HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1782-2025
Submission Date : 21-08-2025 07:20:09 PM
Applicant Type : Company
Project Type: NEW




MANSHA BUILDWELL PVT. LTD.
P-23, SECTOR-75, FARIDABAD, HARYANA, INDIA, 121002
9810855773 (Number Shared by Promoter in Public)
info@manshagroup.in
https://www.manshagroup.in
XXXX397L
U45400HR2008PTC081927
 
 


 
 


 
 







MANSHA EVERNEST
VILLAGE SADPURA, SECTOR 104
FARIDABAD
FARIDABAD
9810855773 (Number Shared by Promoter in Public)
info@manshagroup.in
HIMASHU MALIK
8447129022 (Number Shared by Promoter in Public)
info@manshagroup.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1011-08-20252585000ONLINE PAYMENT SHALL BE PROCESSED THROUGH RERA PORTALHRERA Panchkula







10.575 (Acre)
2.37 % FOR AFFORDABLE RESIDENTIAL & 1.87% FOR COMMERCIAL COMPONENT
2.37
10.575 (Acre)
License No. 108 of 2024 dated 05.08.2024 (VALID UPTO 04.08.2029) and License No. 27 of 2024 dated 19.02.2024 (VALID UPTO 18.02.2029).
No
Address     VILLAGE SADPURA, SECTOR 104, FARIDABAD
Address     VILLAGE SADPURA, SECTOR 104, FARIDABAD
Annexure-B- COLLABORATION AGREEMENT
YES THE AGREEMENT REGISTERED BEFORE GRANT OF LICENSE.
Yes
AS PER CLAUSE NO. G OF THE COLLABORATION AGREEMENT EXECUTED VIDE DATED 04.10.2023, THE LAND OWNER WILL GET PURCHASE PRICE INCLUDING STAMP DUTY & REGISTRATION FEE AND 20% OF THE NET PROFIT AFTER TAX, EARNED IN THE SAID PROJECT.
No
Yes
Yes







50082.24 Lakhs
3007.87 Lakhs
37100.00 Lakhs
2900.00 Lakhs
7074.37 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 8476.67
3CONSTRUCTION OF ROADS 9026.70
4PAVEMENTS 1388.94
5PARKS AND PLAYGROUNDS 8687.58
6GREEN BELTS 0
7VEHICLE PARKINGS 6166.37
8ELECTRICITY SUB-STATION 459.69
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
13ANAGANWADI CUM CRECHE 377.29
14COMMUNITY HALL 377.29
15COMMERCIAL SHOPS 2669.04
16METER ROOM 11.97
17MILK AND VEG BOOTH 27.50
18RAMP AND STAIR MUMTY 306.19
19EXT ROAD 4820.27
Total42795.5




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPNo
ELECTRICITYDHBVNLNo
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS400.00AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM375.00AS PER PROJECT REPORT
3STORM WATER DRAINAGE125.00AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM900.00AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL225.00AS PER PROJECT REPORT
6STREET LIGHTING50.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING325.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS150.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE175.00AS PER PROJECT REPORT
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM25.00AS PER PROJECT REPORT
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER150.00AS PER PROJECT REPORT


NA (date)
06-08-2025 (date)
05-01-2026
05-08-2032
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings59.982161
Apartment/Shops/Other Buildings59.98121
Apartment/Shops/Other Buildings59.992161
Apartment/Shops/Other Buildings59.99121
Apartment/Shops/Other Buildings48.594961
Apartment/Shops/Other Buildings48.59241
Apartment/Shops/Other Buildings48.5941
Apartment/Shops/Other Buildings54.974961
Apartment/Shops/Other Buildings54.97241
Apartment/Shops/Other Buildings54.9721
Apartment/Shops/Other Buildings54.9721
Apartment/Shops/Other Buildings61.9621
Apartment/Shops/Other Buildings29.99521
Apartment/Shops/Other Buildings11.6861
Apartment/Shops/Other Buildings29.9961
Apartment/Shops/Other Buildings56.8521
Apartment/Shops/Other Buildings56.0211
Apartment/Shops/Other Buildings59.1011
Apartment/Shops/Other Buildings27.9011
Apartment/Shops/Other Buildings24.47281
Apartment/Shops/Other Buildings5.7431
Apartment/Shops/Other Buildings33.3911
Apartment/Shops/Other Buildings35.2311
Apartment/Shops/Other Buildings61.2021
Apartment/Shops/Other Buildings36.9421
Apartment/Shops/Other Buildings42.4911
Apartment/Shops/Other Buildings50.2011
Apartment/Shops/Other Buildings000
Apartment/Shops/Other Buildings24.56181
Apartment/Shops/Other Buildings24.3621
Apartment/Shops/Other Buildings2.7211
Apartment/Shops/Other Buildings20.7421
Apartment/Shops/Other Buildings19.03141
Apartment/Shops/Other Buildings18.8821
Apartment/Shops/Other Buildings20.62101





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1068.001068.001424.001424.00
Shops45.0045.0060.0060.00
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1424.001424.001424.001424.00
Shops60.0060.0060.0060.00
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1424.001424.001424.001424.00
Shops60.0060.0060.0060.00
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1424.001424.001424.001424.00
Shops60.0060.0060.0060.00
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1424.001424.001424.001424.00
Shops60.0060.0060.0060.00
Plots0000

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1424.001424.001424.001424.00
Shops60.0060.0060.0060.00
Plots0000

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1068.001068.00
Shops45.0045.00
Plots00




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements12.0012.0016.0016.00
Water Supply System11.2511.2515.0015.00
Sewerage treatment & garbage disposal6.756.759.009.00
Electricity Supply System27.0027.0036.0036.00
Storm Water Drainage3.753.755.005.00
Parks and Playgrounds4.504.506.006.00
Clubhouse/community centres0000
Shopping area0000
Other21.7521.7529.0029.00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.0016.0016.0016.00
Water Supply System15.0015.0015.0015.00
Sewerage treatment & garbage disposal9.009.009.009.00
Electricity Supply System36.0036.0036.0036.00
Storm Water Drainage5.005.005.005.00
Parks and Playgrounds6.006.006.006.00
Clubhouse/community centres0000
Shopping area0000
Other29.0029.0029.0029.00

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.0016.0016.0016.00
Water Supply System15.0015.0015.0015.00
Sewerage treatment & garbage disposal9.009.009.009.00
Electricity Supply System36.0036.0036.0036.00
Storm Water Drainage5.005.005.005.00
Parks and Playgrounds6.006.006.006.00
Clubhouse/community centres0000
Shopping area0000
Other29.0029.0029.0029.00

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.0016.0016.0016.00
Water Supply System15.0015.0015.0015.00
Sewerage treatment & garbage disposal9.009.009.009.00
Electricity Supply System36.0036.0036.0036.00
Storm Water Drainage5.005.005.005.00
Parks and Playgrounds6.006.006.006.00
Clubhouse/community centres0000
Shopping area0000
Other29.0029.0029.0029.000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.0016.0016.0016.00
Water Supply System15.0015.0015.0015.00
Sewerage treatment & garbage disposal9.009.009.009.00
Electricity Supply System36.0036.0036.0036.00
Storm Water Drainage5.005.005.005.00
Parks and Playgrounds6.006.006.006.00
Clubhouse/community centres0000
Shopping area0000
Other29.0029.0029.0029.00

ParticularsYear-2031
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements16.0016.0016.0016.00
Water Supply System15.0015.0015.0015.00
Sewerage treatment & garbage disposal9.009.009.009.00
Electricity Supply System36.0036.0036.0036.00
Storm Water Drainage5.005.005.005.00
Parks and Playgrounds6.006.006.006.00
Clubhouse/community centres0000
Shopping area0000
Other29.0029.0029.0029.00

ParticularsYear-2032
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements12.0012.00
Water Supply System11.2511.25
Sewerage treatment & garbage disposal6.756.75
Electricity Supply System27.0027.00
Storm Water Drainage3.753.75
Parks and Playgrounds4.504.50
Clubhouse/community centres00
Shopping area00
Other21.7521.75












Yes
No
ICICI BANK LIMITED, SCO 45 OMAXE WORLD STREET, SEC 79, FARIDABAD
732305000746
ICIC0007323
110229324
07323
Sh. Naresh Kumar Malik, r/o H. NO. 1041, Sector 14, Faridabad
Uploaded.











No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO. 108 OF 2024 ALREADY BEEN OBTAINED05-08-2024
II. LICENSE NO. 27 OF 2024 ALREADY BEEN OBTAINED19-02-2024
III. BUILDING PLAN APPROVAL ALREADY BEEN OBTAINED06-08-2025








Yes


Yes


The RERA Provisions shall be incorporated in the Draft Agreement.







MANSHA ORCHID SECTOR 110 FARIDABAD
11.25625
0
197
0
193
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3936.775273.664018.42
Cost of the apartments000
Cost of the infrastructure1703.002794.112034.88
Others costs2233.772479.551983.54


8488.18 Lakhs
1002.23 Lakhs
0 Lakhs
0 Lakhs
No
25-12-2027
25-12-2027










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILE FLOORING- TITONIC OR EQUIVALENT
2WALL FINISHING DETAILSPLASTERED & PAINT FINISH OBD -ASIAN OR EQUIVALENT
3KITCHEN DETAILS COUNTER TOP- INDIAN GRENITE OR EQUIVALENT
4BATHROOM FITTINGSCP FITTING- CERA OR EQUIVALENT
5WOOD WORK ETCDOOR SHUTTER FLUSH DOOR- WOODLYTE OR EQUIVALENT
6DOORS AND WINDOS FRAMESFRA MES- SUPER SAKTI OR EQUIVALENT
7GLASS WORKGLASS ON EXTERNAL AREAS- SAINT GOBAIN OR EQUIVALENT
8ELECTRIC FITTINGSINTERNAL ELECTRICAL FITTING- WIRING- KALINGA OR EQUIVALENT SWITCHES- ANCHOR OR EQUIVALENT
9CONDUCTING AND WIRING DETAILSINTERNAL ELECTRICAL WIRING -KALINGA OR EQUIVALENT
10CUPBOARD DETAILSUNDERGROUND R.C.C TANK -AS PER HSVP SPECIFICATIONS
11WATER STORAGEUNDERGROUND R.C.CTANK -AS PER HSVP SPECIFICATIONS
12LIFT DETAILSLIFT -KONE OR EQUIVALENT
13EXTERNAL GLAZINGSUPVC FRAME GLAZING -FINESTA OR EQUIVALENT
13.1WINDOWS/GLAZINGSUPVC FRAME GLAZING -FINESTA OR EQUIVALENT
14DOORSFLUSH DOOR -WOODLYTE OR EQUIVALENT
14.1MAIN DOORSFLUSH DOOR -WOODLYTE OR EQUIVALENT
14.2INTERNAL DOORSFLUSH DOOR -WOODLYTE OR EQUIVALENT
15AIR CONDITIONINGN.A.
16ELECTRICAL FITTINGSISI STD WIRING/SWITCHES WIRING- KALINGA OR EQUIVALENT SWITCHES- ANCHOR OR EQUIVALENT
17CNG PIPE LINEN.A.
18PROVISION OF WIFI AND BROADBAND FACILITYN.A.
19EXTERNAL FINISHING/COLOUR SCHEMEPLEASTER/ WETHERSHIED PAINT ASIAN OR EQUIVALENT
20INTERNAL FINISHINGPLEASTER/ WETHERSHIED PAINT ASIAN OR EQUIVALENT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILE FLOORING -TITONIC OR EQUIVALENT
1 . 2 WALLSOBD PAINTED OVER CEMENT PLASTER -ASIAN OR EQUIVALENT
1 . 3 CEILINGOBD PAINTED CEILING- ASIAN OR EQUIVALENT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILE FLOORING -TITONIC OR EQUIVALENT
2 . 2 WALLSOBD PAINTED OVER CEMENT PLASTER -ASIAN OR EQUIVALENT
2 . 3 CEILINGOBD PAINTED CEILING- ASIAN OR EQUIVALENT
2 . 4 MODULAR WARDROBESNOT APLICABLE
3 . MASTER TOILET
3 . 1 FLOORVITRIFIED TILE FLOORING -TITONIC OR EQUIVALENT
3 . 2 WALLSOBD PAINTED OVER CEMENT PLASTER -ASIAN OR EQUIVALENT
3 . 3 CEILINGOBD PAINTED CEILING- ASIAN OR EQUIVALENT
3 . 4 COUNTERSGRANITE/INDIAN MARBLE -INDIAN GRANITE OR EQUIVALENT
3 . 5 SANITARY WARE/CP FITTINGSCHINAWARE -CERA OR EQUIVALENT
3 . 6 FITTING/FIXTURESCP FITTING -CERA OR EQUIVALENT
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILE FLOORING -TITONIC OR EQUIVALENT
4 . 2 WALLSOBD PAINTED OVER CEMENT PLASTER -ASIAN OR EQUIVALENT
4 . 3 CEILINGOBD PAINTED CEILING- ASIAN OR EQUIVALENT
4 . 4 WARDROBESNOT APLICABLE
5 . TOILET
5 . 1 FLOORVITRIFIED TILE FLOORING -TITONIC OR EQUIVALENT
5 . 2 WALLSVITRIFIED TILE FLOORING -TITONIC OR EQUIVALENT
5 . 3 CEILINGOBD PAINTED CEILING- ASIAN OR EQUIVALENT
5 . 4 COUNTERSGRANITE/INDIAN MARBLE -INDIAN GRANITE OR EQUIVALENT
5 . 5 SANITARY WARE/CP FITTINGS CHINAWARE -CERA OR EQUIVALENT
5 . 6 FIXTURESCP FITTING -CERA OR EQUIVALENT
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILE FLOORING -TITONIC OR EQUIVALENT
6 . 2 WALLSOBD PAINTED OVER CEMENT PLASTER -ASIAN OR EQUIVALENT
6 . 3 CEILINGOBD PAINTED CEILING- ASIAN OR EQUIVALENT
6 . 4 COUNTERSGRANITE / INDIAN MARBLE -GRANITE OR EQUIVALENT
6 . 5 FIXTURESCP FITTING -CERA OR EQUIVALENT
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGOBD PAINTED OVER CEMENT PLASTER -ASIAN OR EQUIVALENT
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYANTI SKID TILE FLOORING (1’ X 1’)- TITONIC OR EQUIVALENT
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 14-08-2025 View Document
2 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 14-08-2025 View Document
3 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 11-08-2025 View Document
4 ZONING PLAN 11-08-2025 View Document
5 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 11-08-2025 View Document
6 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 14-08-2025 View Document
7 DEMARCATION PLAN 14-08-2025 View Document