9812562240 (Number Shared by Promoter in Public)
eorohtakhuda2@gmail.com
DK AHUJA XEN HSVP DIVISION NO ONE
0126226661
9215501732 (Number Shared by Promoter in Public)
xendiv1.rtk@gmail.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
1897
26-06-2020
3855200
HDFC
HRERA Panchkula
190.52 (Acre)
FAR ANNEXURE ATTACHED
1.98
0 (Acre)
DTP(R)1981/18 DT. 02.05.2018
Yes
19240.48 Lakhs
8778.88 Lakhs
0 Lakhs
4534.60 Lakhs
5927.00 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
31.63
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
3
3
CONSTRUCTION OF ROADS
26.12
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
0
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
68.0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
2.85
12
ANY OTHER
56.84
13
SHOPPING
2.08
Total
190.52
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP
No
WATER SUPPLY
PUBLIC HEALTH ENGINEERING DEPARTMENT
No
ELECTRICITY
UHBVNL
No
SEWAGE DISPOSAL
PUBLIC HEALTH ENGINEERING DEPARTMENT
No
STORM WATER DRAINAGE
PUBLIC HEALTH ENGINEERING DEPARTMENT
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
1292.75
SUBMITTED TO HUDA
2
WATER SUPPLY SYSTEM
255.25
SUBMITTED TO HUDA
3
STORM WATER DRAINAGE
295
SUBMITTED TO HUDA
4
ELECTRICITY SUPPLY SYSTEM
291.50
SUBMITTED TO HUDA
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
344.50
SUBMITTED TO HUDA
6
STREET LIGHTING
0
SUBMITTED TO HUDA
7
SECURITY AND FIRE FIGHTING
0
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
0
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
02-05-2018 (date)
02-05-2018 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
PLOT Type PLOT
23400
52
0
52
0
2
PLOT Type PLOT
26244
81
0
81
0
3
PLOT Type PLOT
29988
136
0
136
0
4
PLOT Type PLOT
15876
98
0
98
0
5
PLOT Type PLOT
23490
174
0
174
0
6
PLOT Type PLOT
9000
100
0
100
0
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
PLOT
0
NA
01-01-2017
31-03-2024
01-04-2024
01-01-2017
20
31-05-2024
NA
ANNEXURE ATTACHED
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
NA
01-01-2017
20
31-03-2024
NA
NA
0
0
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
0
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
0
0
0
Shops
0
0
0
Plots
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
298.45
Water Supply System
46.05
Sewerage treatment & garbage disposal
122.85
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2017
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
99.48
0
0
Water Supply System
0
15.35
0
0
Sewerage treatment & garbage disposal
0
20.475
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2018
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
99.48
99.48
0
Water Supply System
0
15.35
15.35
0
Sewerage treatment & garbage disposal
0
20.475
20.475
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2019
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
75
75
75
Water Supply System
0
15
10
10
Sewerage treatment & garbage disposal
0
15
10
10
Electricity Supply System
0
94.10
94.10
94.10
Storm Water Drainage
0
20
20
15
Parks and Playgrounds
0
29.10
29.10
29.10
Clubhouse/community centres
0
100
100
100
Shopping area
0
10
10
10
Other
0
5
5
3
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
50
30
30
30
Water Supply System
10
10
5
4
Sewerage treatment & garbage disposal
10
10
5
5
Electricity Supply System
94.10
94.10
94.10
94.10
Storm Water Drainage
15
15
10
10
Parks and Playgrounds
29.10
29.10
29.10
29.10
Clubhouse/community centres
75
75
50
40
Shopping area
10
10
5
5
Other
3
3
3
2
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
30
30
19.30
100
Water Supply System
4
1.20
0
50
Sewerage treatment & garbage disposal
5
5
1.65
0
Electricity Supply System
94.10
94.10
94.10
0
Storm Water Drainage
10
10
5
30
Parks and Playgrounds
29.10
29.10
29.10
0
Clubhouse/community centres
40
25
25
0
Shopping area
5
5
3.50
0
Other
1.50
1.10
0
0
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
100
100
100
75
Water Supply System
50
25
25
25
Sewerage treatment & garbage disposal
25
20
20
15
Electricity Supply System
0
0
0
0
Storm Water Drainage
30
30
25
25
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
50
50
100
Shopping area
0
20
20
20
Other
0
0
0
0
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
75
0
Water Supply System
15
0
Sewerage treatment & garbage disposal
15
0
Electricity Supply System
0
0
Storm Water Drainage
25
0
Parks and Playgrounds
0
0
Clubhouse/community centres
100
0
Shopping area
20
0
Other
5
0
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
0
NA
ii. No. of Flats/ Apartments booked
0
NA
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
0 Lakhs
NA
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
0 Lakhs
NA
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
0 Lakhs
NA
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
0 Lakhs
NA
vii. Amount invested in the project upto the date of application
0 Lakhs
NA
Land cost (If any)
8778.88 Lakhs
Apartments
0 Lakhs
NA
Infrastructure
0 Lakhs
NA
EDC/ Taxes Etc.
5927.00 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
0 Lakhs
(a) In respect of existing allottees
0 Lakhs
(b) In respect of rest of the project
0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
1292.75
298.45
II. WATER SUPPLY SYSTEM
255.25
46.05
III. STORM WATER DRAINAGE
295
0
IV. ELECTRICITY SUPPLY SYSTEM
291.00
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
344.50
122.85
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
153.50
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
941.00
0
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
31.60
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
930
0
Yes
No
PNBMANIMAJRA
1183005900001699
PUNB0118300
NA
PUNB0118300
CA, HSVP, SECTOR-6, PANCHKULA.
NA
Yes
No
No
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. CA,HSVP, PANCHKULA
ALREADY BEEN OBTAINED
02-05-2018
Yes
No
NA
SECTOR-14 (PART-II) AND SECTOR-33(PART-1) HISSAR
0
0
2878
0
2878
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
05-05-2013
05-05-2013
MANDI TOWNSHIP KALANWALI (SIRSA)
0
0
903
0
903
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
10-03-2014
03-10-2019
RESIDENTIAL SECTOR-32(PART-1) & 33 (PART) KARNAL
0
0
1135
0
1135
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
12-04-2014
12-03-2019
RESIDENTIAL SECTOR-30 PINJORE
0
0
901
0
901
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
12-03-2014
12-03-2019
SECTOR-56A FARIDABAD
0
0
453
0
453
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-09-2014
01-10-2019
SECTOR-12 PALWAL
0
0
333
0
333
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-09-2014
01-10-2019
SECTOR-11 FATEHABAD
0
0
891
0
891
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
08-10-2014
08-10-2019
SECTOR-27 AMBALA
0
0
474
0
474
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
08-10-2014
08-10-2019
SECTOR-1 TARAORI
0
0
617
0
617
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
12-10-2014
12-10-2019
SECTOR-8 DADRI
0
0
225
0
225
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
14-08-2015
14-08-2020
SECTOR-9 DADRI
0
0
297
0
297
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
14-08-2015
14-08-2020
SECTOR-7 SAFIDON
0
0
334
0
334
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
14-08-2015
14-08-2020
SECTOR-77& 78 FARIDABAD
0
0
654
0
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
19-10-2015
19-10-2020
SECTOR-10 BAHADURGARH
0
0
540
0
540
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
21-09-2016
21-09-2021
SECTOR-21 (PART) ROHTAK
0
0
249
0
249
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
28-12-2016
28-12-2021
SECTOR-9A,10 & 11(P)J MAHENDRAGARH
0
0
105
0
105
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
28-12-2016
28-12-2021
SECTOR-16 KARNAL
0
0
424
0
424
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-01-2018
01-01-2023
AUTO MARKET HANSI
0
0
690
0
690
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
0
0
0
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
04-10-2018
04-10-2023
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
NA
2
WALL FINISHING DETAILS
NA
3
KITCHEN DETAILS
NA
4
BATHROOM FITTINGS
NA
5
WOOD WORK ETC
NA
6
DOORS AND WINDOS FRAMES
NA
7
GLASS WORK
NA
8
ELECTRIC FITTINGS
NA
9
CONDUCTING AND WIRING DETAILS
NA
10
CUPBOARD DETAILS
NA
11
WATER STORAGE
NA
12
LIFT DETAILS
NA
13
EXTERNAL GLAZINGS
NA
13.1
WINDOWS/GLAZINGS
NA
14
DOORS
NA
14.1
MAIN DOORS
NA
14.2
INTERNAL DOORS
NA
15
AIR CONDITIONING
NA
16
ELECTRICAL FITTINGS
NA
17
CNG PIPE LINE
NA
18
PROVISION OF WIFI AND BROADBAND FACILITY
NA
19
EXTERNAL FINISHING/COLOUR SCHEME
NA
20
INTERNAL FINISHING
NA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1
FLOOR
NA
1 . 2
WALLS
NA
1 . 3
CEILING
NA
2 . MASTER BEDROOM/DRESSROOM
2 . 1
FLOOR
NA
2 . 2
WALLS
NA
2 . 3
CEILING
NA
2 . 4
MODULAR WARDROBES
NA
3 . MASTER TOILET
3 . 1
FLOOR
NA
3 . 2
WALLS
NA
3 . 3
CEILING
NA
3 . 4
COUNTERS
NA
3 . 5
SANITARY WARE/CP FITTINGS
NA
3 . 6
FITTING/FIXTURES
NA
4 . BED ROOMS
4 . 1
FLOOR
NA
4 . 2
WALLS
NA
4 . 3
CEILING
NA
4 . 4
WARDROBES
NA
5 . TOILET
5 . 1
FLOOR
NA
5 . 2
WALLS
NA
5 . 3
CEILING
NA
5 . 4
COUNTERS
NA
5 . 5
SANITARY WARE/CP FITTINGS
NA
5 . 6
FIXTURES
NA
6 . KITCHEN
6 . 1
FLOOR
NA
6 . 2
WALLS
NA
6 . 3
CEILING
NA
6 . 4
COUNTERS
NA
6 . 5
FIXTURES
NA
6 . 6
KITCHEN APPLIANCES
NA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1
FLOOR
NA
7 . 2
WALLS & CEILING
NA
7 . 3
TOILET
NA
7 . 4
BALCONY
NA
8 . SIT-OUTS
8 . 1
FLOOR
NA
8 . 2
WALLS & CEILING
NA
8 . 3
RAILINGS
NA
8 . 4
FIXTURES
NA
Sr. No.
Document Description
Date of Document Upload
View Document
1
DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT