9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in/
XXXX494N
L70101HR1963PLC002484
THE DAHLIAS
R16, DLF 5, SECTOR 54 GURUGRAM
WAZIRABAD ST
GURUGRAM
0124769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
VILAS NIDSOSHI
0124769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
525375
24-12-2025
4300000
ICICI BANK LIMITED
HRERA Gurugram
16.489 (Acre)
1.75
1.75
16.489 (Acre)
License Approve by DTCP vide License No. 129 of 1995, 131 of 1995, 38 of 1996, 52 of 1996, 53 of 1996, 57 of 1996, 02 of 2002, 04 of 2002, 06 of 2002
Yes
692424 Lakhs
5309 Lakhs
649672 Lakhs
31887 Lakhs
5557 Lakhs
Sr. No.
Land area under usage
Area of land (Acres)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
4.0477
3
CONSTRUCTION OF ROADS
9.4190
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
2.5648
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0
8
ELECTRICITY SUB-STATION
0.4320
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0.0253
Total
16.4888
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
CONCERNED AUTHORITY
No
WATER SUPPLY
GMDA
Yes
ELECTRICITY
DHBVN
Yes
SEWAGE DISPOSAL
GMDA
Yes
STORM WATER DRAINAGE
GMDA
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
17911.36
AS PER PROJECT REPORT
2
WATER SUPPLY SYSTEM
2059.06
AS PER PROJECT REPORT
3
STORM WATER DRAINAGE
220.28
AS PER PROJECT REPORT
4
ELECTRICITY SUPPLY SYSTEM
472.28
AS PER PROJECT REPORT
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
180.23
AS PER PROJECT REPORT
6
STREET LIGHTING
309.25
AS PER PROJECT REPORT
7
SECURITY AND FIRE FIGHTING
496.09
AS PER PROJECT REPORT
8
PLAYGROUNDS AND PARKS
5530.13
AS PER PROJECT REPORT
9
CLUB HOUSE/COMMUNITY CENTRE
0
AS PER PROJECT REPORT
10
SHOPPING AREA
0
AS PER PROJECT REPORT
11
RENEWABLE ENERGY SYSTEM
146.73
AS PER PROJECT REPORT
12
SCHOOL
0
AS PER PROJECT REPORT
13
HOSPITAL/DISPENSARY
0
AS PER PROJECT REPORT
14
ANY OTHER
0
AS PER PROJECT REPORT
15
PARKING
517.05
AS PER PROJECT REPORT
16
STP
383.68
AS PER PROJECT REPORT
17
UNDERGROUND WATER TANK
1293.20
AS PER PROJECT REPORT
18
RAINWATER HARVESTING
157.30
AS PER PROJECT REPORT
19
ELECTRICAL SUB STATION
2210.02
AS PER PROJECT REPORT
24-12-2025 (date)
24-12-2025 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Total size of the plots/carpet area of the apartments
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-40
721.61
14
10102.54
7
7
1
2
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-41
721.61
1
721.61
0
1
0
3
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-42
724.37
4
2897.48
0
4
0
4
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-43
726.57
6
4359.42
5
1
1
5
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-44
728.31
14
10196.34
10
4
1
6
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-45
729.42
1
729.42
0
1
0
7
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-46
890.31
1
890.31
0
1
0
8
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-47
892.89
1
892.89
0
1
0
9
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-48
912.80
1
912.8
0
1
0
10
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-49
916.91
1
916.91
0
1
0
11
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-50
921.01
1
921.01
0
1
0
12
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-51
971.12
2
1942.24
1
1
1
13
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-52
972.52
1
972.52
0
1
0
14
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-53
973.24
2
1946.48
0
2
0
15
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-54
1093.38
1
1093.38
0
1
0
16
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-55
1205.34
1
1205.34
0
1
0
17
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-56
1208.24
1
1208.24
1
0
1
18
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-57
1212.84
1
1212.84
0
1
0
19
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-58
1223.28
1
1223.28
0
1
0
20
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-59
34397.04
1
34397.04
0
1
0
21
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-1
520.47
2
1040.94
0
2
0
22
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-2
528.94
2
1057.88
0
2
0
23
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-29
685.53
24
16452.72
6
18
1
24
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-30
685.53
1
685.53
0
1
0
25
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-31
692.88
4
2771.52
0
4
0
26
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-32
693.81
4
2775.24
0
4
0
27
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-33
701.95
20
14039
11
9
1
28
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-34
701.95
1
701.95
0
1
0
29
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-35
703.70
6
4222.2
4
2
1
30
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-36
712.52
14
9975.28
13
1
1
31
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-37
713.01
1
713.01
1
0
1
32
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-38
717.31
4
2869.24
0
4
0
33
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-39
719.87
6
4319.22
2
4
1
34
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-3
532.09
4
2128.36
1
3
1
35
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-4
533.22
2
1066.44
0
2
0
36
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-5
533.29
4
2133.16
1
3
1
37
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-6
537.04
24
12888.96
16
8
1
38
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-7
537.04
1
537.04
0
1
0
39
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-8
538.80
20
10776
6
14
1
40
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-9
538.80
1
538.8
0
1
0
41
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-10
553.24
24
13277.76
20
4
1
42
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-11
553.24
24
13277.76
18
6
1
43
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-12
553.24
1
553.24
0
1
0
44
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-13
553.24
1
553.24
0
1
0
45
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-14
556.50
24
13356
9
15
1
46
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-15
556.50
1
556.5
0
1
0
47
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-16
561.81
8
4494.48
5
3
2
48
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-17
563.93
2
1127.86
2
0
1
49
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-18
584.57
24
14029.68
17
7
1
50
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-19
584.57
1
584.57
1
0
1
51
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-20
584.69
48
28065.12
30
18
2
52
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-21
584.69
48
28065.12
30
18
2
53
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-22
584.69
2
1169.38
0
2
0
54
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-23
584.69
2
1169.38
0
2
0
55
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-24
640.87
2
1281.74
0
2
0
56
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-25
655.34
2
1310.68
2
0
1
57
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-26
658.26
2
1316.52
0
2
0
58
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-27
675.58
2
1351.16
1
1
1
59
APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-28
683.15
2
1366.3
0
2
0
Total
421
297341.07
220
201
29
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
TYPE-55
0
UNDER CONSTRUCTION
TYPE-56
1
UNDER CONSTRUCTION
TYPE-57
0
UNDER CONSTRUCTION
TYPE-58
0
UNDER CONSTRUCTION
TYPE-59
0
UNDER CONSTRUCTION
TYPE-1
0
UNDER CONSTRUCTION
TYPE-2
0
UNDER CONSTRUCTION
TYPE-3
1
UNDER CONSTRUCTION
TYPE-4
0
UNDER CONSTRUCTION
TYPE-5
1
UNDER CONSTRUCTION
TYPE-6
16
UNDER CONSTRUCTION
TYPE-7
0
UNDER CONSTRUCTION
TYPE-8
6
UNDER CONSTRUCTION
TYPE-9
0
UNDER CONSTRUCTION
TYPE-10
20
UNDER CONSTRUCTION
TYPE-11
18
UNDER CONSTRUCTION
TYPE-12
0
UNDER CONSTRUCTION
TYPE-38
0
UNDER CONSTRUCTION
TYPE-39
2
UNDER CONSTRUCTION
TYPE-40
7
UNDER CONSTRUCTION
TYPE-41
0
UNDER CONSTRUCTION
TYPE-42
0
UNDER CONSTRUCTION
TYPE-43
5
UNDER CONSTRUCTION
TYPE-44
10
UNDER CONSTRUCTION
TYPE-45
0
UNDER CONSTRUCTION
TYPE-46
0
UNDER CONSTRUCTION
TYPE-47
0
UNDER CONSTRUCTION
TYPE-48
0
UNDER CONSTRUCTION
TYPE-49
0
UNDER CONSTRUCTION
TYPE-50
0
UNDER CONSTRUCTION
TYPE-51
1
UNDER CONSTRUCTION
TYPE-52
0
UNDER CONSTRUCTION
TYPE-53
0
UNDER CONSTRUCTION
TYPE-54
0
UNDER CONSTRUCTION
TYPE-13
0
UNDER CONSTRUCTION
TYPE-14
9
UNDER CONSTRUCTION
TYPE-15
0
UNDER CONSTRUCTION
TYPE-16
5
UNDER CONSTRUCTION
TYPE-17
2
UNDER CONSTRUCTION
TYPE-18
17
UNDER CONSTRUCTION
TYPE-19
1
UNDER CONSTRUCTION
TYPE-20
30
UNDER CONSTRUCTION
TYPE-21
30
UNDER CONSTRUCTION
TYPE-22
0
UNDER CONSTRUCTION
TYPE-23
0
UNDER CONSTRUCTION
TYPE-24
0
UNDER CONSTRUCTION
TYPE-25
2
UNDER CONSTRUCTION
TYPE-26
0
UNDER CONSTRUCTION
TYPE-27
1
UNDER CONSTRUCTION
TYPE-28
0
UNDER CONSTRUCTION
TYPE-29
6
UNDER CONSTRUCTION
TYPE-30
0
UNDER CONSTRUCTION
TYPE-31
0
UNDER CONSTRUCTION
TYPE-32
0
UNDER CONSTRUCTION
TYPE-33
11
UNDER CONSTRUCTION
TYPE-34
0
UNDER CONSTRUCTION
TYPE-35
4
UNDER CONSTRUCTION
TYPE-36
13
UNDER CONSTRUCTION
TYPE-37
1
UNDER CONSTRUCTION
01-04-2025
31-12-2031
31-12-2031
31-03-2027
0
31-12-2030
ATTACHED
ATTACHED
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
31-03-2027
0
31-12-2030
1000
0
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
42298
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
4626
Shops
0
Plots
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
6534
9853
13144
13996
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
25117
37018
30756
21852
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
23817
16438
24864
21313
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
24479
29704
31624
20391
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
24576
29471
29192
15782
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2031
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
15895
43331
64815
26533
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2032
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
2252
Shops
0
Plots
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Electrical Sub Station
0
Parking
0
Rainwater Harvesting
0
Renewable Energy System
0
Security and Firefighting
0
STP
0
Street Lighting
0
Underground Water Tank
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Security and Firefighting
0
Renewable Energy System
0
Electrical Sub Station
0
Rainwater Harvesting
0
Underground Water Tank
0
STP
0
Parking
0
Street Lighting
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
0
Water Supply System
0
0
0
0
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
0
0
0
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
STP
0
0
0
0
Underground Water Tank
3
240
238
150
Parking
0
0
0
0
Renewable Energy System
0
0
0
0
Security and Firefighting
0
0
0
0
Street Lighting
0
0
0
0
Electrical Sub Station
0
0
0
0
Rainwater Harvesting
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
0
0
0
1541
Water Supply System
0
0
0
177
Sewerage treatment & garbage disposal
0
0
0
16
Electricity Supply System
0
0
0
41
Storm Water Drainage
0
0
0
19
Parks and Playgrounds
0
0
0
476
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Electrical Sub Station
0
0
0
190
Rainwater Harvesting
0
0
0
14
Underground Water Tank
190
238
235
0
STP
0
0
0
33
Parking
0
0
0
44
Renewable Energy System
0
0
0
13
Security and Firefighting
0
0
0
43
Street Lighting
0
0
0
27
Particulars
Year-2029
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
1860
2418
2392
1515
Water Supply System
214
278
275
174
Sewerage treatment & garbage disposal
19
24
24
15
Electricity Supply System
49
64
63
40
Storm Water Drainage
23
30
29
19
Parks and Playgrounds
574
747
738
468
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Street Lighting
32
42
41
26
Electrical Sub Station
230
298
295
187
Rainwater Harvesting
16
21
21
13
Underground Water Tank
0
0
0
0
STP
40
52
51
32
Parking
54
70
69
44
Renewable Energy System
15
20
20
12
Security and Firefighting
52
67
66
42
Particulars
Year-2030
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
1887
2392
2392
1515
Water Supply System
217
275
275
174
Sewerage treatment & garbage disposal
19
24
24
15
Electricity Supply System
50
63
63
40
Storm Water Drainage
23
29
29
19
Parks and Playgrounds
583
738
738
468
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Electrical Sub Station
233
295
295
187
Street Lighting
33
41
41
26
Security and Firefighting
52
66
66
42
Renewable Energy System
15
20
20
12
Parking
54
69
69
44
STP
40
51
51
32
Underground Water Tank
0
0
0
0
Rainwater Harvesting
17
21
21
13
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
421
ii. No. of Flats/ Apartments booked
220
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
1571339.77 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
340872.31 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
1230467.46 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
1230467.46 Lakhs
vii. Amount invested in the project upto the date of application
52565 Lakhs
Land cost (If any)
5309 Lakhs
Apartments
42298 Lakhs
Infrastructure
0 Lakhs
EDC/ Taxes Etc.
4958 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
639859 Lakhs
(a) In respect of existing allottees
639859 Lakhs
(b) In respect of rest of the project
639859 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
0 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
17911.36
0
II. WATER SUPPLY SYSTEM
2059.06
0
III. STORM WATER DRAINAGE
220.28
0
IV. ELECTRICITY SUPPLY SYSTEM
472.28
0
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
180.23
0
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
4500.18
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
5530.13
0
XIII. COVERED PARKING
517.05
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
496.09
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
0
0
Yes
Yes
ICICI BANK LTD.,QUTUB PLAZA, DLF PHASE-1, GURGAON-122002
017705014812
ICIC0000177
110229030
0177
Mr. Sanjay Goenka, Mr. Puneet Rakheja, Mr. Pankaj Kumar Jain, Mr. Gaurav Arora, Ms. Sandhya Singla, Mr. Himanshu Garg, Mr. Ashok Nanda, Mr. Pankaj Kumar, Mr. Amit Bansal, Mr. Sunil Sharma
Attached
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
Statutory Approvals
Statutory Approvals Status
Date
I. LICENSE
ALREADY BEEN OBTAINED
18-12-2024
II. AIRPORT AUTHORITY
ALREADY BEEN OBTAINED
27-12-2023
III. ARAVALI NOC
ALREADY BEEN OBTAINED
15-04-2024
IV. FOREST NOC
ALREADY BEEN OBTAINED
18-03-2024
V. CONSENT TO ESTABLISH
ALREADY BEEN OBTAINED
17-09-2024
VI. ENVIRONMENTAL CLEARANCE
ALREADY BEEN OBTAINED
14-09-2024
VII. CONSTRUCTION WATER NOC
ALREADY BEEN OBTAINED
23-02-2024
VIII. REVISED BUILDING PLAN APPROVAL (BR-III)
ALREADY BEEN OBTAINED
24-12-2025
IX. ASSURANCE OF ELECTRICAL LOAD
ALREADY BEEN OBTAINED
29-01-2024
X. TREE CUTTING PERMISSION
ALREADY BEEN OBTAINED
24-12-2024
Yes
Yes
As per Act 2016
SUMMIT PLAZA
2.65
292
1
292
1
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
23537.96
34483.50
25748.73
Cost of the apartments
15098.33
32044.50
23644.66
Cost of the infrastructure
0
0
0
Others costs
8439.63
2439
2104.06
6105.63 Lakhs
4328.37 Lakhs
0 Lakhs
3943.79 Lakhs
No
30-06-2026
30-06-2026
GARDENCITY ARCADE, GURGAON
1.42
99
1
99
1
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
6309.19
6227.62
5277.19
Cost of the apartments
4162.28
4672.00
4015.02
Cost of the infrastructure
0
0
0
Others costs
2146.91
1555.62
1262.17
8160.48 Lakhs
590.1 Lakhs
0 Lakhs
4544.91 Lakhs
No
29-04-2025
29-04-2025
INDEPENDENT FLOORS AT DLF GARDENCITY ENCLAVE, SECTOR-93, GURUGRAM
3.5698
388
97
388
97
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT