTINGSWASH BASIN EWC BASIN MIXER WALL MIXER SHOWER HEALTH FAUCET AND ANGLE VALVES
3 . 6 FITTING/FIXTURESGLASS PARTITION VANITY MIRROR TOWEL RACK EXHAUST FAN AND GEYSER
4 . BED ROOMS
4 . 1 FLOORWOODEN TEXTURE TILE OR VITRIFIED TILE FLOORING
4 . 2 WALLSSAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT
4 . 3 CEILINGPLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORCERAMIC TILES OR WOODEN TEXTURE TILES
5 . 2 WALLSCERAMIC TILE DADO WITH EMULSION PAINT FINISH ABOVE
5 . 3 CEILINGPLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH
5 . 4 COUNTERSMARBLE GRANITE QUARTZ OR VITRIFIED TILE SLAB COUNTER
5 . 5 SANITARY WARE/CP FITTINGSWASH BASIN EWC BASIN MIXER SHOWER HEALTH FAUCER AND ANGLE VALVES
5 . 6 FIXTURESMIRROR TOWEL REACK EXHAUST FAN GEYSER AND GLASS PARTITION
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE FLOORING
6 . 2 WALLSCERAMIC TILE DADO ABOVE COUNTERTOP WITH EMULSION PAINT FINISH ABOVE
6 . 3 CEILINGPLASTER OR GYPSUM PLASTER WITH EMULSION PAINT FINISH AND FALSE CEILLING
6 . 4 COUNTERSQUARTZ GRANITE OR TILE COUNTERTOP
6 . 5 FIXTURESSTAINLESS STEEL SINK MIXER ANGLE VALVES AND PNG OR LPG PROVISION
6 . 6 KITCHEN APPLIANCESKITCHEN CABINETS HOB CHIMNEY DISHWASHER MICROVAVE OVEN OTG WATER PURIFIER GEYSER AND EXHAUST FAN
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORUTILITY BALCONY FLOORING SHALL BE CERAMIC TILES OR WOODEN TEXTURE TILES OF SUITABLE QUALITY AND FINISH
7 . 2 WALLS & CEILINGWALLS SHALL HAVE SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT. CEILING SHALL HAVE PLASTER WITH EMULSION PAINT FINISH
7 . 3 TOILETSTAFF TOILET, WHEREVER, APPLICABLE, SHALL BE PROVIDED WITH FLOOR MOUNTED EWC, WASH BASIN, PTMT FRAMED MIRROR, PILLAR COCK, BIB TAPS, ANGLE VALVES AND OTHER STANDARD SANITARY AND CP FITTINGS
7 . 4 BALCONYUTILITY BALCONY SHALL BE PROVIDED WITH CERAMIC TILES OR WOODEN TEXTURE TILES WITH GLAZED OR MATT FINISH AND A VENTILATED DOOR
8 . SIT-OUTS
8 . 1 FLOORSIT OUT AREAS AND BALCONIES SHALL BE FINISHED WITH CERAMIC TILES OR WOODEN TEXTURE TILES OF SUITABLE QUALITY AND FINISH
8 . 2 WALLS & CEILINGWALLS SHALL HAVE SAND CEMENT PLASTER OR POP FINISH WITH EMULSION PAINT FINISH
8 . 3 RAILINGSMETAL OR WALL RAILINGS SHALL BE PROVIDED AS PER APPROVED ARCHITECTURAL DESIGN AND SPECIFICATIONS
8 . 4 FIXTURESCLOTH HANGER SHALL BE PROVIDED IN ONE BALCONY ONLY. OTHER FIXTURES, IF ANY, SHALL BE AS PER APPROVED ARCHITECTURAL DESIGN AND PROJECT SPECIFICATIONS












Sr. No.Document DescriptionDate of Document UploadView Document
1 NON-ENCUMBRANCE CERTIFICATE 03-06-2026 View Document
2 BBA 05-06-2026 View Document
3 SECTION-1&2 (COMMUNITY BUILDING) 03-06-2026 View Document
4 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 05-06-2026 View Document
5 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 03-06-2026 View Document
6 AGREEMENT BETWEEN AHL VS HSIIDC 03-06-2026 View Document
7 EWS APPROVAL 03-06-2026 View Document
8 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 03-06-2026 View Document
9 AAI NOC 03-06-2026 View Document
10 ELEVATION-1&2 (TOWER-2,4&5) 03-06-2026 View Document
11 DD 05-06-2026 View Document
12 IFC ASHIANA DEBENTURE TRUST DEED NCD 03-06-2026 View Document
13 MUTATION COPY 03-06-2026 View Document
14 1ST FLOOR PLAN & AREA DETAILS (TOWER-1,3&6) 03-06-2026 View Document
15 ELEVATION -3&4 (TOWER-2,4&5 03-06-2026 View Document
16 LOWER GROUND FLOOR AND AREA DETAILS ( COMMUNITY BUILDING) 03-06-2026 View Document
17 GROUND FLOOR AREA DETAILS (COMMUNITY BUILDING) 03-06-2026 View Document
18 BALANCE SHEET- AHL STANDALONE SIGNED FINANCIALS FY 22-23 03-06-2026 View Document
19 GROUND FLOOR PLAN& AREA DETAILS (TOWER-3) 03-06-2026 View Document
20 1ST FLOOR PLAN & AREA DETAILS (TOWER-2,4&5) 03-06-2026 View Document
21 PLANS,SLEVATION,SECTION & AREA CALCULATIONS (NURSERY SCHOOL LEARNING CENTER 03-06-2026 View Document
22 TYPICAL FLOOR PLAN & AREA DETAILS (TOWER-1,3&6) 03-06-2026 View Document
23 SECTION -A (TOWER-6) 03-06-2026 View Document
24 TERRACE PLAN (COMMUNITY BUILDING) 03-06-2026 View Document
25 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 03-06-2026 View Document
26 REVISED ZONNING PLAN 03-06-2026 View Document
27 CA CERTIFICATE PROMOTER CONTRIBUTION IN FUND 05-06-2026 View Document
28 BASEMENT PLAN & AREA DETAILS 03-06-2026 View Document
29 CONVENIENT SHOPPING (PLANS, ELEVATIONS, SECTIONS & AREA CALCULATIONS) 03-06-2026 View Document
30 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 05-06-2026 View Document
31 GREEN AREA DETAILS 03-06-2026 View Document
32 GROUND COVERAGE AREA DETAILS ( COMMUNITY BUILDING) 03-06-2026 View Document
33 GROUND COVERAGE AREA DETAILS (TOWER-1,3&6) 03-06-2026 View Document
34 SECATION-A (TOWER-1&3) 03-06-2026 View Document
35 CLUBE ELEVATIONS (COMMUNITY BUILDING) 03-06-2026 View Document
36 GROUND FLOOR PLAN & AREA DETAILS (TOWER-1&6) 03-06-2026 View Document
37 TERRACE PLAN & AREA DETAILS (TOWER-1,3&6) 03-06-2026 View Document
38 NATURAL CONSERVATION ZONE NOC 03-06-2026 View Document
39 ELEVATION-3&4 (TOWER-6) 03-06-2026 View Document
40 ENVIRONMENT CLEARANCE 03-06-2026 View Document
41 20TH FLOOR PLAN & AREA DETAILS (REFUGE FLOOR) (TOWER-2,4 &5) 03-06-2026 View Document
42 DEMARCATION PLAN 03-06-2026 View Document
43 ALLOTMENT LETTER AND ZONING LETTER 03-06-2026 View Document
44 BALANCE SHEET- AHL STANDALONE 23-24 SIGNED 03-06-2026 View Document
45 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 05-06-2026 View Document
46 ZONING PLAN 03-06-2026 View Document
47 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 03-06-2026 View Document
48 JAMABANDI COPY 03-06-2026 View Document
49 ELEVATION-1&2 TOWER-6) 03-06-2026 View Document
50 SITE & PODIUM SECTIONS 03-06-2026 View Document
51 APPROVAL-TEMPORARY SITE OFFICE 03-06-2026 View Document
52 POSSESSION CERTIFICATE HSIIDC 03-06-2026 View Document
53 ELEVATION 1&2 (TOWER-&3) 03-06-2026 View Document
54 SITE PLAN 03-06-2026 View Document
55 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 03-06-2026 View Document
56 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 03-06-2026 View Document
57 20TH FLOOR PLAN& AREA DETAILS ( REFUGE FLOOR) (TOWER-1,3&6 03-06-2026 View Document
58 AKS-SHAJRA 03-06-2026 View Document
59 CONVEYANCE DEED FROM HSIIDC 03-06-2026 View Document
60 FIRST FLOOR PLAN & AREA DETAILS (COMMUNITY BUILDING) 03-06-2026 View Document
61 FOREST NOC 03-06-2026 View Document
62 GROUND FLOOR ( COMMUNITY BUILDING ) 03-06-2026 View Document
63 GROUND FLOOR PLAN & AREA DETAILS (TOWER-2,4&5) 03-06-2026 View Document
64 HSIIDC LETTER FOR SEP 03-06-2026 View Document
65 PODIUM PLAN & AREA DETAILS 03-06-2026 View Document
66 POWER LINE SHIFTING 03-06-2026 View Document
67 SECTION-A (TOWER-2,4 &5) 03-06-2026 View Document
68 SITE PLAN (SERVICE) 03-06-2026 View Document
69 TYP FLOOR PLAN& AREA DETAILS (TOWER-2,4&5) 03-06-2026 View Document
70 CA CERTIFICATE NET WORTH 05-06-2026 View Document
71 PODIUM TERRACE PLAN 03-06-2026 View Document
72 TERRACE,MUMTY MACHINE ROOM PLAN& AREA DETAILS (TOWER-2,4&5) 03-06-2026 View Document
73 NOC BY IFC FOR PHASE 3 OF ASHIANA AAROHAM_SIGNED 05-06-2026 View Document
74 BROCHURE DOCUMENT 05-06-2026 View Document
75 CA CERTIFICATE INVENTORY 05-06-2026 View Document
76 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 23-06-2026 View Document
77 4(2)(I)(D) AFFIDAVIT 23-06-2026 View Document
78 PERT CHART 23-06-2026 View Document
79 FFS APPROVAL 23-06-2026 View Document
80 ALLOTMENT LETTER DRAFT 23-06-2026 View Document
81 APPLICATION FORM 23-06-2026 View Document
82 BANK UNDERTAKING 23-06-2026 View Document
83 CONVEYANCE DEED 23-06-2026 View Document
84 LAND COST & OTHER COST 23-06-2026 View Document
85 PAYMENT RECEIPT 23-06-2026 View Document
86 PROJECT REPORT 23-06-2026 View Document
87 TREE CUTTING PERMISSION AFFIDAVIT 23-06-2026 View Document
88 MINING PERMISSION UNDERTAKING 23-06-2026 View Document