HRERA GurugramTemp Project Id : RERA-GRG-PROJ-2237-2026
Submission Date : 04-06-2026 02:40:14 PM
Applicant Type : Company
Project Type: ONGOING




METRO EDUCATION & WELFARE PRIVATE LIMITED
41ST FLOOR, TOWER 1, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR 66, BADSHAHPUR,GURGAON,HARYANA, INDIA, 122101
1244732000
8929012754 (Number Shared by Promoter in Public)
metroeducation1204@gmail.com
http://www.metroeducationwelfare.in/
XXXX683E
U70100HR2010PTC086524
 
 


 
 


 
 


 
 







M3M RESIDENCES BY ELIE SAAB
SECTOR-111,GURUGRAM
GURGAON
GURUGRAM
1244732000
8929012754 (Number Shared by Promoter in Public)
metroeducation1204@gmail.com
HIMANSHU AGARWAL
1244732000
8929012754 (Number Shared by Promoter in Public)
metroeducation1204@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150034003-06-2026500000ICICI BANK LIMITEDHRERA Gurugram
250035723-06-20261014760ICICI BANK LIMITEDHRERA Gurugram







2.7505 (Acre)
5.07
5.03
15.99375 (Acre)
Licence by DTCP 213 of 2022 Dated 27.12.2022 Valid 26.12.2027
No
Address     41ST FLOOR, TOWER-1, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66, GURUGRAM, HARYANA
Address     F-022, LG, SUSHANT ARCADE, SUSHANT LOK-1, GURUGRAM, HARYANA
Address     41ST FLOOR, TOWER-1, M3M INTERNATIONAL FINANCIAL CENTER, SECTOR-66, GURUGRAM, HARYANA
Annexure-B- COLLABORATION AGREEMENT/ ADDENDUM TO COLLABORATION AGREEMENT VIDE VASIKA NO 7826 DATED 28.09.2022
BEFORE GRANT OF LICENSE
Yes
AS ATTACHED IN FOLDER A
No
Yes
Yes







210058.75 Lakhs
54166.31 Lakhs
97091.58 Lakhs
1742.86 Lakhs
57058.00 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0.00
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.19
3CONSTRUCTION OF ROADS 0.74
4PAVEMENTS 0.00
5PARKS AND PLAYGROUNDS 0.00
6GREEN BELTS 0.00
7VEHICLE PARKINGS 0.00
8ELECTRICITY SUB-STATION 0.00
9CLUB HOUSE 0.00
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.00
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0.00
12ANY OTHER 0.8205
Total2.7505




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS586.46AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM108.56AS PER PROJECT REPORT
3STORM WATER DRAINAGE47.20AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL77.88AS PER PROJECT REPORT
6STREET LIGHTING31.86AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING125.08AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS47.20AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0.00AS PER PROJECT REPORT
10SHOPPING AREA0.00AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0.00AS PER PROJECT REPORT
12SCHOOL0.00AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0.00AS PER PROJECT REPORT
14ANY OTHER0.00AS PER PROJECT REPORT
15UNDERGROUND TANK118.00AS PER PROJECT REPORT
16BOUNDARY WALL94.40AS PER PROJECT REPORT
17STP101.48AS PER PROJECT REPORT
18ELECTRIFICATION389.40AS PER PROJECT REPORT
19RAIN WATER HARVESTING15.34AS PER PROJECT REPORT


03-06-2026 (date)
03-06-2026 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+UTILITY 179.40 6 1076.4 0 6 3
2 APARTMENT/SHOPS/OTHER BUILDINGS Type -1- 4BHK+UTILITY 204.11 92 18778.12 4 88 3
3 APARTMENT/SHOPS/OTHER BUILDINGS Type -2- 4BHK+UTILITY 213.58 48 10251.84 7 42 3
4 APARTMENT/SHOPS/OTHER BUILDINGS Type -3- 4BHK+UTILITY 217.86 6 1307.16 3 3 3
5 APARTMENT/SHOPS/OTHER BUILDINGS Type -4- 4BHK+UTILITY 228.54 90 20568.6 0 90 3
6 APARTMENT/SHOPS/OTHER BUILDINGS Type -1- 4BHK+UTILITY+TERRACE 204.11 4 816.44 0 4 3
7 APARTMENT/SHOPS/OTHER BUILDINGS Type -2- 4BHK+UTILITY+TERRACE 213.58 2 427.16 0 2 3
8 APARTMENT/SHOPS/OTHER BUILDINGS Type -3- 4BHK+UTILITY+TERRACE 228.54 4 914.16 0 4 3
9 APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+S.P.U 217.86 42 9150.12 4 39 3
10 APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+S.P.U+TERRACE 217.86 2 435.72 0 2 3
Total29663725.721828030






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
4BHK+UTILITY14ANNEXED
4BHK+ S.P.U4ANNEXED


01-10-2025
29-02-2032
29-02-2032
01-10-2025
4.13
30-09-2031
ATTACHED
ATTACHED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-10-2025
0
30-09-2031
NA
NA


268
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments3499.20
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments871.31871.31
Shops00
Plots00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1291.291500.821467.652379.48
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments3338.083540.993526.833705.88
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments4051.035863.447282.036723.56
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments6523.447023.787581.0510629.10
Shops0000
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments6601.995112.963706.34
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Boundary Wall72.04

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Boundary Wall11.1811.18

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Underground tank23.6035.4035.4023.60

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Water Supply1.091.092.172.17

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP3.045.078.129.13
Storm Water drainage2.363.303.303.78
Sewerage3.895.455.456.23
Water Supply3.264.348.6810.86

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds00011.80
Clubhouse/community centres0000
Shopping area0000
Other0000
Roads and Pavements41.0558.6587.97117.29
Water Supply14.1116.2816.2813.03
Sewerage7.0111.6811.6811.68
Storm Water drainage4.257.087.086.14
STP13.1916.2416.2413.19
Electrification19.4746.7362.3073.99
Rain Water Harvesting001.533.07

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds11.8011.8011.80
Clubhouse/community centres000
Shopping area000
Other000
Roads and Pavements117.2999.7064.51
STP11.166.09
Sewerage7.014.673.12
Water Supply10.864.34
Storm Water drainage5.192.831.89
Street Light7.977.9715.93
Security41.2841.2842.53
Rain Water Harvesting3.843.843.07
Electrification73.9970.0942.83












Particulars Remarks, if any
i. No. of Flats/Apartments constructed296
ii. No. of Flats/ Apartments booked18
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter24473.14 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter1575.05 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter22898.09 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application11777.18 Lakhs
Land cost (If any)2730.00 Lakhs
Apartments3499.20 Lakhs
Infrastructure72.04 Lakhs
EDC/ Taxes Etc.5475.94 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession229581.26 Lakhs
(a) In respect of existing allottees1575.05 Lakhs
(b) In respect of rest of the project393611.95 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS586.460
II. WATER SUPPLY SYSTEM108.560
III. STORM WATER DRAINAGE47.200
IV. ELECTRICITY SUPPLY SYSTEM389.400
V. SEWAGE TREATMENT & GARBAGE DISPOSAL77.880
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM125.080
XVII. OTHER FACILITIES AS PER PROJECT REPORT408.2872.04









Yes
Yes
ICICI BANK LIMITED, SECTOR-54, SUNCITY BRANCH, GURUGRAM
777705006693
ICIC0000399
110229060
000399
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 AreraColony Bhopal M.P. 462016 2) MS. Amarjot Kaur Sahni-3/66Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi-House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon,Haryana- 122002 4)Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad,Haryana- 121001 5) Mr. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, UP 6) Mr. Pratap Singh-10A Pocket 2 MayurVihar East Delhi 110096 7) Ms. Meenal Sood- C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015 8) Mr. Anurag Kulshrestha- 1 F Pocket-3, Mayur Vihar, Phase 1, Chilla Saroda Khadar, East Delhi 9) Mr. Surender Kumar Gupta- 954 Gokul Dham, Society 1st Floor Krishna Colony, Gurugram 10) Mr.Rajiv Kumar Verma- House No.-06 E,Pratap Enclave,Mohan Garden,Uttam Nagar,,West Delhi 11) Mr.Ashok Kumar- Hajipur(15),Guragon,Haryana 12) Mr.Amit Saxena- 163,Sarai Nazar Ali,Behind M.M,G Hospital,Ghaziabad Uttar Pradesh
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSEALREADY BEEN OBTAINED27-12-2022
II. ENVIRONMENT CLEARANCEALREADY BEEN OBTAINED11-05-2021
III. FOREST NOCALREADY BEEN OBTAINED07-08-2018
IV. BR-IIIALREADY BEEN OBTAINED03-06-2026
V. ASSURANCE STP TREATED WATERALREADY BEEN OBTAINED15-05-2026
VI. ASSURANCE SEWERAGE CONNECTIONALREADY BEEN OBTAINED15-05-2026
VII. ASSURANCE STORM WATERALREADY BEEN OBTAINED20-05-2026
VIII. ASSURANCE DRINKING WATERALREADY BEEN OBTAINED15-05-2026








Yes


Yes


Attached







M3M CROWN PHASE 1, SECTOR -111,GURUGRAM
11.6023
1332
0
1284
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
151428.34151428.34114177.87
Cost of the apartments98400.2498400.2473975.24
Cost of the infrastructure7145.537145.530
Others costs45882.5645882.5640202.63


200126.45 Lakhs
175662.49 Lakhs
0 Lakhs
0 Lakhs
No
31-01-2028
31-01-2028










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES / MARBLE FLOORING
2WALL FINISHING DETAILSPUTTY WITH OBD / ACRYLIC EMULSION
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESDOOR/LAMINATE OR ENGINEERED DOOR FRAME & DOOR PANEL OR SKIN DOOR PANELS
7GLASS WORKONLY EXTERNAL DOOR/WINDOW
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSNA
11WATER STORAGEAS PER NORMS
12LIFT DETAILSLIFTS AS PER BUILDING PLANS
13EXTERNAL GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
13.1WINDOWS/GLAZINGSGLASS WITH ALUMINIUM FRAMINGSLIDING
14DOORSNA
14.1MAIN DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
14.2INTERNAL DOORSHARD WOOD DOOR FRAME WITHFLUSH DOOR /LAMINATE
15AIR CONDITIONINGAS PER SALES SCHEME OPTED
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINESERVICE PROVIDER
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISIONS ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER PROOF PAINT
20INTERNAL FINISHINGPUTTY WITH A COMBINATION OF OBD AND ACRYLIC EMULSION PAINT PLASTER NOT REQUIRED FOR RCC FINISHED SURFACES
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES/ MARBLE FLOORING
1 . 2 WALLSPUTTY WITH OBD / ACRYLIC EMULSION
1 . 3 CEILINGPUTTY WITH OBD / ACRYLIC EMULSION
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES/LAMINAT ED WOODEN FLOORING
2 . 2 WALLSPUTTY WITH OBD / ACRYLIC EMULSION
2 . 3 CEILINGPUTTY WITH OBD / ACRYLIC EMULSION
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILES/LAMINATED WOODEN FLOORING
3 . 2 WALLSPLASTER, VITRIFIED / CERAMIC TILES
3 . 3 CEILINGGRID FALSE CEILING / MR BOARD FALSE CEILING
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES/LAMINATED WOODEN FLOORING
4 . 2 WALLSPUTTY WITH OBD / ACRYLIC EMULSION
4 . 3 CEILINGPUTTY WITH OBD / ACRYLIC EMULSION
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORVITRIFIED / CERAMIC TILES
5 . 2 WALLSPLASTER, VITRIFIED / CERAMIC TILES
5 . 3 CEILINGGRID FALSE CEILING / MR BOARD FALSE CEILING
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSMIX. OF PLASTER AND DADO
6 . 3 CEILINGOBD
6 . 4 COUNTERSNA
6 . 5 FIXTURESSS SINK
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPUTTY AND PAINT OBD
7 . 3 TOILETAS PER APPROVED MAKE
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 04-06-2026 View Document
2 ASSURANCE SEWERAGE CONNECTION 01-07-2026 View Document
3 TOWER-ES-2 TERRACE & MUMTY FLOOR PLAN 01-07-2026 View Document
4 TOWER-ES-1 (2ND FLOOR & AREA DIAGRAM) 01-07-2026 View Document
5 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 01-07-2026 View Document
6 LIST OF SOLD UNITS 01-07-2026 View Document
7 TOWER-ES-2 REFUGE FLOOR PLAN (17TH & 25TH FLOOR PLAN) 01-07-2026 View Document
8 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 01-07-2026 View Document
9 AKS SIZRA 01-07-2026 View Document
10 RAPAT 01-07-2026 View Document
11 TITLE SEARCH REPORT (5 OF 6) 01-07-2026 View Document
12 AFFIDAVIT FOR ENVIRONMENT CLEARANCE 01-07-2026 View Document
13 DEMAND DRAFT 01-07-2026 View Document
14 TITLE SEARCH REPORT (3 OF 6) 01-07-2026 View Document
15 SUPERIMPOSED DEMARCATION PLAN ON THE SITE PLAN 01-07-2026 View Document
16 TITLE SEARCH REPORT (6 OF 6) 01-07-2026 View Document
17 SITE PLAN WITH AREA SUMMARY SHEET-1 01-07-2026 View Document
18 AFFIDAVIT 4 2 L D 01-07-2026 View Document
19 AFFIDAVIT NO LOAN ON PROJECT LAND 01-07-2026 View Document
20 AFFIDAVIT NO REGISTERED AGENT 01-07-2026 View Document
21 TOWER ES-2 1ST FLOOR PLAN 01-07-2026 View Document
22 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 01-07-2026 View Document
23 CA CERTIFICATE COST INCURRED 01-07-2026 View Document
24 TITLE SEARCH REPORT (1 OF 6) 01-07-2026 View Document
25 TITLE SEARCH REPORT (2 OF 6) 01-07-2026 View Document
26 TOWER-ES-1 TYPICAL FLOOR PLAN (3RD TO 16TH & 18TH TO 21ST FLOOR) 01-07-2026 View Document
27 PHASE 2 TOWER- ES-1, ES-2, ES-3 CLUSTER ROAD SIDE ELEVATION 2 & 4, SECTION BB 01-07-2026 View Document
28 TOWER-ES-3 REFUGE FLOOR PLAN (17TH & 25TH FLOOR PLAN) 01-07-2026 View Document
29 EARLIER APPROVED BR-III 01-07-2026 View Document
30 ENVIRONMENT CLEARANCE 01-07-2026 View Document
31 TOWER-ES-1 (1ST FLOOR & AREA DIAGRAM) 01-07-2026 View Document
32 TOWER-ES-3 TYPICAL FLOOR PLAN (3RD FLOOR TO 16TH FLOOR & 18TH TO 21ST FLOOR PLAN) 01-07-2026 View Document
33 TITLE SEARCH REPORT (4 OF 6) 01-07-2026 View Document
34 ZONING PLAN 01-07-2026 View Document
35 SITE PLAN WITH AREA SUMMARY SHEET-2 01-07-2026 View Document
36 COMPARISON SHEET 01-07-2026 View Document
37 TOWER ES-2 2ND FLOOR PLAN 01-07-2026 View Document
38 LOI 01-07-2026 View Document
39 MUTATION 01-07-2026 View Document
40 TOWER-ES-3 TERRACE & MUMTY FLOOR PLAN 01-07-2026 View Document
41 LIST OF UNSOLD UNITS 01-07-2026 View Document
42 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 01-07-2026 View Document
43 ASSURANCE DRINKING WATER SUPPLY 01-07-2026 View Document
44 BANK UNDERTAKING 01-07-2026 View Document
45 AFFIDAVIT FOR 10% AUTO- CREDIT 01-07-2026 View Document
46 REVISED ZONING PLAN 01-07-2026 View Document
47 BASEMENT 1 PLAN 01-07-2026 View Document
48 TOWER ES-2 (GROUND FLOOR PLAN) 01-07-2026 View Document
49 NON-ENCUMBRANCE CERTIFICATE 01-07-2026 View Document
50 TOWER-ES-1 REFUGE FLOOR (17TH AND 25TH FLOOR PLAN) 01-07-2026 View Document
51 TOWER-ES-1 TYPICAL FLOOR PLAN (22ND TO 24TH FLOOR) 01-07-2026 View Document
52 TOWER-ES-3 (2ND FLOOR PLAN) 01-07-2026 View Document
53 TOWER-ES-3 FIRST FLOOR PLAN 01-07-2026 View Document
54 AAI NOC 01-07-2026 View Document
55 CA CERTIFICATE INVENTORY 01-07-2026 View Document
56 DEMARCATION PLAN 01-07-2026 View Document
57 AFFIDAVIT FOR NON-APPLICABLILITY OF NCZ, POWERLINE SHIFTING, TREE CUTTING AND FOREST LAND DIVERSION 01-07-2026 View Document
58 ASURANCE STORM WATER 01-07-2026 View Document
59 CA CERTIFICATE NET WORTH 01-07-2026 View Document
60 ELECTRICAL LOAD AVAILABILITY 01-07-2026 View Document
61 ROAD ACCESS PERMISSION 01-07-2026 View Document
62 BASEMENT 2 PLAN 01-07-2026 View Document
63 TOWER ES-3 (GROUND FLOOR PLAN) 01-07-2026 View Document
64 TOWER-ES-1 (GROUND FLOOR PLAN) 01-07-2026 View Document
65 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 01-07-2026 View Document
66 CONSTRUCTION WATER NOC 01-07-2026 View Document
67 TOWER-ES-2 TYPICAL FLOOR PLAN (3RD FLOOR TO 16TH FLOOR & 18TH TO 21ST FLOOR PLAN) 01-07-2026 View Document
68 REVISED APPROVED BR-III 01-07-2026 View Document
69 PHASE 2 TOWER- ES-1, ES-2, ES-3 CLUSTER SECTION AA 01-07-2026 View Document
70 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 01-07-2026 View Document
71 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 01-07-2026 View Document
72 ESTIMATED EXPENDITURES 01-07-2026 View Document
73 FOREST NOC 01-07-2026 View Document
74 JAMABANDI 01-07-2026 View Document
75 LC- IV 01-07-2026 View Document
76 TOWER- ES-1, ES-2, ES-3 ELEVATION 1 01-07-2026 View Document
77 TOWER-ES-1 TERRACE & MUMTY FLOOR PLAN 01-07-2026 View Document
78 TOWER-ES-3 TYPICAL FLOOR PLAN (22ND TO 24TH FLOOR PLAN) 01-07-2026 View Document