OT-14, 3RD FLOOR, NEXTDOOR PARKLANDS,SECTOR-76 FARIDABDFARIDABAD HR 121004 IN
01204492650
7428396818 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
http://bptp.com
XXXX442A
U45201HR2003PLC082732
SKYNEST TOWERS
SECTOR 80 FARIDABAD
FARIDABAD
FARIDABAD
8800209777
9810810516 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
ROHTASH KANWAR
8800209777
7428396818 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
49064
03-03-2026
1793240
INDUSIND BANK BARAKHAMBA ROAD
HRERA Panchkula
75030.981 (Sqr/mtrs)
2.38
2.29
147514.581 (Sqr/mtrs)
License 44 of 2008 dated 07.03.2008
Yes
107177.01 Lakhs
1254.14 Lakhs
83899.03 Lakhs
6306.98 Lakhs
15716.86 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
0.76
3
CONSTRUCTION OF ROADS
1.36
4
PAVEMENTS
0.07
5
PARKS AND PLAYGROUNDS
0.00
6
GREEN BELTS
0.16
7
VEHICLE PARKINGS
0.10
8
ELECTRICITY SUB-STATION
0.01
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
13
OPEN SPACES
0.23
14
PRIMARY SCHOOL
1
15
CONVENIENT SHOPPING
0.75
16
TWENTY MTR ROAD TRANSFERRED TO GOVT
0.47
Total
4.91
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP
No
WATER SUPPLY
FMDA
No
ELECTRICITY
DHBVN
No
SEWAGE DISPOSAL
HSVP
No
STORM WATER DRAINAGE
HSVP
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
104
YET TO BE PREPARED
2
WATER SUPPLY SYSTEM
17.25
YET TO BE PREPARED
3
STORM WATER DRAINAGE
31
YET TO BE PREPARED
4
ELECTRICITY SUPPLY SYSTEM
913
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
122.475
YET TO BE PREPARED
6
STREET LIGHTING
8.77
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
351
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
605
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
2871
YET TO BE PREPARED
10
SHOPPING AREA
161
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
42.48
YET TO BE PREPARED
12
SCHOOL
1080
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
NA (date)
05-03-2026 (date)
01-06-2026
31-03-2033
Sr. No
Plot Area(In Square Meter)
Number of plots in the project
1
0
0
Total
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
24297.44
161
1
Apartment/Shops/Other Buildings
30220.62
164
1
Apartment/Shops/Other Buildings
240.45
14
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
293.65
1468.23
1468.23
Shops
0
0
0
Plots
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
880.94
1644.42
1938.07
1174.59
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
880.94
1409.50
1585.69
880.94
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
1233.32
1233.32
1409.50
1585.69
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
6745.48
6921.67
5889.71
4933.26
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
5889.71
6644.80
4832.58
4832.58
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2032
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
4832.58
4832.58
2416.29
3020.36
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2033
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
3020.36
Shops
0
Plots
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
Water Supply System
0
0
0
Sewerage treatment & garbage disposal
0
0
0
Electricity Supply System
0
0
0
Storm Water Drainage
0
0
0
Parks and Playgrounds
0
0
0
Clubhouse/community centres
0
0
0
Shopping area
8.05
8.05
8.05
Other
0
0
0
SCHOOL
54
54
54
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
1.38
1.38
1.55
Sewerage treatment & garbage disposal
0
9.80
9.80
11.02
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
9.66
6.44
11.27
8.05
Other
0
0
0
0
STREET LIGHTING
0.70
0.70
0.79
SCHOOL
64.8
43.2
75.6
54
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
10.40
9.36
8.32
Water Supply System
1.73
2.07
2.42
2.59
Sewerage treatment & garbage disposal
12.25
14.70
17.15
18.37
Electricity Supply System
0
0
0
182.60
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
11.27
8.05
4.83
6.44
Other
0
0
0
0
SCHOOL
75.6
54
32.4
43.2
STREET LIGHTING
0.88
1.05
1.23
1.32
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
10.40
11.44
10.40
9.36
Water Supply System
1.38
1.90
0.52
0.35
Sewerage treatment & garbage disposal
9.80
13.47
3.67
2.45
Electricity Supply System
182.60
182.60
182.60
182.60
Storm Water Drainage
1.55
3.10
3.10
3.72
Parks and Playgrounds
30.25
60.50
60.50
72.60
Clubhouse/community centres
143.55
287.10
287.10
344.52
Shopping area
4.83
3.22
4.83
6.44
Other
0
0
0
0
STREET LIGHTING
0.70
0.96
0.26
0.18
Security fire fighting
35.10
35.10
School
32.40
21.60
SCHOOL
32.40
43.20
RENEWABLE ENERGY SYSTEM
3.40
SECURITY FIRE FIGHTING
42.12
Security Fire fighting
17.55
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
10.40
8.32
3.12
2.08
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
2.79
2.48
3.10
2.48
Parks and Playgrounds
54.45
48.40
60.50
48.40
Clubhouse/community centres
258.39
229.68
287.10
229.68
Shopping area
8.05
4.83
6.44
3.22
Other
0
0
0
0
SECURITY FIRE FIGHTING
31.59
28.08
35.10
28.08
RENEWABLE ENERGY SYSTEM
5.10
8.50
6.37
SCHOOL
54.00
32.40
43.20
21.60
RENEWABLE ENERGY
4.25
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
3.12
2.08
2.08
1.04
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
2.79
1.86
2.17
0.93
Parks and Playgrounds
54.45
36.30
42.35
18.15
Clubhouse/community centres
258.39
172.26
200.97
86.13
Shopping area
4.83
3.22
4.83
3.22
Other
0
0
0
0
SECURITY FIRE FIGHTING
31.59
21.06
24.57
10.53
RENEWABLE ENERGY
5.10
2.55
SCHOOL
32.40
21.60
32.40
21.60
RENEWABLE ENERGY SYSTEM
2.12
Renewable energy
5.10
Particulars
Year-2032
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
1.04
1.04
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0.93
0
0
0
Parks and Playgrounds
18.15
0
0
0
Clubhouse/community centres
86.13
0
0
0
Shopping area
3.22
1.61
3.22
1.61
Other
0
0
0
0
SCHOOL
21.60
10.8
21.6
10.8
SECURITY FIRE FIGHTING
10.53
Particulars
Year-2033
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
3.22
Other
0
SCHOOL
21.6
Yes
Yes
INDUSIND BANK M-56 GREATER KAILASH – 2 NEW DELHI 110048
256000500159
INDB000012
110234003
000012
Mr. Kabul Chawla Address: 7, Amrita Shergill Marg Delhi-110003 Mr. Sudhanshu Tripathi Address: 202, 3rd Floor, Jor Bagh, , Delhi -110003 Mr. Manik Malik D- 2/2406 Vasant Kunj, South West Delhi, Delhi- 110070 Mr. Sachin Gupta H.No C-5/32. Yamuna Vihar, Delhi -110053 Mr. Rakesh Kumar Agrawal D-308 , Narwana Apartment , 89, IP Extension , Patparganj Delhi- 110092 Mr. Amit Singhal Address: E3/28, Nand Nagri Mandoli Delhi- 110093 Mr. Sanjeev Loknath Agrawal Flat no 32 Sudarshan Apartments IP Extension Delhi -110092
Attached
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
Statutory Approvals
Statutory Approvals Status
Date
I. LICENSE NO 44 OF 2008
ALREADY BEEN OBTAINED
07-03-2008
II. RENEWAL OF LICENSE NO 44 OF 2008
ALREADY BEEN OBTAINED
28-04-2025
III. APPROVAL OF PHASING PLAN
ALREADY BEEN OBTAINED
06-11-2023
IV. APPROVAL OF REVISED ZONING PLAN
ALREADY BEEN OBTAINED
29-01-2026
V. APPROVAL OF BUILDING PLAN BR III
ALREADY BEEN OBTAINED
05-03-2026
Yes
Yes
As per the given Agreement to sale and Allotment Letter
BPTP DISTRICT 6 BLOCK L
6.318
0
114
0
111
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
1732.14
2481.38
2481.38
Cost of the apartments
0
0
0
Cost of the infrastructure
968
1154.04
1154.04
Others costs
764.14
1327.34
1327.34
12422 Lakhs
0 Lakhs
1105 Lakhs
1105 Lakhs
No
01-12-2021
26-08-2026
DISTRICT WALK A
0.495
70
0
68
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
1131.6
2136.21
1256.76
Cost of the apartments
834.00
1804
924.55
Cost of the infrastructure
0
0
0
Others costs
297.60
332.21
332.21
6239 Lakhs
2033 Lakhs
0 Lakhs
0 Lakhs
No
16-03-2021
21-10-2025
DISTRICT WALK B
0.418
70
0
68
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
1051.08
1684.87
1684.87
Cost of the apartments
0
0
0
Cost of the infrastructure
826.00
1250.32
1250.32
Others costs
225.08
232.31
232.31
5790 Lakhs
24 Lakhs
0 Lakhs
0 Lakhs
No
24-03-2021
01-11-2024
DISTRICT WALK D
0.466
64
0
63
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
1216.78
1216.78
521.52
Cost of the apartments
965.45
965.45
270.19
Cost of the infrastructure
0
0
0
Others costs
251.33
251.33
251.33
5625 Lakhs
3425 Lakhs
0 Lakhs
0 Lakhs
No
01-02-2023
31-12-2027
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
LAMINATED WOODEN/TILE/MARBLE, PERGO/LOTUS KALEEN/ACTION/ NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
2
WALL FINISHING DETAILS
TILE/MARBLE/METAL , NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK/ OR EQUIVALENT
ACRYLIC EMULSION/OBD/ ASIAN/DULUX/BERGER/ NEROLAC OR EQUIVALENT
3
KITCHEN DETAILS
GREENPLY/SOHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/ANCHO/EURO OR EQUIVALENT MAKE
GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/ANCHO/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
6
DOORS AND WINDOS FRAMES
FLUSH DOOR, ENGINEERED DOOR GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
7
GLASS WORK
CLEAR/TINTED/COATED/FROSTED GLASS SAINT GOBAIN /ASAHI/ GUARDIAN OR EQUIVALENT MAKE
8
ELECTRIC FITTINGS
SWITCH CONTROL FOR LIGHT, FAN GEYSER AND AC ETC. HOME AUTOMATION IN SELECT AREAS AS PER DESIGN
9
CONDUCTING AND WIRING DETAILS
FR PVC INSULATED MULTI STRAND COPPER WIRE
10
CUPBOARD DETAILS
NA
11
WATER STORAGE
UPVC,CPVC, SUPEREME/PRINCE/FINLOEX/ASTRAL/RCC OR EQUIVALENT MAKE
12
LIFT DETAILS
OTIS/MITSUBISHI/KONE/THYSSENKRUPP/ SCHINDLER OR EQUIVALENT
13
EXTERNAL GLAZINGS
GLAZED WINDOWS WITH UPVC/AL/MS FRAMES ALUPLAST/DECUNIK/ENCRAFT/ASAHI/KOMMERLING/SHEDA/LG/SCHUCO/ALUK/ALUMIL/REYNAERS/MAHAVIR/HINDALCO/JINDAL/BHORUKA/EQUIVALENT
13.1
WINDOWS/GLAZINGS
GLAZED WINDOWS WITH UPVC/ALUMIUM FRAMES,ALUPLAST/DECUNIK/ENCRAFT/ASAHI/SHEDA/LG/SCHUCO/ALUK/ALUMIL/REYNAERS/MAHAVIR/HINDALCO/JINDAL/BHORUKA/ EQUIVALENT
14
DOORS
FLUSH DOOR, ENGINEERED DOOR GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/
DESHBANDHU OR EQUIVALENT MAKE
14.1
MAIN DOORS
FLUSH DOOR, ENGINEERED DOOR GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
14.2
INTERNAL DOORS
FLUSH DOOR, ENGINEERED DOOR GREENPLY/SOBHA/SPACEWOOD/GREENLAM/ARCHIDPLY/MERINO/CENTURY/KITPLY/KUTTY/EURO/ACNARENDRA/AKHUUMBER/HARYANA PLYWOOD/PRADEEP TIMBER/EDIFICE/SHREEJIWOOD/PARASNATH/DESHBANDHU OR EQUIVALENT MAKE
15
AIR CONDITIONING
VRV / VRF WITH HIGH UNITS IN LIVING/DINING, BEDROOMS DAIKIN/BLUESTAR/TOSHIBA/HITACHI/LG/SAMSUNG/VOLTAS/PANASONIC OR EQUIVALENT MAKE
16
ELECTRICAL FITTINGS
SP MCB(6-20AMP) 10KA, 4P MCB(32-63AMP)10KA, LEGRAND/HAGER/ABB/SCHNEDIER/SIEMENS/HAVELLS/L&T OR EQUIVALENT MAKE
17
CNG PIPE LINE
-
18
PROVISION OF WIFI AND BROADBAND FACILITY
PROVISIONS ONLY
19
EXTERNAL FINISHING/COLOUR SCHEME
EXTERIOR GRADE PAINT / TEXTURED PAINT ASIAN/BERGER/AKZONOBEL/JOTUN/KENAI NEROLAC OR EQUIVALENT MAKE
20
INTERNAL FINISHING
ACRYLIC EMULSION / OBD, ASIAN/BERGER/AKZONOBEL/JOTUN/KENAI NEROLAC OR EQUIVALENT MAKE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
TILE/MARBLE/GRANITE, ORIENTBELL/NITCO/JOHNSON/SOMANY/KAJARIA/ RAK OR EQUIVALENT MAKE
1 . 2
WALLS
ACRYLIC EMULSION, ASIAN/BERGER/NEROLAC/ OR EQUIVALENT MAKE
1 . 3
CEILING
ACRYLIC EMULSION, ASIAN/BERGER/NEROLAC/OIKOS/ OR EQUIVALENT MAKE
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
LAMINATED WOODEN FLOORING, PERGO/LOTUSKALEEN/ACTIONTESSA/DECOWOOD/EGGER/EDIFICE/GREENLAM OR EQUIVALENT MAKE
2 . 2
WALLS
ACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
2 . 3
CEILING
ACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
2 . 4
MODULAR WARDROBES
-
3 . MASTER TOILET
3 . 1
FLOOR
TILE/MARBLE/GRANITE, ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT MAKE
3 . 2
WALLS
COMBINATION OF TILES / MARBLE / ACRYLIC EMULSION PAINT & MIRROR, ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT PAINT- DULUX/ASIAN/BERGER/AKZONOBEL/JOTUN/KENAINEROLAC/OIKOS/SHERVINWILLIAM OR EQUIVALENT MAKE
3 . 3
CEILING
ACRYLIC EMULSION, DULUX/ASIAN/BERGER/ OR EQUIVALENT MAKE
3 . 4
COUNTERS
MARBLE / GRANITE / QUARTZ / TILE
3 . 5
SANITARY WARE/CP FITTINGS
CHINAWARE, KOLHER/GHROHE/JAQUAR/HINDWARE/PARRYWARE OR QUIVALENT MAKE
3 . 6
FITTING/FIXTURES
CP FITTINGS (BASIN MIXER, FAUCET, SHOWER, DIVERTER, ANGLE VALVES, ETC.) GROHE/JAQUAR/HINDWARE/PARRYWARE, OR EQUIVALENT MAKE
4 . BED ROOMS
4 . 1
FLOOR
LAMINATED WOODEN FLOORING, PERGO/LOTUSKALEEN/ACTIONTESSA/DECOWOOD/EGGER/EDIFICE/GREENLAM OR EQUIVALENT
4 . 2
WALLS
ACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
4 . 3
CEILING
ACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
4 . 4
WARDROBES
-
5 . TOILET
5 . 1
FLOOR
TILE/MARBLE/GRANITE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
5 . 2
WALLS
COMBINATION OF TILES / MARBLE / ACRYLIC EMULSION PAINT & MIRROR, MARBLE/ORIENTBELL/NITCO/H&R JOHNSON/SOMANY/KAJARIA/RAK OR EQUIVALENT ACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
5 . 3
CEILING
ACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
5 . 4
COUNTERS
MARBLE/ GRANITE/ QUARTZ/ TILE
5 . 5
SANITARY WARE/CP FITTINGS
CHINAWARE, KOLHER/GHROHE/JAQUAR/HINDWARE/PARRYWARE OR QUIVALENT MAKE
5 . 6
FIXTURES
CP FITTINGS (BASIN MIXER, FAUCET, SHOWER, DIVERTER, ANGLE VALVES, ETC.) GROHE/JAQUAR/HINDWARE/PARRYWARE, OR EQUIVALENT MAKE
6 . KITCHEN
6 . 1
FLOOR
TILE/MARBLE/GRANITE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
6 . 2
WALLS
TILE/QUARTZ UP-TO 2' ABOVE COUNTER & EMULSION PAINT IN BALANCE AREA, NITCO/SOMANY/ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
6 . 3
CEILING
ACRYLIC EMULSION, ASIAN/BERGER/NEROLAC OR EQUIVALENT MAKE
6 . 4
COUNTERS
MARBLE/ GRANITE/ QUARTZ
6 . 5
FIXTURES
SS, JAYNA/NEELKANTH/FRANKE, OR EQUIVALENT MAKE
6 . 6
KITCHEN APPLIANCES
CHINAWARE, KOLHER/GHROHE/JAQUAR/HINDWARE/PARRYWARE OR QUIVALENT MAKE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
TILE/MARBLE/GRANITE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT
7 . 2
WALLS & CEILING
ACRYLIC EMULSION, ASIAN/BERGER/ NEROLAC/ OR EQUIVALENT MAKE
7 . 3
TOILET
CHINAWARE, KOLHER/GHROHE/JAQUAR/HINDWARE/PARRYWARE OR QUIVALENT MAKE, CP ANGLE VALVES, KOLHER/JAGUAR/ GROHE OR EQUIVALENT MAKE
7 . 4
BALCONY
TILE, ORIENTBELL/NITCO/H&R JOHNSON/KAJARIA/RAK OR EQUIVALENT- OBD /
SEMI ACRYLIC /TILES, DULUX/ ASIAN/BERGER/EXTERNAL GRADE TEXTURE PAINT OR EQUIVALENT MAKE
8 . SIT-OUTS
8 . 1
FLOOR
NA
8 . 2
WALLS & CEILING
NA
8 . 3
RAILINGS
NA
8 . 4
FIXTURES
NA
Sr. No.
Document Description
Date of Document Upload
View Document
1
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.